HomeMy WebLinkAboutSW8100701_CURRENT PERMIT_20220906STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8 1(,) b TO �
DOC TYPE
41 CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
N17,01 OU
YYYYMMDD
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
September 6, 2022
Marine Corps Base Camp Lejeune
Attn: Neal Paul, Deputy Public Works Officer
1005 Michael Road
Camp Lejeune, NC 28547
NORTH CAROLINA
Enviranmental Quality
Subject: Permit Renewal
Post -Construction Stormwater Management Permit No. SW8 100701
Birch Street Physical Fitness Center P-1160
Onslow County
Dear Mr. Paul:
The Division of Energy, Mineral and Land Resources received a complete 8-year Permit Renewal Application for
the subject permit on August 10, 2022. The Division is hereby notifying you that permit SW8100701 has been
renewed, updated, and re -issued on September 6, 2022, as attached. Please be aware that the renewal and re -
issuance of this stormwater permit does not imply that the site is currently in compliance.
This permit shall be effective until December 31, 2029 and does not supersede any other agency permit that may
be required. The project shall be subject to the conditions and limitations as specified therein. This permit does
not impose new or increased stormwater control requirements; it clarifies the rules and requirements of this
program to provide you with a better understanding of your obligations under this permit. Failure to comply with
these requirements will result in future compliance problems. Please note that this permit is not transferable
except after notice to and approval by the Division.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request
an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The
written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the
OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding
the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center,
Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless
such demands are made this permit shall be final and binding.
If you have any questions concerning this permit, please contact Ashley Smith in the Wilmington Regional
Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov.
Sincerely,
Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
Enclosures: Attachment C — Permitting History
Renewal Application Documents
DES/ams: \\\Stormwater\Perrnits & Projects\2010\100701 14D\2022 09 permit 100701
cc: Wilmington Regional Office Stormwater File
Irlik Q North Carolina Department of Environmental Quality I Division of Energy. Mineral and land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
wmx nauw
wu.o�mnu�tim+h 910.796.7215
Post -Construction Stormwater Management
Permit No. SW8 100701
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
POST -CONSTRUCTION STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
US MCB Camp Lejeune
Birch Street Physical Fitness Center, P-1160
Birch Street, Camp Lejeune, Onslow County
FOR THE
construction, operation and maintenance of two (2) wet detention ponds in compliance with the
provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the
"stormwater rules') as outlined in the application, approved stormwater management plans,
supplement, calculations, operation and maintenance agreement, recorded documents,
specifications, and other supporting data (the "approved plans and specifications") as attached and/or
on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or
"DEMLR"). The project shall be constructed, operated and maintained in accordance with these
approved plans and specifications. The approved plans and specifications are incorporated by
reference and are enforceable part of this permit.
This permit shall be effective from the date of issuance until December 31, 2029 and shall be subject
to the following specified conditions and limitations. The permit issued shall continue in force and
effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or
rescission; however, these actions do not stay any condition. The issuance of this permit does not
prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or
terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A
NCAC 2H.1000 and NCGS 143-215.1 et.al.
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data.
This stormwater system has been approved for the management of stormwater runoff as
described in Section 1.9 of this permit. The runoff from all built -upon area within the permitted
drainage areas of this project must be directed into the permitted stormwater control systems.
The stormwater controls, Pond 1 and Pond 2, have been designed to handle the runoff from
119,420 and 202,745 square feet of impervious area, respectively.
3. The maximum amount of built -upon area allowed for the entire project is 322,165 square feet.
4. The additional bioretention cells and permeable pavement shown on the plans do not meet
State Stormwater BMP design requirements and therefore are not considered a part of the
approved state stormwater treatment system. These additional measures are incorporated
only by reference and are not enforceable parts of the permit.
Page 1 of 5
Post -Construction Stormwater Management
Permit No. SW8 100701
The drainage areas will be limited to the amounts of built -upon area indicated in Sections 1.2
and 1.9 of this permit, and per approved plans. This permit does not provide any allocation of
built -upon area for future development.
A vegetated filter strip is not required for this pond as it has been designed for a 90% total
suspended solids removal efficiency.
The project shall maintain a 50' wide vegetated buffer adjacent all surface waters, measured
horizontally from the normal pool of impounded structures, the bank of each side of rivers and
streams and the mean high water line of tidal waters. The wet detention pond(s) may not be
located within the buffer and no built -upon area is allowed within the buffer.
All runoff being directed into wetlands shall flow into and through those wetlands at a non -
erosive velocity of 2 fps or less.
The following design criteria have been provided in the wet detention pond and must be
maintained at design condition:
Pond 1
Pond 2
a. Drainage Area, acres:
Total, ft2:
Onsite, ft2:
Offsite ft2:
5.07
220,986
220,986
0
8.53
371,715
367,130
4,585
b. Total Impervious Surfaces, ft2:
Onsite, ft2:
Offsite, ft2:
119,420
119,420
0
202,745
198,160
4,585
c. Design Storm, inches:
1.5
1.5
d. Average Pond Design Depth, ft:
3.0
3.5
e. TSS removal efficiency:
90%
90%
f. Permanent Pool Elevation, FMSL:
6.50
9.50
g. Permanent Pool Surface Area, ft2:
17,025
23,374
h. Permanent Pool Volume, ft':
52,342
78,792
i. Permitted Forebay Volume, ft':
10,053
16,765
j. Permitted Storage Volume, ft':
87,843
109,600
k. Temporary Storage Elevation, FMSL:
10.00
13.00
I. Pre-dev. 1 yr-24 hr. discharge rate,
cfs:
0.20
0.33
m. Controlling Orifice:
1.5" 0 pipe
2.0" O pipe
n. Orifice Flowrate, cfs:
0.06
0.11
o. Fountain Horsepower, HP:
1/6
1/3
p. Receiving Stream / River Basin
Beaverdam Creek / White Oak
Stream Index Number.
19-20-2
r. Classification of Water Body:
SB, NSW
II. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in its entirety, vegetated and
operational for its intended use prior to the construction of any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance necessary to assure
that all components of the permitted stormwater system function at design condition. The
approved Operation and Maintenance Agreement is incorporated by reference into this permit
and must be followed in its entirety and maintenance must occur at the scheduled intervals.
Page 2 of 5
Post -Construction Stormwater Management
Permit No. SW8 100701
Records of maintenance activities must be kept and made available upon request to
authorized personnel of the Division. The records will indicate the date, activity, name of
person performing the work and what actions were taken.
Decorative spray fountains are allowed in the pond, subject to the following criteria:
a. The minimum permanent pool volume is 30,000 cubic feet.
b. The fountain must draw its water from less than 2' below the permanent pool surface.
C. Separated units, where the nozzle, pump and intake are connected by tubing, may be
used only if they draw water from the surface in the deepest part of the pond.
d. The fountain may not be placed into the forebay.
e. The falling water from the fountain must be centered in the main pond, away from the
shoreline.
f. The maximum horsepower for a fountain in Pond 1 is 1/6 horsepower, and in Pond 2 is
1/3 horsepower.
6. The facilities shall be constructed, operated and maintained in accordance with the provisions
of this permit, the approved plans and specifications, and the supporting documents attached
to this permit and on file with the Division.
Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to
operation of this permitted facility, a certification must be received from an appropriate
designer for the system installed certifying that the permitted facility has been installed in
accordance with this permit, the approved plans and specifications, and other supporting
documentation. Any deviations from the approved plans and specifications must be noted on
the Certification. A modification may be required for those deviations.
8. No person or entity, including the permittee, shall alter any component shown in the approved
plans and specifications. Prior to the construction of any modification to the approved plans,
the permittee shall submit to the Director, and shall have received approval for modified plans,
specifications, and calculations including, but not limited to, those listed below. For changes to
the project or SCM that impact the certifications, a new or updated certification(s), as
applicable, will be required and a copy must be submitted to the appropriate DEQ regional
office upon completion of the modification.
a. Any modification to the approved plans and specifications, regardless of size including
the SCM(s), BUA, details, etc.
b. Redesign or addition to the approved amount of BUA or to the drainage area.
G. Further development, subdivision, acquisition, lease or sale of any, all or part of the
project and/or property area as reported in the approved plans and specifications.
d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any
component of the approved SCM(s), the stormwater collection system and/or
vegetative conveyance shown on the approved plan.
e. The construction of any allocated future BUA.
f. The construction of any permeable pavement, #57 stone area, public trails, or
landscaping material to be considered a permeable surface that were not included in
the approved plans and specifications.
g. Other modifications as determined by the Director.
9. If the stormwater system was used as an Erosion Control device, it must be restored to design
condition prior to operation as a stormwater treatment device, and prior to occupancy of the
facility.
10. All stormwater collection and treatment systems must be located in either dedicated common
areas or recorded easements. The final plats for the project will be recorded showing all such
required easements, in accordance with the approved plans. Access to the stormwater
facilities for inspection and maintenance shall be maintained via appropriate recorded
easements at all times.
Page 3 of 5
Post -Construction Stormwater Management
Permit No. SW8 100701
11. The Director may notify the permittee when the permitted site does not meet one or more of
the minimum requirements of the permit. Within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director for modifying the site to meet
minimum requirements. The permittee shall provide copies of revised plans and certification in
writing to the Director that the changes have been made.
III. GENERAL CONDITIONS
1. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the
permittee shall take immediate corrective actions. This includes actions required by this
Division and the stormwater rules such as the construction of additional or replacement on -site
stormwater systems. These additional or replacement measures shall receive a permit from
the Division prior to construction.
2. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to
the expiration date of this permit. The renewal request must include the appropriate
application, documentation and the processing fee as outlined in Title 15A NCAC
02H.1045(3).
3. CHANGES TO THE PROJECT NAME, PERMITTEE NAME OR CONTACT INFORMATION.
The permittee shall submit a completed Permit Information Update Application Form to the
Division within 30 days to making any one of these changes.
4. TRANSFER. This permit is not transferable to any person or entity except after notice to and
approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor
the conveyance of common area to a third party constitutes an approved transfer of the permit.
a. TRANSFER REQUEST. The transfer request must include the appropriate application,
documentation and the processing fee as outlined in 15A NCAC 02H.1045(2). This
request must be submitted within 90 days of the permit holder meeting one or more of
the following:
i. A natural person who is deceased;
ii. A partnership, limited liability corporation, corporation, or any other business
association that has been dissolved,
iii. A person or entity who has been lawfully and finally divested of title to the
property on which the permitted activity is occurring or will occur through
foreclosure, bankruptcy, or other legal proceeding.
iv. A person or entity who has sold the property, in whole or in part, on which the
permitted activity is occurring or will occur
V. The assignment of declarant rights to another individual or entity;
vi. The sale or conveyance of the common areas to a Homeowner's or Property
Owner's Association, subject to the requirements of NCGS 143-214.7(c2);
b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site
inspection will be conducted by Division personnel to ensure the permit conditions
have been met and that the project and the on -site stormwater system complies with
the permit conditions. Records of maintenance activities performed to date may be
requested. Projects not in compliance with the permit will not be transferred until all
permit and/or general statute conditions are met.
5. COMPLIANCE. The permittee is responsible for compliance with the terms and conditions of
this permit until the Division approves the transfer request.
a. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans,
application, supplement, operation and maintenance agreement, all applicable
recorded documents, and specifications shall be maintained on file by the permittee at
all times.
b. DIVISION ACCESS. The permittee grants Division Staff permission to enter the
property during normal business hours to inspect all components of the permitted
project.
Page 4 of 5
Post -Construction Stormwater Management
Permit No. SW8 100701
C. ENFORCEMENT. Any individual or entity found to be in noncompliance with the
provisions of a stormwater management permit or the requirements of the stormwater
rules is subject to enforcement procedures as set forth in NCGS 143 Article 21.
d. ANNUAL CERTIFICATION. The permittee shall electronically submit to the Division an
annual certification completed by either the permittee or their designee confirming the
projects conformance with permit conditions
e. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted
site does not meet one or more of the minimum requirements of the permit. Within the
time frame specified in the notice, the permittee shall submit a written time schedule to
the Director for modifying the site to meet minimum requirements. The permittee shall
provide copies of modified plans and certification in writing to the Director that the
changes have been made.
f. OTHER PERMITS. The issuance of this permit does not preclude the permittee from
complying with and obtaining any other permits or approvals that are required for this
development to take place, as required by any statutes, rules, regulations, or
ordinances, which may be imposed by any other Local, State or Federal government
agency having jurisdiction. Any activities undertaken at this site that cause a water
quality violation or undertaken prior to receipt of the necessary permits or approvals to
do so are considered violations of NCGS 143-215.1, and subject to enforcement
procedures pursuant to NCGS 143-215.6.
Permit renewed, updated and reissued this the 6th day of September 2022.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Cbrian lJLWrenn,
�(ctO
�nan renn�irect r
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Permit Number SW8 100701
Page 5 of 5
Attachment C - Permitting History
Birch Street Physical Fitness Center
Permit No. SW8 100701
Approval
Permit
BIMS
Description of the Changes
Date
Action
Version
construction, operation and maintenance of two (2) wet
9/30/2010
Original
1.0
detention ponds in compliance with the provisions of ISA
Approval
NCAC 2H .1000 and Session Law 2008-211
The removal of the low density trail area previously
covered under this permit. This low density area has
been incorporated into the adjacent North Wallace Creek
2/25/2015
Modification
1.1
Roads and Jogging Trail permit, SW8120612. This
adjustment was done to avoid overlap between these two
permits and to simplify the permit boundaries.
9/6/2022
Renewal
2.0
Expires December 31, 2029
Permit Number: _!5_/�W/e�� ; O/
(to be provided by DWQ)
Drainage Area Number:
Wet Detention Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
The wet detention basin system is defined as the wet detention basin,
pretreatment including forebays and the vegetated filter if one is provided.
This system (check one):
❑ does ❑ does not incorporate a vegetated filter at the outlet.
This system (check one):
❑ does ❑ does not incorporate pretreatment other than a forebay.
Important maintenance procedures:
— Immediately after the wet detention basin is established, the plants on the
vegetated shelf and perimeter of the basin should be watered twice weekly if
needed, until the plants become established (commonly six weeks).
— No portion of the wet detention pond should be fertilized after the first initial
fertilization that is required to establish the plants on the vegetated shelf.
— Stable groundcover should be maintained in the drainage area to reduce the
sediment load to the wet detention basin.
— If the basin must be drained for an emergency or to perform maintenance, the
flushing of sediment through the emergency drain should be minimized to the
maximum extent practical.
— Once a year, a dam safety expert should inspect the embankment.
After the wet detention pond is established, it should be inspected once a month and
within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a
Coastal County). Records of operation and maintenance should be kept in a known set
location and must be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potential problem:
How I will remediate the problem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the wet
Areas of bare soil and/or
Regrade the soil if necessary to
detention basin
erosive gullies have formed,
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Vegetation is too short or too
Maintain vegetation at a height of
long.
approximately six inches.
Form SW401-Wet Detention Basin O&M-Rev.4
9 P 0 7 2010
Page 1 of 4
Permit Number:
(to he provided by DWQ)
Drainage Area Number:
BMP element:
Potentialproblem:
How I will remediate theproblem:
The inlet device: pipe or
The pipe is clogged.
Unclog the pipe. Dispose of the
swale
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged.
Erosion is occurring in the
Regrade the swale if necessary to
swale.
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
The forebay
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design depth for
possible. Remove the sediment and
sediment storage.
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than s ra in .
The vegetated shelf
Best professional practices
Prune according to best professional
show that pruning is needed
practices
to maintain optimal plant
health.
Plants are dead, diseased or
Determine the source of the
dying.
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessary,
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
The main treatment area
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design sediment
possible Remove the sediment and
storage depth.
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Algal growth covers over
Consult a professional to remove
50% of the area.
and control the algal growth,
Cattails, phragmites or other
Remove the plants by wiping them
invasive plants cover 50 % of
with pesticide (do not spray).
the basin surface.
�tr U 7 2010
Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4
Permit Number:
(to be provided by DWQ)
Drainage Area Number:
BMP element:
Potentialproblem:
How I will remediate theproblem:
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present.
consult a professional to remove
beavers.
A tree has started to grow on
Consult a dam safety specialist to
the embankment.
remove the tree.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair. if applicable)
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the local NC Division of
damage have occurred at the
Water Quality Regional Office, or
outlet.
the 401 Oversight Unit at 919-733-
1786.
The measuring device used to determine the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments.
When the permanent pool depth reads 5.5 feet in the main pond, the sediment
shall be removed.
When the permanent pool depth reads 55 feet in the forebay, the sediment
shall be removed.
Sediment Removal
Bottom
BASIN DIAGRAM
(/ill in the blanks)
17 Permanent Pool Elevation 6_5
1.0 Pe maven Pool
------------- -- Volume Sediment Removal Elevation 1.0 Volume
t0.0 -tt Min. ---------------------------=- ------------- ------
Sediment Bottom Elevation 0.0 1-I1 n
Storage Sedimer
Storage
FORERAY MAIN POND
Form SW401-Wet Detention Basin O&M-Rcv.4
SEP072010
Page 3 of 4
Permit Number:
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:P1160 Camp Leieune Birch Street Physical Fitness Center
BMP drainage area number:BMP #1
Print name:Carl Baker
Title:Denuty Public Works Office
Address:Bldg 1005 Michael Road Camp Lcieune NC 28542
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, )f7lb AzyzzA , a Notary Public for the State of
County of OVA) , do hereby certify that
personally appeared before me this
day of _, o�o/d and acknowledge the due execution of the
forgoing wet detention basin maintenance requirements. Witness my hand and official
seal, ZA�yr,
ALICE A SONNETTE
Notary Publlc
Onslo% County
State of North Carolina
My Commission Expires Oct 23, 2010
SEAL
My commission expires '�
Form SW401-Wet Detention Basin O&M-Rev.4 T'EP
Page 4 of 4
i 3 2010
3` :— -- — -
Permit Number:
(to be provided by DWQ)
Drainage Area Number: %
Wet Detention Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
The wet detention basin system is defined as the wet detention basin,
pretreatment including forebays and the vegetated filter if one is provided.
This system (check one):
❑ does ® does not incorporate a vegetated filter at the outlet.
This system (check one):
❑ does ® does not incorporate pretreatment other than a forebay.
Important maintenance procedures:
— Immediately after the wet detention basin is established, the plants on the
vegetated shelf and perimeter of the basin should be watered twice weekly if
needed, until the plants become established (commonly six weeks).
— No portion of the wet detention pond should be fertilized after the first initial
fertilization that is required to establish the plants on the vegetated shelf.
— Stable groundcover should be maintained in the drainage area to reduce the
sediment load to the wet detention basin.
— If the basin must be drained for an emergency or to perform maintenance, the
flushing of sediment through the emergency drain should be minimized to the
maximum extent practical.
— Once a year, a dam safety expert should inspect the embankment.
After the wet detention pond is established, it should be inspected once a month and
within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a
Coastal County). Records of operation and maintenance should be kept in a known set
location and must be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the wet
Areas of bare soil and/or
Regrade the soil if necessary to
detention basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Vegetation is too short or too
Maintain vegetation at a height of
long.
approximately six inches.
Form SW401-Wet Detention Basin O&M-Rev.4
i
SEP 0 7 2010
Page 1 of 4
Permit Number:
(to be provided by DWQ)
Drainage Area Number:
BMP element:
Potentialproblem:
How I will remediate theproblem:
The inlet device: pipe or
The pipe is clogged.
Unclog the pipe. Dispose of the
swale
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged.
Erosion is occurring in the
Regrade the swale if necessary to
swale.
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
The forebay
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design depth for
possible. Remove the sediment and
sediment storage.
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
The vegetated shelf
Best professional practices
Prune according to best professional
show that pruning is needed
practices
to maintain optimal plant
health.
Plants are dead, diseased or
Determine the source of the
dying.
problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide a one-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessary.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticide is used, wipe it on
the plants rather than spraying.
The main treatment area
Sediment has accumulated to
Search for the source of the
a depth greater than the
sediment and remedy the problem if
original design sediment
possible. Remove the sediment and
storage depth.
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Algal growth covers over
Consult a professional to remove
50% of the area.
and control the algal growth.
Cattails, phragmites or other
Remove the plants by wiping them
invasive plants cover 50% of
with pesticide (do not spray).
the basin surface.
I SEP 0 7 2010 '
Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4
Permit Number:
(to be provided by DWQ)
Drainage Area Number:
BMP element:
Potentialproblem:
How 1 will remediate theproblem:
The embankment
Shrubs have started to grow
Remove shrubs immediately.
on the embankment.
Evidence of muskrat or
Use traps to remove muskrats and
beaver activity is present.
consult a professional to remove
beavers.
A tree has started to grow on
Consult a dam safety specialist to
the embankment.
remove the tree.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair. if applicable)
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the local NC Division of
damage have occurred at the
Water Quality Regional Office, or
outlet.
the 401 Oversight Unit at 919-733-
1786.
The measuring device used to determine the sediment elevation shall be such
that it will give an accurate depth reading and not readily penetrate into
accumulated sediments.
When the permanent pool depth reads 5.5 feet in the main pond, the sediment
shall be removed.
When the permanent pool depth reads 5.5 feet in the forebay, the sediment
shall be removed.
Sediment Removal
Bottom
BASIN DIAGRAM
(fill in the blanks)
4_0 Pe manenN m Volue
3.0 ft Min.
Sediment
Storage
FOREBAY
Form SW401-Wet Detention Basin O&M-Rev.4
Permanent Pool Elevation 9.5
Pool
Sediment Removal Elevation 4_0 Volumi
----------- ------
Bottom Elevation
MAIN POND
FSEP o 7 2010
�4T.
Page 3 of 4
1-ft
Storage
Permit Number:
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:P1160 Camp Lcieune Birch Street Physical Fitness Center
BMP drainage area number:BMP #2
Print name:Carl Baker
Title:Deputy Public Works Office
Address:Bldg 1005 Michael Road Camp Lejeune NC 28542
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president
I, ,,Jl"l e Ja �/��µ , a Notary Public for the State of
/�JI-A Vie. %1u County of ()/✓/ 41 do hereby certify that
personally appeared before me this L
day of 4ow4 >/d and acknowledge the due execution of the
I
forgoing wet detention basin maintenance requirements. Witness my hand and official
seal, /'` f�l
ALICE A BONNETTE
Notary Public
Onslow County
State of North Carolina
My Commission Expires Oct 23. 2010
SEAL
My commission expires C 2 (veld
Form SW401-Wet Detention Basin O&M-Rev.4 _ Page 4 of 4
QCD 1 3 2010
UtMLH UJt UNLY
Date Received Fee Paid Permit Number
NC DEO Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW8 100701
2. Project name: Birch St Physical Fitness Center P1160
3. Project street address: XXX
City: MCB Camp Leieune County: Onslow
ZIP: 28542
4. What, if any, changes have been made to the project as permitted?
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at: https:Hdeg.nc.gov/about/divisions/energv-
mineral-land-resou rces/ene rqy-m ine ral-land-ru les/stormwater-pros ram/post-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at: https://deg.nc.gov/abou/divisions/energv-mineral-land-
resources/energv-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune
2. Signing Official's Name: Neal Paul
3. Signing Official's Title: Deputy Public Works Division
4. Mailing Address: MCB Camp Lejerme 1005 Michael Rd.
City: MCB Camp Leieune State: NC
ZIP: 28547-2521
5. Street Address:
City: State: ZIP
6. Phone: (910) 451-2213 Email: neal.paul@usmc.mil
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HOW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
MCT 1. A permit application processing fee of $505.00 payable to NCDEO.
MCT 2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
MCT 3. One hard copy and one electronic copy of recorded documents required by the original permit that have
not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
MCT 4. O&M Agreements, Please select one:
® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
MCT 5. Designer Certifications, Please select one:
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
MCT 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
https://www.sosnc.gov/online services/search/by title/ Business Registration
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
State Stormwater Management Systems
Permit No. SW8 100701
Certification Requirements:
✓ 1. The drainage area to the system contains approximately the permitted
acreage.
✓ 2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
✓ 4. All roof drains are located such that the runoff is directed into the system.
✓ 5. The outlet structure elevations are per the approved plan.
_ 6, The outlet structure is located per the approved plans.
✓ 7. Trash rack is provided on the outlet structure.
i 8. All slopes are grassed with permanent vegetation.
✓ 9. Vegetated slopes are no steeper than 3:1.
✓ 10, The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
✓ 12, Required drawdown devices are correctly sized and located per the.
approved plans.
13. All required design depths are provided.
✓ 14. All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
15, The required system dimensions are provided per the approved plans.
✓ 16. All components of the stormwater BMP are located in either recorded
common areas, or recorded easements.
cc: NCDENR-DWQ Regional Office
Page 8 of 8
D. PERMITTEE'S CERTIFICATION
I, �;6+ 1 r • &A.'J4.r , the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my
knowled and co lete.
Signature: Date: 1 titi
NOTARIZATION:
I, L.lr� 1 J��� a Notary Public for the State of
�Dt( L.L OXVY\&. , County of do hereby certify
that baUk lA • Lc v-,I d-t f personally appeared before me
th;`4hA`Iuu"� day of JJ��1 20 22 , and acknowledge the due
_��u�`pgR��rgoing instrument. Witness my hand and official seal,
(]Votary Seal)
0". PUB%-%c
My commission expires
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
State Stormwater Management Systems
Permit No. SW8.100701
Birch Street Physical Fitness Center, P-1160
Stormwater Permit No. SW8 100701
Onslow County
Designer's Certification
1, rCst i7 !'� ' as a duly registered 117,7i/7CG✓ in the
State of North Carolina, having been authorized to observe (periodically/ weekly/ full
time) the construction of the project,
t�'ca,1 Al�.e'ttr 4w4e, , ? - //& 0
(Project)
for /TCR &,I"n �o/'ealm (Project Owner) hereby state that, to the
best of my abilitles, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specifications:
��--� SEAL
Signature % ��((// I l- E—
Registration Number O Zr O&O
Date /2//07/Z6/Z
Page 7 of 8
iio
�=•+„�....
UEMLH USE UNLY
Date 9lecei ed
Fee Paid
Permit Number
a as
So D of
INC DEG Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number:
2. Project name: Birch St Physical Fitness Center P1160
3. Project street address: XXX
City: MCB Camp Leieune County: Onslow
ZIP : 28542
4. What, if any, changes have been made to the project as permitted?
If the project has changed from the original approved plans, please complete SWU-101 fore Major
Modification or Minor Modification Application form available at: hhpsJ/deg.nc.gov/about/di4isions/enerav-
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at., https://deg.nc.gov/about/divisions/energy-mineral-land- -
resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune
2. Signing Official's Name: Neal Paul
3. Signing Official's Title: Deputy Public Works Division
4. Mailing Address: MCB Camp Leicune 1005 Michael Rd.
City. MCB Camp Leieune State: NC
ZIP: 28547-2521
5. Street Address:
City. State: ZIP:
6. Phone: (910)451.2213 Email: neal.paul®usmc.mil
AUG 101� f
Stormwater Permit Renewal Form Page 1 of 3 Byf_ May 11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non•Coaste/ HQW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
MCT 1. A permit application processing fee of $505.00 payable to NCDEQ.
MCT 2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
MCT 3. One hard copy and one electronic copy of recorded documents required by the original permit that have
not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
MCT 4. O&M Agreements, Please select one:
® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ I do not have a copy of the current recorded 0&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
MCT 5. Designer Certifications, Please select one:
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
MCT 6. (IF APPLICABLE) If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. (IF APPLICABLE) When the permittee is a corporation or a limited liability corporation (LLC):
Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
tJb C4..��I
AUG 10 2022
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
.X—y ,---,-.-`e 3, �4+ za,``1 ti .A�S'_�` Q i. tiin'e1, .$•'�r"T'7 cj777,77sh,,;.; y,
D. PERMITTEE'S CERTIFICATION
I, rWWl+ A• IA -'OM- the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper fomis to modify or transfer the permit prior to any changes to the
project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my
knowled9e, ee and co late.
Signature: Date:
INIK1Jt AGOR;
a Notary Public for the State of
County of On5lOyn( , do hereby certify
rnnm -1 api- .2a2-5'
My commission expires
Slormwater Permit Renewal Application Form Page 3 of 3
personally appeared before me
20 2-2- , and acknowledge the due
AUG 10 2022
BY:
2018
. �...... _ ..-�r
Permit No. tN,,Jr% 1 w70l
(to oe Provided by DWO)
A2OF W A 7FgO
NCDENR o�
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
the Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information.
I. PROJECT INFORMATION
Project name CAMP LEJEUNE BIRCH STREET PHYSICAL FITNESS CENTER
Contact person
Phone number
Date 22-Sep-10
Drainage area number 2
II. DESIGN INFORMATION
Site Characteristics
Drainage area
371,715 If
Impervious area, post -development
202,745 ft'
%impervious
54.54 %
Design rainfall depth
1.5 in
Storage Volume: Non-SAWaters
Minimum volume required
Volume provided
Storage Volume: SA Waters
1.5' runoff volume
Pre -development 1-yr, 24-hr runoff
Post -development 1-yr, 24-hr runoff
Minimum volume required
Volume provided
Peak Flow Calculations
Is the prelpost control of the Tyr 24hr storm peak Bow required?
1-yr, 24-hr rainfall depth
Rational C, pre -development
Rational C, post -development
Rainfall intensity: l-yr, 24-hr storm
Pre -development 1-yr, 24-hr peak flow
Post -development 1-yr, 24-hr peak fow
Pre/Post 1-yr, 24-hr peak flow control
Elevations
Temporary pool elevation
Permanent pool elevation
SHWT elevation (approx. at the perm. pool elevation)
Top of 1Oft vegetated shelf elevation
Bottom of 1Oft vegetated shelf elevation
Sediment cleanout, lop elevation (bottom of pond)
Sediment deanout, bottom elevation
Sediment storage provided
Is there additional volume stored above the stale -required temp. pool?
Elevation of the top of the additional volume
25,132 113
109,600 R'
fl3
Y (Y or N)
3.7 in
OK
OK, volume provided is equal to or in excess of volume required.
0.16 (unidess)
0.62 (unidess)
0.15 inlhr OK
0.33 ft'Isec
0.14 ff'Isec
-0.19 ft'Isec
13.00 first
9.50 lost
9.00 lost
10.00 fmsl
9.00 fmsl
Data not needed for calculation option #1, but OK if provided.
4.00 foist
3.00 fmsl
Data not needed for calculation option #1, but OK if pjovided
D
1.00It
EY`V
Y (Y or N)
2 7 2010
130 fmsl
OK LSEp
-----
Form SW401-Wet Detention Basin-Rev.74V13r09 Parts I. & 11. Design summary, Page 1 or 2
Permit
(to Ps provided by DWO)
II. DESIGN INFORMATION
Surface Areas
Area, temporary pool
Area REQUIRED, permanent pool
SAIDA ratio
Area PROVIDED, permanent pool, A.,,
Area, bottom of 10ft vegetated shelf, Ate_ n
Area, sediment deanout, top elevation (bottom of pond), A..
Volumes
Volume, temporary pool
Volume, permanent pool, Vr,,,,,.
Volume, forebay (sum of forebays if more than one forebay)
Forebay %of permanent pod volume
SAIDA Table Data
Design TSS removal
Coastal SAIDA Table Used?
MountalnlPiedmont SAIDA Table Used?
SAIDA ratio
Average depth (used in SAIDA table):
Calculation option 1 used? (See Figure 10-2b)
Volume, permanent pool, VPo,.,
Area provided, permanent pool, A.,.
Average depth calculated
Average depth used in SAIDA, it., (Round to nearest 0.511)
Calculation option 2 used? (See Figure 10-2b)
Area provided, permanent pool, A.,,,
Area, bottom of 10ft vegetated shelf, A.,
Area, sediment cleanoul, top elevation (bottom of pond), A� �
'Depth' (distance blw bottom of 1 Oft shelf and top of sediment)
Average depth calculated
Average depth used in SAIDA, it., (Round to nearest 0.5ft)
Drawtlown Calculations
Drawdown through orifice?
Diameter of orifice (if circular)
Area of orifice (d-non-circular)
Coefficient of dscharge (Co)
Driving head (Ha)
Drawtlown through weir?
Weir type
Coefficient of discharge (C.)
Length of weir (L)
Driving head(H)
Pre -development 1-yr, 24-hr peak flow
Post -development 1-yr, 24-hr peak flow
Storage volume discharge rate (through discharge odfice or weir)
Storage volume drawdown time
Additional Information
Vegetated side slopes
Vegetated shelf slope
Vegetated shelf width
Length of flowpath to width ratio
Length to with ratio
Trash rack for overflow 8 onfice?
Freeboard provided
Vegetated filter provided?
Recorded drainage easement provided?
Capures all runoff at ultimate build -out?
Drain mechanism for maintenance or emergencies
Form SW401-Wet Detention Basin-Rev.7-e/13109
37,037 ft'
21,336 ft'
5.74 (unitless)
23,374 ft' OK
19,765 ft'
7,984 ft
109,600 ft' OK
78,792 113
16,765 ft'
21.3% h OK
90 k
Y (Y or N)
N (Y or N)
5.74 (unitless)
Y (Y or N)
78,792 ft3
23,374 fl'
3.37 it
3.5 ft
N (Y or N)
it,
If
flz
Y (Y or N)
2.00 in
OK
OK
Check calculation. Need 3 it min.
Insufficient. Check calculation.
in'
0.60 (unitless)
1.14 it
N (Y or N)
(unitless)
(unitless)
it
it
0.33 ft3lsec OK
0.14 ft3lsec OK
0.11 Wiser:
2.59 days
4 :1
10 :1
10.0 it
3 :1
2.0 :1
Y
(Y or N)
1.0 it
N
(Y or N)
N
(Y or N)
Y
(Y or N)
PUMP OUT
OK, draws down in 2-5 days.
OK, drawdown time is conect.
OK
OK
OK
OK
OK
OK
OK
OK
�w
a
0.5 i :F,z9e
'r"nE11101,
'FP 272010
BY:
Insufficient. Recorded drainage easement required.
OK
Parts I. a II. Design Summery, Page 2 of 2
Permit No.
(to bo prov'Mod by DWD)
III.`REQUIRED ITEMS CHECKLIST 777771
Please Indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result In a request for additional Information. This will delay final review and approval of the project. Initial In the space provided to
Indicate the following design requirements have been met. If the applicant has designated an agent, the agent may Initial below. If a
requirement has not been met, attach Justification.
Pagel Plan
Initials Sheet No.
QLANS 1.Plans (1"-50'arlarger) of the entire site showing:
- Design at ultimate build -out,
- Off -site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Basin dimensions,
- Pretreatment system,
- High flow bypass system,
- Maintenance access,
- Proposed drainage easement and public right of way (ROW),
- Overflow device, and
Boundaries of drainage easement.
R?LWS 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing:
- Outlet structure with trash rack or similar, .
- Maintenance access,
- Permanent pool dimensions,
- Forebay and main pond with hardened emergency spillway,
- Basin cross-section,
- Vegetation speciricalion for planting shelf, and
- Filler stdp.
V111NS 3. Section view of the wet detention basin (1" = 20' or larger) showing:
-Side slopes, 3:1 or lower,
- Pretreatment and treatment areas, and
- Inlet and outlet siruclures.
&-jr ftAWS A. If the basin is used for sediment and erosion control during conslruction, dean out of the basin is specified
on the plans prior to use as a wet detention basin.
CAW_ULPM NS5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay,
to verity volume provided.
_ 11FNS 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the
entire drainage area is stabilized.
CAOX, M14S7. The supporting calculations.
QLC� 6. A copy of the signed and notarized operation and maintenance (0&M) agreement.
Iv l n 9. A copy of the deed restrictions (if required).
P6E 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County
soil maps are not an acceptable source of soils information.
RECEIVED
Fomr SW401-Wol Dotantlon Basin-Rov.Tali r00 $ E P 2 7 2010 Part 111. Roquired Items Chocklisf, Pago I of 1
BY:
Permit No. JM'g 100701
(to ba provide0 by DWO)
Awn
02°'�
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part III) must be printed filled out and submitted along with all of the required information.
I. PROJECT INFORMATION
Project name
CAMP LEJEUNE BIRCH STREET PHYSICAL FITNESS CENTER
Contact person
Phone number
Date
22-Sep-10
Drainage area number
1
II. DESIGN INFORMATION
Site Characteristics
Drainage area
220,986 ft2
Impervious area, post -development
119,420 ft2
%impervious
5404 h
Design rainfall depth
1.5 in
Storage Volume: Non -SA Waters
Minimum volume required
14,816 Its OK
Volume provided
87,843 ft3
OK, volume provided is equal to or in excess of volume required.
Storage Volume: SA Waters
1.5" mnoff volume
ft3
Pre -development 1-yr, 24-hr runoff
ft3
Post -development 1-yr, 24-hr mnoff
ft3
Minimum volume required
0 113
Volume provided
ft3
Peak Flow Calculations
Is the prelpost control of the lyr 24hr storm peak flow required?
1 -yr, 24-hr rainfall depth
Rational C, pre -development
Rational C, post -development
Rainfall intensity: 1-yr, 24hr storm
Pre -development 1-yr, 24hr peak flow
Post -development 1-yr, 24-hr peak flow
Pre/Post 1-yr, 24-hr peak bow control
Elevations
Temporary pool elevation
Permanent pool elevation
SHWF elevation (approx. at the perm. pool elevation)
Top of 10ft vegetated shelf elevation
Bottom of 1Oft vegetated shelf elevation
Sediment cleanout, top elevation (bottom of pond)
Sediment deanout, bottom elevation
Sediment storage provided
Is there additional volume stored above the state -required temp. pool?
Elevation of the top of the additional volume
Fonn SW401-Wet Detention Basin -Rev 7-811WM
Y (Y or N)
3.7 in
0.15 (unitless)
0.62 (unitless)
0.15 in/hr OK
0.20 Wise,
0.07 ft3lsec
-0.13 ft3lsec
10.00 frost
6.50 fmsl
6.00 fmsl
7,00 fmsl
6.00 fmsl
1.00 fmsl
000 fmsl
1 00 ft
Y (Y or N)
10.0 frost
NC,
035,
Data not needed for calculation option #1, but OK if provided.
Data not needed for calculation option 41, but OK if provided.
OK
rC,
Ski i �610
sit:
Pans I. 611, Design summary, Page 1 of 2
'
.
Permit No.
((0 6e PmvWetl aY DW0)
II. DESIGN INFORMATION.
Surface Areas
Area, temporary pool
31,010 ft'
Area REQUIRED, permanent pool
13,613 ft'
SAIDA ratio
6.16 landless)
Area PROVIDED, permanent pool, A,e,,,,.I
17,025 It'
OK
Area, bottom of 10ft vegetated shelf, A,, I
13,790 ft
Area, sediment cleanout, top elevation (bottom of pond), A..
4,742 ft
Volumes
Volume, temporary pool
87,843 ft3
OK
Volume, permanent pool, Vp,,,,,,
52,342 ft'
Volume, forebay (sum of forebays if more than one forebay)
10,053 ft'
Forebay% of permanent pool volume
19.2%%
OK
SAIDA Table Data
Design TSS removal
90 %
Coastal SAIDA Table Used?
Y (Y or N)
Mountain/Piedmont SAIDA Table Used?
N (Y or N)
SAIDA ratio
6.16 limitless)
Average depth (used in SAIDA table):
Calculation option 1 used? (See Figure 10-2b)
Y (Y or N)
Volume, permanent pool, Vp,,,, mw
52,342 ft3
OK
Area provided, permanent pool, A...,
17,025 ft'
OK
Average depth calculated
3.07 it
Check calculation. Need 3 ft min.
Average depth used in SAIDA, day, (Round to nearest 0.5ft)
10 ft
Insufficient. Check calculation.
Calculation option 2 used? (See Figure 10-2b)
N (Y or N)
Area provided, permanent pool, A..
ft
Area, bottom of 1 Oft vegetated shelf, A, ,w,
fl'
Area, sediment cleanout, top elevation (bottom of pond), A,,.,
ft'
'Depth' (distance blw bottom of 1 Oft shelf and top of sediment)
ft
Average depth calculated
it
Average depth used in SAIDA, d„, (Round to nearest 0.5ft)
ft
Drawdown Calculations
Drawdown through orifice?
Y (Y or N)
H
Diameter of orifice (if circular)
1.50 in
�••••Q�� �ARp''•0
E
Area of orifice (if -non -circular)
in°
f 7%�OV"',
Driving entofdischarge (Ce)
(andless)�
Omig head (Ha)
1.15
1.15 it
Drawdown through weir?
N (Y or N)
035380 ? r
Weir type
(uniless)
Z
Coefficient of discharge(C„)
(unitless)�•;,GINE',
•••
Lngth of we
I(H))
,,,,,
Drivi g head
It
���rr E��,•••.
Pre -development 1-yr, 24-hr peak Bow
0.20 ft/sec
OK
Post -development 1-yr, 24-hr peak Bow
0.07 ft'Isec
OK
Storage volume discharge rate (through discharge orifice or weir)
0.06 ft'Isec
Storage volume drawdown time
2.71 days
OK, draws down in 2.5 days.
OK, drawdown time is correct.
Additional Information
Vegetated side slopes
Vegetated shelf slope
Vegetated shelf width
Length of fiowpath to width ratio
Length to width ratio
Trash rack for overflow & orifice?
Freeboard provided
Vegetated filter provided?
Recorded drainage easement provided?
Capures all runoff at ultimate build -out?
Drain mechanism for maintenance or emergencies
Form SW401-Wet Detention aasin-Rev.7-afl3I09
4 :1
10 :1
10.0 it
3 :1
2.01
Y
(Y or N)
1.0 it
N
(Y or N)
N
(Y at N)
Y
(Y or N)
PUMP OUT
OK
OK
OK
OK
OK
OK
OK
OK
Insufficient. Recorded drainage easement required.
OK
Parts I. E II, Deslgn Summary, Page 2 of 2
L c "'TVED
S E F :E 7 2010 R.
r-,.
Permit
III. REQUIRED ITEMS CHECKLIST
(to bo provldod by D WQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An Incomplete submittal package will
result In a request for additional Information. This will delay final review and approval of the project. Initial In the space provided to
Indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Pagel Plan
Initials
Sheet No.
PLMNS
1. Plans (1" - 50' or larger) of the entire silo showing:
Design at ultimate bulld-out,
Off -site drainage (if applicable),
Delineated drainage basins (Include Rational C coefficient per basin),
Basin dimensions,
Pretreatment system,
High Sow bypass system,
- Maintenance access,
- Proposed drainage easement and public right of way (ROW),
- Overflow device, and
- Boundaries of drainage easement.
F
PIANS
2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing:
- Outlet structure with trash rack or similar,
- Maintenance access,
- Permanent pool dimensions,
• Forebay and main pond with hardened emergency spillway,
- Basin cross-section,
- Vegetation specification for planting shelf, and
- Filler strip.
pp
F-CL
LAMS
3. Section view of the wet detention basin (1" = 20' or larger) showing:
- Side slopes, 3:1 or lower,
- Pretreatment and treatment areas, and
- Inlet and outlet structures.
_�_
NS
4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified
on the plans prior to use as a wet detention basin.
ChLUU\110NS5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay,
to verify volume provided.
Ql1FNS 6. A construction sequence that shows how the wel detention basin will be protected from sediment until the
entire drainage area is stabilized.
C�L4Mtjt S The supporting calculations.
- x� -- QAcKAUE 8. A copy of the signed and notarized operation and maintenance (0&M) agreement
H 1—k— 9. A copy of the deed restrictions (if required).
ft—r % A soils report that Is based upon an actual field investigation, soil borings, and infiltration tests. County
soil maps are not an acceptable source of soils information.
Fenn SW401-Wet Detention Basin-Rov.7-9/13409 Part Ill. Required I(oms Checklist, Pago I or I
p 0 7 2010 1
lye
State Stormwater Management Systems
Permit No. SW8.100701
Birch Street Physical Fitness Center, P-1160
Stormwater Permit No. SW8 100701 /
Onslow County �j
Designer's Certification
I, fir rCA r.7- eall W as a duly registered in the
State of North Carolina, having been authorized to observe (periodically/ weekly/ full
time) the construction of the project,
girt,
(Project)
r�'ca 1 A'1h t f
?-//loll
for /TCF C G( (//rJ GEyeal)f (Project Owner) hereby state that, to the
best of my abilities; due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specifications:
L/
SEAL
Signature P� 67-�—
Registration Number 02-0e&o �� CARQI/
Date /Z��/,_T 0/� �0
L
28860 "A
NF��
ECEIVE
Page 7 of 8 JAN 1 1 2013
BY:
State Stormwater Management Systems
Permit No. SWB 100701
Certification Requirements:
1. The drainage area to the system contains approximately the permitted
acreage.
✓ 2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
✓' 3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
✓ 5. The outlet structure elevations are per the approved plan.
✓ 6. The outlet structure is located per the approved plans.
✓ 7. Trash rack is provided on the outlet structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
✓ 10. The inlets are located per the approved plans and do not cause short-
/ circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
✓ 12. Required drawdown devices are correctly sized and located per the
approved plans.
13. All required design depths are provided.
✓ 14. Ali required parts of the system are provided, such as a vegetated shelf,
and a forebay.
15, The required system dimensions are provided per the approved plans.
✓ 16. All components of the stormwater BMP are located in either recorded
common areas, or recorded easements.
cc: NCDENR-DWQ Regional Office
Page 8 of 8