Loading...
HomeMy WebLinkAboutSW8100406_HISTORICAL FILE_20100628STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD w r NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor June 28, 2010 Division of Water Quality Coleen H. Sullins Director Carl Baker, Deputy Public Works Officer Commanding Officer, US MCB Camp Lejeune Bldg 1005 Michael Road Camp Lejeune, NC 28542 Subject: State Stormwater Management Permit No. SW8 100406 Marine Mart Convenience Store at Courthouse Bay High Density Infiltration Project Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received a State Stormwater Management Permit Application for Marine Mart Convenience Store at Courthouse Bay on May 19, 2010 with additional information submitted on June 9, 18, and 28, 2010. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 100406 dated June 28, 2010, for the construction of the subject project. This permit shall be effective from the date of issuance until June 28, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions please contact me at (910) 796-7215. Sincerely, Georgette colt Stormwater Supervisor Division of Water Quality GDS/mjn: S:\WQS\STORMWATER\PERMIT\100406jun10 cc: Leon W. Schnur, PE Mickie Redhage, BIS Frucon Engineering, Inc., 636-391-4585, fax: 636-391-4497 Wilmington Regional Office MJ Naugle Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-7215 \ FAX: 910-350-2004 \ Customer service: 1-877-6236748 Noitl l CaTO11I1a Internet .ncwaterquality.org a'�n��rn//� An Equal Opporlun4ylAffmiafive Action Employer (/ Y[4 s FL(( State Stormwater Management Systems Permit No. SW8 100406 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO US MCB Camp Lejeune Marine Mart Convenience Store at Courthouse Bay HWY 172 at Horn Road, Camp Lejeune, Onslow County FOR THE Construction, operation and maintenance of two (2) infiltration basins in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter collectively and separately referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 28, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. The stormwater controls labeled Basin A and Basin B have been designed to handle the runoff from 19,347,square feet and 32,644 square feet of impervious area, respectively. 3. Each basin must be operated with a 50 foot vegetated filter, designed to provide effective infiltration of the design storm such that no discharge to surface waters occurs. 4. The tract will be limited to the amount of built -upon area indicated in Section 1.8 of this permit, and as shown on the approved plans and documentation. There is no built -upon area allocated for future development. Additional BUA requires submittal and approval of a permit modification. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 100406 7 Ll The project shall provide a 50 foot wide vegetated buffer adjacent surface waters, measured from the normal pool of impounded structures, the top of bank of streams and rivers, and the mean high water line of tidal waters. The following design criteria have been permitted for the infiltration basins and must be provided and maintained at design condition: a. Drainage Area, acres: Onsite, ft2: Offsite, ft2: b. Total Impervious Surfaces, ft2: Onsite, ft2: Offsite, ft2: C. Design Storm, inches: d. Bottom Elevation, FMSL: e. Storage elevation, FMSL: f. Permitted Storage Volume, ft3: g. Predevelopment 1 yr 24 hr peak flow, cfs: h. Post -development 1 yr 24 hr peak flow, cfs: i. Type of Soil: j. Expected Infiltration Rate, in/hr: k. Design depth, ft: I. Surface area at storage elevation, ft2: M. Seasonal High Water Table, FMSL: n. Time to Draw Down, hours: o. Receiving Stream/River Basin: P. Stream Index Number: q. Classification of Water Body: II. SCHEDULE OF COMPLIANCE "A" "B" 0.75 1.19 32,863 51,774 none none 19,347 32,644 19,347 32,644 none none 3.7 (pre/post 1 yr 24 hr) for both 35.8 35.8 36.8 36.8 5,779 9,129 0.02 0.03 0.08 0.12 SM silty sand SP-SM silty sand 6.2 10 1 1 6,617 9,613 31.8 31.8 2 2 Courthouse Bay / White Oak 19-36 19-36 "SA;HQW" "SA;HQW" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 5. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 6. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 100406 7. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 2. This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the permittee or of the project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change form to the Division of Water Quality, accompanied by the appropriate documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project in whole or in part, nor the conveyance of common area to a third party shall be considered an approved permit transfer request. 4. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 5. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 100406 6. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 7. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 8. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 9. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying 'the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008-211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the twenty-eighth day of June 2010. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION r,�C z07�� 0, &v -d oleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 100406 Marine Mart at Courthouse Bay Stormwater Permit No. SW8 100406 Onslow County Page 1 of 2 Designer's Certification I, , as a duly registered I in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 Page 2 of 2 State Stormwater Management Systems Permit No. SW8 100406 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The basin elevations are provided per the approved plans and documentation. 6. Vegetation is planted according to planting plans and supplement as permitted. 7. The permitted amounts of surface area and volume have been provided. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The vegetated filter strips are grassed with permanent vegetation. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. 15. The level spreaders are installed in accordance with plans and documentation. 16. The vegetated filter strips are installed in accordance with plans and documentation, including the length, width, slope, location, elevations, etc... cc: NCDENR-DWQ Regional Office David Towler, Camp Lejeune Page 7 of 7 LJ .;DWQ USE ONLY. Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW - 1995 ne Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M gmt Plan: 1p `"�5��"3lp(op3 ADIIJFU State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This fornr may 6e photocopied for use as an original L GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, sl-ecificaFions; letters, operation -and maintenance agreement,etc.): Marine Mart Convenience Store Pgr GOutvriloosrs C-D>A%4 2. Location of Project (street address): _ North Carolina Highway 172 fci Aoeo zP City:Camp Lejeune County:Onslow Zip:28542 3. Directions to project (from nearest major intersection): From the intersection of North Carolina I-Iighway210 and North Carolina Highway 172, go east on North Carolina highway 172 approximately 7 miles to I-torn/Marines Road. Site is at the southeast corner of the intersection of North Carolina Highway 172 and Horn Road. 4. Latitude:34° 35' 15" N Longitude:77° 21' 34" W of the main entrance to the project. It. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to.an existing permit, list the existing permit number , its issue date (if known) and the stratus of construction: ❑Not Started ❑Partially Completed* []Completed* *prcmide a designer's certification 2. Specify the type of project (check one)' ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. if this application is being subrnitted'as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, _ and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 2.44 ac of Disturbed Area 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: MAY 1 7 2010 FonrSWU-101 Version07July2009 Page I of III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/ Organization:Commanding Officer, US MCB Camp Lejeune Signing Official & Title:Carl Baker, Deputy Public Works Officer b.Contact information for person listed in item la above: Street Address:Blde 1005 Michael Road City:Camp Lejeune State:NC Zip:28542 Mailing Address (if applicable):131dg'1005 Michael Road City:Camp Lejeune State:NC Zip:28542 Phone: (910 ) 451:2213 Fax: (910 ) 451-2927 ._.. _ Email:carl.h.bakerCrusmc.mil ._... ._ c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a.Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/ Organization:Commandine.Officer, US MCB Camo Lejeune Signing Official & Title:Carl Baker, Deputv Public Works Officer b.Contact information for person listed in item 2a above: Street Address:Bldg 1005 Michael Road City:Camp Lejeune State:NC Zip:28542 Mailing Address (if applicable):131dg 1003 Michael Rd City:Camp Lejeune State:NC Zip:285,12 Phone: (910 ) 451=2213 Pax: (910 ) 451-2927 Email:carl.h.baker@usmc.mil 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/ Organizafion:Centemial Contractors Enterprises, Inc. Signing Official & TitleXelly Snook, Project Manager b.Contact information for person listed in item 3a above: Mailing Address:8500 Phone: 4. Local jurisdiction for building permits: Camp I-ejeune Fax: Point of Contact:loe Walbert Phone #: (910 1 451-5694 Dorm SWLI-101 Version 07.1uly2009 Page 2 of MAY 1 7BY:_-- -- IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff from the site will drain overland through one of two two bioretention areas then outlet via level spreader and filter strip to existing ditches at the site's perimeter. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ® Ph 11- Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 3.095 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) -Total Coastal Wetlands Area (5) - Total Surface Water Area (6) =Total Project Area':3.095 acres Total project area shall be cnlndnted to exchrde the foil raving the normal pool of iurppwarded structures, the area behveeu the brinks of streams and rivers, the area belory the Normal Hi h Water (NM line or Mean High Water (MHW) line, and coasted wetlands landward from the NFIW (or MHM line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal rvetlamds lamrhoard of the NHW (or MPIW) line runy be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X "100 9. How many drainage areas does the project have?2 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. "If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area A Drainage Area B Drainage Area Drainage Area Receiving Stream Name Courthouse Bay Courthouse Bay Stream Class * SA; HQW SA; HQW Stream Index Number * 19-36 19-36 "Total Drainage Area (so 32863 51774 On -site Drainage Area (sf) 32863 51774 Off -site Drainage Area (sf) 0 0 Proposed Impervious Area** (so 19347 32644 Impervious Area" (total 59 63 Impervious" Surface Area Drainage Area A Drainage Area B Drainage Area _ Drainage Area _ On -site Buildings/ Lots (so 0 9258 On -site Streets (so 0 0 On -site Parking (so 18698 21333 On -site Sidewalks (sf) 649 2053 �— Other on -site (so 0 0 Future (so 0 0 Off -site (so 0 0 Existing BUA*** (so 0 0 Total (so: 19347 32644 Strewn Class and tinder Nunnber can be determined at: http://h2oxmr.state.nc.us/bims/reports/reportsWB.btud Inpervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 'Report only that amount ofexisting BUA that will remain after development. Do not report any existing BUA that is to be rennoved and which will be replaced by new BUA. Form SWU-I01 Version 07July2009 Page 3 of 6 11. How was the off -site impervious area listed above determined? Provide documentation. Site Survey Proiects in Union County: Contact DWQ. Central Office steno check if the project is located within a threatened & Endangered Species watershed that stay be subject to snore stringent storunvater requirements ay per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://h2o.enr.statc.nc.us/su/bmp forns.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://h2o.enr.state.nc.us/su/bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://h2o.enr.statL.ncus/su/msi tnaps.htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://h2o.enr.state.nc.us/su/bmp forms.htm. Initials 1. Original and one corny of the Stonnwater Management Permit Application Form. at 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants JVIA Form. (if required as per Part VII beloro) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. ���,�� 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to 9W S_ http:/ /www.envlielp.tirg/12ages/`onestopexRrcss,htTnl for information on the Express program Ltom and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor ✓4T the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the Ac_� receiving stream drains to class SA waters within b4 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. IRR 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. in. Wetlands delineated, or a note onthe plans that none exist. (,Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. u. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). FormSWU-101 Version07July2009 Page 4of6 MAY 1 7 2010 BY: 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit forblNQ to verity the SHM' prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: N/A Page No: N/A lViA 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC N)A Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. littp://www.secret,iry.state.nc.us/Cori2orations/"`CSearch.ispx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to"be recorded prior to the sale of any lot. if lot sizes vary significantly or the'proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized heed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from hltti•/lh2o.enrstate.nc.us/suPomp forms.htm#deed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible, for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenantscannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. V111. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (Stich as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engincer:Mickie Redhage Consulting Firm: BiS Frucon Engineering, Inc. Mailing Address:15933 Clayton Road City:Ballwin State:MO Zip:6301'1 Phone: (636 1 3914585 Fax: (636 1 391-4497 Eniail:tnickie.redhage@bisfei.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) 1, (print or h/pe name of person listed in Contact lnformation, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type mmne ofperson listed in Contact Information, item, la) with (print or type nine of organization listed in Contact Information, item lb) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal; which indicates the Duty responsible for the operation and maintenance of the stormwater system. FormSWU-101 Version07Julv2009 Page 5of6 RR —TV EU MAY 77 2010 BY: As the legal property owner I acknowledge, understand, and agree by my signature below, that it my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my, responsibility to notify DWQ immediately and submit completed Name/Ownership Change Form within 30 clays; otherwise I will be operating a stormwater treatment facility without a valid pernut. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of ztv�il penaltie f up to $25,000 per day, pursuant to NCGS 143-215.6. i /1 1 t Signature: l Date:0_:/v__ before me a stormwater permit. 1 L& AAA-J , a Notary Pubic for rtthe Stnate of mac' County of -,do hereby certify that �-- A-L personally appeared of aO//), and ack owledge the due execution of the application for Witness my hand and official sea l, d ) SYLVIA NORRIS NOTARY PUBLIC ONSLOW COUNTY, C MY COMMISSION EXPIRES X. APPLICANT'S CERTIFICATION SEAL My commission expirese. � 0 I, (print or hype name of person listed in Contact Inrformation, iteu 2) Carl Baker, Depht Public Works Officer certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective cgwqnants will be recorded, and that the proposed project complies with the requirements of the applicable stor w ter rules ter A NCAC 2H .1000, SL 2006-246 (Ph. ❑ -Post Construction) or SL 2008-211. SignaDate:-_:!� I, 14 1t. J a NotaryyJT'ublic�for the State of ftzt& �{/� C;ounty of do hereby certify that/�e — C-t2h e /�:tt_� ----- Personally appeared before me this jQ day of _ ___. ____ ' _ _a 0(0 , and ack owledge the due execution of the application for a stormwater permit. Witnesses my hand and official seal, !gl _---..__ v � 30� o/U SYLVIA NORRIS NOTARY PUBLIC ONSLOW COUNTY] MY COMMISSION EXPIRES 'Form SWU-10.1 Version 07July2009 SEAL My commission expires r 3 6 7`4_.CiV-n MAY 1 7 2010 Page 6 of 6 y9 /o ` MEMORY TRANSMISSION REPORT TIME :06-28-'10 15:31 FAX NO.1 :910-350-2004 NAME :DENR Wilmington FILE NO. 500 DATE 06.28 15:28 TO : 8 919104512 97 6 DOCUMENT PAGES 8 START TIME 06.21 15:30 END TIME • 06`78 15:31 PAGES SENT 8 STATUS OR *** SUCCESSFUL TX NOTICE *** State of North Ca�WIu. wuml.aw. x.wn..1 omep Bev�iy Eavas P rave. C'overvor FAX COVER SArC£T Dev FYwn�aw. Se�r.lary No. Fpgea (exnl. aovar): / Fho�n: (910)996-0 � Fox: (9101350-2004 121 Cnrdlnsl Orlva xC .--I - (910) 7%-1215 - M Equal OppoMnl{y gHSrm naive / —.— Employor State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHFET Dee Freeman, Secretary Date: _ 8 /r To: Co: Fax: / — Ala - �f5 / `/�'%Z Re: 71— No. Pages (excl. cover): From: Jo Casmer Phone: (910) 796-7336 Fax: (910) 350-2004 ern/`/- ssd"'d— %/--e-✓ Py 1"2 z-;,2If , L, 127 Cardinal Drive Extension, Wilmington, NC 28405 0 (910) 796-7215 -An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT TIME :06-28-'10 15:29 FAX NO.1 :910-350-2004 NAME :DENR Wilmington FILE NO. 499 DATE 06.28 15:28 TO S 916363914497 DOCUMENT PAGES 8 START TIME 6-28-15:28 END TIME 06.28 15 29 PAGES SENT 8 STATUS OK *** SUCCESSFUL TX NOTICE *** 6tate of NorYb C.rotiv. Unp. r[ment o! Evvirovmavr ved Naue.i Rv�ov rau wummsten lie¢icea omm . Bcavi/y Eo.+ra JYrOnr. Govervor FAX COVTiR SHEET Dw tYs.ansv. Svc>et.ry Date: /� No. Pe¢ea (excl. cover): [91 Ol 350-200 a 2"/ Cnrd 4+N Drlvn PaatenslnnWal mingtnnNC 38i05 � (9(0) 796-1213 � M Eevnl OVP"�taan�aY Aitteae�natve Acalnn Em ptuvor State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Dee Freeman, Secretary Date: / To:/G�/ �Gd/IGL9 v y Co: B %/S f/ULO /7/��/l�l1�1n1/ l ��J/ i �✓ Fax: No. Pages (excl. cover) From: Jo Casmer Phone: (910) 796-7336 Fax: �(910) 350-2004 Re: k//2/ /' /ssd�d- /aid li dp�/ / it '5-'2Q , .l 127 Cardinal Drive Extension, Wilmington, NC 28405 0 (910) 796-7215 ® An Equal Opportunity Affirmative Action Employer Naugle, Mary From: Redhage, Mickie K (Mickie.Red hage@bisfei.coml Sent: Monday, June 28, 2010 11:09 AM To: Naugle, Mary Subject: RE: SW8 100460 Marine Mart State Stormwater Attachments: 02 - App permit page 3.pdf Mary Jean, Drainage Area A changed per comment number 1 from the June 10 letter. The Infiltration Basin Supplement is correct. have revised page 3 of the application permit to match it, and it is attached. If you need anything else, let me know. Thank you, Mickie Redhage, RE BIS Frucon Engineering, Inc. Civil Engineering Department 15933 Clayton Road, Suite 305 Ballwin, MO 63011 Email: mickie.redhage@bisfei.com Phone: (636) 391-4585 Fax: (636) 3914497 From: Naugle, Mary [mailto:mary.naugle@ncdenr.gov] Sent: Monday, June 28, 2010 9:38 AM To: Redhage, Mickie K Subject: RE: SW8 100460 Mickie Marine Mart State Stormwater The drainage area and impervious area is different on the supplement than the application page 3 in section IV(1O)... for drainage area A. please verify which is correct ? Thanks... Trying to issue today. Either can be changed if you e-mail the correction. Be sure to include on supplement, calcs, application, etc... Hopefully plans don't change ? elevations ???? The system phone are not working, so you can call my cell at 910-233-8718 if you need to. Thankyou Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax many. naugle@ncdenrgo v RECEIVE� JUN 2 @ 2010 BY:----- LETTER OF TRANSMITTAL Frucon aIs Engineering Project Name: Marine Mart at Courthouse Bay, Camp LeJeune Project No.: 805322.18 To: NC DENR 127 Cardinal Drive Extension Wilmington, NC 28405 Attention: Mary Jean Naugle 910-796-7215 We are sending ® Herewith ® Delivered via UPS UPS Tracking #: June 21, 2010 File No.: 13.10 Transmittal No.: 010 Description: IFA — DENR Express Stormwater Submittal cc: Kelly Snook, CCE David Towler, ® w/ copy Below Camp LeJeune DPW rcc: File Vendor: Manufacturer: Equipment No.: ®Drawings ❑ Calculations ® Specs ❑ Shop Dwgs. ❑ Samples ❑ Change Notice ❑ Copy of Ltr. ❑ Orig. Tracings ® Other No. of Drawing/ This transmittal affects These Are: ❑ Preliminary ❑ Informational M As Requested ❑ Advance Copy ® Engineering ❑ Procurement ❑ Construction For: IN Approval ®7I Your Use �wI Review & Comment 1 Files & Distribution _ ❑ Fabrication _ ❑ Construction Action Legend: 1. No exceptions taken, addressee can proceed with fabrication and/or construction. 2. Addressee can proceed based on making revisions noted. Submit corrected copy for file. 3. Revise as noted and resubmit. Hold fabrication or construction. 4. Submit copies for distribution/file. Remarks: Please find the enclosed resubmital for Express Stormwater permitting of the proposed Marine Mart Convenience Store at Courthouse Bay, Camp LeJeune. Because the originals were sent with the last submittal, only originals that have changed are included herein. If you Have any questions or comments, please call me at 636-391-4585 or email me at Mickie.redhaoe(a)bisfei.com. Any action shown above is subject to terms of contract and does not relieve addressee from his obligations under the contract. If enclosures are not as noted, please notify us at once. By: Mickie Redhage Please sign and return one (1) copy to us. Rec'd By: JUN 2 2 2010 • BIS FRUCON ENGINEERING INC. 15933 CLAYTON ROAD • SUITE 305 • BALLWIN, MISSOURI 63011 (636) 391-4300 9 Fax: (636) 391-4462 CIVIL STORMWATER CALCULATIONS MARINE MART CONVENIENCE STORE CAMP LEJELINE, NORTH CAROLINA BFEI Project No. 805322.18 Frucon ais Engineering PREPARED BY BIS Frucon Engineering, Inc. 15933 Clayton Road Ballwin, MO 63011 April 30, 2010 Revised May 11, 201d Revised June 8, 2010 Revised June 21, 2010 JUN 2 2 2010 OP.NCAR E...... �L 2.'e'F Ny-- 9 SEAL - Civil Site Work Calculations Marine Mart Convenience Store BFEI Project No. 805322.18 MARINE MART CONVENIENCE STORE CAMP LEJEUNE NORTH CAROLINA STORMWATER NARRATIVE 1. GENERAL INFORMATION A new Marine Mart convenience store with fuel pumps, a single -bay self - serve car wash, and car vacuum station is proposed on a 3.1 acre tract of land at the southeast corner of the intersection of North Carolina Highway 172 and Horn Road in Onslow County, North Carolina. The site is located within the Courthouse Bay section of US Marine Corps Base Camp Lejeune. The site is bounded on the south by a tank trail and on the east by Munro Road and will be accessed by two entrance drives from Horn Road on the west and North Carolina Highway 172 on the north. The proposed facility will occupy the western 2.4 acres of the site. No evidence of wetlands has been encountered onsite. Water supply and sanitary wastewater treatment for the proposed facility will be provided by Camp Lejeune. See Figure 1 below for a location map. 2. STORMWATER INFORMATION The site is located within the White Oak River Basin, and drains into Courthouse Bay (Stream Index Number 19-36), which is classified as SA;HQW. The stormwater design is high density commercial for State Stormwater permitting. The existing site is undeveloped. Following construction, approximately 50% of the disturbed area of the project site will be impervious -surfaced. 2.1. Existing Drainage Pattern The site's existing drainage pattern is generally towards the west. The flow overland drains partially into a drainage swale along State Highway 172 and partially into a drainage swale running along the edge of the tank trail. The stormwater draining towards Highway 172 continues to the west into Courthouse Bay while the drainage flowing toward the tank trail drains southward along Horn Road. The drainage from the site ultimately flows to Courthouse Bay, which is classified as SA;HQW according to the North Carolina Department of Environment and Natural Resources (DENR). -- _F ;➢'CI'� Drainage from offsite drains into the existing drainage swales at the site JUN 2 2 2010 Civil Site Work Calculations Marine Mart Convenience Store BFEI Project No. 805322,18 perimeter and does not cross the site. There are no buffer requirements for the site, and coastal management is not a concern. An on -site evaluation of the site soils in each bioretention area has been conducted by ECS Carolinas, LLP. One hand auger boring was performed in the location of bioretention area A on December 23, 2009; the findings of this test can be found in the Report of Subsurface Exploration and Geotechnical Engineering Analysis dated January 13, 2010. A second such boring was performed on area B on March 16, 2010, and the results of the boring can be found in an addendum to the geotechnical report dated March 17, 2010. Based on these evaluations, the seasonal high water level is at elevation 31.80, and the soil infiltration rate in bioretention area A was determined to be 6.2 inches/hour, and the infiltration rate in area B was found to be 10.8 inches per hour. Soils onsite are generally intermittent layers of very loose to medium dense silty and clean sands. 2.2. Proposed Drainage Pattern It is proposed that drainage from the Marine Mart site follow existing drainage patterns, draining overland into two bioretention areas. See Figure 2, below for a drainage area map showing the overall drainage areas. The drainage areas are broken out into pervious and impervious areas on sheet A-1. The western drainage area, area A, will drain into a bioretention area at the northwestern corner of the site. Bioretention area A will drain via a level - spreader and filter strip to a ditch along Horn Road that flows towards the existing inlet at the intersection of Highway 172 and Horn Road. The eastern drainage area, area B, will drain overland into a bioretention area at the eastern edge of the site. Bioretention area B will drain over a level - spreader and filter strip into the existing swale running westward along the edge of the tank trail. The bioretention areas have been designed to retain and infiltrate water from the 1-year, 24-hour storm. The required ponding volume calculations are attached starting on sheet A-7. The actual volume provided is calculated on sheet A-14 Water in excess of the 1-year, 24-hour storm will flow over the level spreader and filter strip to the downstream existing swales as previously described. The length of the level spreader was designed to discharge the 10-year storm. The level spreader calculations are attached starting on page A-15. Civil Site Work Calculations Marine Mart Convenience Store BFEI Project No. 805322.18 2.3. Fuel Canopy Downspouts Stormwater from the canopy roof will drain through the downspouts provided by the canopy vendor to underground pipes, discharging into the eastern bioretention area, area B. The underground drainage pipe size was calculated using International Building Code 2006 Table 1106.3 and Figure 1106.1. These calculations are included on pages A-18 and A-19. A 6 inch diameter pipe at 1% slope is required to drain the fuel canopy. 2.4.Soil Erosion and Sediment Control The existing site is relatively flat, with slopes of approximately 1.5% across the site. Soils onsite are generally loose to medium dense silty and clean sands. Erosion and sediment control during construction is to be provided by silt fence surrounding the disturbed areas on all downslope sides. Sod will be used to stabilize the ditch areas immediately following grading in those areas. Gravel check dams will be installed in the ditches to capture sediment escaping from upstream. 1��i�➢V �T�i� JUN 2 2 2010 3 Civil Site Work Calculations Marine Mart Convenience Store BFEI Project No. 805322.18 Marine Mart Convenience Store Camp Lejeune, North Carolina Site Location Map With '/z Mile Radius Figure 1. USGS Map showing site with mile radius n Civil Site Work Calculations Marine Mart Convenience Store BFEI Project No. 805322.18 FAJU ,:4k191 P.4 FAI Stormwater Calculations Index of Calculations A-1 Drainage Area Calculations A-3 Peak Runoff Calculations — 1-Year Storm A-4 Point Precipitation Frequency Estimates (in/hr) A-7 Pond Volume Requirements A-12 Point Precipitation Frequency Estimates (in) A-15 Pond Volume Calculations A-16 Overland Flow Velocity A-19 Drawdown Time 1-Year, 24-Hour Storm A-20 Stormwater Volume Increase — 10-Year, 24-Hour Storm A-22 Drawdown Time — 10-Year, 24-Hour Storm A-23 Level Spreader Calculations A-25 Fuel Canopy Drainage — 10-Year Storm U cl cc krd J Its 6/-)i/10 Marine Mart Convenience Store Camp Lejeune, North Carolina Area Calculations Total Area A Area B sf acre sf acre sf acre Total Site Area: 157688 3.62 Disturbed Area 107134 2.46 Total Drainage Area: 84637 1.94 32863 0.75 51774 1.19 Impervious Area: 51991 1.19 19347 0.44 32644 0.75 Building Area: 9258 0.21 0 0.00 9258 0.21 Sidewalk Area: 2702 0.06 649 0.01 2053 0.05 Pavement Area: 40031 0.92 18698 0.43 21333 0.49 Project Percent Impervious Area: 49% Calculate Compsite 'C' —C',dalkes+o,6-i �Iuyv-,- A/C 'bENR 5+OrMvJj,r MSee i-i 3-a. &-e- pot,Aa. Clawn, sandy, 2%-7%slopes 0.15 Clavmt 0.95 Drool 0.9 Ocomposite Aroof* Croof+Apvmt * Cpvmt+p`grass* Olawn1/ Atotal Area A Area B Ccomposlte 0.62 0.65 JUN 2 2 2010 A -I �`' NCDENR Stormwater BMP Manual Chapter Revised 06-16-09 3.2. Peak Plow Calculations Some of the state's stornnvater programs require providing attenuation of peak runoff; for example, that the post -development flo", rate for the one-year, 24-hour storm may not exceed the pre -development floe rate (Neuse and Tar -Pamlico NSW Programs). In addition, it is also important to compute flow rates from the watershed when designing BMPs such as grassed swales, filter strips, and restored riparian buffers. The primal)' method that is used to determine peak runoff rate for North Carolina's stormwater programs is the Rational Method. The Rational equation is given as: Q = C � I � A Where: Q = Estimated design discharge (cfs) C = Composite runoff coefficient (unitless) for the watershed I = Rainfall intensity (in/hr) for the designated design storm in the geographic region of interest A = Watershed area (ac) The composite runoff coefficient reflects the surface characteristics of the contributing watershed. The range of runoff coefficient values varies from 0 - 1.0, with higher values corresponding to greater runoff rate potential. The runoff coefficient is determined by estimating the area of different land uses within each drainage area. Table 3-2 presents values of runoff coefficients for various pervious and impervious surfaces. The Division believes that the Rational Method is most applicable to drainage areas approximately 20 acres of less. Table 3-2 Rational runoff coefficients (ASCE, 1975; Viessman, et al., 1996; and Malcom, 1999) Description of Surface Rational Runoff Coefficients, C Unimproved Areas 0.35 Asphalt 0.95 Concrete 0.95 Brick 0.85 Roofs, inclined 1.00 Roofs, flat 0.90 Lawns, sandy soil, flat (<2°6) 0.10 Lawns, sandy soil, average (2-7%) 0.15 Lawns, sandy soil, steep (>7%) 0.20 Lawns, heavy soil, flat (<2%,) 0.15 Lawns, heavy soil, average (2-5%) 0.20 Lawns, heavy soil, steep (>7(/'/O) 0.30 Wooded areas 0.15 The appropriate value for f, precipitation intensity in inches per hour, can be obtained from the NOAA web site at: lit tp:/ /hdsc.nws.noaagov/hdsc/ pfds . This web site A 2 o.,.... ., ,,.... NA,..,,.,,.,,,,, 1 .-I CA dk,tmna R-2 Iu Iv 2007 Marine Mart Convenience Store Camp Lejeune, North Carolina 1-Year Runoff Calculations Area A IArea B 1-year, 24 hr intensity, in/hr 0.15 0.15 Pre -development 1-yr, 24-hr peak flow, cfs 0.02 0.03 Post -development 1-yr, 24-hr peak flow, cfs 0.071 0.12 Calculated by Rational Method Calculated by Rational Method Rainfall intensities are obtained from NOAA Point Precipitation Frequency Estimates, attached. A-3 JUN 2 2 2010 L Precipitation Frequency Data Server Page 1 of 3 All]' 50 POINT PRECIPITATION y.,..` FREQUENCY ESTIMATES FROM NOAA ATLAS 14� SNI?AUS PCRI21', NOWIFil (CU20LINA (31-8037) 345i N 77.4 NV 49 feel fiom"I4eoiprmliomliequenq AtlasofIbe Uni¢d Slab, NOAA AILS 14.Val ue¢'-. khismir3 QM. Bonnie. D. NLvlln. B. Lin. T. I'mxybnl,. N1,YoW. end 1). Rile, NOAA. National Wvabcr Service, Silva Spring. Nlmvnmid, 2004 Ewoolod Mnn lan'_i 2010 Precipitation tutensity Estimates (in/fir) III 15 JII 611 IZII J Itt, G Itt. _12 24 4R II Ill 211 ](I 4 60 L.. r... L.. ,L,.. II ,t.... ,t.,.. d.,.. :too d�. ri.n 'These precipitalion frequercy estimates are based on a anal durahnneeres. ARl is the Average Recurrence Interval. Please refer to NOAA Atlas 14 Oocal all for more infolmalim. NOTE: Formatting forces estimates near zero to appear as zero. * Upper bound of the 90% confidence interval Precipitation Intensity Estimates (in/hr) ARI•• (years) 0 min 10 min IS min 3U rein (,0 min 12U min L10 1,35 1.7I 3 hr O,SO 0.97 124 6 6, 0.49 OF607 0.77 12 hr 0.29 0.35 0.46 �4 hr 0.17 0.21 0.26 0.39 0.45 48 hr 0.10 0,12 0.15 0.23 0.27 0.31 0.36 4 d9y 0.05 0,07 o.08 0.12 0.14 0.16 O.IS 0.22 0.25 7 day 0.04 0.04 0.05 O.OS 0.09 0.10 0.1] O.I3 0.15 111 clay OD3 0.03 0.04 00 0 0.06 0.07 0.08 0.10 0.11 2U dap 0.02 OF027 0.03 . 03 00 0.04 0.04 405 0.06 0.06 3(1 day 0.01 0,02 . 002 002 0 03020206 0.03 0.0J 0.04 0.04 0.05 ]EA 45 d9y 0.01 0.01 002 . a 02 0.03 0.0J 0,03 0.04 ]ET] 60 d:0 0.01 0.01 0.02 0.02IO9 025 0.02 U.U2 0.07 0.03 1�6.41 5.12 4.26 2.92 LS2 2.E 07.57 6.06 5.08 3.51 0 8.R4 7A9 5.98 4.24 2.72 . 790 6G6 . 1.80 2.08 1.12 1.29 0.67 0.75 50 LI 12.12 8.88 9.G5 7.50 R.15 5.56 6.14 3.70 4.16 2.44 2.79 100 13.14 10.44 8.80 6.74 4.64 3.17 2.79 2.72 1.49 1.71 0.91 1.04 0.52 0.60 200 14.16 11.22 9.44 7.35 5.15 3.58 500 15.48 12.24 10.27 8.17 5.86 4,17 4.67 3.23 3.G6 2.03 2.31 1.25 1,4J 0,73 0.83 0,43 0.50 I OOU 16.57 13.04 IU.92 8.84 G.45 -The upper bound of the confidence interval at 90% confidence level is the value which 5%of the 5lmulaled quanme vames mr a given Irequency are greaser man. " These precipitation Irequency estimates are based on glo rlan senes ARl is the Average Recurrence Interval. Please refer b NOAA Atlas id Documenl for more informal NOTE: Formatting prevents estimates near zero to appear as zero. re Lower bound of the 90% confidence interval Precipitation Inteusit)' Estimates (in/hit ARI"' (ycm's) S min 111 min 15 min 3(1 min 60 min 12(1 min 3 hr (, hr 12 hr 24 Iv 48 lu' 4 dart 0.04 0.05 O07 O,OR KE 0.11 0.13 O.I4 0.17 0.19 7 day 0.03 OA4 0.05 D.OS 0.06 0.07 0.08 0.09 O.I O 0.11 I11 day' 0.02 0.03 0.03 0.04 O.OS 0.05 20G 0.07 0.08 O 08 III dmy OD2 U.02 O02 0.07 O03 0.(13 0.04 O.U4 O.OS 0.U5 JU lay 0.01 0.02 0.02 0.02 0.02 0.03 0.03 O.D3 0.03 0.04 45 day 0.01 0.01 0.01 0.02 0.02 JEDz 0.02 0.02 0.03 0 03 O.Dl 611 'lay 0. 11 0.01 O.UI 0.02 0.02 0.02 0.02 0 02 0.f13 1�5.53 4.42 i68 2.52 1,5E 967U.70 442 0,24 0.14 0.08 0.10 0.12 �G.SS 5.24 4.79 3.03 1.9(I LIfi 0.85 0.51 0.3(1 0.17 �763 6.11 S.IG 3.66 235 1.49 ,fl 0.65 0.38 022 I11 8.51 G.81 5.74 4.IG 2.7I 1.75 1.27 (1.7R 0.45 0.26 0.32 0.37 O,IS O.IR 021 224 028 0.33 0.37 25 9.56 762 G.44 4.77 3.Ift 2.10 L55 0.95 0.56 (LfiS 50 10.37 S.2G G.97 5.25 3.56 2.40 1.78 L- 100 11.16 8.ft7 7.47 5.72 3.94 2.7U 2.(13 1.24 U.74 043 20U 11.94 9.46 7.96 6.19 4.34 3.02 2.29 1.41 0.85 OA9 ,00 100 12. 88 133.61 00. 88 10,72 8.54 8.97 6.80 7.26 4.88 5.3(1 3.48 J.85 2jfl 2.99 1.65 1.85 L00 1.13 0.57 0.64 ' The lower bound of the confidence interval at 90% conference level is the value which 5%al the simulated quanme values ror a given Irequency are cos tnan. Precipitation Frequency Data Server Page 2 of 3 These prerpiUtion frequency es Idol s ale Eased ona AarJ29P@liQy )_na la-se,LC:_ A R I is lne Average Recurrence lntsuval Please refer to NOAA Allas 141 tllh'Og for more information NOTE: Formatting prevents estimates near zero to appear as zero -.Text versionofta6les• ;_I F'arti al doled yn La a=d Pui nt IUT Lorvr?:. - .-r si. r,. 34.55 II ?7.4 11 41 tt O rit I N Yt M M., Jan 25 11:23: 11 2OICr Maps - £ L L L J• 1• J• 7h J• - P in N M P .G n. N M 't W m a, � Innatton - to v a r• F1VFra[JF RFCllrr'?rl%�5 IrlterVal l UFar'..-.) -un:^ C-V?ar --- 10G-Near 50Q-year �- -5-6-ar -- 1nOn-year -e- 1 %0'YI 'I i 0-ld 1 60"W 'no " bl fi01-14 701'ta These maps vrere produced using a direct map request from the U.S. Census BYrR3YJ1d�RALn33Po3Ilp93PhIL_3CSeJw T9., Map.SScerr. Pleurr,"dib,"lt�. inr/o..nnuon. A - S Precipitation Frequency Data Server Page 3 of 3 LEGEIID — State — Connector ..-_-._ County txzi Stream --'. Intl ian Resv Military Area �.Aa, Lake/Pmldl Oc can 's'= National Park — Street i _ii Other Park — Expresssmy 7 City — hl ighway — C9un tyd 2 nIi �G Scale 7: 228583 0 - �; o rw t.P...1'2c--tall`. c-T.lc dell?OiiS m IY,TitVP," D ut1e0 Other Maps/Photographs - Vica USCS digitnl urthall_h010 luadiangde (_DQQ) covering this location from TemSclver; USCS Aerial Photograph tray also be available from this site. A DOQ is a computer -generated image of an aerial photograph in which image displacement caused by terrain relief ,aid camera lilts has been removed. It combines the image characteristics of a photoamplh with the geometric yuith ties of a map. Visit the USGS for more inl'ormmion. Watershed/Stream Flow 1a1m"mation - Find the W. g he 1 fm'this location using the U.S. Environmental Protection Agency's site. Climate Data Sources - Precipitatioa equencv iesuhs are baser! on Aura f oll, a "alien' ojsou, ces. but large/v NCDC. The hallolviag links In general information ethane observing tiles in the Oleo. r'eg idless ofif their Ana li as used in this sm(N. For'rletailed in(arrnntion about the stations esed in this sindv. please refer to N04A Ades 14 Docl ram. Using the National Climatic [).all Ce lea's (NCDC) station search engine, locate other climate stations within: 30iminules 3?,� n'� de reel!" E - ...OR 9 iElS of this location (34.55/-77.4 ). Digital ASCII data car be obtained directly liom NCDC. 11rdr9meieorologir.J Uesign Sonlics fennel' DOCIN'oANN.11mll \Ponlhm service Ines E11sbO'v5111iglrmm, Sn>er spring, Gm 20910 00117I3-1669 Queslioni.". 11nSC0 i 'gy,laiypnwS+`• )isrl,'in�cr Marine Mart Convenience Store Camp Lejeune, North Carolina Ponding Volume - Area A Calculate the required stormwater ponding volume: Use method from Chapter 3 of NCOENR Stormwater BMP Manual Required to retain/infiltrate the 1-year, 24-hour storm volume = 3.68 in. per NOAA Point Precipitation Frequency Estimates for Sneads Ferry, NC. Compare rainfall volume from first 1.5" with post- predevelopment quantity. Runoff volume per Manual Section 3.3.1 Simple Method (for first 1.5") Area A R,= 0.05+0.9'I, Where 1,=impervious area/entire area sq ft acre impervious area 19347 0.44 acre entire area 32863 0.75 acre I, 0.59 R, 0.58 Vrs=3630`Rv'R,* A Ro 1.5 in. A 0.754 Acre Vrs 2381.9313 ft Compare the volume difference for pre and post development, Rd=3.68" Pre -development R,= 0.05+0.9`I, 0 acre impervious area 0.75 acre entire area 1, 0 Rv 0.05 Ve,e 3630'Rd`Rvp„'A Rd 3.68 in. A 0.75 acre V 503.90 ft' Post -development R,= 0.05+0.9'I, R, 0.58 (see above) Vp,,, 3630'R,'R,p,,,'A Rd 3.68 in. A 0.754 acre V 5843.67 ft' Vp,:,s,,=3630'Rd'(Rvpovi Rvp,.)'A Rd 3.68 in. A 0.75 acre V 5339.77 ft' V 1.47 acre -in A-7 Marine Mart Convenience Store Camp Lejeune, North Carolina Podding Volume - Area B Calculate the required stormwater pending volume: Use method from Chapter 3 of NCDENR Stormwater BMP Manual Required to retain/infiltrate the 1-year, 24-hour storm volume= 3.68 in. per NOAA Point Precipitation Frequency Estimates for Sneads Ferry, NC. Compare rainfall volume from first 1.5" with post- predevelopment quantity. Runoff volume per Manual Section 3.3.1 Simple Method (for first 1.5") Area B R,= 0.05+0.9`I, Where 1, impervious area/entire area impervious area 0.75 acre entire area 1.189 acre 1, 0.63 R. 0.617459 Vr.s=3630*11v"Rv"A Ro 1.5 in. A 1.189 Acre Vis 3996.038 ft Compare the volume difference for pre and post development, Ra=3.68" Pre -development R�= 0.05+0.9% 0 acre 1.189 acre 0 R, 0.05 R, 3.68 in. A 1.189 acre V 793.868 h' Post -development R�= 0.05+0.9'I, R„ 0.617459 (see above) R, 3.68 in. A 1.189 acre V 9803.612 ft' V.... .. 3630' Ra' (R,aosr R„p„)'A R, 3.68 in. A 1.189 acre V 9010 ft' V 2.482023 acre -in impervious area entire area w Frucon DEPT: PAGE IOF Engineering ISSUE DATE: BY qrAe DATE: CHK'D J ��k PROJ TITLE/PROJ #a:F e ne APRV'D CLIENT REV NCDHNR Stormwater BM? Manual Chapter Revised 06-16-09 allows the user to select from one of NOAA's numerous data stations throughout the state. Then, the user can ask for precipitation intensity and view a table that displays precipitation intensity estimates for various annual i et -urn intervals (ARIs) (1 year through 1000 years) and various storm durations (5 minutes through 60 days). The requirements of the applicable stormwater program will determine the appropriate values for ARI and storm duration. If the design is for a level spreader that is receiving runoff directly from the drainage area, then the value for I should simply be one inch per hour (more information on level spreader design in Chapter 8). 3.3. Runoff Volume Many stormwater programs have a volume control requirement; that is, capturing the first 1 or 1.5 inches of stormwater and retaining it for 2 to 5 days. There are two primary methods that can be used to determine the volume of runoff from a given design storm. the Simple Method (Schueler,1987) and the discrete SCS Curve Number Method (NRCS, 1986). Both of these methods are intended for use at the scale of a single drainage area. Stormwater BMps shall be designed to treat a volume that is at least as large as the volume calculated using the Simple Method. If the SCS Method yields a greater volume, then it can also be used. 3.3.1. Simple Method The Simple Method uses a minimal amount of information such as watershed drainage area, impervious area, and design storm depth to estimate the volume of runoff. The Simple Method was developed by measuring the runoff from many watersheds with known impervious areas and curve -fitting a relationship between percent imperviousness and the fraction of rainfall converted to runoff (the runoff coefficient). This relationship is presented below: R t, = 0.05 +0.9 * IA Where: Rv = Runoff coefficient [stone runoff (in)/storm rainfall (in)], ututless IA = Impervious fraction [impervious portion of drainage area (ac)/ drainage area (ac)], unitless. Once the runoff coefficient is cleternnined, the volume of runoff that must be controlled is given by the equation below: V=3630*Ru*R„*A Where: V = Volume of runoff that "'List be controlled for the design storm (ft3) Rt, = Design storm rainfall depth (in) (Typicnlly, LO" nr 1.5") A = Watershed area (ac) G ............ — 3-3 July 2007 NCDENR Stormwater BMP Manual ChapLer Revised 06-16-09 Example Runoff Volume Calculations using The Simple Method: Projects draining to SA or ORW waters in a Coastal County: 'Effective October 1, 2008, the revised Coastal Stormwater Rules (Session Law 2008-211) stipulate new volume control requirements for high density projects draining to shellfishing waters (SA) or Outstanding Resource Waters (OR1\� in the Coastal Counties. The designer must compare different scenarios: runoff from first 1.5" of rainfall the pre- /post -development for the 1-year, 24-hour storm.These criteria provide a useful demonstration of runoff volume calculations used in different North Carolina stormwater programs. The following example uses the Simple Method (Schueler, 1987) to estimate runoff volume in a hypothetical situation: Esn)1,ple: What is the appropriate runoff volume for choosing and designing a BMP to control stormwater runoff from a high density development project within one-half mile and draining to SA waters? Description: 4-acre site within a half -mile and drainhng to SA waters will be developed with a 15,000 sq. foot building (0.34 ac), 0.5 acre of asphalt road, parking, and concrete walkway areas (see Figure 3-1), and 1.86 acres of grassy lawn. The rest of the property (1.3 ac) will remains unimproved. Figure 3-1 Schematic of Property for Example Runoff Volume Calculation The BUA density, will be (0.34 + 0.5)/4 = 21.5%. This will be considered a high -density project as it is above the "t2% threshold. Because of this, the engineer must determine which runoff volume is greater in the followin&design conditions. Note that the area when, BMPs will eventually be installed is assumed to be grass areas in these calculations. M Precipitation Frequency Data Server POINT PRECIPITATION FREQUENCY ESTIMATES FROM NOAA ATLAS 14 Pege I of3 SN'EAUS FLIiaY. NOR'III CAROLINA 13LA1137) 34.5s N 77.4 W 491um Iln,n"I°Ic;I,nImL.ILF¢,Inmly, Al lotel Inc Ullily I Su,,, NUAA All.,, 14, CuLmm `. YeulonJ G M. Ilmeun, 1) Alnrnn. If. LIn.'1, I':rtaybvkhl.Yekln. mr41) R.1u, NUAA. Nnlinnal \\'I.Ilnl r Si'iciic. Silvcl Se,inc, Mnllnaal. I I'll Lnl e,lauc l:ln le IMP Conhdence!Limits I Seasonality'.I, ':Location Map_ .. Olhe'nlnfo ':;GISdata 'Maps Does.!.: Relurll to Slate Map:' Precipitation Frequency Estimates (inches) ARIL' �_ min III minminpiinminmin I: JII GII I20 3 Ur E19❑❑2. G Lr I. Gr J da'7 dayIII G.OG 727 9.f11 I(1.44 12.50 14.21 1G.04 16.00 20.H0 23.11 nil 79H 9.49 11.55 I3.23 15.G2 77.55 19.G4 21.52 88 2734 IN 9.79 I L69 1400 IS.H8 IS.43 20.57 '_2.G9 24.68 27.68 30.22 12.33 14G0 17.43 19.75 23AI 25.66 25.40 312G 3522 3S.3S GII 1499 17.63 20.A0 23.34 26.80 E9.52 3'_.28 35.07 3S.S4 41.74 '.21 3.91 5.04 6A1 7.44 3.G9 I(1.07 11.61 13.91 L+.91 j241fi0h' 4 4S 5.79 6.91 b. 9.95 I IS( I332 15.94 18.19 5.17 6.G5 791 9.82 11.49 I334 15.4I 16.55 21.2G 4.75 5.75 7.31 8.60 10.49 12.09 13.53 15.72 IS.8(1 21.44 S.4S G.6(1 8.317 9.7U 11.72 13.41 15.22 17.17 99.99 22.32 2.04 2.53 2.92 2.52 3.20 3.77 2.72 3.47 4.12 5.05 S.SS 6.71 7.GG 9.05 I023 22 3.31 4.^S 5.U4 6.20 7.19 5.29 9!19 1128 12.79 2� �U.(9 10 0.5'J 0.77 U.94 LI(1 L22 L I8 1.39 1.55 LG3 1.97 2.24 25 0.87 13S 1.75 L59 3A5 3.67 4.31 4.57 5.22 5.9t 5U lUU 094 L02 L511 L(2 19(I 2.04 2.SG 3.13 2Uf1 5011 10110 1.09 1.19 L'_7 1 .73 L87 2.00 2.1) 237 '_.52 341 1.75 407 4.75 5.42 5.95 6.G9 7.77 8.[,6 ' These precipilalivnlrequencyesnrnatec ale based.aall dua'on es ARl is the Average Resten.Interval. %mse mlello=AI Goc t lama¢bf.e.fon.NOTE! Famall,q laws estimatesheal xadtoslue asIne- * Upper bound of the 90 % confidence interval - Precipitation Frequency Estimates (inches) Alit** (years) 5 min mn U m 2.21 2.39 2.94 3.S 4.05 4.75 5.27 7y 6.03 If der 6.G7 d 8.67 30 der 10.5(, dac I3.45 1 clay I<i.09 10053 O.Si LU7 IAG LS2 FTJ Q63 LOI 1.27 1.75 22U 2.7(1 292 3.72 3.59 4.59 42R 5.49 4.93 G.35 755 9.39 5.7C 7.38 5.76 10.85 6.33 8, I U 9.52 IL57 725 9.1 I IU.63 12.78 A.01 9.90 11.4G 13.66 1032 12.54 14.34 16.89 12.54 I S.0(, 17.U9 19.58 15.91 19.02 2L56 25.15 19. 11 22.41 25.11 28.52 0 0.74 I.18 1.49 2.12 2.72 3.43 Ili 0.32 L32 1.67 2.41 3.14 4.04 4.41 5.45 G.SG =Efl 1.45 IBS 2.78 3.70 4.SS 5.39 6.65 8.09 50 L01 LGI 2.U4 3.07 4.16 5.59 G.24 7. 55 9.43 10.89 12.74 14.79 13.31 1524 14.64 16.63 IS.SG 17.56 1-0 21.23 2'_.I6 24.47 28.(14 31.07 31.76 34.72 100 1.09 1.74 2.20 3.37 4.64 G.35 7.16 R.91 10.91 12.59 20U 1.18 LS7 2.3(i 3.G7 5.15 7.16 S.IS 10.22 12.57 14.51 17.14 17.36 18.78 19.75 23.68 2(a.89 34.1E 37.84 50U 129 2.04 257 4.U9 5.86 5.34 9.69 12.15 IDA9 IZ41 20.69 E0.A7 F2 2-0 41 22.99 E19] 30.30 38. 77 42. 14 1000 1.3R 2.17 2.73 4.42 G.45 9.33 10.99 13.RI I729 1L98 23.53 23.99 24.78 2A6C 30.00 32.99 42.34 45.53 'the upper bxnaJ al the cgnrdence inlenal 3 1nce 99%.1delevel is Ilse v&. vi 5%0l the simulated quanlila values fa a given Ins,encv... 9ma:el than pe. "These intad.. 9equenry eshLee e based on a pallial duralivn series. Afll is Inv Fvvrage Rowname Interval. %ease Iola Iv IJOAA Allns W Ovcmnenl la mere Inlormalion. NOTE Formatting Mevenls esimates nearzem to aPoea as xao. Lower bound of the 90 % confidence interval ILI ecipitalion Fieguene , Estimates (inches) Alit** (pcxrs) min I11 min IS min 311 min fill min I211 min 3 Irr ( hr 12 Ur 24 Iv 3.38 4.11 48 Iv 3.58 4.69 4 day 4.30 5.21 7 dap 5.00 G.U3 7.57 5.81 10.60 12.04 13.5C I5.15 17.4U 19.19 I11 clap 5.55 G.65 8.22 9.48 11.30 12.78 14.34 15.9U f8.16 19. 22 2(1 der 7.37 R.77 10.62 12.15 14.25 15.96 17.73 19.51 21BU 23.A4 3ll dac 9.13 IO.R6 13.03 14.75 17J2 1693 211.30 2263 25.11 27f10 4i dap 11.41 13A9 IG.OS 18.19 21.08 '_3.41 25.75 23.11 iE2G 33.71 611 Aap 13.9$ 16.49 19J1 2L74 24.84 27 2A6H 32.(77 35.I9 3Z54 1� 0.46 0.74 U.92 12G L57 1.93 209 2.53 3.07 295 3.58 2�0.55 O.R7 L10 L52 1.90 2.35 2.55 �5 464 1.02 L29 LS3 2.35 2.93 3.24 3.92 4.G0 5.47 6.72 7.H0 8.97 IU.22 12.UR 13.62 5.71 6.30 7.74 895 1028 11.70 13.75 15.46 G.00 7.II 5.76 I(1.18 ILJI 13.33 15.72 17.72 6.G0 7.74 9.39 I(1.7G 12.20 1373 16.17 16.20 I11 25 U.71 O.AO 1.14 I27 IA4 L61 2.08 2.35 2.71 3.16 3.49 4.21 3.52 4(+6 5.34 G.09 G.8'1 S.(14 8.99 4.G5 iG7 G.53 7A5 8.45 9.H9 Llfl SU 100 O.RG 0.93 1.36 1.45 1.74 1.87 ?G2 2.86 3.5(a 7.94 4.79 5.40 2110 5U11 IUIIO U.99 1.07 1.13 LSS 1.70 1.79 199 2.13 2.24 3.10 3.4(I 3.G3 4.34 4.86 5.3f1 6.114 6.95 Zli9 In, I.- bwnd p1 in. conhdenav linterval at 9g%senhdence level -s the value vmisn 5%el the simulated quanlile values 1a a 9nen neill are lass he. A --I I Precipitation Frequency Data Server "TbrioP,rao,labon11e4.mty esiraaeos are bate. on a1male,ro nI es ARI., Irn aver aae R111"ame Imes val. Plea s=reler 1. IIOAA allas14U.i nenl lonnor a b11..me.n.IIOTE'. Fwmalbng Illn,10s inannat,, -an or. to appear as tram. ,'.,:Tezl.versioniof sables ' ear -tsar Juratlen I.aSaj Point F'r e, i I. i La t i un FI-e9uenoy E-Ir,at -- - ._1_ a 34. 55 11 77.4 It 45 I' 4L 4.1 34 30 as G 'tJ 22 Is la. 14 LL 2 t0 2 6 1 1 i r I I _ - - I tY l b Y I I - -'-( 11 a- -mot ` 7 .. _ 1 2 5 10 o f E0 100 200 5013 1000 w/er o,e 5enurr=nee Literval 6�ears) Toe Jen to 1S 38: 35 2010 Lust Yen _ In I.. _�. 42-hr — 3G-!Rry — Irj-rlrlll 4-ad — --' -da0 — 60-tleU �' c-elin -- 12-Iv 5y' 1P-A n0-miry 24-1,r �- 2f1-tlaz, -tom Per•tial duration based Point Preol Ri tation Ft,e!lusnoy Estirratas - Versicm: _ 34.5E Il )7.4 II 49 It 42 14 30 - an 2S �_ 26 N 24 22 2fi 1: 16 14 12 10 0 4 J Lon f0 v. D., tr." - on r, i It. Ara Jar. 19 15: 30:'35 2A 10 w Hueragye F,ettrrrmce Interval (u+ars 19 pA "c5 IAf1r1 -� Maps - Page 2 of 3 Precipitation Frequency Data Server Page 3 of 3 I Jfi-41 iIo-L1 I(a-DI 96 it 20"bl ?rrul These maps wee aoOucad oem9 a auect map rammll Lan The U.S census B,Illa 1,11pell and C.ft glph" PI ..... .... Id,,,A luvd,�,,,,e LEGEND — State — Connector ---- County F3e31 Stream L.=_)Intl iall Resv «T Military Area P '! LaK e l P and f Oc ear) „ z Rational Park — Street t4 Other Park Expressway [_j City Highway o < C9unty r, e ®i Scale 1:ZZ8583 ,1 taveraFF--Gue seal, tleneniT: un monitor-recol ution Other Maps/Photographs - Vie\\US CS di - it iI orti uphoto quad,:InnLc,_LDQ_Q] covering Ih is location It onl Tel I aServel'; USGS Aerinl Phol up apL nmy also he available I rom Ili is site. A DOQ is a computer -emerald image of an nerial photoernpbill which image displacement caused by Terrain I'cIieI ind came", ti la has been emoved. IT combines the image characteristics ofn phologrnph with Ibe geometric qua Ii ties ol'a neap. visit the USGS for more information. Watershed/Stream Flow Information - Find the Watershed for 11111 location using the U.S. Envirri nienoil Protection Agency's site. Climate Data Sources - Preaipiluli un /i'cv....... I'uslllLv t,, I, based all [lulu /I'ulu a ..... wit, l/ d,, a e,, but NCDC. rho hl//On'me link, 111'ut'id, 9,11,1'r11 ",fill 111,16,111 ah altl Obdel'I' mg .r Bed' in lll, aP"'. l'ag[udlcss of if then'flab. u'a.x... ,.I in rhie .Vu A. Far d wiled hfifir lllbliuu obulll file 'la i..1, wed in lllis sl... A. plea.,, I slur la LOA, I A, , 14 Dacnnl n Using Ilse Nntipo.l CI' rit'c Dail CC tel's (NCDQ sin Tlon semcb Cllglli C. locale ollier climate stations within: r OR . .Digital ASCII Gu1 C17C. I lnh'umawnl uin;;in'l ❑—l", .abatis, Conmr II OCINMAIN.I alml \\'- h,l' So Sih-or Spdng. All) 219111 001)71}-I4M19 Onclunu!l I iP.5—r iueell�)a�L' L-IJS A--1.4 Marine Mart Convenience Store Camp Lejeune, North Carolina Pond Volume Calculations Drainage Area A Required Volume: 5340 ft3 Elevation Area (ft) Volume (ft) 35.8 5272 0 36.8 6617 5944.5 Volume of Riprap in Forebay (triangular area): 221'*3'*.5'*0.5 166 ft3 Volume Provided in Pond = 5779 ft3 Drainage Area B Required Volume: 9010 ft3 Elevation Area (ftZ) Volume (ft3) 35.8 8779 0 36.8 9613 9196 Volume of Riprap in Forebay (triangular area): 89'*3'*.5'*0.5 67 ft3 Volume Provided in Pond = 9129 ft3 Frucon ais Engineering DEPT ISSUE PAGE OF DATE: I BY PROJ TITLE/PROJ # % ari&Q,A1,9..d /4fCOr,rfkovSz_-3clV rteZcieu CLIENT C wYC,, j, / OKtra�? S CHK'D 7 K.""" APRV'D REV DATE:t.: Chapter 3 Sheet flow Time of Concentration and Travel Time Technical Release 55 Urban Hydrology for Small watersheds Sheet flow is flow over plane surfaces. It usually occurs in the headwater of streams. With sheet. flow, the friction value (Mamung's n) is an effective rough- ness coefficient that includes the effect of raindrop impact; drag over the plane surface; obstacles such as litter, crop ridges, and rocks; and erosion and trans- portation of sediment. These n values are for very shallow flow depths of about 0.1 foot or so. Table 3-1 gives Manning's n values for sheet flow for various surface conditions. Table 3-1 Roughness coefficients (Manning's n) for ® sheet flow Surface description n v Smooth surfaces (concrete, asphalt, gravel, or bare soil) .......................................... 0.011 Fallow (no residue) .................................................. 0.05 Cultivated soils: Residue cover 520%......................................... 0.06 Residue cover >200/a......................................... 0.17 Grass: Short grass prairie ............................................ 0.15 Dense grasses ?� ................................................ 0.24 Bermudagrass.................................................. 0.41 Range (natural)......................................................... 0.13 Woods:1 Light underbrush .............................................. 0.40 Dense underbrush ............................................ 0.80 I The n values are a composite of information compiled by Engman (1986). x Includes species such as weeping lovegrass, bluegrass, buffalo grass, blue grama grass, and native grass mixtures. a When selecting n , consider cover to a height of about 0.1 ft. This is the only part of the plant cover that will obstruct sheet flow. For sheet flow of less than 300 feet, use Mantning's kinematic solution (Overtop and Meadows 1976) to compute T,: 0.007(n0o s Tt — `PzJ/ \o.5S0A [eq. 3-31 l where: Tt = travel time (hr), n = Mamung's roughness coefficient (table 3-1) L = flow length (ft) P, = 2-year, 24-hour rainfall (in) s = slope of hydraulic grade line (land slope, ft/ft) This simplified form of the Manning's kinematic solu- tion is based on the following: (1) shallow steady uniform flow, (2) constant intensity of rainfall excess (that part of a rain available for runoff), (3) rainfall duration of 24 hours, and (4) minor effect of infiltra- tion on travel time. Rainfall depth can be obtained from appendix B. Shallow concentrated flow After a maximum of 300 feet, sheet flow usually be- comes shallow concentrated flow. The average veloc- ity for this flow can be determined from figure 3-1, in which average velocity is a function of watercourse slope and type of channel. For slopes less than 0.005 ft/ft, use equations given in appendix F for figure 3-1. Tillage can affect the direction of shallow concen- trated flow. Flow may not always be directly down the watershed slope if tillage runs across the slope. After determining average velocity in figure 3-1, use equation 3-1 to estimate travel time for the shallow concentrated flow segment. Open channels Open channels are assumed to begin where surveyed cross section information has been obtained, where channels are visible on aerial photographs, or where blue lines (indicating streams) appear on United States Geological Survey (USGS) quadrangle sheets. Manning's equation or water surface profile informa- tion can be used to estimate average flow velocity. Average flow velocity is usually determined for bank - full elevation. (210-1T-TR-55, Second Ed., June 1986) A-1.7 3-3 Figure B-3 2-year, 24-hr rainfall Figure B-4 5-year, 24-hour rainfall (210-VI-TR-55, Second Ed., June 1986) A -I �; Drawdown Time - 1-Year, 24-Hour Storm Infiltration Basin A /(2*K*T) A = 5944.5 Effective Infiltrating Area (ft) V = 5340 Volume of Water Requiring Infiltration (ft3) K = 6.2 Hydraulic Conductivity of Soil (in/hr) T = Dewatering Time (Days) T = 0.07 Days 1.74 Hours Drawdown Time - 1-Year, 24-Hour Storm Infiltration Basin B A=V/(2*K*T) ere A = 8779 Effective Infiltrating Area (ft2) V = 9010 Volume of Water Requiring Infiltration (ft) K = 10 Hydraulic Conductivity of Soil (in/hr) T = Dewatering Time (Days) T = 0.05 Days 1.23 Hours Marine Mart Convenience Store Camp Lejeune, North Carolina Pending Volume- Area A Calculate the required stormwater ponding volume: Use method from Chapter 3 of NCDENR Stormwater BMP Manual Required to infiltrate the 10-year, 24-hour storm volume = 6.91 in. per NOAA Point Precipitation Frequency Estimates for Sneads Ferry, NC. Compare rainfall volume from first 1.5" with post- predevelopment quantity. Area A Pre -development Rv= 0.05+0.9'la 0 acre impervious area 0.75 acre entire area 0 R 0.05 Vpre=3630' Rd * Rsp,,*A Rd 6.91 in. A 0.75 acre V 946.18 ft' Post -development Rv= 0.05+0.9'la Where 1,=impervious area/entire area sq ft acre Impervious area 19347 0.44 acre entire area 32863 0.75 acre la 0.59 Rs, 0.58 Vpoz=3630'Rd*R.pon'A Rd 6.91 in. A 0.754 acre V 10972.76 ft3 Vpoa.me 3630*Rd*(R.posrRvp,e)*A Rd 6.91 in. A 0,75 acre V 10026.58 ft' A-.)o Marine Mart Convenience Store Camp Lejeune, North Carolina Pending Volume - Area B Calculate the required stormwater pending volume: Use method from Chapter 3 of NCDENR Stormwater BMP Manual Required to retain/infiltrate the 1-year, 24-hour storm volume = 6.91 in. per NOAA Point Precipitation Frequency Estimates for Sneads Ferry, NC. Compare rainfall volume from first 1.5" with post- predevelopment quantity. Area B Pre -development R,= 0.05+0.9'I, 0 acre impervious area 1.189 acre entire area 0 R 0.05 Vpfe 3630-Ra'R„p,e'A Ra 6.91 in. A 1.189 acre V 1490,65975 ft3 Post -development R,= 0.05+0.9"I, Where la impervious area/entire area impervious area 0.75 acre entire area 1.189 acre I, 0.63 R 0.62 Vppa=3630'Re'R,,,n A Re 6.91 in. A 1.189 acre V 18408.41 ft3 Vp.r-we 3630'Re*(R,"'-R,j*A Rc 6.91 in. A 1.189 acre V 16917.75 ft' A )l Drawdown Time - 10-Year, 24-Hour Storm Infiltration Basin A A=V/(2*K*T) where A = 5944.5 Effective Infiltrating Area (ft) V = 10027 Volume of Water Requiring Infiltration (ft3) K = 6.2 Hydraulic Conductivity of Soil (in/hr) T = Dewatering Time (Days) T = 0.14 Days 3.26 Hours Drawdown Time - 10-Year, 24-Hour Storm Infiltration Basin B A = 8779 Effective Infiltrating Area (ft2) V = 16918 Volume of Water Requiring Infiltration (ft) K = 10 Hydraulic Conductivity of Soil (in/hr) T= Dewatering Time (Days) T = 0.10 Days 2.31 Hours Marine Mart Convenience Store Camp Lejeune, North Carolina Level Spreader Calculations - Area A Bioretention facilities are designed to capture and infiltrate the 1-year 24-hour storm. Discharge from the rain gardens shall be via a level spreader and filter strip, which shall be designed to carry the flow from a 10-year storm. Peak flow calculation, use Rational Method Area A Q=C*1*A Atntai 0.79 acre Calculate composite C C 0.636548 Since site is small, assume T 5 min 110yr 5min 9.18 in/hr (see attached chart for Sneads Ferry, NC) Q10yr 4.63 cfs Calculate level spreader/fiilter strip length (perpendicular to flow) Use method described in NCDENR BMP Manual Chapter 8 or Section 13.3.4 -for Vegetation characterized as grass or thick ground cover: 13ft of length on slopes 0-8% per 1 cfs of flow Bioretention Area A: L=13ft*4.63cfs L 60.2163� Calculate flow velocity over level spreader onto filter strip: Weir equation: Q=C x L x H"5 C= 3.33 Q= 4.63 L= 60 ft." H= 0.08 ft� V=Q/(HxL) V 0.96 ft/s A -� Marine Mart Convenience Store Camp Lejeune, North Carolina Level Spreader Calculations - Area B Bioretention facilities are designed to capture and infiltrate the 1-year 24-hour storm. Discharge from the rain gardens shall be via a level spreader and filter strip, which shall be designed to carry the flow from a 10-year storm. Area B Q=C*I*A Atotal 1.19 acre Calculate composite C C 0.645467- Since site is small, assume T,=5 min hoyrsmm 9.18 in/hr (see attached chart for Sneads Ferry, NC) Qi%r (7.04 cfs.) 1 Calculate level spreader/fiilter strip length (perpendicular to flow) Use method described in NCDENR BMP Manual Chapter 8 or Section 13.3.4 -for Vegetation characterized as grass or thick ground cover: 13ft of length on slopes 0-8% per 1 cfs of flow Biorete�,���.t^'iGGo�n Area B: L=13ft*7�L sf' `Y-„_._ JpiV(� 51111 ID L—91:55537 I o S Calculate flow velocity over level spreader onto filter strip: Weir equations Q=C x L x His C= 3.33" Q= 7.04"s ii " L=-91:55537 ft Mi R SI H= 0:08-ft- C?,C)SjIJ'paLlt ��n�i, V=Q/(HxL) a to V —0-.96—It9 A- 34I il.Lel IAnD�� '�ailA�,L- 1b'y�t JiD'n� _ 1fm� loB'x.32' 3H5oPZ. = 0,0Ba�re C= o,9s CrbD+) C),95-x9,i�40' S d 0 cc-s Wpe sprecwLe{ =13;TI I ss 0� how Arm. I - CCU Y, D•-7 e;Cs q. I � I I o IS-�, no, IMLunl ltvd SPA k,t# u�,L a —,Vnc;c,rU,(a� � tl p. b.arbf is �}L �� spy-surrou„���, ow� p e (,d,,, . � �bCZ61 ,A -Zs 44. afr k Oi b(-VLJ iso,, �� / _ z mr,y-vlo,,s ofw . 105x 32' Arc,, OT 31.g�f�> NCDENR Stormwater BMI' Manual Revised 09-28-07 is required for all filter strips unless it can be proven that the inflow will be evenly distributed sheet flow without the use of a level spreader. 13.3.4. Length and Width for Pollutant Removal Credit The top edge of the filter strip should follow an elevation contour. if a section of the top edge of the strip dips below the contour, runoff eventually may form a channel at the low spot. Under some site topography and grading circumstances, runoff may travel along the top of the filter strip rather than through it. Berms may be placed at intervals perpendicular to the top edge of the strip to prevent runoff from bypassing any portion of the filter strip. The length (perpendicular to flow) of a filter strip is based on the same criteria as the length of a level spreader presented in Chapter 8 Level Spreaders. The length of the filter strip must be between a minimum of 13 feet and a maximum of 130 feet. The length must be calculated as follows. — For vegetation characterized as grass or thick ground cover: 13 feet of length per 1 cfs of flow on slopes 0-8%. — For vegetation characterized as forested: 65 feet of length per 1 cfs of flow for slopes from 0-6%. — If the forest vegetation is 100-150 feet in width, then the length can be reduced to 50 feet of filter strip per 1 cfs of flow. — If the forest vegetation is more than 150 feet in width, then the length can be reduced to 40 feet of filter strip per 1 cfs of flow. Forested filter strips must be significantly wider than those with grass or thick ground cover, due to the forest's greater susceptibility to erosion. If the filter strip has discrete sections with grass or thick ground cover in one part and forest vegetation in another, then the length should be determined by calculating the weighted average of the lengths required for each vegetation type. For example, if a filter strip that has 20 feet of the width maintained as grass and 30 feet of the width is existing forested vegetation, the appropriate filter strip length will be: (20/50) x (13 ft/lcfs) + (30/50) x (65 ft/1 cfs) = 44.2 or 44 feet per cfs of flow The width (parallel to flow) of a filter strip shall in all cases be a minimum of 50 feet. 13.3.5. Length and Width for Compliance with the State Stormwater Program In most circumstances under the State Stormwater Management Program rules at NCAC 15A 2I-I .1000, a filter strip is a required additional component of a control system based on another BMP. For example, the discharge of a wet detention basin must flow through a companion vegetated filter strip for ponds designed to treat 85% TSS. Ponds designed to treat 90% do not require a level spreader/filter strip. No specific numerical value of pollutant removal is assigned for the filter strip alone, but the filter strip must Filtcr Strip 13-5 d— 1�1,,9 July 2007 la fl IIR-4arf C1hK,;1rhu,.�Or� STORM DRAINAGE ewLi N104 TABLE 1106.2 SIZE OF VERTICAL CONDUCTORS AND LEADERS HORIZONTALLY PROJECTED ROOF AREA (square feel) DIAMETER OF OF Rainfall rate (inches per hour) LEADER (inches)' 1 2 3 4 6 6 7 8 9 10 11 12 2 2.8SO 1,440 900 720 575 1 480 410 360 320 290 260 240 3 8,800 1,,01 2,930 2.200 1.700 1,470 I260 1,1(10 980 980 800 730 4 18.400 U00 6,130 4.600 3690 3,070 2,630 2300 2,045 1.840 1,675 1,530 5 34.600 17,300 11,530 8.650 6,910 5.705 4945 4,325 3.845 3,460 3.145 '_,850 6 54,000 27,000 1 17,995 13.500 10.800 9.0(K) 7,715 6.750 5,000 5,400 4.910 4,500 8 I )6.001) 58.000 1 38.660 1 29.000 21200 ),315 16-570 14.500 12,890 1 11.600 10.545 1 9,600 ks P oaided/s y Fur Sl: finch ='_i.4 nun.lsyuarc lout =(L(19^_9n1' /�o-. i2: 5 bhwp'linnn ✓Cnc�Of. a. Sizeslndiruedare hedi:mutlernlc cAfar pipin@. This mblc i9 applicable to plpm¢nlulhersh:1pesprovidedtheCn,o-tinLShape I'ull)' encluxeS n Miele of the dimnctcr indirucd in This wl lc. TABLE 1106.3 Cabs, ,/ha5 OjYS(p 5Y fa% 0.rCcS ((f{Irl3ir SIZE OF HORIZONTAL STORM DRAINGE PIPING P) SIZE OF HORIZONTALLY PROJECTED ROOF AREA (square feet) HORIZONTAL Rainfall rate (inches per hour) PIPING (inches) 1 2 1 3 4 irtXS 5 6 1/sunit vertical in 12 units horizomal (1-percent slope) 3 3,285 1,644 1,096 S2'_ Z `L 657 548 4 7.520 3,760 2.506 1.800 1.504 I _53 5 13,360 6.680 4.453 9 3.340 {Dd�iP 2.672 2.227 .�6 21,400 10,70O 7,133 5.350 ",3h{5 4,280 v'}{S 3,506 8 46,000 23.000 15.330 11.500 9.200 7,600 10 S2.800 41.400 27,600 20.700 16580 13.800 12 133.200 66.000 44,400 33.300 26,650 22.200 15 218,000 109,000 72.800 59.500 47,000 39,650 11,, unit vertical in 12 units hot izonlal (2-percent slope) 3 4.640 2,320 1,546 1,160 928 773 4 10.600 5,300 3.533 2,650 2,120 1.760 5 I S.S80 9.440 6,293 4,720 3,776 3,140 6 30.200 15.100 10.066 7,550 6,040 5.033 8 65200 32,000 21,733 16,300 13.040 10,666 10 116.800 58,400 35.950 29,200 23351 19450 12 1SSM00 94,000 62.600 47.000 37.600 31?50 15 310.000 168,000 111.000 84,000 67250 50,000 1/. unif vcilietd in 12 units hni ivonial (4-percent slope) 3 6.576 3,288 '295 1,044 1,310 1,096 4 15.040 7.520 5.010 3.760 1010 2.500 5 26,720 13300 8,900 6,630 5,320 4,450 6 42,800 21.400 13.700 10,700 8.580 7,140 8 92.000 46 000 30.650 23,000 13.400 15,320 10 171.600 85.800 55200 41,400 33.150 '_7,600 12 266,400 133.200 88,800 66.6111 5(2 44400 15 476.000 235.000 15S.WO 119A00 953(I(l 79251 PntSI: Iinch = 'SA mnh.I ,lch,lint=(L0929m2. °, U59- (fl 0 pip a� 4,140%)516fx_ 88 A-)--) 2006 INTERNATIONAL PLUMBING CODE' STORM DRAINAGE FIGURE 1106.1 100-YEAR, 1-HOUR RAINFALL (INCHES) EASTERN UNITED STATES Par SI: I inch = 25.4 nun. Sum'cc: Nnli nal Wemhcr Sv,, ec. National Oucunic and Almaspher lc Admiliil"Minn- Nkl,ehlugmn D.C. 2006 INTERNATIONAL PLUMBING CODE® �._�� 83 Friction Method Manning Formula Solve For Full Flow Capacity Input Data Roughness Coefficient 0.012 Channel Slope 1,00000 % Normal Depth 0.50 ft Diameter 0.50 ft Discharge 0.61 W/s Discharge —j 0.61 ft'/s Normal Depth 0.50 ft Flow Area 0.20 ft' Welted Perimeter 1.57 ft Hydraulic Radius 0.13 ft Top Width 0.00 ft Critical Depth 0.40 ft Percent Full 100.0 % Critical Slope 0.01066 ft/ft Velocity --? 3.10 fus Velocity Head 0.15 ft Specific Energy 0.65 ft Froude Number 0.00 Maximum Discharge 0.65 ft-/s Discharge Full 0.61 ftY/s Slope Full 0.01000 ft/ft Flow Type SubChtical GVF lnput'Data `r" , z n : t9a, fk ' p " a ua, t :.x E Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 Upstream Depth 0.00 It Profile Description Profile Headloss 0.00 ft Average End Depth Over Rise 0.00 % Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMasler [08.11.00.03] 4130/2010 2:13:00 PM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-7554666 Page 1 of 2 A-21 6" D.I.P. Normal Depth Over Rise 100.00 % Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.50 ft Critical Depth 0.40 ft Channel Slope 1.00000 % 0.01066 ft/ft Critical Slope Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.031 4/3012010 2:13:00 PM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 a 0.3 �n k 0 O H b m 0.1 00 W p m oS m o Ho m � c v lwe n HORIZONTAL d50 = 0.15 D(F)3 1/2 Do DEEP SCOUR HOLE 50 = 0.09 Do(F)3 1 DO DEEP SCOUR HOLE d50 = 0.055 Do (F)3 1 5 - F=V/ SD .04\ wa�6' L� DEFINITION OF TERMS! F = FROUDE NUMBER (RIP RAP HOLE) D = DEPTH OF FLOW d50 = DIAMETER OF STONE (50%.SIZE) Do = DIAMETER OF OUTLET j V = AVERAGE VELOCITY AT OUTLET L^ D 3 1 ON 3 A 1 A (( o Wo ON N 3 DO 1 ON 3 J n PJ 1 ON 3 t F PLAN Do 3 yVARIES (0-1.30 Do) `= 1 f m 3 SECTION A -A 0 PERFORMED SCOUR HOLE `� S O%a• SernlGrcti �/' toret�yy EM 1110-3-136 9 Apr 84 .7 5 C' J 01 L C.S. -krmc Corps of Engineers DISSIPATon CHAf'`k—E —S .der. _.35 l:,, Fc: D a'JEPiL _ (IF J:: C>,5 D A 31 15,,--0, zs ,:; m BILFINGER BERGER Industrial Services June 21. 2010 Mary Jean Naugle NC DENR 127 Cardinal Drive Extension Wilmington, NC 28405 Frucon sls Engineering Phone: 636 391 4300 Fax: 636 391 4497 RE: Marine Mart Convenience Store at Courthouse Bay, Onslow County Stormwater Project No. SW8 100406 Responses to Comments Dated June 10, 2010 and June 17, 2010 Dear Ms. Naugle: Please find the enclosed resubmittal for Express Stormwater Permitting of the proposed Marine Mart Convenience Store at Courthouse Bay, Camp Lejeune. This resubmittal is in response to your comments dated June 10, 2010. Itemized below are the comments given along with responses describing how each comment has been addressed. If the road entrance on the southwest corner is not routed to the bmp, or any amount on the east road entrance, then remove that area from the drainage area plan for the BMP area on drawing no. 4. It appears from elevations that the area is sloped off the permit area and away from the BMP. Response: The drainage area has been revised. The Drainage Plan is now signed, sealed, and incorporated into the drawing set as sheet C-105. 2. Please delineate the drainage area routed to the level spreader/filter strip reported on the supplement for B-2 Gas Canopy Drain. The area should be on the drainage area plan #4 as well as details, dimensions, slope, etc... on the detail and layout plan sheets. If this level spreader is on the inlet to BMP B, then label as such on the plans and details. Area B-2 is now delineated on the Drainage Plan, sheet C-105. Area B-2 is the gas island canopy. The semicircular forebay and level spreader from area B-2 only receives drainage from the gas canopy. The plans have been clarified accordingly. FResponse: Please provide calculations that demonstrate the discharge from the BMPs provideeffective 11111, infiltration, including the soil infiltration rate in each area of the vegetated strip A and B. Use the equation in BMP Ch 16. No stormwater discharge is allowed from new sites within SA waters. Response: Comment has been addressed by email message June 17, 2010. Corporate Office 15933 Clayton Road, Suite 305 4019 Woodcock Drive 3520 Thomasville Road 2600 South Shore Blvd. Ballwin, Missouri 63011 Suite 200 Suite 200 Suite 300 www.bisfei.com Jacksonville, Florida 32207 Tallahassee, Florida 32309 League City, Texas 77573 Page 2 of 2 Comments were also received by email on June 17, 2010. These comments have also been addressed as follows. 4. Application IV(8) reports 50% density. When I add the impervious areas and divide by permit area it seems like is should be 40%? (21,000+32,644) / 3.095 acres = 40%. Please verify. Response: The percent impervious was previously miscalculated. The impervious percentage has been revised per this comment and in response to comment 1 from the June 10 letter. Page 3 of the application permit has been resubmitted. 1. Planting plan on supplement page 2. Why did the # of species change from "6" down to " 1" between the submittal on May 17 and June 9 ? At least 3 species are recommended. Please verify and include the # species consistently on the plans and supplements in accordance with the BMP. Response: Per our telephone conversation on June 18, 2010, the Bioretention Areas have been redesigned as 'Infiltration Basins'. The sodded bottom of the previous bioretention areas has been changed to a layer of sand (see sheet C-503). Due to pretreatment requirements for infiltration basins, a forebay has been added to each basin. The forebay area is bordered by a berm, and encompasses approximately 20% of each basin, in accordance with Chapter 5 of the BMP Manual. The drawdown time for the Infiltration Basins has been calculated per Chapter 16 of the BMP Manual for the anticipated 1-year and 10-year storm events. These calculations have been included in the calculation package beginning on sheet A-19. The semicircular forebay and level spreader from area B-2 has been left on the plans in order to more evenly distribute the concentrated pipe flow into the larger forebay. The Operation and Maintenance Agreements for the Infiltration Basins is being sent separately from David Towler at the Camp Lejeune DPW. If you have any further questions or comments, feel free to contact me at 636-391-4585 or by email at Mickie.Redhage(c)bisfei.com . I look forward to receiving your approval soon. Sincerely, Mickie Redhage, P.E. BIS FRUCON ENGINEERING, INC. cc: File David Towler, Camp Lejeune Kelly Snook, Centennial Contractors, Inc. Dennis Collins. BFEI CIVIL STORMWATER CALCULATIONS MARINE MART CONVENIENCE STORE CAMP LEJEUNE, NORTH CAROLINA BFEI Project No. 805322.18 Frucon ais Engineering PREPARED BY BIS Frucon Engineering, Inc. 15933 Clayton Road Ballwin, MO 63011 April 30, 2010 Revised May 11, 2016 Revised June 8, 2010 Revised June 21, 2010 ,,,,,11I,,,/ CAR 0P�HEF sip���'Y% 2.QQo1y�.9 " SEAL _ JUN 2 2 2010 BYSLLDe l any o(o r Civil Site Work Calculations Marine Mart Convenience Store BFEI Project No. 805322.18 MARINE MART CONVENIENCE STORE CAMP LEJEUNE NORTH CAROLINA STORMWATER NARRATIVE 1. GENERAL INFORMATION A new Marine Mart convenience store with fuel pumps, a single -bay self - serve car wash, and car vacuum station is proposed on a 3.1 acre tract of land at the southeast corner of the intersection of North Carolina Highway 172 and Horn Road in Onslow County, North Carolina. The site is located within the Courthouse Bay section of US Marine Corps Base Camp Lejeune. The site is bounded on the south by a tank trail and on the east by Munro Road and will be accessed by two entrance drives from Horn Road on the west and North Carolina Highway 172 on the north. The proposed facility will occupy the western 2.4 acres of the site. No evidence of wetlands has been encountered onsite. Water supply and sanitary wastewater treatment for the proposed facility will be provided by Camp Lejeune. See Figure 1 below for a location map. 2. STORMWATER INFORMATION The site is located within the White Oak River Basin, and drains into Courthouse Bay (Stream Index Number 19-36), which is classified as SA;HQW. The stormwater design is high density commercial for State Stormwater permitting. The existing site is undeveloped. Following construction, approximately 50% of the disturbed area of the project site will be impervious -surfaced. 2.1. Existing Drainage Pattern The site's existing drainage pattern is generally towards the west. The flow overland drains partially into a drainage swale along State Highway 172 and partially into a drainage swale running along the edge of the tank trail. The stormwater draining towards Highway 172 continues to the west into Courthouse Bay while the drainage flowing toward the tank trail drains southward along Horn Road. The drainage from the site ultimately flows to Courthouse Bay, which is classified as SA;HQW according to the North .Carolina Department of Environment and Natural Resources (DENR). Drairiage from offsite drains into the existing drainage swales at the site JUN 2 2 2010 1 Civil Site Work Calculations Marine Mart Convenience Store BFEI Project No. 805322.18 perimeter and does not cross the site. There are no buffer requirements for the site, and coastal management is not a concern. An on -site evaluation of the site soils in each bioretention area has been conducted by ECS Carolinas, LLP. One hand auger boring was performed in the location of bioretention area A on December 23, 2009; the findings of this test can be found in the Report of Subsurface Exploration and Geotechnical Engineering Analysis dated January 13, 2010. A second such boring was performed on area B on March 16, 2010, and the results of the boring can be found in an addendum to the geotechnical report dated March 17, 2010. Based on these evaluations, the seasonal high water level is at elevation 31.80, and the soil infiltration rate in bioretention area A was determined to be 6.2 inches/hour, and the infiltration rate in area B was found to be 10.8 inches per hour. Soils onsite are generally intermittent layers of very loose to medium dense silty and clean sands. 2.2. Proposed Drainage Pattern It is proposed that drainage from the Marine Mart site follow existing drainage patterns, draining overland into two bioretention areas. See Figure 2, below for a drainage area map showing the overall drainage areas. The drainage areas are broken out into pervious and impervious areas on sheet A-1. The western drainage area, area A, will drain into a bioretention area at the northwestern corner of the site. Bioretention area A will drain via a level - spreader and filter strip to a ditch along Horn Road that flows towards the existing inlet at the intersection of Highway 172 and Horn Road. The eastern drainage area, area B, will drain overland into a bioretention area at the eastern edge of the site. Bioretention area B will drain over a level - spreader and filter strip into the existing Swale running westward along the edge of the tank trail. The bioretention areas have been designed to retain and infiltrate water from the 1-year, 24-hour storm. The required ponding volume calculations are attached starting on sheet A-7. The actual volume provided is calculated on sheet A-14 Water in excess of the 1-year, 24-hour storm will flow over the level spreader and filter strip to the downstream existing swales as previously described. The length of the level spreader was designed to discharge the 10-year storm. The level spreader calculations are attached starting on page A-15. F _:ffCT,nVED L 2 2 2010 2 ----- Civil Site Work Calculations Marine Mart Convenience Store BFEI Project No. 805322.18 2.3. Fuel Canopy Downspouts Stormwater from the canopy roof will drain through the downspouts provided by the canopy vendor to underground pipes, discharging into the eastern bioretention area, area B. The underground drainage pipe size was calculated using International Building Code 2006 Table 1106.3 and Figure 1106.1. These calculations are included on pages A-18 and A-19. A 6 inch diameter pipe at 1 % slope is required to drain the fuel canopy. 2.4. Soil Erosion and Sediment Control JUN 2 2 WO Lf L- The existing site is relatively flat, with slopes of approximately 1.5% across the site. Soils onsite are generally loose to medium dense silty and clean sands. Erosion and sediment control during construction is to be provided by silt fence surrounding the disturbed areas on all downslope sides. Sod will be used to stabilize the ditch areas immediately following grading in those areas. Gravel check dams will be installed in the ditches to capture sediment escaping from upstream. M Civil Site Work Calculations Marine Mart Convenience Store BFEI Project No. 805322.18 Marine Mart Convenience Store Camp Lejeune, North Carolina Site Location Map With'/2 Mile Radius JUN222010 BY:� 11 Civil Site Work Calculations Marine Mart Convenience Store BFEI Project No. 805322.18 APPENDIX A Stormwater Calculations Index of Calculations A-1 Drainage Area Calculations A-3 Peak Runoff Calculations — 1-Year Storm A-4 Point Precipitation Frequency Estimates (in/hr) A-7 Pond Volume Requirements A-12 Point Precipitation Frequency Estimates (in) A-15 Pond Volume Calculations A-16 Overland Flow Velocity A-19 Drawdown Time 1-Year, 24-Hour Storm A-20 Stormwater Volume Increase — 10-Year, 24-Hour Storm A-22 Drawdown Time — 10-Year, 24-Hour Storm A-23 Level Spreader Calculations A-25 Fuel Canopy Drainage — 10-Year Storm CZAVIl D' JUN 2 2 2010 V Marine Mart Convenience Store Camp Lejeune, North Carolina Area Calculations Total Area A Area B sf acre sf acre sf acre Total Site Area: 157688 3.62 Disturbed Area 107134 2.46 Total Drainage Area: 84637 1.94 32863 0.75 51774 1.19 Impervious Area: 51991 1.19 19347 0.44 32644 0.75 Building Area: 9258 0.21 0 0.00 9258 0.21 Sidewalk Area: 2702 0.06 649 0.01 2053 0.05 Pavement Area: 40031 0.92 18698 0.43 21333 0.49 Project Percent Impervious Area: 49% Calculate Compsite'C'-Cvalats+o,6n�6f A/C �£A)R S4or^tW-4r-B1"iP4aua1Sedivyi3-. &,'-pat Clawn, sandy, 2%-7%slopes 0.15 Cpvmt 0.95 Croof 0.9 Ccomposite (Aroof Croof+Apvmt Cpvmt+Agrass Clawn Atotal Ccomposite JUN 2 2 2010 IF3X:---- Area A 0.62 Area B 0.65 A-1 NCDENR Storni",ater 13MP Manual _ Chapter Revised 06-16-09 3.2. Peak Flow Calculations Some of the state's stormwater programs require providing attenuation of peak runoff; for example, that the post -development flow rate for the one-year, 24-hour storm may not exceed the pre -development flow rate (Neuse and Tar -Pamlico NSW Programs). In addition, it is also important to compute flow rates from the watershed when designing BMPs such as grassed swales, filter strips, and restored riparian buffers. The primary method that is used to determine peak runoff rate for North Carolina's stormwater programs is the Rational Method. The Rational equation is given as: O=C*I*A Where: Q = Estimated design discharge (cfs) C = Composite runoff coefficient (unitless) for the watershed I = Rainfall intensity (in/hr) for the designated design storm in the geographic region of interest A = Watershed area (ac) The composite runoff coefficient reflects the surface characteristics of the contributing watershed. The range of runoff coefficient values varies from 0 - 1.0, with higher values corresponding to greater runoff rate potential. The runoff coefficient is determined by estimating the area of different land uses within each drainage area. Table 3-2 presents values of runoff coefficients for various pervious and impervious surfaces. The Division believes that the Rational Method is most applicable to drainage areas approximately 20 acres or less. Table 3-2 Rational runoff coefficients (ASCE, 1975, Viessman, et al., 1996; and Malcom, 1999) Description of Surface Unimproved Areas Asphalt Concrete Brick Roofs, inclined Roofs, flat Lawns, sandy soil, flat (<2%) Lawns, sandy soil, average (2-7%) Lawns, sandy soil, steep (>7/,) Lawns, heavy soil, Flat (Q%) Lawns, heavy soil, average (2-5%) Lawns, heavy soil, steep (>7%) WC)OdPd areas Rational Runoff Coefficients, C 0.35 0.95 0.95 U5 1.00 0.90 0.10 0.15 0.20 0.15 0.20 0.30 0.15 JUN 2 2 2010 The appropriate value for I, precipitation intensity, in inches per hour, can be obtained from the NOAA web site at: This web site Az C ... AA ilal'inn< s-% IuI\' 2007 Marine Mart Convenience Store Camp Lejeune, North Carolina 1-Year Runoff Calculations Area A jArea B 1-year, 24 hr intensity, in/hr 0.151 0.15 Pre -development 1-yr, 24-hr peak flow, cfs 0.02 0.03 Post -development 1-yr, 24-hr peak flow, cfs 0.071 0.12 Calculated by Rational Method Calculated by Rational Method Rainfall intensities are obtained from NOAA Point Precipitation Frequency Estimates, attached. A-3 JUN 2 2 2010 ;Y: Precipitation Frequency Data Server Page I of 3 POINT PRECIPITATION 5f '4t FREQUENCY ESTIMATES i FROM NOAA ATLAS 14 SNEAUS FERRY, NORTH CAROLINA (31-8037) 34.55 N 77.4 VV 49 feel lions "Pmcipimdon-14egaenoc Adu of the Unired SaudNOAA Atlas W. Fatnnm'_. Vnsion 3 G.Nj. lit infl, (). Mnnin, a. Lin. T'. Pnrnyb.k. NIA'chm. nod n. Rill, NOAA. Nntinnal Weather Bowl,,,Silver Spring. Nhtnlmul.2004 These precipitation frequency esgmztes are based on Canal ARI is the Average Recurrence Interval. Please rotor to NOAA All ,14 UNUMni for more ndomonhon. NOTE: Formatting Tomes estimates near zero to appear as zero. * Upper bound of the 90% confidence interval Precipitation Intensity Estimates (in/hr) A tit"* (Vest's) 5 min 10 min I5 min 3U min 2.92 3.51 4.24 6U min LS2 2.20 2.72 12U min I.10 1.35 1.71 2.02 2.44 2.79 7.17 }.58 4.17 3 hr 0.80 I 0.97 1:24 1.47 1.30 2.08 2.39 2.72 3.23 }.66 ( hr 0 49 0.60 0.77 0.91 1.12 1.29 1.49 L71 2.03 2.}I 12 hr KEEE 0.35 0.4G 0.54 0.G7 0,78 0 91 1.04 1.25 1.43 T4 lu' 0.21 0.2G 0.31 0.39 OA5 0.52 0.60 0.73 0.83 4R hr 0.10 0.12 0.15 0.18 0.2J 0.27 0.31 0.36 0,43 0.50 4 day 0.05 0.07 0.U8 0.10 0.12 0.14 0.16 0.18 0.22 0.25 7 Aay 0.04 0.04 0.05 OA6 0.08 O09 0,10 0.11 0.13 0.15 111 clay 0.03 0.03 0.04 0.05 0.06 0.06 0.07 0.08 0.1(I 0.11 20 dap 0.02 0.02 0.03 0.03 0.04 0.04 0.04 0.05 006 0.06 311 day 0.01 0.02 EK102 O02 0.03 0.03 0.03 0.04 0.04 EE 45 Any 0.0 0.01 0.02 0.02 0.03 0.03 0.03 0.(14 0.04 60 dap 00.01 0.01 0.02 U.02 0.02 0.02 0.02 0.03 0.03 0.0J S� 6.41 7.57 8.84 5.12 6.0G 7.09 426 5.08 5.98 IU 9.88 7.90 6bG 4.82 5.56 6.14 6.74 3.14 3.70 4.16 4.64 5.15 25 11 15 8.88 7.50 50 100 12. 12 13.14 9.65 10.44' 8.15 8.90 200 M 16 I L22 9.44 7.35 5110 15.48 12.24 10.27 8.17 S.RG 1000 1G.57 13.04 10.92 8.84 G.45 4.67 - The upper bound of the confidence interval at W%confidence level m the were which 5%of the sinwlaled qua rile values for a given frequency are greater man. "These precipitation frequency esldnatp5 are based on aRadial dur iOn se'eLARlislhe Average Recmzencelnterval. Please refer to TOM Atlas 14 Occurrent for come information. NOTE: Formatting prevents estimates near zero to appear as zero. ARI' (years) S min I11 min IS min * 311 mia Lowei Precipitation 611 min bound I211 min of 3 In' the Intensity G hr 042 90'Y, 12 lu' 0.24 confidence Estimates T4 hr 0.14 022 O:Z6 0.32 0.37 (143 0.49 0.57 0.G4 (io/hr) 4R hr O.OR 0 0.12 O.IS O.Ifi 0.21 0.24 0.2R 0 73 0.37 interva 4 dny 0.04 O.U7 U.(IR FE]Efl 0.1I 0.13 0.14 U.17 0.19 7 dny (1.03 O 0.05 [L(15 0.07 0.01 0.09 O.IU 0.11 111 Any (1.02 OT A0G55 OA3 0.(14 0.(15 0.05 0.06 0.07 0.08 0 (IS pll (try 0.02 2 0.02 0.03 0.03 0.03 L04 0.04 (1.05 0.05 3f dnr p.(11 002 0.02 0.(12 0.02 U.(13 0.(13 U.03 (1 O3 U.04 45 day (1.01 0.01 0.01 (1.02 0.02 U.O2 0.02 0.03 U.U3 0 03 fill clay 0.010 OAI 0.02 0.02 (1.02 0.(12 0.02 (1.(12 097 �5.53 4.42 3.(8 2.52 1.57 0.9G 0.7U � 0.65 0.7R 0.95 1.09 1.24 1.41 1.65 1.85 0.38 045 (1.5G 1165 0.74 0.R5 L00: L I3 =7.63 G.II S.IG 3.GG 2.35 1.49 1.75 LOS 1.27 L55 1.78 2.03 2.29 10 8.51 G.81 5.74 4.IG 2.7I 25 9.5G 7.62 644 ET3.18 3.56 2.1(I 2 4(1 2.70 3.02 F7,07 10.37 8 26 G.97 5.25 100 2U0 ILI(, 11.94 8.R7 94G 7.47 Z96 5.72 6.19 3.94 4.34 500 I1100 12.8R 13.61 10.18 10.72 854 8.97 6.80 7.26 4.88 5.3(1 3 48 7.85 2.6R 2.99 - The lower bound of the confidence Interval at 90%confidersto level is the value which 5%of the simulated quanthe values 'Of 9 given Irequency are less than. JUN 2 2 2010 ^Y: Precipitation Frequency Data Server Page 2 of 3 These precipitation frequency eshm ales are based on a partialSpldl9pIDTSi111dSefICi ARl is the Average Recurrence Interval. Please refer to NOAA Alta, 14 DOC'melll for more Inlormalmn. NOTE: Formatting prevents eshntates near xem to appeal as iem. Text: verston.oftables ,r• I F'a rti al 1,,a If ian 1, -d F'oi nt I D F Lcnve_ - 'J-rai my S 4 55 11 77.4 11 49 It 10 a u: a 0. 3 - n.c .5 u .05 .03 y .02 .01 a 001 s _ _ _ _ _ _ _ v m �' In v a In m _ _ '• £ - J 's c• <� t t m m m m a a s ' N III O N w lv N 6• — N — Sr �L• C• P N M M N 1� N 0 0 in do Plan Jan 25 11:23:11 2010 Maps - 9o-r a 0e R-currence Internal r VPdr>) - 5-�kiear — Al' IJear — 2500-year �- -wear IOTiO-year � I i �r-w 110-w 1or;^'m go'la NO-W -n^'w These maps were produced using a meet map request from the U_5_.C¢ B M pp1p9294�d1�2ph�s-945�u Tamer Map 5emer. vlodre rmrd rAd,Hrikm.7 'rnoro in/rrrrrrnnon A-S l:r C�g'V�Pc.I� JUN 2 2 2010 'Y: Precipitation Frequency Data Server Page J of J LEGEIID — State — Connector --- ---- Colin ty L1,7, Stream Indian Resv ;_a. Military Area ':Lake/Pond/Ocean tw.v'',+. National Park --- Street n Other Park — Expressway J City — Highway o — Crdunty,n ,a Ini Scale 7: 22(t563 6 - F, ->)G I'In t.t a,Frsse--rrue sc.le cl-otnds on Inenitor `re=o LAM) Other Maps/Photographs- VienU5OS digital ortllo photo quads m�lc D (�] covcl'ing this Iecalion I}om "rcn'uServei; USOS Aeiinl 1'hotugi aph may also be available lionl this site. A DOQ is a computer' -generated image of an aerial photograph ill which image displacement caused by terrain relief and camera tills has been removed. It combines the image characteristics of a photograph with the geometric qualities of a map. Visit the L1SGS for more inl'onnation. Watershed/Stream Plow Information - Pind the WatevshetI for this location using the U.S. Environmental Protection Agency's site. Climate Data Sources - Precipitation equeney results it, based on dnitifrom It "a,riety nfsomaces. ban largeln NCDC. The,r (lowing links provide general inf...mrrlion nbola ob.mn,ing .sires in the ar'ea,'cgrudless ofif their rinto was used in this study. Fer derailed infr)rrrnntior about thestations used in thi.ssruily. please refer to N04.1 Ada s l4 Dn uc n eat. Using the National Chi n_tic Data Center's (NCDC) station search engine, locate other climate stations within: le g y OR... � "�...�+% tag � ree" � of this location (34.55/-77.41. Digital ASCII data can be obtained directly from N D 11vrh'omeaenrntugicntl Design St miles Cnito DOCINOAAINaaionnl WemLer Service 1325 E'W-\Vest Hipinrn. Siker Spring, NID 20910 (301)713-1669 Quaaions'.S up5l: Dsasiuuwonaa+n: Di vi RE, CEIVE!'D JUN 2 2 2010 BY: AM, Marine Mart Convenience Store Camp Lejeune, North Carolina Ponding Volume - Area A Calculate the required stormwater ponding volume: Use method from Chapter 3 of NCDENR Stormwater BMP Manual Required to retain/infiltrate the 1-year, 24-hour storm volume = 3.68 in. per NOAA Point Precipitation Frequency Estimates for Sneads Ferry, NC. Compare rainfall volume from first 1.5" with post- predevelopment quantity. Runoff volume per Manual Section 3.3.1 Simple Method (for first 1.5") Area A R,=0.05+0.9' I, Where 1,=impervious area/entire area sq It acre impervious area 19347 0.44 acre entire area 32863 0.75 acre 1, 0.59 R 0.58 Vas=3630'Rp'Rv'A Ro 1.5 in. A 0.754 Acre Vrs 2381.9313 ft Compare the volume difference for pre and post development, Rd=3.68" Pre -development R, 0.05+0.9'I, 0 acre 0.75 acre 0 R 0.05 V, 3630'Rd'R,,p,,*A Rd 3.68 in. A 0.75 acre V 503.90 ft' impervious area entire area Post -development R,= 0.05+0.9'1, R„ 0.58 (see above) V,.,, 3630'Rd'Rv,,*A Rd 3.68 in. A 0.754 acre V 5943.67 ft' Vpon.p,e 3630'Rd'(R„,,,-Rwrc)'A Rd 3.68 in. A 0.75 acre V 5339.77 It' V 1.47 acre -in JUN 2 2 2010 A-7 Marine Mart Convenience Store Camp Lejeune, North Carolina Ponding Volume -Area B Calculate the required stormwater ponding volume: Use method from Chapter 3 of NCDENR Stormwater BMP Manual Required to retain/infiltrate the 1-year, 24-hour storm volume = 3.68 in. per NOAA Point Precipitation Frequency Estimates for Sneads Ferry, NC. Compare rainfall volume from first 1.5" with post- predevelopment quantity. Runoff volume per Manual Section 3.3.1 Simple Method (for first 1.5") Area B R,=0.05+0.9'I, Where 1,=impervious area/entire area impervious area 0.75 acre entire area 1.189 acre I, 0.63 R„ 0.617459 Vt.s=3630'Ro'Rv'A Rd 1.5 in. A 1.189 Acre Vis 3996.038 fit Compare the volume difference for pre and post development, Rd=3.68" Pre -development R,= 0.05+0.9'1, 0 acre 1.199 acre I, 0 R,, 0.05 Rd 3.68 in. A 1.189 acre V 793.868 ft' impervious area entire area Post -development Rv= 0.05+0.9% R„ 0.617459 (see above) Rd 3.68 in. A 1.189 acre V 9803.612 ft' V,-I ,r. 3630' Rd' (R,-R.ore) *A Rd 3.68 in. A 1.189 acre V 903o ft' V 2.482023 acre -in JUN 2 2 2010 Frucon BIS Engineering I DEPT: I BILE DATE: PAGE BY PROJ TITLE/PROJ # &i r; � /11�CHK'D 3 CLIENT ceejen[14—���� APRV'D REV ac j; LArlo J D J OF I DATE: 6l.?,11, NCDENR Stormwater 6MP Manual Chapter Reviscd 06-16-09 allows the user to select from one of NOAA's numerous data stations throughout the state. Then, the user can ask for precipitation intensity and view a table that displays precipitation intensity estimates for various annual return intervals (ARIs) (1 year through 1000 years) and various storm durations (5 minutes through 60 days). The requirements of the applicable stormwater program will determine the appropriate values for ARI and storm duration. If the design is for a level spreader that is receiving runoff directly from the drainage area, then the value for I should simply be one inch per hour (more information on level spreader design in Chapter 8). 3.3. Runoff Volume Man), stormwater programs have a volume control requirement; that is, capturing the first 1 or 1.5 inches of stormwater and retaining it for 2 to 5 days. There are two primary methods that can be used to determine the volume of runoff from a given design storm: the Simple Method (Schueler, 1987) and the discrete SCS Curve Number Method (NRCS, 1986). Both of these methods are intended for use at the scale of a single drainage area. Stormwater BMPs shall be designed to treat a volume that is at least as large as the volume calculated using the Simple Method. If the SCS Method yields a greater volume, then it can also he used. 3.3.1. Simple Method The Simple Method uses a minimal amount of information such as watershed drainage area, impervious area, and design storm depth to estimate the volume of runoff. The Simple Method was developed by measuring the runoff from man)' watersheds with known impervious areas and curve -fitting a relationship between percent imperviousness and the fraction of rainfall converted to runoff (the runoff coefficient). This relationship is presented below: Rv=0.05+0.9*IA Where: Rv = Runoff coefficient [storm runoff (in)/storm rainfall (in)], unitless IA = Impervious fraction [impervious portion of drainage area (ac)/ drainage area (ac)], unitless. Once the runoff coefficient is determined, the volume of runoff that must be controlled is given by the equation below: V=3630*Ru*P.,,*A Where: V = Volume of runoff that must be controlled for the design storm (It3) Ro = Design storm rainfall depth (in) (Ti/picalli/, 1.0" or 1.5") A = Watershed area (ac) JUN 2 2 2010 y-[ o n.......... ...... AA:.,,o nn�„�.d 'nrl Calnile hinnc 3-3 July 2007 NCDENR SLOI'M"IatelBIAP Manual Chapter Revised 06-16-09 Example Runoff Volume Calculations using The Simple Method: Projects draining to SA or ORW waters in a Coastal County: 'Effective October 1, 2008, the revised Coastal Stormwater Rules (Session Law 2008-231) stipulate new volume control requirements for high density projects draining to shellfishing waters (SA) or Outstanding Resource Waters (ORW) in the Coastal Counties. The designer must compare different scenarios: runoff from first 1.5" of rainfall the pre- /post -development for the 1-year, 24-hour storm.These criteria provide a useful demonstration of runoff volume calculations used in different North Carolina stormwater programs. The following example uses the Simple Method (Schueler, 1987) to estimate runoff volumeun a hypothetical situation: Exawple: What is the appropriate runoff volume for choosing and designing a BMP to control stormwater runoff from a high density development project within one-half mile and draining to SA waters? Description: 4-acre site within a half -mile and draining to SA waters will be developed with a 15,000 sq. foot building (0.34 ac), 0.5 acre of asphalt road, parking, and concrete walkway areas (see Figure 3-1), and 1.86 acres of grassy lawn. The rest of the property (1.3 ac) will remain unimproved. Figure 3-1 Schematic of Property for Example Runoff Volume Calculation The BUA density will be (0.34 + 0.5)/4 = 21.5%. This will be considered a high -density project as it is above the 12% threshold. Because of this, the engineer must determine which runoff volume is gr reater in the following, design conditions. Note that the aea where BMPs �A,ill eventually be installed is assumed to be grass areas in these calculations, d'✓ i q-�� JUN 2 2 2010 Precipitation Frequency Data Server 1-11 POINT PRECIPITATION FREQUENCY ESTIMATES . FROM NOAA ATLAS 14 SN'EADS FE I t 10'. NO WI11 CAI tOLIN'A (31-9037) 34.55 N 77.4 W 49IT, I b nrrr "19ccI Ir14111 Fill, c3 Ala-d the UnueJ tiara" NOAA Alba, Ia, Ynlnao 2, Veninn 1 Ghl. itnnnin, O. N, l.. IL Lin, I. I'alvlx . M RrAe,:md U. Ililel Nl1AA. Nalinnnl I anfia Sal Ice. Sllv[r Sri. in, MarvLaul. 21914 I!nu:¢IcA I or Lin I'I 20It A, Sea`sonahty I�;eLocatiiiri:Maps ,.l�e�Othei„Info �`.,GIS:data:q ,Map's'i Docsl;.. Estimates fine III IS 311 611 12011 III 211 311 J GII A till, nnnn - - 3 la G hr 1=hr 24 1-,4%In' 4 TiNa 7 da5' Ilae dnc cm Anv dal ' These peoiontern Ioannina, attaches are baser, on a wishal der cat sreies. ARI Is Me Avawe Rreoweal Interval. %ease refer to NOAA Alas 14 Oon me I fa more alerawron. NOTE: Famalling faces ostmalet near area to appere as sets. " Upper bound of the 90 % confidence interval Precipitation Frequency EstinTates (inches) Alit'* (years) 5 min III min IS min 30 min fi0 min 1211 ntin 2.2I 2.7(I 3 lu' 2.39 2.92 3.72 4.41 5.39 6.24 7.16 8.18 9.G9 I(1.9J 6 6r 294 3.59 4.59 5.45 6.65 7.75 8.91 10.22 12.15 13-RI 1_ hr 3.52 4.28 5.49 6.5(, 8.09 J.43 IU.91 1257 15.09 1729 24 Lr 4D5 4.93 C,.35 7.55 9.3i 10.89 12.59 14.51 IZ41 19.98 48 Lr 4.75 5.76 . 7.3R R.7S 1U.88 12.74 14.79 17.14 2U.69 Zfl 4 day 5.27 G.33 8.10 9.52 IL57 13.31 15.24 17.3E 20.87 23.99 7 dnr 6.03 7.25 9.11 10.63 12.78 14.64 16.63 18.78 22.04 24.78 III day G.G7 8.UI 9.90 11.4(+ 13.G8 15.56 R56 19.75 2_.99 25.66 211 dap 8.67 10.32 12.54 14.34 IC,.%9 19.00 21.28 23.GR 27.19 30.I)0 30 du)' 10.5( IF541 15.06 17.09 19.85 22.16 24.47 2G.89 30.30 32.99 4� dal 1345 19.02 21.SG 25.15 23.(14 31.07 34.18 38.67 4234 GII don' I(i,09 19.01 32.4I 25.11 2%.82 31.76 34.72 37.94 42.14 4553 1�053 O.fi3 0.85 L01 1.07 I27 1.46 L75 LS2 2.2U �0]4 LI8 1.49 2.12 2.72 3.43 4.04 4.8R 5.59 10 0.52 1.32 L(,7 2.41 i.14 25 SO (1.93 LOI 1,45 LGI L%8 2.04 2,73 3.07 3.70 4.IG IIIII 21111 1.09 LIS L74 LR7 2.20 2.36 3.3E 3.C7 464 5.15 6.35 7.16 =Efl 101111 1.33 LU4 2.17 2.57 2.73 4.0'I 4.42 i868.34 G45 9.33 The uPPsr all of the confidence in1er1ala1%% conManae Inver IS Ire vall w111R1 aKOIme stharaweo aumura v-.v iu. e..ma...... These precildwrion teanency eshimales me based on a partial partial caries. ARI is the Average Rawneroe Interval. Please elm to NOAA Atlas 14 Document fu mere Inlmmatioe. NOTE: FonnAlin9 prevenls esfenztes near zero Is appear as sera. * Lower bound of the gory confidence interval larecipitation Frequency Irslinunes (inches) AHI-v (Will SI nliIT III No, 15 min 30 min 611 min 1211 ulin l hr 6 Lr 12 In 2.95 a]EQ A.60 24 Lr 3.38 5.31 48 II 3.8R 4.69 6.0(1 4 day 4.3U 52I G-60 7 dap 5.00 6.03 7.57 III dry 5.55 6.65 8.22 9.48 1131) Id.78 14.34 IS yll I8.16 19.92 211 trap 7.37 9,77 111.G2 12.15 14.25 15.9G 17.73 19.51 21.9U 23.%4 311 tl:p' 9.13 10- 13.03 I4.75 1212 IS.93 2U.811 2263 25.11 27(111 a dp 1141 1349 16,08 19.19 21AR ff3E 25.75 25.11 31 26 33.71 GII d:q' 13.9R Ifi.49 19.41 21.74 2484 27.29 29,6R 32.117 35.18 3254 =0.46 F 7-41 0.92 1.26 1,57 1.93 2.09 2.55 3.24 1 3 3.07 3.92 =0.55 0.87 I.In 1.52 1.90 2.35 5� 0.64 1.02 L29 LR3 235 L9S III 0.71 1.14 144 2A8 2.71 3.49 3.82 4.GG 5.34 G.09 4.G5 5.67 6.53 7.-05 5.47 6,72 7.80 3.97 111.22 12.118 13.62 GJU 7.74 8.95 IQ28 11.70 13.75 15.46 7.11 R.7G IQ18 11.71 1333 15.72 17.72 7.74 9.39 10,76 12.20 13-7J 16.I7 18.20 8.81 IO.fiO 12,04 1356 15.15 i 7 4U I9.19 25 QRN 1.27 LGI 2.3R 3.IS 4.21 511 0.86 138 1.74 2.62 3.56 4.79 11111 093 1.48 LX7 2.%G 3.94 5<l0 2110 51111 I UIIU 0.99 1.07 LI3 LSS 1.7(1 1.79 L99 2.13 2?4 3.IU 3.411 3.G3 434 4.85 5.311 G.114 fi.95 2.69 G.8Y R.04 8.99 8.45 9.39 IL111 The bwer Island of the confidence Interval 3190%avoidance level Is the vaNerM h 5%.1 In. ..at. Mail vanes ra a goals na-1... I... •••I.. Page 1 01' 3 Ter JUN 2 2 2010 BY A---11) Precipitation Frequency Data Server "These %eo,aWnhequencyesamales are oared waparu90w alimr mh jh ys API Is the Avehe, flemnenm In1aul. %easa relit t. UOA6 Alba I Cusunrenl lamaeW.miho.TOTE Famallrng pardnls esh.et.s near iero to appea as refs. -:Text vOrsloriiof lables -.I Partial (Wuat u.•r'r based Point Pt cipitatiun Frequerroy Ertiurdte--'Jersu•n: 3 34. 55 11 , 7.4 II 49 Tt J2 J9 3d 34 39 28 26 24 u 22 29 18 16 14 12 a 10 4 2 1 c $ U) 25 SO IOG 296 SUO 1009 P VFragF F:ecurrence Lrt erVal (years) Tue Jan 19 15136:35 2910 o ati r5-erin •.. 46-nr -.- 36-clay — 15 Cl- mllr -� 9'-Yir 4-day -+- - 39- + -ti- I 2-h, I 1C-da op-mir -. -.- 24-hrhrau � Partial donation bared Point Preoipitatinn Frequency Estimate- - Versic, 3 34.55 H 77.4 U 49 1't 42 40 3e 36 34 c 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 t = Z L I I I Pl < � T• Tue Jan 19 M r,8135 2010 everra9F PFornrFnoe Irrterwal 1 - 1nP — r- 25 1UUrr -o- Maps - Page 2 of 3 r� JUN 2 2 2010 13Y: Precipitation Frequency Data Server VO" a 14-Li 1('o-w 90`a1 W--IT 70-11 all I It 5t These maps alMoo re p 9 duet Map falsest here lbe iq1 N3 USC sBu M LC lomml as..s � �da.psa- - I l7 r4 h �� .,n Jiytfuiu - . r ,-'a �eaA?"^%(1•Y , \ 1 LEGEND State — Connector County' Stream l Indian Resv r'Military Area Lakel Pond/Ocean Ca National Park Street MV.. Other Park E yt(iQll +ale' '\ 1r Expresso y C.--City ielj Ai I e ` '-t'a $ — Highway ,,-- C un ty vl'w r s y Aa >z i 0 E� J rk gga�s Scale 7: 2285H3 10 vaver:we--true seal- il.nerrcls or nonitur reso ution 77 A"al 77 Other Maps/Photographs - Page 3 of 3 View USGS digital ei IhopL to qualu l_LU)Qt wvering This location front Ten'oScrvci; USGS Acrinl I'hoiogniplimay ako be available floor Ill is site A DOQ is a computer-eenemted image of all aerial photograpb in \ehicb image displacement caused by Ieirain relref 'and camera I Its has been removed. II combines the image characteristics ore photograph wish the geometric qualities ofe map. VISIT the USGS for more ill IOrllation. Watershed/Stream Flow Information - Find the Walershed for this location using the U.S. Enviromocrial Protection Agenc}''s site. Climate Data Sources - Preupilnlinu (r'cqueacln'e.adGv me based un domi,(nml a vnrull, pl snmrcx, bnl tar gclr NCDC. Thr lullmring links prurid, general in(nrnmliun abow nbver vb/g .dlCr Ill llie urea, rel; (Il'dle6.V u/ it delidal( Ir[rs ¢red m Obis Ruda. Fol' delailel ili(unnaliun ..boll/ llm .vlolinns ...ed in IN., sf.../I please rc,�/er m NOA-I ndm 14 Docunrem. Using The Natiolod CI' n' t'c Door Cutlet 's (NCDC) station search engine, locMe other climoce stations within: 1 +%r30 minulesq�N� OIL 'r'* l iedegree,^^ ofthill location (34.55/-77 4). Digital ASCII dmo can be obtained dimaly from N' 'DC. Ihrlru .pineaul lien':: Seance Cunmr 000NIIANNal i::::a \\'vulhv:'.Sc:'rlvv 13151::u:-west Ilipl:n u! Sil— S,m, M111) 311410 I.1111))I1-I M1M1a Vucs:ioni!: IT7l5f Y2aii��i�:n:n 1.0r."m Yyr � _ 11`L �.Ci� V JUN 2 2 2010 nY: Marine Mart Convenience Store Camp Lejeune, North Carolina Pond Volume Calculations Drainage Area A Required Volume: 5340 ft3 Elevation Area (ft) Volume (ft) 35.8 5272 0 36.8 6617 5944.5 Volume of Riprap in Forebay (triangular area): 221'*3'*.5'*0.5 166 ft3 Volume Provided in Pond = 5779 ft3 Drainage Area B Required Volume: 9010 ft3 Elevation Area (ft) Volume (ft) 35.8 8779 0 36.8 9613 9196 Volume of Riprap in Forebay (triangular area): 89'*3'*.5'*0.5 67 ft3 Volume Provided in Pond = 9129 ft3 JUN 2 2 2010 �Y: Frucon DEPT Bis Engineering SSUE PAGE OF DATE: BY DATE: n CHK'D PROJ TITLE/PROJ # rI /rJl //d l /Alm house-�a—� e " CHKAPRD CLIENT wYEnn g/ l Otttrac" YS V REV %A Chapter 3 Sheet flow Time of Concentration and Travel Time Technical Release 55 Sheet flow is flow over plane surfaces. It usually occurs in the headwater of streams. With sheet flow, the friction value (Manning's n) is an effective rough- ness coefficient that includes the effect of raindrop impact; drag over the plane surface; obstacles such as litter, crop ridges, and rocks; and erosion and trans- portation of sediment. These n values are for very shallow flow depths of about 0.1 foot or so. Table 3-1 gives Manning's n values for sheet flow for various surface conditions. Table 3-1 Roughness coefficients (Manning's n) for ® sheet flow Surface description n L Smooth surfaces (concrete, asphalt, gravel, or bare soil) .......................................... 0.011 Fallow (no residue) .................................................. 0.05 Cultivated soils: Residue cover 520%......................................... 0.06 Residue cover>20%......................................... 0.17 Grass: Short grass prairie ............................................ 0.15 Dense grasses y................................................ 0.24 Bermu lagrass.................................................. 0.41 Range (natural)......................................................... 0.13 Woods:a Light underbrush .............................................. 0.40 Dense underbrush ............................................ 0.80 I The n values are a composite of information compiled by Engman (1986). 2 Includes species such as weeping lovegrass, bluegrass, buffalo grass, blue grama grass, and native grass mixtures. 3 When selecting n , consider cover to a height of about. 0.1 ft. This is the only part of the plant cover that will obstruct sheet flow. 171. JUN 2 2 2010 ILBY:�-- Urban Hydrology for Small Watersheds For sheet flow of less than 300 feet, use Manning's kinematic solution (Overtop and Meadows 1976) to compute Tt: 0.007(nd s T1 P \0.580A [eq. 1 zJ/ where: Tt = travel time (hr), n = Manning's roughness coefficient. (table 3-1) L = flow length (ft) P2 = 2-year, 24-hour rainfall (in) s = slope of hydraulic grade line (land slope, ft/ft) This simplified form of the Manning's kinematic solu- tion is based on the following: (1) shallow steady uniform flow, (2) constant intensity of rainfall excess (that part of a rain available for runoff), (3) rainfall duration of 24 hours, and (4) minor effect of infiltra- tion on travel time. Rainfall depth can be obtained from appendix B. Shallow concentrated flow After a maximum of 300 feet, sheet flow usually be- comes shallow concentrated flow. The average veloc- ity for this flow can be determined from figure 3-1, in which average velocity is a function of watercourse slope and type of channel. For slopes less than 0.005 ft/ft, use equations given in appendix F for figure 3-1. Tillage can affect the direction of shallow concen- trated flow. Flow may not always be directly down the watershed slope if tillage runs across the slope. After determining average velocity in figure 3-1, use equation 3-1 to estimate travel time for the shallow concentrated flow segment. Open channels Open channels are assumed to begin where surveyed cross section information has been obtained, where channels are visible on aerial photographs, or where blue lines (indicating streams) appear on United States Geological Survey (USGS) quadrangle sheets. Manning's equation or water surface profile informa- tion can be used to estimate average flow velocity. Average flow velocity is usually determined for bank - full elevation. (210-VI-TR-55, Second Ed., June 1986) A-I-� M Figure B-3 2-year, 24-hr rainfall Figure B-4 5-year, 24-hour rainfall U.S. DEPARTMENT OF AGRICULTURE JUN222 5-Year Z4-Hour HnlnfNl( inches) 1E.I, Equal Aroe P,u— NATURAL RESOURCES CONSERVATION SERVICE BY: I (210-VI-TR-55, Second Ed., June 1986) B-3 A- i q Drawdown Time -1-Year, 24-Hour Storm Infiltration Basin A A = 5944.5 Effective Infiltrating Area (ft) V = 5340 Volume of Water Requiring Infiltration (ft) K = 6.2 Hydraulic Conductivity of Soil (in/hr) T = Dewatering Time (Days) T = 0.07 Days 1.74 Hours Drawdown Time -1-Year, 24-Hour Storm Infiltration Basin B A=V/(2*K*T) ere A = 8779 Effective Infiltrating Area (ft) V = 9010 Volume of Water Requiring Infiltration (ft) K = 10 Hydraulic Conductivity of Soil (in/hr) T = Dewatering Time (Days) T = 0.05 Days 1.23 Hours ,JUN 2 2 2010 Marine Mart Convenience Store Camp Lejeune, North Carolina Ponding Volume - Area A Calculate the required stormwater pending volume: Use method from Chapter 3 of NCDENR Stormwater BMP Manual Required to infiltrate the 10-year, 24-hour storm volume = 6.91 in. per NOAA Point Precipitation Frequency Estimates for Sneads Ferry, NC. Compare rainfall volume from first 1.5" with post- predevelopment quantity. Area A Pre -development R,=0.05+0.9*I, 0 acre impervious area 0.75 acre entire area I, 0 R 0.05 Vp,e 3630*Rd*R„p,e*A Rd 6.91 in. A 0.75 acre V 946.18 ft' Post -development Rv= 0.05+0.9*I, Where 1,=impervious area/entire area sq ft acre impervious area 19347 0.44 acre entire area 32863 0.75 acre I, 0.59 R,, 0.58 Vposi 3630'Rd*R,o ,'A Rd 6.91 in. A 0.754 acre V 10972.76 ft3 Vposopre 3630*R,*(R,p,,t- Rvpm)*A Rd 6.91 in. A 0.75 acre V 10026.58 ft' i;'� LgVy JUN 2 2 2010 3Y: Marine Mart Convenience Store Camp Lejeune, North Carolina Pending Volume - Area B Calculate the required stormwater pending volume: Use method from Chapter 3 of NCDENR Stormwater BMP Manual Required to retain/infiltrate the 1-year, 24-hour storm volume = 6.91 in. per NOAA Point Precipitation Frequency Estimates for Sneads Ferry, NC. Compare rainfall volume from first 1.5" with post- predevelopment quantity. Area B Pre -development R�= 0.05+0.9-1, 0 acre impervious area 1.189 acre entire area 0 R,, 0.05 Vpre=3630'Rd'R„p,,*A Rd 6.91 in. A 1.189 acre V 1490.65975 ft3 Post -development R,= 0.05+0.9'I, Where I,=impervious area/entire area impervious area 0.75 acre entire area 1.189 acre I, 0.63 R 0.62 V,,=3630' Rd' R„ po,,*A Rd 6.91 in. A 1.189 acre V 19408.41 ft3 upou-pre 3630.Rd*(R,,,,-Rvpre)'A Rd 6.91 in. A 1.189 acre V 16917.75 ft3 A)1 OnIV"JUN 2 2 20W BY: Drawdown Time -10-Year, 24-Hour Storm Infiltration Basin A A=V/(2*K*T) where A = 5944.5 Effective Infiltrating Area (ftz) V = 10027 Volume of Water Requiring Infiltration (ft) K = 6.2 Hydraulic Conductivity of Soil (in/hr) T = Dewatering Time (Days) T = 0.14 Days 3.26 Hours Drawdown Time - 10-Year, 24-Hour Storm Infiltration Basin B /(2*K*T) where A = 8779 Effective Infiltrating Area (ft2) V = 16918 Volume of Water Requiring Infiltration (ft3) K = 10 Hydraulic Conductivity of Soil (in/hr) T = Dewatering Time (Days) T = 0.10 Days 2.31 Hours JUN 2 2 2010 ]3Y: Marine Mart Convenience Store Camp Lejeune,North Carolina Level Spreader Calculations Area Bioretention facilities are designed to capture and infiltrate the I -year 24-hour storm. Discharge from the rain gardens shall bevia alevel spreader and filter strip, which shall be designed tocarry the flow from a1O'yearstorm. Peak flow calculation, use Rational Method Area [\=C*|*A Amta| 079acre Calculate composite C C O,6]6548 Since site issmall, assume T.=5min 110yr5mm 9.18in/hr (see attached chart for SneadsFerry, NC) [\10y, 4.63dt Calculate level spreader/fi|terstrip length (perpendicular tnflow) Use method described inNCDENRBK4PManual Chapter 8nrSection l3.].4 -for Vegetation characterized as grass nrthick ground cover: l3ftnflength onslopes 8-8% per 1cbufflow Bioretention Area A: L=13ft*4.63cfs � Calculate flow velocity over level spreader onto filter strip: Weir equation: C\=CxLxH" C= 3.33' C= 4.63`' '-�' ; L= �60~�Cw'�{���~'� | - ' H= 0.08ff./ ^ V=O/(HxU Marine Mart Convenience Store Camp Lejeune, North Carolina Level Spreader Calculations - Area B Bioretention facilities are designed to capture and infiltrate the 1-year 24-hour storm. Discharge from the rain gardens shall be via a level spreader and filter strip, which shall be designed to carry the flow from a ID -year storm. Area B Q=C*I*A Atotai 1.19 acre Calculate composite C C 0.643467- Since site is small, assume T 5 min I10yr 5min 9.18 in/hr (see attached chart for Sneads Ferry, NC) QloYr cfs Calculate level spreader/fiilter strip length (perpendicular to flow) Use method described in NCDENR BMP Manual Chapter 8 or Section 13.3.4 -for Vegetation characterized as grass or thick ground cover: 13ft of length on slopes 0-8% per 1 cfs of flow i Bioretet*ioon_Area B: L=13ft*s L—91-:55537 Calculate flow velocity over level spreader onto filter strip: Weir equatiori"Q=C x L x H15 C= 3.33� Q= 7.04 L=-91:55537,.ft H= 0:08-ft- C) J ll✓MGic s/n lio V=Q/(HxL) V—09fi-ft-/s Ti v u;vD JUN 2 2 2010 A- zy �Q f I ✓ts 0'/ ; 3�15(�4/fZ = 0.D8ac e C= 0,95 CrDOO Q= C*z-x-A -off 0 c�'s 3Ck 0•� ens 9,1 �+ 13cl I s`C Minim(Av.t ltvd sPmkrk,# use a � Iwo( owfld PTC dz tt Q'Q LA � A-z,s 4yi. ar(o, Ot cbrjx, I iso,)'% covlf Jgin z �rn rJ�o�s aw, : 108' x 32' = 3g5S, k Arc., Dc { Kb,J - 31.E-'4:L> 7F2- ok JUN 2 2 2010 PY: NCDENR Stonnwater BMP Manual Revised 09-28-07 is required for all filter strips unless it can be proven that the inflow will be evenly distributed sheet flow without the use of a level spreader. 13.3.4. Length and Width for Pollutant Removal Credit The top edge of the filter strip should follow an elevation contour. If a section of the top edge of the strip dips below the contour, runoff eventually may form a charnel at the low spot. Under some site topography and grading circumstances, runoff may travel along the top of the filter strip rather than through it. Berms may be placed at intervals perpendicular to the top edge of the strip to prevent runoff from bypassing any portion of the filter strip. The length (perpendicular to flow) of a filter strip is based on the same criteria as the length of a level spreader presented in Chapter 8 Level Spreaders. The length of the filter strip must be between a minimum of 13 feet and a maximum of 130 feet. The length must be calculated as follows. — For vegetation characterized as grass or thick ground cover: 13 feet of length per 1 cfs of flow on slopes 0-8%. — For vegetation characterized as forested: 65 feet of length per 1 cfs of flow for slopes from 0-6%. — If the forest vegetation is 100-150 feet in width, then the length can be reduced to 50 feet of filter strip per 1 cfs of flow. — If the forest vegetation is more than 150 feet in width, then the length can be reduced to 40 feet of filter strip per 1 cfs of flow. Forested filter strips must be significantly wider than those with grass or thick ground cover, due to the forests greater susceptibility to erosion. If the filter strip has discrete sections with grass or thick ground cover in one part and forest vegetation in another, then the length should be determined by calculating the weighted average of the lengths required for each vegetation type. For example, if a filter strip that has 20 feet of the width maintained as grass and 30 feet of the width is existing forested vegetation, the appropriate filter strip length will be: (20/50) x (13 ft/1cfs) + (30/50) x (65 ft/1 cfs) = 44.2 or 44 feet per cfs of flow The width (parallel to flow) of a filter strip shall in all cases be a minimum of 50 feet. 13.3.5. Length and Width for Compliance with the State Stormwater Program In most circumstances under the State Stormwater Management Program rules at NCAC 15A 21-1.1000, a filter strip is a required additional component of a control system based on another BMP. For example, the discharge of a wet detention basin must flow through a companion vegetated filter strip for ponds designed to treat 85% TSS. Ponds designed to treat 90% do not require a level spreader/filter strip. No specific numerical value of pollutant removal is assigned for the filter strip alone, but the filter strip must Filter Strip 13-5 July 2007 �Iarf &Iwen;en CG.. 5fb1<z, STORM DRAINAGE ,�^`Q c�rpj1C- I 1%/ TABLE 1106.2 SIZE OF VERTICAL CONDUCTORS AND LEADERS HORIZONTALLY PROJECTED ROOF AREA (square feel( DIAMETER OF OF Rainfall rate (inches per hour) LEADER (inches)' 1 2 3 40233,200 6 7 6 9 10 11 12 2 1880 1,440 960 720480 410 360 320 290 260 240 3 8,800 4,400 2!930 22001,470 126O 1,10O 980 880 800 730 4 IS4f1(I 9.20b G,130 4,6(I(13p7(I 2.630 2300 2(45 1.8411 L675 1,5311 5 34.600 17,300 1 030 8.6505,765 4945 4,325 3,845 3,460 3.145 ? 880 6 54,000 27,000 17,995 13,500 9,0(10 7,715 6,750 6,000 5,410 4,910 4,500 8 I I6,U11(1 58.(100 35660 '29,00019,315 IG,57(I 14.5O0 12,890 11.600 10545 9,600 For SI: 1 inch =25.A nil. I squ:uu loot =11.0929 )112. Nok.: Co,wr,/ ✓CnG7dr, a. Sizesindlcetederethedii.... �l cireulxr piping. This txhlc id npplicnhlu to plping nl otheushupes prm :dttlthe cros,c-s canal shape 111lly eneluscsaorcle n(Ihe diameter Indicamd in this lahle. TABLE 1106.3 &no ,/r`0.S RDF nF HnR17nNTAL STORM DRAINGE PIPING Pi OF HORIZONTALLY PROJECTED ROOF AREA (square feet) SIZE HORIZONTAL Rainfall rate (inches per hour) PIPING (inches) 1 2 3 4t p%, 5 6 1/N unit vertical in 12 units 11011ZOM01 (I -Percent S10130 3 3,289 1,644 1,096 822 c h57 548 4 7.520 3,760 2.506 1 XX) 1.504 1,'_'53 5 13.360 6.680 4.453 3,340 tic( (Q 2,672 2.227 �6 21,400 10.700 7,133 5,3507,3;(5' 4,280>Y45, 3.506 8 46,000 23,000 15,330 11.500 9.200 7.600 10 82.800 41400 27,600 21,700 16.580 13,800 12 133.200 66,600 44,400 33.300 26,650 22.00 15 218,000 109,000 72,800 59,500 47.600 39,650 114 unit vcrtic:d in 12 units h0riWrtal (2-pcl'Cent Slupc) 3 4.040 2320 1,546 1.160 928 773 4 10.600 5,300 3533 2,650 2,120 1,766 5 1S.88f) 9.440 6293 4.720 3,776 3,146 6 30.200 15.100 10-066 7,550 6.040 5.033 8 65200 32.600 21,733 16.300 13.040 10,866 10 1 16.800 58,400 38.950 29200 27 350 19,450 12 188.(I(10 91,000 62.600 47.000 37.600 31,350 15 330.000 1 1650Of 112.000 84.000 67 250 56,000 unit verlicul in 12 units hmir.Onfit 1 (4-percent slope) 3 6.576 3,288 1295 1,644 1.310 1.096 4 15D40 7.S20 5.010 3.760 3,010 ^_ 500 5 26.720 13360 8.900 6.690 5,320 4.450 6 42.800 21400 13.700 10,700 8.580 7.140 8 92.000 46.000 30.05O 23,000 18A00 15.320 If 171.600 85.800 S5.200 41,400 33.1% 27,600 12 266.400 133.200 88.800 66.600 51200 44400 15 476M00 238.000 158.800 119.000 95,300 79250 For SII inch = 25A tun:. 1 xqunrc 1'anl = 0.0929 nr'. to I uSQ. b" T ;F"- P`� X7,-Y4 JUN 2 2 2010 88 A-fJ 2006 INTERNATIONAL PLUMBING CODE© STORM DRAINAGE 4.28 / - FIGURE 1106.1 100-YEAR, 1-HOUR RAINFALL (INCHES) EASTERN UNITED STATES 5- ;ZTAV,"4 i ice >✓ For SI: I inch-'_i.J nun. JUN 2 2 2010 Snu« c Nalmnnl Wcmhcr Sci'r ice, NnliumJ Oceanic and Almgaplml'ic Admin'ndcnlnn. Wu,aLlu_iim D.C. 2006 INTERNATIONAL PLUMBING CODE® �,_�� 83 c Friction Method Manning Formula Solve For Full Flow Capacity Roughness Coefficient 0.012 Channel Slope 1.00000 % Normal Depth 0.50 ft Diameter 0.50 ft Discharge 0.61 ft-Is ,R*++, }r f>?" Wk 1 "t ♦ �!' S4 `kt .n ;pTj�."^-" R �: y?� CR Xc. grhy ups 'M1 LC1" t } F` v74i M .' Discharge 0.61 ft-Is Normal Depth 0.50 ft Flow Area 0.20 ft' Wetted Perimeter 1.57 ft Hydraulic Radius 0.13 ft Top Width 0.00 ft Critical Depth 0.40 ft Percent Full 100.0 % Critical Slope 0.01066 tuft Velocity --> 3.10 f /S Velocity Head 0.15 ft Specific Energy 0.65 ft Froude Number 0.00 Maximum Discharge 0.65 ft'/s Discharge Full 0.61 ft'/s Slope Full 0.01000 ft/ft Flow Type SubCritical Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 Upstream Depth 0.00 n Profile Description Profile Headloss Average End Depth Over Rise 0.00 It 0.00 % JUN 2 2 2010 Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03] 4/30/2010 2:13:00 PM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Normal Depth Over Rise 100.00 % Downstream Velocity Infinity fUs Upstream Velocity Infinity ft/s Normal Depth 0.50 ft Critical Depth 0.40 It Channel Slope 1.00000 % Critical Slope 0.01066 ft/ft 1tiC' �Y V'Jc�'u�D JUN 2 2 2010 j By: - Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.11.00.03) 413012010 2:13:00 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 A-30 C) O 0 %r t r Ui w ca 0 b ro H N m 0 C z 1 � o L� 0.3 in 0 0 H m m 0 p 0.1 00 0 oS m o ti o m � c v 0 0 HORIZONTAL d50 = 0.15 D(F)3 1/2 Do DEEP SCOUR HOLF. 50 = 0.09 Do(F)3 5 1 Do DEEP SCOUR HOLE d50 = 0.055 Do (F)3 1 5 n z n.5 7-7 1 F=V/ gD � b ;0,5 L�. A DEFINITION OF TERMS: F = FROUDE NUMBER (RIP RAP HOLE) D = DEPTH OF FLOW d50 = DIAMETER OF STONE (50%.SIZE) Do = DIAMETER OF OUTLET d V = AVERAGE VELOCITY AT OUTLET U D `\ 3 1 ON 3 \) 1 A �? Wo ON N 3 Do 1 ON 3 A 1 ON 3 / 0 r PLAN PC Do 3 yVARIES (0-1.0 Do)' S o 1 F m 3 SECTION A -A 0 PERFORMED SCOUR HOLE a�W , r 3b0� l.5 `� S O��a. Se✓%tlGrc,.(a( toredq,/ EM 1110-3-136 9 Apr $4 .7 i DISSIPATOP.S CM -MI -I S -- CEAK`. .�y c D ItL _ Jw L -77 / 3i , s C.S. Army Corps of Engineers 7�JLN 2 2 2010 JU_--_ D BY: I A-, 3.� Naugle, Mary From: Naugle, Mary Sent: Thursday, June 17, 2010 9:51 AM To: 'Collins, Dennis'; Redhage, Mickie K Cc: Towler CIV David W Subject: RE: SW8 100460 Marine Mart State Stormwater Dennis; Thank you for your response. I wondered if Mickie was out What you stated below in your memo will be fine. I have a couple additional questions: 1. Application IV(8) reports 50% density. When I add the impervious areas and divide by permit area it seems like is should be 40%? (21,000+32,644) / 3.095 acres = 40%. Please verify. 2. Planting plan on supplement page 2. Why did the p of species change from "6" down to " 1" between the submittal on May 17 and June 9 ? At least 3 species are recommended. Please verify and include the If species consistently on the plans and supplements in accordance with the BMP. Please submit electronically so I can proceed with final reviews tomorrow and you can send 2 sets of the original /full size plans in the overnight mail. Mary Jean Naugle NCDENR Express permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mary.naugle@ncdenrgov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Collins, Dennis [mailto:Dennis.Collins@bisfei.com] Sent: Thursday, June 17, 2010 9:04 AM To: Naugle, Mary; Redhage, Mickie K Cc: Towler CIV David W Subject: RE: SAS 100460 Marine Mart State Stormwater Mary: Thank you for the response.to Mickie's questions. She is out of the office today but will be addressing your comments and responding on Friday. I would hope that the one day delay will not be a problem. In addition, in order to respond to the quick turn around with signed and sealed documents, the next revision will likely be sealed by another registered engineer (Tim Caveny) in our office as Leon is out on vacation. Tim is Mickie's direct supervisor and has been involved with the project throughout as well. I assume that this will not cause any issues. Dennis W. Collins, AIA BIS Frucon Engineering Inc. Vice President Architecture 15933 Clayton Road Suite 305 Ballwin, MO 63011 E-mail: dennis.collinsici)bisfei.con Phone: (636) 391-4446 Mobile Phone: (314) 302-0536 Fax: (636) 391-4462 From: Naugle, Mary [mailto:mary.naugle@ncdenr.gov] Sent: Thursday, June 17, 2010 7:44 AM To: Naugle, Mary; Redhage, Mickie K; Collins, Dennis Cc: Towler CIV David W Subject: RE: SW8 100460 Marine Mart State Stormwater Mickie; Be sure to seal the plans. The last version of drainage plan that was submitted to us was not sealed. It should be 2 sets of plans, sealed, including the drainage plan - Figure 2, drawing no. 4. The drainage plan had no sheet number on it. Also when you look for the issued version, it will be mailed to the attention of the FE on the plans, Leon W. Schnur. Just so it doesn't get delayed in the mail since it is not addressed to you, Mickie. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext, Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mart' nougle @ncdenr go v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Naugle, Mary Sent: Thursday, June 17, 2010 8:37 AM To: Naugle, Mary; Redhage, Mickie K; dennis.collins@bisfei.Com Cc: Towler CIV David W Subject: RE: SW8 100460 Marine Mart State Stormwater Mickie If you can pdf me the plans, I can move forward as long as I can read the labeling on the plans for item 1 and 2-... and you can put the 2 sets of full size plans in the overnight to us. We have to issue the full size plans, but if I can read the pdf that allows us to move forward with the internal reviews in our office by multiple persons. THANKYOU! Mary Jean Naugle NCDENR Express Perrriitfing NC Division of Wafer Quality 127Cardinal Drive Ex Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mart' naugle @n cdenrgo v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Naugle, Mary Sent: Thursday, June 17, 2010 8:22 AM To: 'Redhage, Mickie K'; 'dennis.collins@bisfei.com' Cc: 'Towler CIV David W' Subject: RE: SW8 100460 Marine Mart State Stormwater Importance: High MY Comments in CAPS UNDER YOUR NOTE. I APOLOGIZE FOR 3. My mistake! ON 1 AND 2, JUST LABEL ON THE PLANS. PLEASE TRY TO GET IT BACK OVERNIGHT. IT SHOULD BE ISSUED TOMORROW. THANKYOU Mary Jean Naugle NCDENR Express Permitting NCDivision of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mar y. naugleGncdenr go v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Redhage, Mickie K[maiIto: Mickie.Redhage@bisfei.com] Sent: Wednesday, June 16, 2010 5:26 PM To: Naugle, Mary Cc: Collins, Dennis Subject: RE: SW8 100460 Marine Mart State Stormwater Mary, I have received your comments and am planning to resubmit by June 28 as required. I do have two minor questions, however. Comment 2 asks for information about the area draining to the gas canopy drain. It is not clearly marked on the Civil plans that the Concrete Fuel Dispensing Slab is to be covered with an overhead canopy. I will clarify this on the Civil plans. Do you need to see plans and details for the fuel canopy or will clarification that the area is under a canopy be sufficient? NEED CONSISTENT LABELING. THE STATE STORMWATER APPLICATION NEEDS TO BE ABLE TO VERIFY BUA, DIMENSIONS, AND STORMWATER SYSTEM. WHEN YOU LABEL THE LEVEL SPREADER "CANOPY B-2" ON THE SUPPLEMENT, AND IT IS NOT ON THE PLANS, THEN IT IS HARD TO FOLLOW. JUST LABEL THE AREA THE SAME ON THE DRAINAGE AREA AND PLANS, AS WELL AS THE LOCATION OF THE LEVEL SPREADER. I SEE SEMICIRCULAR ROCK ON THE FOREBAY, BUT NO LEVEL SPREADER. Comment 3 requires that'No stormwater discharge is allowed from new sites within SA waters'. The bioretention areas have been designed to capture and infiltrate runoff generated by the 1-year 24-hour storm as required by Session Law 2008-211 Section 2.(b)(1)b.3. Does an amount greater than the 1-year, 24-hour storm need to be captured? I APOLOGIZE.... I FOUND THE SOIL REPORT. THIS IS MY MISTAKE. ITEM ADDRESSED. Thank you, Mickie Redhage, P.E BIS Frucon Engineering, Inc. Civil Engineering Department 15933 Clayton Road, Suite 305 Ballwin, MO 63011 Email: mickie.redhage@bisfei.com Phone: (636) 391-4585 Fax: (636) 391-4497 From: Naugle, Mary [mailto:mary.naugle@ncdenr.gov] Sent: Wednesday, June 16, 2010 3:15 PM To: Redhage, Mickie K Cc: Towler CIV David W Subject: SW8 100460 Marine Mart State Stormwater Please see the attached ad info request Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mary.naugle@ncdenrgov Please note: E-mail correspondence to and from this address may. be subject to the North Carolina Public Records Law and may be disclosed to third parties. Notice: This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying, distribution, reliance or other use by unintended recipients is prohibited. If you've received this message in error, please advise by replying to this message and deleting it from your computer. Notice: This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying, distribution, reliance or other use by unintended recipients is prohibited. If you've received this message in error, please advise by replying to this message and deleting it from your computer. Notice: This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying, distribution, reliance or other use by unintended recipients is prohibited. If you've received this message in error, please advise by replying to this message and deleting it from your compute. Notice: This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying, distribution, reliance or other use by unintended recipients is prohibited. If you've received this message in error, please advise by replying to this message and deleting it from your computer. Naugle, Mary From: Naugle, Mary Sent: Thursday, June 17, 2010 9:51 AM To: 'Collins; Dennis'; Redhage, Mickie K Cc: Towler CIV David W Subject: RE: SW8 100460 Marine Mart State Stormwater Dennis; Thank you for your response. I wondered if Mickie was out What you stated below in your memo will be fine. I have a couple additional questions: 1. Application IV(8) reports 50% density. When I add the impervious areas and divide by permit area it seems like is should be 40%? (21,000+32,644) / 3.095 acres = 40%. Please verify. 2. Planting plan on supplement page 2. Why did the # of species change from "6" down to " 1" between the submittal on May 17 and June 9 ? At least 3 species are recommended. Please verify and include the # species consistently on the plans and supplements in accordance with the BMP. Please submit electronically so I can proceed with final reviews tomorrow and you can send 2 sets of the original /full size plans in the overnight mail. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext, Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax many nougleGncdenr go v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Collins, Dennis[mailto:Dennis.Collins@bisfei.com] Sent: Thursday, June 17, 2010 9:04 AM To: Naugle, Mary; Redhage, Mickie K Cc: Towler CIV David W Subject: RE: SW8 100460 Marine Mart State Stormwater Mary: Thank you for the response to Mickie's questions. She is out of the office today but will be addressing your comments and responding on Friday. I would hope that the one day delay will not be a problem. In addition, in order to respond to the quick turn around with signed and sealed documents, the next revision will likely be sealed by another registered engineer (Tim Caveny) in our office as Leon is out on vacation. Tim is Mickie's direct supervisor and has been involved with the project throughout as well. I assume that this will not cause any issues. Dennis W. Collins, AIA BIS Frucon Engineering Inc. Vice President Architecture 15933 Clayton Road Suite 305 Ballwin, MO 63011 E-mail: dennis.collins(afbisfei.com Phone:(636) 391-4446 Mobile Phone: (314) 302-0536 Fax: (636) 391-4462 From: Naugle, Mary [mailto:mary.naugle@ncdenr.gov] Sent: Thursday, June 17, 2010 7:44 AM To: Naugle, Mary; Redhage, Mickie K; Collins, Dennis Cc: Towler CIV David W Subject: RE: SW8 100460 Marine Mart State Stormwater Mickie; Be sure to seal the plans. The last version of drainage plan that was submitted to us was not sealed. It should be 2 sets of plans, sealed, including the drainage plan - Figure 2, drawing no. 4. The drainage plan had no sheet number on it. Also when you look for the issued version, it will be mailed to the attention of the PE on the plans, Leon W. Schnur. Just so it doesn't get delayed in the mail since it is not addressed to you, Mickie. Mary Jean Naugle NCDENR Express Permitting NC Division of Water Quality 127Car6nal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mary.naugle@ncdenrgov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Naugle, Mary Sent: Thursday, June 17, 2010 8:37 AM To: Naugle, Mary; Redhage, Mickie K; dennis.collins@bisfei.com Cc: Towler CIV David W Subject: RE: SW8 100460 Marine Mart State Stormwater Mickie If you can pdf me the plans, I can move forward as long as I can read the labeling on the plans for item 1 and 2... and you can put the 2 sets of full size plans in the overnight to us. We have to issue the full size plans, but if I can read the pdf that allows us to move forward with the internal reviews in our office by multiple persons. THANKYOU! Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cordinol Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fox many. nougle@ncdenr go v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Naugle, Mary Sent: Thursday, June 17, 2010 8:22 AM To: 'Redhage, Mickie K'; 'dennis.collins@bisfei.com' Cc: Towler CIV David W' Subject: RE: SW8 100460 Marine Mart State Stormwater Importance: High MY Comments in CAPS UNDER YOUR NOTE. I APOLOGIZE FOR 3. My mistake! ON 1 AND 2, JUST LABEL ON THE PLANS. PLEASE TRY TO GET IT BACK OVERNIGHT. IT SHOULD BE ISSUED TOMORROW. THANKYOU Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext, Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax many naugle @ncdenr go v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Redhage, Mickie K [mailto:Mickie.Redhage@bisfei.com] Sent: Wednesday, June 16, 2010 5:26 PM To: Naugle, Mary Cc: Collins, Dennis Subject: RE: SW8 100460 Marine Mart State Stormwater Mary, I have received your comments and am planning to resubmit by June 28 as required. I do have two minor questions, however. Comment 2 asks for information about the area draining to the gas canopy drain. It is not clearly marked on the Civil plans that the Concrete Fuel Dispensing Slab is to be covered with an overhead canopy. I will clarify this on the Civil plans. Do you need to see plans and details for the fuel canopy or will clarification that the area is under a canopy be sufficient? NEED CONSISTENT LABELING. THE STATE STORMWATER APPLICATION NEEDS TO BE ABLE TO VERIFY BUA, DIMENSIONS, AND STORMWATER SYSTEM. WHEN YOU LABEL THE LEVEL SPREADER "CANOPY B-2" ON THE SUPPLEMENT, AND IT IS NOT ON THE PLANS, THEN IT IS HARD TO FOLLOW. JUST LABEL THE AREA THE SAME ON THE DRAINAGE AREA AND PLANS, AS WELL AS THE LOCATION OF THE LEVEL SPREADER. I SEE SEMICIRCULAR ROCK ON THE FOREBAY, BUT NO LEVEL SPREADER. Comment 3 requires that 'No stormwater discharge is allowed from new sites within SA waters'. The bioretention areas have been designed to capture and infiltrate runoff generated by the 1-year 24-hour storm as required by Session Law 2008-211 Section 2.(b)(1)b.3. Does an amount greater than the 1-year, 24-hour storm need to be captured? I APOLOGIZE.... 1 FOUND THE SOIL REPORT. THIS IS MY MISTAKE. ITEM ADDRESSED. Thank you, Mickie Redhage, RE BIS Frucon Engineering, Inc. Civil Engineering Department 15933 Clayton Road, Suite 305 Ballwin, MO 63011 Email: mickie.redhage@bisfei.com Phone: (636) 391-4585 Fax: (636) 391-4497 From: Naugle, Mary [mailto:mary.naugle@ncdenr.gov] Sent: Wednesday, June 16, 2010 3:15 PM To: Redhage, Mickie K Cc: Towler CIV David W Subject: SW8 100460 Marine Mart State Stormwater Please see the attached ad info request Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mary.naugle@ncdenrgov Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Notice: This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying, distribution, reliance or other use by unintended recipients is prohibited. If you've received this message in error, please advise by replying to this message and deleting it from your computer. Notice: This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying, distribution, reliance or other use by unintended recipients is prohibited. If you've received this message in error, please advise by replying to this message and deleting it from your computer. Notice: This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying, distribution, reliance or other use by unintended recipients is prohibited. If you've received this message in error, please advise by replying to this message and deleting it from your computer. Notice: This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying, distribution, reliance or other use by unintended recipients is prohibited. If you've received this message in error, please advise by replying to this message and deleting it from your computer. MEMORY TRANSMISSION REPORT TIME :06-17-'10 09:07 FAX NO.1 :910-350-2018 NAME :DENR Wilmington FILE NO. 245 DATE 06.17 0 9 : 0 6 TO S 919104512976 DOCUMENT PAGES 2 START TIME 06.17 09:07 END TIME 06.17 09:07 PAGES SENT 2 STATUS OR *** SUCCESSFUL TX NOTICE g—'witt North Caroline Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Pardue Colson H. Sullins Oaa Freeman Governor Director Secretary Juna to. 2010 Carl Salter, Deputy Public Worka Cfficar Commanding >M..r. US MCa Camp Lajauna Bldg 1005 Michael Road Camp L.l.una, NC 28542 Subjact: Raquamt far Additional lnformatlon Stormwater Project No. SWB 100400 Marine Mart at Count.... May OnslO C..nty Dear Mr. Oskar- Th. Wilmington Regional OMca r.calv.d an Expraaa Storrrmwatar Monagament Permit Application for Marine Mart at Courthouse Bay On May 19. 2010 with additional Information .ubmitlod on June 0. 2010. A prolim...ry review of that Information hoe cl tarminod that mho application Is not complate. Tha fallowing information la needed to continua the atarmW®ter rawfavv: 1 . If the read antranca on the aouthwast corner is not r .too to the faro,, r any omount on the ..at road rom entrance. than ovo that area from the drainage area plan for the aMP w area on drawing n 4 If Up;..,. from elevations that the area 1. stopped an the permit area and away from the BMP. 2_ Plans. dallneato the drainage area routed to tha leval apreadmrMiltar strip reported On the nupplament for 0-2 Gas Canopy Ural.. "1-ha one. should be on the dralnago area plan N4 a wall as detalls, dlmanalone, slop., etc... On the detail and layout plan shoots. If this Iev.l ep,..a.r la on the Intel to 13MP R. than label 05 such on the plans and details. 3. Plaaea provide calculations that damonstrata tha discharga from tn. OMPa provide Off.atly , Infiltration, Including the soil Infiltration rats In each arom of the vag.tated strip A and e. Us. the equation In BMP Ch 10. No stonnwator diachar8a In allaw.d from now sites within SA wmtara. Planes note that this request for additional Information Is In rempon.o to m preliminary ravlaw. Th. requeslad information ahould ba recslvad In this CMica prior to June 26, 2010. or the application will ba returned as Incomplete. Tha return of a projact will nacnaaltnts re-aubmlttal of all required items. Including the application fee. If you need .daltlonal tlm. to submit 1"o informallon. plasma mall, small or fax your request for m time .xtenolon to the Uivlalon at tn.."area. and fax number at the bottom of this latter. pla.aa note that a n ,scasignificant requoat for adaltl ... I Information may r Bull In lha return of the project. If that occur.. you will mesa to r acheaula the projact through the Exprsas coordinator for the next available ravlaw data. and resubmit all of the required itame. Including the application fee. Tha construction of any Imparvlous surfaces. other than a construction entrance unclar an approved Sadlmantatlon Eroalon Control Plan. 1* a violation of "CGS 143-215.1 and la subject to onforcamanl action pureuant to NCGS 143-215.6A. Plaaea label all packagso and cover latlara ••Expramm•• Una raferanoa the project n mo and re Stela assigned projact number on all curapondancsg If you have, any questions c n m corning thin nttar planes feel free to call ma at (010) 790-7303 or email me at mary.Naugia®ncdanr.gov. wn Ana � oc�a...iomm eaa..w.., ...-mo. sees teen.. ze.oe vno.e: ern-rmmetaaso- -ra � rxx: zoo. I cw.,..., s.�as: tazzozam.e ,pith Carolina ..m....c.,....��..a,00•Inr.oq atllCCZl�f/ MEMORY TRANSMISSION REPORT TIME :06-17-'10 09:08 FAX NO.1 :910-350-2018 NAME :DENR Wilmington FILE NO. 246 DATE 06.17 09:07 TO : 8 916363914497 DOCUMENT PAGES 2 START TIME 06.17 09:08 END TIME 06.17 09:08 PAGES SENT 2 STATUS OK *** SUCCESSFUL TX NOTICE ** North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves perdu. Colgan 11. Sullins Do. Fle.man Govamor Director Secretary Jun. 15, 2010 Carl Baker. U.puty Publlc W.M. Olflcar Commanding OM.er, US MOM Camp Lejauno Bldg 1005 Michael Road Camp Lajauna. NO 28542 Subject Req..et for Additional Information Stormwater prajo.t No. SWB 100400 Marine Mart at Courthou.a aay Onalew County Oaar Mr. Baker: The Wilmington Regional OMca raceivad an Express Stormwater Management p.rmlt Application far Marine Mart at C fthouso Bay on May 19, 2010 with additional Information submitted On Juna 0, 2010. A preliminary review of that information has determined that the application is not complata. The following Information Is nead.d to c.ntlnu. the et.rnlwater review: 1. If the road entrance on the southwest corner Is not routorl to thO bmp, Or ny amount on the east road ntren.a, than remove that area from tho drains.a sros, plan for the BMP area on drawing no. A. It appears from alavatione that the area Is slopped off the permit area and away from that BMP_ 2. pl.aaa dalln.ato the drainage area routed to the loval spr.adar/filter strip reported on the eupplamant for 0-2 Gan Canopy Ural n. Tha or.. should bs on the drainage area plan # as well as details, dim ... jana, elope, at.... on the d.t.11 and layout plan .".at.. If this level spread., la on the Inlet to BMP M. than label as such on the plan. and tlalall.. 3. "Lase provide .alculabon. that domonatrats the discharge from the aMpa pr.vid. affactiva Infiltration. Including the Boll Infiit,atl.n rate In each area of tn. vagatatatl strip A and a. Uss the equation in BMP Ch 1e. NO stormwater discharge Is allowed from new aitee within SA waters. plsa.e note that this request for additional Infomlatlon Is In response to a preliminary review. Tha requeatad Information should lea received In this Ofsca prior to Juno 29, 2010. or the mpplicatlOn will be returned as I ... mplata. Tha return Of is project will nOccoultata re -submittal of all requlr.d Items. including the application fee. If you n ad additional time to mubmlt the Information, plans. mall, ornall Or fax your reque.t for a time axtenaon to the Ulvlslon at,the adtlro.. and fax number at the bottom Of thla letter. Rio... not. that a second significant roquosl for additional Information may result In the return of tha projact. If that occurs, you will need to reschedule the projact through the Exproso coordinator for the na d available roviow, data, and resubmit all Of the raquirad (lams, including the sppllcation fee. Tho construction of any Imparvloua surfaces, other tn... construction antra... under an appr.vsd S.i imantation Emalon Control plan, Ia . violation of NCGS 143-215.1 and Is .."act to .nfor.emonl action pursuant to NCGS 143-215.0A. PI¢aaa label all pack.... and cover letters es "Express" and rafaranco tho project name and State a ai.natl project number On all correspondence. If you have any qusstlona concerning this matter please feel free to call me at (91 O) 796-7303 or small me at mary.Nnugle®nodenr.go, WI] CFere1„wRi 0,1wr Eab,ulnn, W Ilmlrybn, Nnrr, Cagllm 'A{O! JJ pM1�pN;B\O-]BB-]116\PN(: B10JB0-3006\.ub,mr.nrvlm: l<]]iY]{]a! .t�l /C�BI'O3311H mnt wa�.m]vearnwllh.w �LHi�aIL wn lnuy Orme�nlb \ wrNrrWw ncbn Er,pUYar w � NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director June 16, 2010 Carl Baker, Deputy Public Works Officer Commanding Officer, US MCB Camp Lejeune Bldg 1005 Michael Road Camp Lejeune, NC 28542 Subject: Request for Additional Information Stormwater Project No. SW8 100406 Marine Mart at Courthouse Bay Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received an Express Stormwater Management Permit Application for Marine Mart at Courthouse Bay on May 19, 2010 with additional information submitted on June 9, 2010. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. If the road entrance on the southwest corner is not routed to the bmp, or any amount on the east road entrance, then remove that area from the drainage area plan for the BMP area on drawing no. 4. It appears from elevations that the area is slopped off the permit area and away from the BMP. 2. Please delineate the drainage area routed to the level spreader/filter strip reported on the supplement for B-2 Gas Canopy Drain. The area should be on the drainage area plan #4 as well as details, dimensions, slope, etc... on the detail and layout plan sheets. If this level spreader is on the inlet to BMP B, then label as such on the plans and details. 3. Please provide calculations that demonstrate the discharge from the BMPs provide effective infiltration, including the soil infiltration rate in each area of the vegetated strip A and B. Use the equation in BMP Ch 16. No stormwater discharge is allowed from new sites within SA waters. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to June 28, 2010, or the application will be returned as incomplete. The return of a project will necessitate re -submittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If that occurs, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7303 or email me at mary.Naugle@ncdenr.gov. Sindaug e Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX: 910-350-20041 Customer Service: 1-877-623-6748 NorthCarol i na Internet: www.ncwaterquality.org An Equal Opportunity\Affirmative Action Employer Naturally GDS/mjn: S:\WQS\STORMWATER\ADDINFO\2010\100406jun10 cc: Mickie Redhage, BIS Frucon Engineering, Inc. 636-391-4585, fax: 4497 M.J. Naugle Page 2 of 2 Project Name: Project No.: LETTER OF TRANSMITTAL Marine Mart at Courthouse Bay, Camp LeJeune 805322.18 To: NC DENR Cardinal Drive Extension Wilmington, NC 28405 Attention: Mary Jean Naugle 910-796-7215 We are sending ® Herewith ® Delivered via UPS UPS Tracking #: 1Z 697 AW4 01 9207 5974 Frucon als Engineering June 8, 2010 File No.: 13.10 Transmittal No.: 008 Description: IFA— DENR Express Stormwater Submittal cc: Kelly Snook, CCE David Towler, ® w/ copy Below Camp LeJeune DPW rcc: File Vendor: Manufacturer: Equipment No.: ®Drawings ❑ Calculations ® Specs ❑ Shop Dwgs. ❑ Samples ❑ Change Notice ❑ Copy of Ltr. ❑ Orig. Tracings ® Other No. of Drawing/ This transmittal affects These Are: ❑ Preliminary ❑ Informational r� As Requested I Advance Copv —Area B2 Gas Canopy Drainage — Stormwater Calculation File with Narrative, USGS Map, ® Engineering ❑ Procurement ❑ Construction For: I�I�I Approval V�I Your Use Review & Comment ❑ Files & Distribution _ ❑ Fabrication ❑ Construction `Action Legend: 1. No exceptions taken, addressee can proceed with fabrication and/or construction. 2. Addressee can proceed based on making revisions noted. Submit corrected copy for file. 3. Revise as noted and resubmit. Hold fabrication or construction. 4. Submit copies for distribution/file. Remarks: Please find the enclosed resubmittal for Express Stormwater permitting of the proposed Marine Mart Convenience Store at Courthouse Bay, Camp LeJeune. Because the originals were sent with the last submittal, only originals that have changed are included herein. If you Have any questions or comments, please call meat 636-391-4585 or email meat Mickie.redhage(c).bisfei.com. Any action shown above is subject to terms of contract and does not relieve addressee from his obligations under the contract. If enclosures are not as noted, please notify us at once. By: Mickie Redhage Please sign and return one (1) copy to us. Rec'd By: • BIS FRUCON ENGINEERING INC. : `c, 15933 CLAYTON ROAD • SUITE 305 • BALLWIN, MISSOURI 63011 (636) 391-4300 • Fax: (636) 391-4462 JUN 0 9 2010 BY:_6r,PceS` m -BILFINGER BERGER Industrial Services June 8, 2010 Mary Jean Naugle NC DENR 127 Cardinal Drive Extension Wilmington, NC 28405 :3 JUN 0 9 2010 Frucon Bls Engineering Phone: 636 391 4300 Fax: 636 391 4497 RE: Marine Mart Convenience Store at Courthouse Bay, Onslow County Stormwater Project No. SW8 100406 Responses to Comments Dated 5-26-2010 Dear Ms. Naugle: Please find the enclosed resubmittal for Express Stormwater Permitting of the proposed Marine Mart Convenience Store at Courthouse Bay, Camp Lejeune. This resubmittal is in response to your comments dated May 26, 2010 with additional clarification from Linda Lewis from your office via email on June 2, 2010. Itemized below are the comments given along with responses describing how each comment has been addressed. Comment: Please either delineate all wetlands on site, disturbed or undisturbed, or note on the plans that none exist within the permit area. It is not permissible to locate stormwater BMP's within wetlands. Response: Note #4 has been added to sheet C-103 stating that no wetlands exist within the permit area. 2. Comment: All bioretention cells must be designed with a pretreatment area. Options for pretreatment devices are discussed on page 12-11 of the BMP Manual. Without a forebay or other pretreatment device, sediment can collect on top of the bioretention cell, clog the soil media, and become a maintenance burden. The supplement reports pretreatment is provided, however, none is shown on the plans. Response: Both bioretention areas have been designed with gravel and grass pretreatment, which is option 1 on page 12-11 of the BMP Manual. This has been clarified on the grading plan sheet C-103 as well as the bioretention section on sheet C-503. A forebay with level spreader has been added to Bioretention Area B where the roof drain discharges to the bioretention area; the forebay detail has been added to sheet C-103. Level spreader calculations have been added to the calculation package on pages A-21 and A-22, and a level spreader supplement form is included as well. Corporate Office 15933 Clayton Road, Suite 305 4019 Woodcock Drive 3520 Thomasville Road 2600 South Shore Blvd. Ballwin, Missouri 63011 Suite 200 Suite 200 Suite 300 www.bisfei.com Jacksonville, Florida 32207 Tallahassee, Florida 32309 League City, Texas 77573 Page 2 of 4 3. Comment: Please add bioretention basin details on the plans, including a layout plan view with contour and dimensions and a section view with depths and elevations. Response: The bioretention plan on sheet C-103 has been revised to show more detail, including the top and bottom contours of the bioretention areas. The contours at the downstream end of the level spreader and filter strip for area A have been revised as well to provide smooth flow into the western ditch. The bioretention section view on sheet C-503 has been revised to clearly indicate that it is applicable to both areas A and B. Comment: Please provide inflow into bioretention facilities at or below 3 fps for grassed cells or use an energy dissipating device or a flow spreader device. The provided calculations report an inlet velocity from the paved area of 4.25 fps into BMP A. Inlet flow into BMP B is through a pipe and therefore needs a flow spreader to promote sheet flow. Provide details on the plans for the flow spreader and for the inlet devices on both BMPs A and B. The 3 ft. wide riprap area at the inlet to BMP B is good for energy dissipation but is not sufficient to provide sheet flow. Response: The sheet flow velocity into the bioretention facilities has been calculated using the equation published in the National Resources Conservation Service document "Urban Hydrology for Small Watersheds" (TR-55) published June 1986. These calculations are included in the calculation package on pages A-16 through A-18. The overland flowrate to Bioretention Area A is calculated to be 2.48 fps. The overland flowrate into Bioretention Area B is calculated to be 2.78 fps. Both velocities are below the 3 fps maximum allowable. The pipe inlet to Bioretention Area B has been provided with a forebay and level spreader designed per Section 8.3.4 of the BMP Manual. These calculations are included beginning on page A-21 of the calculation package. 5. Comment: Since grassed cells are used, please specify on the plans that bioretention cells must be grassed with sod and the sod must not be grown in soil with an impermeable (clay) layer in accordance with BMP design element 20. Note 1 on drawing # C-503 mentions sod on forebay slope, but the entire area needs to be sodded and it must be specified that no impermeable layer exists and is verified at construction. Response: The entire cells are now shown to be sodded. Note 3 of the bioretention section on sheet C-503 requires that no impermeable layer exist within the sod. Comment: Please label the topsoil stockpile area on the level spreader for BMP B as "temporary during construction only" or take it off the stormwater plans. The JUN 0 9 2010 ;3 Y: Page 3 of 4 temporary stockpile area should be on the Erosion Control plans, but is not needed on the stormwater plans. Response: The topsoil stockpile area has been labeled as 'temporary' on sheet C-104. Comment: Please complete the required items checklist for the bioretention supplement in Section III items 5 and 6 on BMP A. Response: The supplement checklist has been completed and is included in the resubmittal package. 8. Comment: Please correct the elevation on drawing # C-503 for the bioretention cross section, which reports the undisturbed elevation is at 34.63 ft. when the bottom of the cell is reported at 33.8 ft. Response: The undisturbed subgrade elevation has been corrected to 33.8. 9. Comment: Please demonstrate on the plans that the road entrance on the southwest corner of the permit area is routed to the BMP. It appears from elevations that the area is slopped off the permit area. If slope and contour cannot be modified to route runoff to the proposed BMP A, please provide treatment. You may consider an underground trench for that area of the paving. Response: Per your suggestion, the southwest road entrance area has been regraded to slope as much pavement as possible into the bioretention area. Approximately 0.04 acre slopes off the permit area. An underground infiltration trench was considered, but is not permissible at the southwest corner of the site per Chapter 16 of the BMP Manual due to the lack of elevation between the SHWT (31.8) and the pavement (34.0±). Installing the infiltration trench further to the east along the driveway is not recommended due to conflicts with the existing water mains buried in that utility corridor. Though a trench drain could be installed under the pavement near the roadway, draining into the ditch, doing so would create a point discharge, which is thought to be less desirable than the overland flow currently shown. 10. Comment: Utility and non-stormwater details are not needed on these plans for the state stormwater application. The Division does not have storage for plans with non -related information such as details for marquee signs, fences, fire hydrants, etc... Civil, stormwater and paving details are needed. Non -essential plan sheets will be removed from the approved plan set. 12:F`C➢y`I E)D "I'll", I09l", BY: 3 Page 4 of 4 Response: The details sheets have been rearranged to include paving details on sheet C-503. The sign detail has been removed from sheet C- 503. Sheets C-501 and C-502 are not included in the resubmittal. 11. Comment: Due to the additional review time that will be needed in the express review program, please submit a reapplication fee of $500. Response: The -requested check has been included in the resubmittal. If you have any further questions or comments, feel free to contact me at 636-391-4585 or by email at Mickie.Redhage(a)bisfei.com . I look forward to receiving your approval soon. Sincerely, Mickie Redhage, P.E. BIS FRUCON ENGINEERING, INC. cc: File David Towler, Camp Lejeune Kelly Snook, Centennial Contractors, Inc. Dennis Collins, BFEI �J $ID JUN (; 9 2010 Lewis,Linda From: Lewis, Linda Sent: Wednesday, June 02, 2010 6:13 PM To: Naugle, Mary; Redhage, Mickie K Cc: Towler CIV David W Subject: RE: SW8 100406 Marine Mart at Courthouse Bay State Stormwater Mickie: Mary Jean asked me to respond to your questions regarding the additional information letter dated May 26, 2010. #2- An 8" gravel strip with a 3' grassed strip after it is sufficient pre-treatment, per the BMP Manual. Does the Bioretention Cross Section on C-503 apply to both BMP's A and B? I see the notes in BMP "B" for the gravel strip and the grass strip, but I don't see a comparable note for BMP "A". Also, is it your intention to run the gravel / grass pretreatment device only along the pavement edge, or along the perimeter of the BMP? I think that is what is confusing us on the bioretention cross section detail on C-503 because the pretreatment device is incorporated into that detail, and there's no way to tell where the pretreatment device begins and ends. #3- The Section view provided on C-503 is sufficient, but a more detailed plan view is needed. The grading plan on C-103 needs to show precise, separate, labeled lines on the plan that are the proposed bottom contour at elevation 35.8 and the storage contour at 36.8. The proposed contour should be darkened up to stand out better. Right now, I am guessing as to the location and extent of those 2 contours. There are areas where the proposed spot elevations and the contour conflict. Also, I am confused over how the grading for the vegetated filter for BMP "A" works. It does not appear to follow the detail on C-503. The grade in the filter drops from 36.8 to 34.3, but then has to rise back up and over the 35 in order to exit the site. It would be better if the vegetated filter dropped smoothly from 36.8 to 35 and just petered out into the ditch per the detail, The dimensions you have provided for the two cells are adequate. #4 — As long as the semi -circular level spreader at the piped discharge into Basin "B" has sufficient length to adequately disperse the piped discharge, that will be fine. We need some type of flow spreader at the piped discharge. I'd keep the gravel energy dissipater pad and add the level spreader after. You also need to deal with pre-treatment for that piped inflow as well. Perhaps a forebay would better serve that purpose. #7- The application indicates that these are grassed bioretention cells, so sod is required - not seed, not plantings and not mulch. Please remove the "plant" list from the plans and specify the sod type to be used in the cells. There are no other plantings except for sod that is required in a grassed cell. I do not know exactly what is required for "Assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized." I think this is a reference to the fact that bioretention should probably not be used as an erosion control device during construction. I would also take this to mean that the permittee needs to make sure that once the project is complete or no longer under the SEC plan, and the drainage area is stabilized, the planted cell will meet the design requirements. #9 — The rules require that all proposed BUA be collected and treated. It doesn't all have to drain to the same BMP. Multiple BMP's and BMP types are allowed to be permitted under one permit. If soils and SHWT are suitable, one solution might be an oversized (10 year storm) under the pavement rocked infiltration trench which could bypass directly into the road ditch. An alternate solution may be to look at revising the grading in that driveway to capture more of the runoff and direct it into the bioretention cell. Hope that helps to get you started on the revisions. Linda Please note my new email address is Linda.Lewis@ncdenr.gov :.l Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Naugle, Mary Sent: Friday, May 28, 2010 1:34 PM To: Redhage, Mickie K Cc: Towler CIV David W; Lewis,Linda Subject: RE: SW8 100406 Marine Mart at Courthouse Bay State Stormwater Mickie; I have to be out for a few days. Linda Lewis, the stormwater program manager, is going to reply to you on Tuesday or Wednesday by e-mail. You can have 5 working days to submit after Linda replies to you. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mart'. nauglec9ncdenr.go v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Redhage, Mickie K (mailto:Mickie.Red hage@bisfei.com] Sent: Friday, May 28, 2010 11:49 AM To: Naugle, Mary Cc: Collins, Dennis Subject: RE: SW8 100406 Marine Mart at Courthouse Bay State Stormwater Mary Jean, I have a few questions about your comments dated 5/26/2010. I need to discuss them before I can address some of them. I am out of the office today, but feel free to call me at home (314)518-1620. I will list a few of my questions below in case you cannot get to your phone today. Comment 2: I had proposed the 8" gravel/ T grass strip pretreatment described on page 12-11 of the BMP manual. Is this sufficient? If so, do I need to label it better? Comment 3: Is the section view on sheet C-503 not what you need to see? For the layout, do I need to combine the dimensions on sheet C-102 with the grading on sheet C-103, or do I need to create a new sheet? Comment 4: For the pipe inlet to Bioretention area B, could I call for a semicircular level spreader surrounding the pipe outlet, sized per BMP manual Chapter 8? Comment 7: Pertaining to items 4 and 5 on the Bioretention Area checklist, Are the planting requirements shown on sheet C-503 sufficient? What is required by the "Assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized"? Comment 9: A portion or the southwestern road entrance is below the elevation of the bottom of the basin since the bottom of the basin is above the road elevation. Where should the 'underground trench' that you suggest drain? The paved drainage area is 0.07 acres. Thank you for your help with these questions. I hope to meet all of your requirements with this resubmittal Mickie Redhage, PE BIS Frucon Engineering Inc. Civil Engineering Dept. 15933 Clayton Road Suite 305 Ballwin, MO 63011 E-mail: mickie.red hage(abbisfei.com Phone: (636) 391-4585 Fax: (636) 391-4497 From: Naugle, Mary [mary.naugle@ncdenr.gov] Sent: Thursday, May 27, 2010 7:52 AM To: Naugle, Mary; Redhage, Mickie K Subject: RE: SW8 100406 Marine Mart at Courthouse Bay State Stormwater Mickie; I am sorry that I missed your calls yesterday. We had an all day meeting. I have meetings this morning, I will call you this afternoon or tomorrow morning. Mary Jean Naugle NC DENR Express Permitting NC Division of Water Quality 127Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mary. naugle@ncdenr go v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Naugle, Mary Sent: Wednesday, May 26, 2010 9:48 AM To: 'mickie.redhage@bisfei.com' Cc: Towler CIV David W'; Russell, Janet Subject: SW8 100406 Marine Mart at Courthouse Bay State Stormwater Please find attached the additional information request for this stormwater application. Mary Jean Naugle NCDENR Express Permitting .J " NC Division of Water Quality 127Cardinal Drive Ext, Wilmington, NC 28405 910-796-7215 910-796-7303 910-350-2004 fax mary. naugle @ncdenr.go v Please note: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Notice: This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying, distribution, reliance or other use by unintended recipients is prohibited. If you've received this message in error, please advise by replying to this message and deleting it from your computer. Notice: This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying, distribution, reliance or other use by unintended recipients is prohibited. If you've received this message in error, please advise by replying to this message and deleting it from ' your computer. MEMORY TRANSMISSION REPORT TIME :05-26-'10 11:09 PAX NO.1 :910-350-2018 NAME :DENR Wilmington FILE NO. 143 DATE 05.26 11:08 TO : 8 919104512927 DOCUMENT PAGES 2 START TIME 05.26 11:08 END TIME 05:26 11:0 PAGES SENT 2 STATUS OR * SUCCESSFUL TX NOTICE gq�R North Carolina Department of Environment and Natural Resources Division of Water Quality Bayarly Eaves Pardus Colson H. Sullins 0.0 Freeman GOvamor Director Sscratory May 20. 2010 Carl Baker, Deputy Public war m Officar Commanding OMlcsr, un MCB Camp L.l.unn Bldg 1005 Michsol Road Camp Lefaun., NC 28542 aubj.at R..... t for Additional Inforrrrallon 8tofrrweter Project No- SWS 100406 Marine Mart at C...... a. Bay Q..low County Einar Mr. Baker: Tha eWilmington riagional Office r vad an Exprass Storrnwatar Manmgsmont Parrmit Application far Marine Mart at Caurthounn any an Me, 19, 2010- A prellmin.ry nWiew of that inforrt\adon has autarminad that tho appllcatlOn Is not complata. Tno following Information In nOOdod to continuo the .tormw.t.r review: 1. Plans. either dellnaats all wetlands on It.. dinturb.d o ndlaurbad, or not. on the plan. that none exist within the permit aroa_ It 1n not perrnlsslbla to locate .tormwater BMP'n within wetlands. 2_ All bloratantlon calls must be designed with a pralramtm.nt area. Options for pratrentmant devlcn i era discussed on page 12-11 of the BMP Manual. Without a foroboy or other pretreatm.nt device. .adlmant can collect on top of the bloratantlon call, clog iha soil r atlla, and become a rnalntananca burden. The supplentant reports pns1r.atmen4: 1. provided, however, none Is shown on the plane. 3- PI .... ..a bloratantlon basin details on the plan.. InrJuding a layout plan vl.w with comour and dimensions and s section vlaw with depths and elevation.. 4. Please Provlde inflow Into bloretentlon facllltien at or below 3 fps for greased call. or us. an energy dissipating dovioo or a now spreader davico. -rho provided calculations ropart an inlet velocity from the p.v.d area of 4.25 fps Into 0MP A. Inlet flow Into 13MP cl 1. through a pip. and th.relore nand. a flow spreader to promote sheet flow. Provida details on the plans for the flow spreader and for tha Inlet devices an both BMPs A and B. Tha 3 ft. wide riprap area at tho inlet to BMP B In good for .nergy disapatlon but 1. not sufficient t0 provid.."set flow- S. alnca aranaad calla ans used, plann. npeolfy an the plane that bloratantlon rlaile rnuat he grassed with sod and the nod must not be grown In sell with an Impermsabls (Clay) layer in aceordonee with BMP dacign element 20. Note 1 on drawing 0 0-50a ma lions cod on forabay atop., but the -"it'- area need. to be .added and it .aunt be spacllled that no Impermeable layer sxlete and to verified at constfuotion. - a. Please label the topsoil stockplls area on the level spreader for BMP B as "temporary during onatruction only" or take it off lhu stormwatar plans. "rho temporary stockpile area should ba on the Eronlon Control plane, but In not needed on the ntormwetar plans. Wtll'mlrgbn Rpbnrl OXb p umin.l o�na er\aa�rv.. w�mn,va.. no.v. cemrl,.. teeoe TI ° Carolina Pryn.: 910.)Gn-'!t\6 \ P1VC 910J60J(Ot \!.`�.Iwwf Berviu' \-0t'1$]l8f.t Inlan�el a�e'�.r�c�.nb�gwllry.aq - /t /Qtu�r���,/ MEMORY TRANSMISSION REPORT FILE NO. DATE TO DOCUMENT PAGES START TIME END TIME PAGES SENT STATUS 144 05.26 11:08 S 916363914497 2 TIME :05-26-'10 11:10 FAX NO.1 :910-350-2018 NAME :DENR Wilmington SUCCESSFUL TX NOTICE *** North Carolina Department of Environment and Natural Rosources Division of Water Quality Beverly Eaves Perdua Calash H. Sullins Doe Freeman Governor Director Secretary May 20. 2010 Carl Bak.1, Deputy Public Work. Officer Commanding Offican US MCn Osmp L.J.une Bldg 1006 Michael Road d Camp LoJouna. NC 26a42 BubJ.ct: t far St.mhw.ter P ojaot Mo. Swe 100406 Morin. Mart at Courthoua. Bay Onalow County Oavr Mr. Bakac The Wilmington Kagional Onlco rocalvatl n Exproaa atormwatar Management Perntlt Application for Marina Mart at C........ Bay an May, 10. 2010. A prellminary review of that information has e.term inad that the application is not complota. Ttra following Inform.tlon la Headed to continue tn. .tormwator review: 1. Ploaaa aithor cialinaata all woumnds an site, dlaturhed or unciaturherl. or nuts nn the plans that nona ..let within tn. permit area. It Is not parmisslbla, to locate atormwatar BMP's within w.tlende. 2. All bioratomion calls must lea daaignad with a pretreatment area. Optlona for pretreatment devlcas are disc .... d On P.O. 12-11 of th. BMP Manual_ Without a forobay or otter pratraalm.nt device, sediment can collect on top of the bioratantlon cell. clog the moll m.dla, and become a mamtenancp burden. Tha supplement reports pretreatment Is provided. however. nona is shown on the piano. 3. Plessa add biomtantlon baain datalls on the plans. Including a layout plan view with contour and dimsnelanm and a motion view with depth. and olovationa. 4. Pl.... provide inflow Into blOret.nu.n facilities at or below 3 fps for grOsaad calla or use an energy dissipating device or a now sproadar ciaviae. This provldad cadcuintionn report an Inlet velocity from the paved area of 4.25 fps Into BMP A. Inlet flow Into BMP B I. through a pipe and themfora n.aa. a flow spreader to promote sheet now. Provide Oatmilm on the plane for the flow spreader and for tn. Inlet d.vices on both BMPa A and B. Tha 3 R_ wide riprap area at the Inlet to BMP B is good for ..orgy dissipation but 1. not euf/Icl.nt to provide sheet flow. a. Since greased calla are used. plesee mpeowy on the plane that blorstantion cells must bo grmanad with cod and the cod must not be grown in .oil with an impormoablo (cl.y) toyer In sac.roance with BMP design alamont 20. Note 1 on tlrawing p C-503 me tions nod On forsbay elope, but tn0 Onura a ...On to he sodd.d .ne It must be specified that no Imparmoabla layer axiet& and In vsrifisd at construction. a. Pleas I.bal tn. topsoil stockpile area on the I.v.1 a,ro.osr for BMP B as 'Yamporary during construction only- or take it off the stormwaler plans. Tha temporary smakpils area .houlo lea on tn. Erosion Control plans, but Is not need.d on the stofmwater plans. ph Ca NCO IlB9,lw Ei,arubn. Wllml�abn. NON, C�wiw zMMJ - zt6 \ FM%: A\1)3RO-10Ot \ (Sebnr� aprvlw' 12rr-0ztOrb lnbme. www.AMrequsllboR ♦n 5V�/ Wpo-�in�N\ na.mwiv� weuen empe� r`4p Caro a .2vatura1lny r PIA NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor May 26, 2010 Division of Water Quality Colleen H. Sullins Director Carl Baker, Deputy Public Works Officer Commanding Officer, US MCB Camp Lejeune Bldg 1005 Michael Road Camp Lejeune, NC 28542 Subject: Request for Additional Information Stormwater Project No. SW8 100406 Marine Mart at Courthouse Bay Onslow County Dear Mr. Baker: Dee Freeman Secretary The Wilmington Regional Office received an Express Stormwater Management Permit Application for Marine Mart at Courthouse Bay on May 19, 2010. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Please either delineate all wetlands on site, disturbed or undisturbed, or note on the plans that none exist within the permit area. It is not permissible to locate stormwater BMP's within wetlands. All bioretention cells must be designed with a pretreatment area. Options for pretreatment devices are discussed on page 12-11 of the BMP Manual. Without a forebay or other pretreatment device, sediment can collect on top of the bioretention cell, clog the soil media, and become a maintenance burden. The supplement reports pretreatment is provided, however, none is shown on the plans. 3. Please add bioretention basin details on the plans, including a layout plan view with contour and dimensions and a section view with depths and elevations. 4. Please provide inflow into bioretention facilities at or below 3 fps for grassed cells or use an energy dissipating device or a flow spreader device. The provided calculations report an inlet velocity from the paved area of 4.25 fps into BMP A. Inlet flow into BMP B is through a pipe and therefore needs a flow spreader to promote sheet flow. Provide details on the plans for the flow spreader and for the inlet devices on both BMPs A and B. The 3 ft. wide riprap area at the inlet to BMP B is good for energy dissipation but is not sufficient to provide sheet flow. Since grassed cells are used, please specify on the plans that bioretention cells must be grassed with sod and the sod must not be grown in soil with an impermeable (clay) layer in accordance with BMP design element 20. Note 1 on drawing # C-503 mentions sod on forebay slope, but the entire area needs to be sodded and it must be specified that no impermeable layer exists and is verified at construction. 6. Please label the topsoil stockpile area on the level spreader for BMP B as "temporary during construction only" or take it off the stormwater plans. The temporary stockpile area should be on the Erosion Control plans, but is not needed on the stormwater plans. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX: 910-350-20041 Customer service: 1-877-623-6748 North]Carol Ina Internet: vvvrv.ncvvaterquality.org Va{�yin l / An Equal Opportunity l Affirmative Action Employer (/VKL sf4`(a/L1. Please complete the required items checklist for the bioretention supplement in Section III items 5 and 6 on BMP A. 8. Please correct the elevation on drawing # C-503 for the bioretention cross section, which reports the undisturbed elevation is at 34.63 ft. when the bottom of the cell is reported at 33.8 ft. 9. Please demonstrate on the plans that the road entrance on the southwest corner of the permit area is routed to the BMP. It appears from elevations that the area is slopped off the permit area. If slope and contour cannot be modified to route runoff to the proposed BMP A, please provide treatment. You may consider an underground trench for that area of the paving. 10. Utility and non-stormwater details are not needed on these plans for the state stormwater application. The Division does not have storage for plans with non -related information such as details for marquee signs, fences, fire hydrants, etc... Civil, stormwater and paving details are needed. Non -essential plan sheets will be removed from the approved plan set. 11. Due to the additional review time that will be needed in the express review program, please submit a reapplication fee of $500. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to June 4, 2010, or the application will be returned as incomplete. The return of a project will necessitate re -submittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If that occurs, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. Any original documents that need to be revised have been returned to the engineer or agent. All original documents must either be revised and returned, or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7303 or email me at mary.Naugle@ncdenr.gov. Sincerely, 4M.J.'N ugle C, GDS/mjn: S:\WQS\STORMWATER\ADDINFO\2010\100406 may10 cc: Mickie Redhage, BIS Frucon Engineering, Inc. 636-391-4585, fax: 4497 M.J. Naugle W IRo Page 2 of 2 REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS MARINE MART AT COURTHOUSE BAY MCB CAMP LEJEUNE, NORTH CAROLINA PREPARED FOR: MS. MICKIE REDHAGE, P.E. BIS FRUCON ENGINEERING, INC. 15933 CLAYTON ROAD SUITE 305 BALLWIN, MISSOURI 63011 ECS CAROLINAS, LLP. PROJECT NO.: 22.15452 JANUARY 15, 2010 MAY 1 7 2010 BY: _Evc_s.s _ DIVISION OF WATER QUALITY INFILTRATION SYSTEM INVESTIGATION Scheduled Site Visit Date and Time 31161401z) Cam/ Project Name: ?-�y County: Dns/bw Street Address: r_orner i 4r"t^Aon X AIC Hw; I?7 an,4 ffa n Mond Directions from the nearest intersection of two major roads: SF Cc� rrier DrAc 04rse(4ion of NC V 4 W4rr /?)- and Na'n ':R�od >1 acre being disturbed? 0 NO CAMA Major required? YES Consultant Name:-Mic it,..t�t.hr'c _Phone:lv3o 391 A/Sg5 Consultant Firm Name:-br5 Fruron Fna;navrna ; Inc Bore Number 1 2 3 4 5 6 7 a Existing Ground Elevation 3' b Proposed Bottom Elevation �6 c Subtract a — b d Add 2 ft. Min. Bore Depth) e Soil Type Infiltration Rate OK? Actual Elev. Of SHWT b ' h Max. lowest bottom elev. IOur lurt- Required Attachments: 1. Legible vicinity map & written directions to the project. 2. Compete Soils Report. 3. Map of the site with the boring locations to be tested. All proposed infiltration areas and existing, active utility lines located within the proposed basin/trench must be marked and flagged. If these areas are not flagged, the Soils Scientist reserves the right to decline to do the investigation. If the proposed infiltration system will be located in an area of existing pavement and there is no open area nearby, equipment capable of breaking through the impervious layer must be provided. The soils investigation does not take the place of a soils report prepared by an appropriate professional. The Soils Scientist will only verify the soil conditions that are reported in the Soils Report, and make a determination as to the suitability of the site to meet the infiltration design requirements under NCAC 21-1.1000, and assumes no liability should the system fail. S:\WQS\STORMWATER\FORMS\infiltration site visit.for Project: Marine Mart Convenience Store at Courthouse Bay, Camp Lejeune Comments from Express Permitting Meeting with INC DENR Meeting Date: 5-4-2010 Category Comment Response Replace point designators on Grading Drawing, sheet C103 Spot elevations are now shown on the C-103 Grading drawing. 1 Stormwater with elevations. Add planting information to the plans, specifically, number of The requested planting information has been added to detail sheet 2 Stormwater plants, spacing, and types/species should be shown C-503 as well as to the Bioretention Supplement forms. Send copy of BMP Chapter on Bioretention to Landscaper for The appropriate BMP was forwarded electronically to the 3 Stormwater his reference. landscaper on 5/5/2010. Add note about wetland evidence to plans. The requested note was added as part of General Note 7 on sheet 4 Stormwater C-001. Silt fence should use steel posts and trench shown is improper The details on sheet C-504 have been revised to incorporate the 5 E & SC size. Rhonda has provided NC specific detail for silt fence and requirements of the North Carolina standard details. construction exit. 'Limits of Construction' should be changed to 'Limits of The requested correction has been made on sheets C-102, C-103, 6 E & SC Disturbance' on the plan sheets. and C-104. Add Erosion and Sediment Maintenance note to details on The requested maintenance note has been added to the details on 7 E & SC sheet C-504. sheet C-504 as well as to Erosion and Sediment Control Plan sheet C-104. 100 Lf. of silt fence shall be provided per each 1/4 acre of The plans comply with the required amount of silt fence. A note 8 E & SC disturbed area. Document this on the plan. has been added to sheet C-104 confirming the requirement. Specify planting media along with planting information Planting media has been specified per the NC DENR Stormwater required in item 2 above on Bioretention Supplement Forms. BMP manual chapter 12, section 12.3.4. The specification has been added to the Bioretention Supplement forms as well as to the 9 Stormwater Bioretention detail notes on sheet C-503. Add Bioretention inlet velocity to Bioretention Supplements Bioretention inlet velocity has been added to the calculation file, 10 Stormwater and calculations. I pages A-15 and A-16. MAYIg2010 ^Y. Label Bioretention Areas and Level Spreader/Filter Strips as A Bioretention, Level Spreader and Filter Strip areas have been 11 Stormwater and B on the plans corresponding to the calculations and identified as A and B on plan sheetc C-102, C-103 and C-104. supplement forms. i Due to the sandy soil onsite, backfill the silt fence trench with The silt fence detail on sheet C-504 has been modified to require 12 E & SC gravel. gravel backfill in the silt fence trench. The drainage area map included in the calculation package The drainage area map has been resized as requested and is 13 Stormwater should be full-size instead of 11x17. Two copies of the included with the Stormwater calculations. drainage area map shall be submitted. Add velocity calculations for Level Spreader and Filter Strip. Velocity calculations for level spreader have been added to the 14 Stormwater level spreader calculations in the calculation file. Add stockpile detail to plans. Stockpile shall have 2:1 A stockpile detail has been added to sheet C-504. 15 E & SC maximum side slopes with a 10-foot maximum height. Soil stockpile shall be surrounded with silt fence. Add note to plans requiring soil materials hauled offsite or The requested note has been added to sheet C-001 as Grading 16 E & SC materials brought in from offsite shall come from/go to an Note 14. approved/permitted facility. Project Name: Project No.: LETTER OF TRANSMITTAL Marine Mart at Courthouse Bay, Camp Lejeune Frucon Bis Engineering May 12, 2010 File No.: 5.0 805322.18 Transmittal No.: 006 To: NC DENR 127 Cardinal Drive Extension Wilmington, NC 28405 Attention: Janet Russell 910-796-7421 We are sending ❑ Herewith ® Delivered via UPS Description: IFA —DENR Express Stormwater Submittal cc: Kelly Snook, CCE David Towler, Camp Lejeune DPW rcc: File Vendor: Manufacturer: UPS Tracking # 1Z 697 AW4 02 9847 0499 Equipment No.: ® Drawings ❑ Sepias ❑ Specs ❑ Shop Dwgs. ❑ Samples ❑ Change Notice ❑ Copy of Ltr. ® Other No. of Date Copies Title/Description 5LPD 1 Check for $4,000 � ' 1 4-28-2010 Checkfor$195 —La- 1 Bioretention Operation and Maintenance Agreement — Area A 1 Bioretention Cell Supplement —Area B 1 Bioretention Operation and Maintenance Agreement — Area B 1 Level Spreader, Filter Strio Supplement — Area A 1 Filter Strip and Level Spreader Operation and Maintenance Agreement - Area A 1 Filter Strip and Level Spreader Operation and Maintenance Agreement - Area B 1 Copy of Soils Report with Infiltration Test Supplement for Area B and NRCS Soils 1 List of Comments from Meeting 5-4-2010 1 List of Comments from Meeting 5-4-2010 1 Pi—';ol P-- =-- I A� py 19 '��t' Roennndhllfl•. This transmittal affects These Are: Preliminary Informational As Requested Advance Copy Remarks: ® Engineering For: Approval Your Use Review & Comment 11 Files & Distribution Fabrication n Construction ❑ Procurement ❑ Construction Action Legend: 1. No exceptions taken, addressee can proceed with fabrication and/or construction. 2. Addressee can proceed based on making revisions noted. Submit corrected copy for file. 3. Revise as noted and resubmit. Hold fabrication or construction. 4. Submit copies for distribution/file. Any action shown above is subject to terms of contract and does not relieve addressee from his obligations under the contract. If enclosures are not as noted, please notify us at once. By: Mickie Redhage _ Please sign and return one (1) copy to us. Rec'd By: Date: BIS FRUCON ENGINEERING. INC. 15933 CLAYTON ROAD • SUITE 305 • BALLWIN, MISSOURI 63011 (636) 391-4300 9 Fax: (636) 391-4462 309391 CENTENNIAL CONTRACTORS, -. SUNTRUSr $UP(IYtUST I ENTERPRISES INC . 3111711 SUNSET HILL ROAD SUITE 350 0/550 I ' 'RESTON,`VA 20190 " ""� ., '- CONTROL NUMBER -L� 17031287-0000 - CHECK DATE. _ AMOUNT - s 4/201 010-:,'3093.91 $+}+ ++4,000.00 - :.Four Thousand and 00/100 - - ----'- - -- '- ---= -_ _ ___ _ . PAY VOID AFTER'180 DAYS .NORTH'CAROLINA DEPARTMENT OF-`.. d. - `.ENVIRONMENT&'NATURAL"_.RESOURCE -. -" •-` "' - ° TO THE 127 CARDINAL DRIVE EXTENSION ,.. O OFR,-WILMINGTON ,NC; 28405F 7 COiijoae4v�e ::Sw�/005�0� IOWITUR EOUIREO OVER 425.000.00 . N ;;o Iw1 1 mae� KV mAP—T b;k- cAme t-Ef J�� oPi E-�pR�SS SI�� llo r�� _!5 A& /0�1047 North Carolina Department of Environment and AA Natural Resources NC®ENR Request for Express Permit Review For DENR Use ONLY Reviewer. �t) Imo--" Submit: S — L4 lMP ,S Time: 51' 3d7 / Confirm: ,i r ZCo FILL-IN all the information below and CHECK the Permits) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. q�� Fn/n+Rnle�-I � - l 4,s • Asheville Region -Alison Davidson 828-296.4698;alison.davidsonCa)ncmail.net • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee(dncmail.net • Mooresville & -Patrick Grogan 704-663.3772 or patrick.grogan(o)ncmail.net • Washington Region -Lyn Hardison 252-946-9215 or Ivn.hardison(a).ncmail.net • Wilmington Region -Janet Russell 910-350-2004 or fanet.russell(a ncmail.net NOTE: Project application received after 12 noon will be stamped in the following work day. Permits of request SW SW SW SW SW Or 1 Project Name: MARINE MART CONVENIENCE STORE County: ONSLOW Applicant: CARL BAKER Company: US MOB CAMP LEJEUNE Address: BLDG 1005 MICHAEL ROAD City: CAMP LEJEUNE, State: NO Zip: 28542-_ Phone: 910-451-2213, Fax:910-451-2927, Email: carl.h.baker@usmc.mil Physical Location:SOUTHEAST CORNER OF THE INTERSECTION OF HORN ROAD AND NO HIGHWAY 172/SNEADS FERRY ROAD Project Drains into COURTHOUSE BAY waters — Water classification SA (for classification see-http://h2o.enr.state.nc.us/bims/reports/repor[sWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , within % mile and draining to class SA waters Y or within 1 mile and draining to class HOW waters? N Engineer/Consultant: MICKIE REDHAGE Company: BIS FRUCON ENGINEERING. INC. ��F Cam.➢ v Address: 15933 CLAYTON ROAD City: BALLWIN, State: MO Zip: 63011-_ Phone: 636-391-4585, Fax: 636-391-4497, Email: mickie.redhaoe@bis eiCom APR 2 1 2010 SECTION ONE: REQUESTING A SCOPING MEETING -ONLY ❑ Scoping Meeting ONLY ❑ DWQ, ❑ Di ❑ DLR, ❑ OTHER: LBY SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ Intermittent Perennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear fit or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bl Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ® High Density -Bio-Retention 2 # Treatment Systems ❑ High Density -SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems / ❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 2_4 acres to be disturbed.(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scopino and express meetina reauest Wetlands on Site ❑ Yes ® No Buffer Impacts: ® No ❑ YES: —acre(s) Wetlands Delineation has been completed: ❑ Yes ❑ No Isolated wetland on Property ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit Received from US ACOE ❑ Yes ❑ No *******«+•+++*+***««*«+++*++«x++x+xxx*xx**x**xxxxxxx*•**Ior DENR use onlyx*««««++«*++«*+xxrtxxxx***xx•xx••••**•xx••x•*•••sx♦*••+«***«« Fee Split for multiple permits:(Check# ) Total Fee Amount$ SUBMITTAL DATES Fee I SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; El Min) $ Sw (❑ HD, ElLD, El Gen) $ 401: $ LQS $ Stream Deter,_ 1 $ NCDENR EXPRESS March 2009 TM �LLp E C S C A R O L I N A S, L L P "Setting the Standard for Service" 6caGc®�owca� Geotechnical • Construction Materials • Environmental • Facilities January 15, 2010 Ms. Mickie Redhage, P.E. BIS Frucon Engineering, Inc. 15933 Clayton Road Suite 305 Ballwin, Missouri 63011 Re: Report of Subsurface Exploration and Geotechnical Engineering Evaluation Marine Mart at Courthouse Bay MCB Camp Lejeune, North Carolina ECS Project No.: 22.15452 Dear Mr. Brewer: As authorized by your acceptance of our proposal number 13005R, dated August 15, 2009, ECS Carolinas, LLP has completed a subsurface exploration for the subject project. This report presents the results of the field exploration; laboratory testing and engineering analysis, along with our recommendations for design of geotechnical related items. We appreciate the opportunity to be of service to you during the design phase of this project and look forward to our continued involvement during the construction phase. If you have any questions concerning the information and recommendations presented in this report, please contact us at (910) 686-9114 for further assistance. Respectfully submitted, ECS CAROLINAS, LLP U Winslow E. Goins, P.E. Project Engineer North Carolina License No. 033751 LiUt/lM � ' Walid M. Sobh, P.E. Principal Engineer North Carolina License No. 022983 c `rir> ) MAY 1 7 2010 BY: 7211 Ogden Business Park, Suite 201, Wilmington, NC 28411 • T. 910-686-9114 F: 910-686-9666 www.ecslimited.com ECS Carolinas, LLP • ECS Florida, LLC • ECS Illinois, LLC • ECS Mid -Atlantic, LLC ECS Southeast, LLC ECS Texas, LLP 34° 35 16" k_-IF WIA Custom Soil Resource Report Soil Map Map Srale-. 1:1,650 4 PnRE m A siu (B.S • 11') sMet. N Meters 0 20 40 60 120 N Fae 0 50 100 200 300 M.3s 16" 34° 36 11' REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING ANALYSIS MARINE MART AT COURTHOUSE BAY MCB CAMP LEJEUNE, NORTH CAROLINA PREPARED FOR: MS. MICKIE REDHAGE, P.E. BIS FRUCON ENGINEERING, INC. 15933 CLAYTON ROAD SUITE 305 BALLWIN, MISSOURI 63011 PREPARED BY: ECS CAROLINAS, LLP 7211 OGDEN BUSINESS PARK SUITE 201 WILMINGTON, NORTH CAROLINA 28411 ECS CAROLINAS, LLP PROJECT NO.: 22.15452 FIRM NO. F-1087 5/i INS. P.E. ��40FSAL / bIC�C 9f 9 - 03 7,51 - li I IE111\\\\ NC LICENSE NO. 033751 JANUARY 15, 2010 MAY 1 7 2010 BY: TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY......................................................................................................1 2.0 PROJECT OVERVIEW.........................................................................................................2 2.1 Project Information..........................................................................................................2 2.2 Scope of Work.................................................................................................................2 2.3 Purpose of Exploration....................................................................................................2 3.0 EXPLORATION PROCEDURES..........................................................................................3 3.1 Subsurface Exploration Procedures.................................................................................3 3.1.1 Soil Borings.............................................................................................................3 3.1.2 Hand Auger Borings and Infiltration Tests...............................................................3 3.2 Laboratory Testing Program............................................................................................4 4.0 EXPLORATION RESULTS...................................................................................................5 4.1 Site Conditions............................................................. 4.2 Regional Geology......................................................... 4.3 Soil Conditions.............................................................. 4.4 Groundwater Conditions ............................................... 4.5 Laboratory Test Results ................................................ 4.6 Season High Water Table and Infiltration Results ........ 5.0 ANALYSIS AND RECOMMENDATIONS ............................................ 5.1 Subgrade Preparation.................................................................... 5.2 Engineered Fill Placement............................................................. 5.3 Foundations Design....................................................................... 5.4 Floor Slab Design.......................................................................... 5.5 Seismic Site Class Determination and Liquefaction Potential ........ 5.6 Lateral Earth Pressures................................................................. 5.7 Excavation Conditions and Dewatering.......................................... 5.8 Pavement Recommendations........................................................ 59 Site Drainage ................................. 7 ................................. 7 ................................. 8 ................................. 9 ...............................10 ...............................10 ............... .......................................................... I............. 5.10 Construction Considerations.............................................................. ..........................11 ..........................11 ..........................12 ..........................13 ..........................13 6.0 CLOSING...........................................................................................................................14 APPENDICES APPENDIX A -FIGURES APPENDIX B-SPT BORING LOGS AND SOIL CLASSIFICATION SYSTEM, DESCRIPTION, AND TERMINOLOGY APPENDIX C-LABROTORY TEST RESULTS APPENDIX D-HAND AUGER BORING AND INFILTRATION TEST RESULTS APPENDIX E-GENERAL CONDITIONS APPENDIX F-PROCEDURES REGARDING FIELD LOGS, LABORATORY DATA SHEETS AND SAMPLES MAY 1 7 2010 BY: --- Report of Subsurface Exploration and Geotechnical Engineering Analysis Marine Mart at Courthouse Bay MCB Camp Lejeune, North Carolina ECS Project No.: 22.15452 1.0 EXECUTIVE SUMMARY This report contains the results of our subsurface exploration and geotechnical engineering analysis for the proposed site located at the intersection of Marine Road and N.C. Highway 172 in MCB Camp Lejeune, North Carolina. At the time of our field exploration, the site had recently been cleared. The site is relatively level with typical elevations ranging from 97 to 99 feet referencing the benchmark (existing manhole) elevation as 100 feet. ECS understands that the project will consist of approximately 5,200 square foot, one-story convenience store building with complete gas station facilities. ECS understands that a three -bay car wash is also proposed with vacuum area and a 2,000 square foot, tent -type canopy for automotive detailing. Project information including structural loads and site grading was not available at the time this report was prepared. Approximately 5 to 8 inches of organic topsoil was reported by the drillers at the borings locations. Beneath the surface to depths of 22 feet, the test borings typically encountered intermittent layers of very loose to medium dense silty and clean sands (SM, SP). From 22 feet to depths of 47 feet, the test borings typically encountered intermittent layers of very loose to loose silty and clayey sands (SM, SC) and very soft to firm sandy clays (CL). A Shelby tube was pushed in boring B-1 at a depth of 23 feet with 6 inches of recovery. From 47 feet to depths of 100 feet, the test borings typically encountered intermittent layers of loose to very dense silty and clean sands (SM, SP). In summary, the proposed building can be supported on conventional shallow foundations. For foundations designed and constructed in accordance with the recommendations provided in this report, a net allowable soil bearing pressures of 2,000 pounds per square foot (psf) is recommended for use in proportioning shallow foundations. We request the opportunity to review our foundation recommendations and make any necessary changes once building location, structural loads, and site design grades are determined. Specific information regarding ,the subsurface exploration procedures used, the site and subsurface, conditions at the time of our exploration, and our conclusions and recommendations concerning the geotechnical design and construction aspects of the project are discussed in detail in the subsequent sections of this report. Please note this Executive Summary is an important part of this report and should be considered a "summary" only. The subsequent sections of this report constitute our findings, conclusions, and recommendations in their entirety. Prepared By: Reviewed By: Winslow E. Goins, P.E. Walid M. Sobh, P.E. Project Engineer Principal Engineer ?tic C11�C`✓1�r� MAY 1 7 2010 J Jy Report of Subsurface Exploration and Geotechnical Engineering Analysis Marine Mart at Courthouse Bay MCB Camp Lejeune, North Carolina( ECS Project No.: 22.15452 2.0 PROJECT OVERVIEW 2.1 Project Information Our understanding of the proposed development is based upon our discussions with representatives of BIS Frucon Engineering, Inc. and a review of the site plan provided to ECS by BIS Frucon Engineering, Inc. The proposed site is located at the intersection of Marine Road and N.C. Highway 172 in MCB Camp Lejeune, North Carolina. At the time of our field exploration, the site had recently been cleared. The site is relatively level with typical elevations ranging from 97 to 99 feet referencing the benchmark (existing manhole) elevation as 100 feet. ECS understands that the project will consist of approximately 5,200 square foot, one-story convenience store building with complete gas station facilities. ECS understands that a three -bay car wash is also proposed with vacuum area and a 2,000 square foot, tent -type canopy for automotive detailing. Project information including structural loads and site grading was not available at the time this report was prepared. 2.2 Scope of Work The conclusions and recommendations contained in this report are based on the results of • six soil test borings, • visual examination of the samples obtained during our field exploration, • one hand auger boring with infiltration test, • the results of select laboratory index and engineering properties testing, • engineering analyses of the. field and laboratory findings with respect to the provided project information. 2.3 Purposes of Exploration The purpose of this exploration program was to determine the soil and groundwater conditions at the site and to develop .engineering recommendations to assist in the design and construction of the proposed project. We accomplished these objectives by: • performing a site reconnaissance to evaluate the existing site conditions, • drilling test borings to explore the subsurface soil and groundwater conditions, • perform hand auger borings to estimate seasonal high ground water table and perform soil infiltration tests, • performing laboratory tests on selected representative soil samples from the borings to evaluate pertinent engineering properties; and • analyzing the field and laboratory data to develop appropriate geotechnical engineering design and construction recommendations. Report of Subsurface Exploration and Geotechnical Engineering Analysis Marine Mart at Courthouse Bay MCB Camp Lejeune, North Carolina ECS Project No.: 22.15452 3.0 EXPLORATION PROCEDURES 3.1 Subsurface Exploration Procedures 3.1.1 Soil Test Borings The six soil test borings drilled on the site were performed using a track -mounted CME 45B drill rig utilizing various cutting bits to advance the boreholes. Mud rotary drilling was utilized to advance the borings. Representative soil samples were obtained by means of the split -barrel sampling procedure in general conformance with ASTM D-1586. In this procedure, a 2-inch O.D., split -barrel sampler is driven into the soil a distance of 18 inches by a 140-pound hammer falling 30 inches. The number of blows required to drive the sampler through a 12-inch interval is termed the Standard Penetration Test (SPT) value and is indicated for each sample on the boring logs in Appendix B. The SPT value can be used as a qualitative indication of the in -place relative density of cohesionless soils. In a less reliable way, it also indicates the consistency of cohesive soils. This indication is qualitative, since many factors can affect the standard penetration resistance value (i.e., differences between drill crews, drill rigs, drilling procedures, and hammer -rod - sampler assemblies) and prevent a direct correlation between SPT resistance value, or N- Value, and the consistency or relative density of the tested soil. Split -spoon samples were obtained at approximately 2.5-foot intervals within the upper 10 feet and at approximately 5-foot intervals thereafter. The approximate locations of the soil test borings are indicated on the Boring Location Plan in Appendix A of this report. The drilling crew maintained a field log of the soils encountered in the borings. After recovery, each sample was removed from the sampler and visually classified. Representative portions of each soil sample were then sealed in air -tight containers and brought to our laboratory in Wilmington, North Carolina for visual examination and formal classification by a geotechnical engineer in general accordance with the Unified Soil Classification System guidelines. 3.1.2 Hand Auger Borings and Infiltration Tests On December 23, 2009, one hand auger boring was performed at the site. The purpose of the hand auger boring was to stratify the subsurface soils and estimate the seasonal high water table of the subsurface soils. We evaluated the subsurface soil and ground water conditions by drilling the hand auger boring to a depth of approximately 70 inches below the existing ground surface at the approximate location indicated on the Boring Location Plan in Appendix A of this report. One infiltration test was performed at each hand auger boring location. We visually classified the subsurface soils on site. The results are provided in Section 4.6 and in Appendix D. In the hand auger borings, redoximorphic depletions and concentrations of iron, known as "drainage mottles", are used as soil indicators to estimate the seasonal high water table. These soil indicator features can form in a matter of days in ideal conditions and remain unchanged for decades or more after the water table has changed. Report of Subsurface Exploration and Geotechnical Engineering Analysis Marine Mart at Courthouse Bay MCB Camp Lejeune, North Carolina ECS Project No.: 22.15452 3.2 Laboratory Testinq Program Representative soil samples obtained during our field exploration were selected and tested in our laboratory to check field classifications and to determine pertinent engineering properties. The laboratory testing program included: • visual classifications of soil according to ASTM D 2487; • index property testing included natural moisture content determinations (ASTM D 2216), Atterberg limits analyses (ASTM D 4318) and grain size analyses (ASTM D 1140). • Corrosivity test (Sulfide soil (SM 4500-S2D), pH Soil (EPA 9045), Chloride in Soil (SM 4500- CI-E) and Sulfate Soil (ASTM D516-90) All data obtained from the laboratory tests are included on the Laboratory Testing Summary and in Appendix C of this report. The soil samples collected for this investigation will be retained at our laboratory for a period of sixty (60) days, after which they will be discarded unless other instructions are received as to their disposition. Report of Subsurface Exploration and Geotechnical Engineering Analysis Marine Mart at Courthouse Bay MCB Camp Lejeune, North Carolina ECS Project No.: 22.15452 4.0 EXPLORATION RESULTS 4.1 Site Conditions The proposed site is located at the intersection of Marine Road and N.C. Highway 172 in MCB Camp Lejeune, North Carolina. At the time of our field exploration, the site had recently been cleared. The site is relatively level with typical elevations ranging from 97 to 99 feet referencing the benchmark (existing manhole) elevation as 100 feet. 4.2 Regional Geology The site is located in the Coastal Plain Physiographic Province of North Carolina. The Coastal Plain is composed of seven terraces, each representing a former level of the Atlantic Ocean. Soils in this area generally consist of sedimentary materials transported from other areas by the ocean or rivers. These deposits vary in thickness from a thin veneer along the western edge of the region to more than 10,000 feet near the coast. The sedimentary deposits of the Coastal Plain rest upon consolidated rocks similar to those underlying the Piedmont and Mountain Physiographic Provinces. In general, shallow unconfined groundwater movement within the overlying soils is largely controlled by topographic gradients. Recharge occurs primarily by infiltration along higher elevations and typically discharges into streams or other surface water bodies. The elevation of the shallow water table is transient and can vary greatly with seasonal fluctuations in precipitation. 4.3 Soil Conditions Soil Test Borings Approximately 5 to 8 inches of organic topsoil was reported by the drillers at the borings locations. Beneath the surface to depths of 22 feet, the test borings typically encountered intermittent layers of very loose to medium dense silty and clean sands (SM, SP) Standard penetration test resistances (N-values) in these soils generally ranged from 1 to 14 blows per foot (bpf). ' From 22 feet to depths of 47 feet, the test borings typically encountered intermittent layers of very loose to loose silty and clayey sands (SM, SC) and very soft to firm sandy clays (CL). Standard penetration test resistances (N-values) in these soils generally ranged from W.O.H. (Weight of Hammer) to 7 bpf. A Shelby tube was pushed in boring B-1 at a depth of 23 feet with 6 inches of recovery. From 47 feet to depths of 100 feet, the test borings typically encountered intermittent layers of loose to very dense silty and clean sands (SM, SP). Standard penetration test resistances (N- values) in these soils generally ranged from 9 to 89 blows per foot (bpf). The descriptions provided in this section are a general summary of the subsurface conditions encountered within the test borings. The Test Boring Records in Appendix B contain detailed information recorded at each of the boring locations and represent the geotechnical engineer's interpretation of the data based on visual examination of the soil samples obtained during the field exploration. The stratification lines on the Test Boring Records represent approximate boundaries between material types and the actual transition between strata is expected to be gradual. I MAY 1 7 2010 T3Y: [. . 'ECS CAROLINAS, LLP "Setting the Standard for Service." Geotechnical • Construction Materials • Environmental • Facilities March 17, 2010 Ms. Mickie Redhage, P.E. BIS Frucon Engineering, Inc. 15933 Clayton Road, Suite 305 Ballwin, Missouri 63011 Reference: Report of Additional Infiltration Testing Marine Mart Site Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.15667 Dear Ms. Redhage: ECS Carolinas, LLP (ECS) recently conducted an additional infiltration evaluation for the proposed stonmwater best management practice (BMP) area at the Marine Mart site on Camp Lejeune, Onslow County, North Carolina. This letter, with attachments, is the report of our testing. Field Testing 06 March 16, 2010, ECS met onsite with Mr. Vince Lewis with the North Carolina Department of Environment and Natural Resources. ECS then conducted an exploration of the subsurface soil and groundwater conditions at one requested location shown on the attached Test Location Plan (Figure 1). The test area was field located with a boring location plan provided by BIS Frucon Engineering, Inc. The purpose of this exploration was to obtain subsurface information of the in -place soils for the proposed stormwater BMP area. ECS explored the subsurface soil and groundwater conditions by advancing one hand auger boring into the existing ground surface at the requested boring location. ECS visually classed the subsurface soils and obtained representative samples of each soil type encountered. ECS also recorded the groundwater level and the seasonal high water table (SHWT) observed at the time of the hand auger boring. The attached Infiltration Evaluation Form provides a summary of the subsurface conditions encountered at the hand auger boring location. The groundwater level and the SHWT were estimated at the boring location below the existing grade elevation. A summary of the findings are as follows: ;:Location Water Levee.'" " "" 7 ; SHWT _ 2 Winches 48 inches ECS has conducted an infiltration test utilizing a compact constant head permeameter near the hand auger boring to estimate the infiltration rate for the subsurface soils. Infiltration tests are typically conducted at two feet above the SHWT. If the SHWT is less than three feet, the tests are conducted at ten .inches below the surface elevation. 7211 Ogden Business Park, Suite 201, Wilmington, NC 28411 • T. 910-686-9114 • F: 910-686-9666 www.ecslimited.com ECS Carolinas, LLP • ECS Florida, LLC • ECS Illinois, LLC • ECS Mid -Atlantic, LLC • ECS Southeast, LLC • ECS Texas, LLP Report of Additional Infiltration Evaluation Marine Mart Site Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.15667 March 17, 2010 Field Test Results Below is a summary of the infiltration test results: Location Description Depth Inches/ hour 2 Tan fine SAND w/trace clay 24 inches 10.8 Infiltration rates and SHWT may vary within the proposed site due to changes in elevation and subsurface conditions. Closure The activities and evaluative approaches used in this assessment are consistent with those normally employed in assessments of this type. ECS's evaluation of site conditions has been based on our understanding of the project information and the data obtained during our field activities. ECS appreciates the opportunity to provide our services have any questions concerning this report or this project, 9114. Respectfully, ECS CAROLINAS, LLP K. Brooks Wall Project Manager Attachments: Figure 1 - Test Location Plan Infiltration Evaluation to you on this project. If you please contact us at (910) 686- w6wN M - A- Walid M. Sobh, P.E. Principal Engineer 2JE TEST LOCATIONS Marine Mart Site Camp Lejeune, Onslow Co., NC ECS Project No. 22-15667 March 16, 2010 KBW Figure 1—Test Location Plan Provided by: Bis Frucon Engineering, Inc. Additional Infiltration Evaluation Marine Mart Site Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.15667 March 17, 2010 Location Depth Soil Description 2 0-101, Gray fine SAND 10"-48" Tan fine SAND w/trace clay 48"-60" Tan/orange fine SAND w/clay lens Seasonal High Water Table was estimated to be at 48 inches below the existing grade elevation. Infiltration Rate: 10.8 inches per hour Test was conducted at 24 inches below existing grade elevation Groundwater was encountered at 60 inches below the existing grade elevation. Report of Subsurface E)vloration and Geotechnical Engineering Analysis Marine Mart at Courthouse Bay MCB Camp Lejeune, North Carolina ECS Project No.: 22.15452 4.4 Groundwater Conditions Groundwater observations were made at the completion of drilling and 24 hours after the completion of the drilling operations in all boring locations. Furthermore, visual observations of the samples retrieved during drilling exploration were also used in evaluating the groundwater conditions. The groundwater depths were observed to range from 2.0 to 6.0 feet below the existing grade after completion of the borings. The groundwater depths were observed to range from 7.4 to 10.4 feet below the existing grade 24 hours after the completion of the borings. The highest groundwater observations are normally encountered in the late winter and early spring. Variations in the location of the long-term water table may occur as a result of changes in precipitation, evaporation, surface water runoff, and other factors not immediately apparent at the time of this exploration. If long term water levels are crucial to the development of this site, it would be prudent to verify water levels with the use of perforated pipes or piezometers. 4.5 Laboratory Test Results Index and engineering properties tests were performed on select samples of the sample soils encountered within the test borings. In summary, the tested samples had in -situ moisture contents ranging from 15.6 to 57.5 percent. The grain size analyses of the tested samples indicated that the tested materials had 8.2 to 24.7 percent fines passing the number 200 sieve. The Atterberg limits analysis of the tested samples indicated a liquid limit of 38, a plastic limit of 19 and a plasticity index of 19. The corrosivity test analysis of the test samples indicated no detectable sulfide, a soil pH of 4.6, a chloride content of 610 mg/kg and a sulfate content of 1,090 mg/kg. Based on the results and AWWA C105-93, corrosion should not be a problem. However, protection against the chloride and sulfates in the soil should be considered. Specific laboratory test results are provided in the Laboratory Testing Summary and in Appendix C of this report. 4.6 Seasonal Hiah Water Table Test Results Based on observations in the hand auger boring, the seasonal high water level is estimated to be at the surface at the locations tested. The results of the hand auger borings, seasonal high water levels, and infiltration results are summarized below: SHWL Ground Infiltration Location (in.) Water (in.) Rate (in/hr) I-1 48 70 6.2 Report of Subsurface E)ploration and Geotechnical Engineering Analysis Marine Mart at Courthouse Bay MCB Camp Lejeune, North Carolina ECS Project No.: 22.1 W2 5.0 ANALYSIS AND RECOMMENDATIONS The recommendations provided in this report are based upon our understanding of the proposed construction, the information provided to us during this study and our past experience with similar conditions. Should any of the information provided to us be changed prior to final design, ECS should be notified to review these recommendations and make appropriate revisions, if necessary. 5.1 Subcarade Preparation The first step in preparing the site for the proposed construction should be to remove all vegetation, rootmat, topsoil, deleterious materials, and any other soft or unsuitable materials from the existing ground surface. These operations should extend at least 10 feet, where possible, beyond the planned limits of the proposed building and pavements. After proper clearing, stripping, grubbing, and prior to fill placement, foundation, slab, or pavement construction, the exposed subgrade soils should be carefully evaluated by an experienced geotechnical engineer to identify any localized unstable or otherwise unsuitable materials. After evaluating the exposed soils, proofrolling using a smooth drum vibratory roller, having an axle weight of at least 10 tons, is suggested to be used at this time to aid in identifying localized soft or unsuitable material which should be removed. The vibratory proofrolling will also densify the upper exposed subgrade soils and improve their load carrying capability. During this process, it may be necessary to allow groundwater brought to the surface during densification to recede prior to continued densification or subsequent fill placement. Any soft or unsuitable materials identified during proofrolling operations should be either repaired in -place or removed and replaced with an approved backfill placed and compacted in accordance with recommendations of this report. Site subgrade conditions will be significantly influenced by weather conditions. Subgrades that are evaluated after periods of rainfall will not respond as well to proofrolling as subgrades that are evaluated after periods of more favorable weather. We strongly recommend that rubber tire equipment not be used if subgrade conditions exhibit elevated moisture conditions. The contractor should use tracked equipment to minimize the degradation of stable subgrade. The preparation of fill subgrades, as well as proposed building subgrades, should be observed on a full-time basis by a representative of ECS. These observations should be performed by an experienced geotechnical engineer, or his representative, to ensure that all unsuitable materials have been removed and that the prepared subgrade is suitable for support of the proposed construction and/or fills. Report of Subsurface Exploration and Geolechnical Engineering Analysis Marine Mart at Courthouse Bay MCB Camp Lejeune, North Carolina ECS Project No.: 22.15452 5.2 Engineered Fill Placement Following the removal of deleterious surface and subsurface materials, and after achieving a stable subgrade, engineered fills can be placed and compacted to achieve the desired site grades. All fill for support of the proposed construction and for backfill of utility lines within expanded building and pavement limits should consist of an approved material, free of organic matter and debris and cobbles greater than 3 inches, and have a Liquid Limit (ILL) and Plasticity Index (PI) less than 40 and 20, respectively. We also recommend that all fills within structural areas have a modified Proctor (ASTM D 1557) maximum dry density of at least 100 pounds per cubic foot (pcf). Unsuitable fill materials include topsoil, organic materials (OH, OL), and high plasticity clays and silts (CH, MH). All such materials removed during grading operations should be either stockpiled for later use in landscape fills, or placed in approved on or off -site disposal areas. An examination of the soils recovered during our current exploration, and our previous experience in the area, indicates that the majority of the on -site soils will generally be suitable for re -use as engineered fill. However, it is expected that moisture conditioning of the fill soils will be required during placement to facilitate proper compaction. In some areas, substantial drying may be needed and it may not be feasible to attempt to re -use such materials as engineered fill. Existing soils containing significant amounts of organic matter will not be suitable for re -use as engineered fill. As such, the organic content of the near surface cultivated soils should be evaluated to determine if some of these soils will be suitable for re -use as engineered fill. Natural fine-grained soils classified as clays or silts (CL, ML) with LL and PI greater than 40 and 20, respectively, should be evaluated by the geotechnical engineer at the time of construction to determine their suitability for use as engineered fill. Prior to the commencement of fill operations and/or utilization of any off -site borrow materials, the contractor should provide representative samples of the proposed fill soils to the geotechnical engineer. The geotechnical engineer can determine the material's suitability for use as an engineered fill and develop moisture -density relationships in accordance with the recommendations provided herein. Samples should be provided to the geotechnical engineer at least 3 to 5 days prior to their use in the field to allow for the appropriate laboratory testing to be performed. Fill materials placed within the building and pavement areas should be placed in lifts not exceeding 8 inches in loose lift thickness and moisture conditioned to within their working range of optimum moisture content. The fills should then be compacted to a minimum of 95 percent of the soil's modified Proctor (ASTM D 1557) maximum dry density to within 12 inches below finished subgrade. The upper 12 inches of fills placed beneath structural development should be compacted to 98 percent of the soil's modified Proctor maximum dry density. The typical working range of optimum moisture for the natural Coastal Plain soils at the site is expected to be within approximately 3 percent of the optimum moisture content. Care should also be taken to provide a smooth, gently sloping ground surface at the end of each day's earthwork activities to help reduce the potential for ponding and absorption of surface water. 8 Report of Subsurface Exploration and Geotechnical Engineering Analysis Marine Mart at Courthouse Bay MCB Camp Lejeune, North Carolina ECS Project No.: 22.15452 Grade controls should also be maintained throughout the filling operations. All filling operations should be observed on a full-time basis by a qualified representative of ECS to determine that the required degrees of compaction are being achieved. We recommend that a minimum of one compaction test per 2,000-square-foot area be performed for each lift of controlled fill. The elevation and location of the tests should be clearly identified at the time of fill placement. Areas which fail to achieve the required degree of compaction should be re -worked until the specified degree of compaction is achieved. Failing test areas may require moisture adjustments or other suitable remedial activities in order to achieve the required compaction. Fill materials should not be placed on frozen, frost -heaved, and/or soils which have been recently subjected to precipitation. All wet or frozen soils should be removed prior to the continuation of site grading and fill placement. Borrow fill materials, if required, should not contain excessively wet or frozen materials at the time of placement. Additionally, if grading operations occur during the winter months, all frost -heaved soils should be removed prior to placement of engineered fill, granular sub -base materials, foundation or slab concrete, and asphalt pavement materials. If problems are encountered during the site grading operations, or if the actual site conditions differ from those encountered during our subsurface exploration, the geotechnical engineer should be notified immediately. 5.3 Foundation Design Provided the subgrade preparation and earthwork operations are completed in strict accordance with the recommendations of this report, the proposed construction can be supported on conventional shallow foundations bearing on approved natural materials and/or properly compacted fill. We recommend a net allowable design soil bearing pressure of 2,000 psf for proportioning continuous and isolated column footings. To reduce the possibility of foundation bearing failure and excessive settlement due to local shear or "punching" failures, we recommend that continuous footings have a minimum width of 18 inches and that isolated column footings have a minimum lateral dimension of 30 inches. Furthermore, all footings should bear at a depth to provide adequate frost cover protection. For this region, we recommend the bearing elevation be a minimum depth of 12 inches below the finished exterior grade or in accordance with the local building code requirements. We request the opportunity to review our foundation recommendations and make any necessary changes once structural loads and site design grades are determined. The net allowable soil bearing pressure refers to that pressure which may be transmitted to the I foundation bearing soils in excess'of the final minimum surrounding overburden pressure. The _ final footing elevation must be evaluated by ECS personnel to verify that the bearing soils are capable of supporting the recommended net allowable bearing pressure and suitable for foundation construction. These evaluations should include visual observations, hand rod probing, and dynamic cone penetrometer (ASTM STP 399) testing, or other methods deemed appropriate by the geotechnical engineer at the time of construction, in each column footing excavation and at intervals not greater than 20 feet in continuous footing excavations. The settlement of a structure is a function of the compressibility of the bearing materials, bearing pressure, actual structural loads, fill depths, and the bearing elevation of footings with respect to the final ground surface elevation. Estimates of settlement for foundations bearing 0 Report of Subsurface E)pIoration and Geotechnical Engineering Analysis Marine Mart at Courthouse Bay MCB Camp Lejeune, North Carolina ECS Project No.: 22.15452 on engineered or non -engineered fills are strongly dependent on the quality of fill placed. Factors which may affect the quality of fill include maximum loose lift thickness of the fills placed and the amount of compactive effort placed on each lift. Provided the recommendations outlined in this report are strictly adhered to, we expect that total settlements for the proposed construction are expected to be in the range of 1 inch or less, while the differential settlement will be approximately '/z of the anticipated total settlement. This evaluation is based on our engineering experience and the assumed structural loadings for this type of structure, and is intended to aid the structural engineer with his design. 5.4 Floor Slab Design Provide a suitable subgrade will be prepared as recommended herein, ground level slabs for the maintenance buildings can be designed as slabs -on -grade. Our findings indicate that a modulus of subgrade reaction (ks) of 125 pci is appropriate for design provided that upper 12 inches of the slab subgrade soils have been uniformly compacted to at least 98 percent of their modified Proctor maximum dry density. We recommend that all slabs -on -grade be isolated from the foundations so that potential differential settlement of the structure will not induce shear stresses in the floor slab. Also, to minimize the crack width of any shrinkage cracks that may develop near the surface of the slab, wire mesh reinforcement may be included in the slab design. The mesh should be located in the top third of the slab to be effective. We also recommend that all slabs -on -grade be underlain by a minimum of 6 inches of clean granular fill with less than 5 percent fines by weight to help prevent the capillary rise of subsurface moisture from adversely affecting the slab. If floor covering such as tile or carpet will be utilized for interior finishes, a polyethylene vapor barrier may be used beneath the floor slab for moisture control considerations. 5.5 Seismic Site Class Determination and Liquefaction Potential The 2006 Edition of the International Building Code (IBC) requires that a seismic Site Class be assigned for new structures. The seismic Site Class may be determined by calculating a weighted average of the N-values of subsurface materials to a depth of 100 feet. For the determination, the N-values recorded in the borings are used for overburden soil, and then, typically, all materials below the depth where refusal is encountered (to a depth of 100 feet) are assigned an N-value of 100. The method for determining the weighted average value is presented in Section 1613.5 of the IBC 2006. The weighted average N-value for the site is 10.9 and the corresponding seismic site classification is "E". 10 Report of Subsurface Exploration and Geotechnical Engineering Analysis Marine Mart at Courthouse Bay MCB Camp Lejeune, North Carolina ECS Project No.: 22.15452 Based on the USGS Seismic Hazard Curves and Uniform Hazard Response Spectra 2003 NEHRP Seismic Design Provisions, for a seismic site class "E" at latitude 33.5874 degrees and longitude-77.3594 degrees, the Sos value is 0.338g and the Sol value is 0.176g. The seismic design category depends on the design use of the building and should be determined by the structural engineer. The potential for liquefaction at the procedures developed by Seed and using a site specific peak ground magnitude of 7.0, the liquefaction approximately 1 inch. 5.6 Lateral Earth Pressures site is considered very low based upon the soil borings and Idriss. Based on our soil boring results and our evaluation acceleration of 0.135g and an earthquake event with a induced settlement at the subject site is estimated to be Any below -grade or retaining walls utilized for this project should be designed to withstand the lateral earth pressures exerted upon them. In the design of below -grade retaining walls to restrain compacted engineered fill or in -situ natural soils, the following soil parameters can be utilized: Active State Earth Passive State At Rest State Pressure Earth Pressure Earth Pressure Soil Unit Depth Coefficient Coefficient Coefficient Cohesion Weight 0-20' 0.36 2.77 0.53 0 psf 115 pcf These recommendations have assumed no surcharge loads. The recommended coefficient of friction is 0.40 for concrete over soil. The increased lateral pressures generated by surcharge loads (i.e. slopes, parking and building areas, etc.) should be considered in the design. Based on our subsurface findings, shallow groundwater levels were measured at the site. We anticipate that the below grade walls will be properly and adequately waterproofed. The wall should be designed to resist hydro static pressures. For wall conditions where wall movement cannot be tolerated or where the wall is restrained at the top, the "At Rest" earth pressure should be used. For wall conditions where outward wall movement in the range of 0.5 to 1 percent of the wall height can be tolerated, the "Active" earth pressure should be used. In evaluating the resistance of soil to lateral loads imposed by structures, the "Passive" earth pressure should be used. Please note that the full development of passive pressure requires deflections toward the soil mass on the order of 1 to 4 percent of the wall height. 5.7 Excavation Conditions and Dewatering Recommendations For excavations deeper than 8 feet, dewatering operations will likely be required. A series of well point systems will likely be required to draw down the water table and allow for construction. We recommend that this be implemented at the earliest possible date, as it may require several days if not weeks to lower the water table. We recommend budgeting for schedule delays and additional costs associated difficult excavation due to site dewatering. 11 Report of Subsurface Exploration and Geolechnical Engineering Analysis Marine Mart at Courthouse Bay MCB Camp Lejeune, North Carolina ECS Project No.: 22.15452 The site soils are OSHA Type B and C soils for the purpose of temporary excavation support. Excavations should be constructed in compliance with current OSHA standards for excavation and trenching safety. Excavations should be observed by a "competent person", as defined by OSHA, who should evaluate the specific soil type and other conditions, which may control the excavation side slopes or the need for shoring or bracing. The soils encountered in the soil test borings will likely not present difficult excavation conditions. 5.8 Pavement Desian Considerations For the design and construction of exterior pavements, the subgrades should be prepared in strict accordance with the recommendations in the "Subgrade Preparation" and "Engineered Fill Placement' sections of this report. An important consideration with the design and construction of pavements is surface and subsurface drainage. Where standing water develops, either on the pavement surface or within the base course layer, softening of the subgrade and other problems related to the deterioration of the pavement can be expected. Furthermore, good drainage should minimize the possibility of the subgrade materials becoming saturated during the normal service period of the pavement. We recommend 2 inches of surface SF9.5 mix overlying 6 inches of compacted crushed stone in the light pedestrian type vehicle areas and 3.0 inches of surface SF9.5 mix overlying 8 inches of compacted crushed stone in the main heavily traveled drive areas, in truck delivery and dumpster areas. In lieu of compacted crushed stone for heavily traveled drive areas, 5 inches of B25.0 mix can be used. Regardless of the section and type of construction utilized, saturation of the subgrade materials and asphalt pavement areas results in a softening of the subgrade material and shortened life span for the pavement. Therefore, we recommend that both the surface and subsurface materials for the pavement be properly graded to enhance surface and subgrade drainage. By quickly removing surface and subsurface water, softening of the subgrade can be reduced and the performance of the parking area can be improved. Site preparation for the parking areas should be similar to that for the building area including stripping, proofrolling, and the placement of compacted structural fill. Please note that large, front -loading trash dumpsters frequently impose concentrated front - wheel loads on pavements during loading. This type of loading typically results in rutting of bituminous pavements and ultimately pavement failures and costly repairs. Consequently, we recommend the use of an 8 inch thick, mesh reinforced concrete slab that extends the entire length of the truck. Concrete pavements should be properly jointed and reinforced as needed to help reduce the potential for cracking and to permit proper load transfer. IVA Report of Subsurface Exploration and Geotechnical Engineering Analysis Marine Mart at Courthouse Bay MCB Camp lejeune, North Carolina ECS Project No.: 22.15452 5.9 Site Drainaae Positive drainage should be provided around the perimeter of the structure to minimize the potential for moisture infiltration into the foundation and slab subgrade soils. We recommend that landscaped areas adjacent to these structures be sloped away from the construction and maintain a fall of at least 6 inches for the first 10 feet outward from the structures. The parking lots, sidewalks, and any other paved areas should also be sloped to divert surface water away from the proposed building. The proper diversion of surface water during site grading and construction will help reduce the potential for delays associated with periods of inclement weather. The proper diversion of surface water is especially critical since portions of the site soils are expected to be moisture sensitive. Based upon our past experience, the use of "crowning" large areas of exposed soils should be useful to help divert surface water from the prepared subgrades. 5.10 Construction Considerations Exposure to the environment may weaken the soils at the foundation bearing elevation if the foundation excavations remain exposed during periods of inclement weather. Therefore, foundation concrete should be placed the same day that proper excavation is achieved and the design bearing pressure verified. If the bearing soils are softened by surface water absorption or exposure to the environment, the softened soils must be removed from the foundation excavation bottom immediately prior to placement of concrete. If the excavation must remain open overnight, or if inclement weather becomes imminent while the bearing soils are exposed, we recommend that a 1 to 3 inch thick "mud -mat" of "lean" concrete be placed over the exposed bearing soils before the placement of reinforcing steel. It is imperative to maintain good site drainage during earthwork operations to help maintain the integrity of the surface soils. The surface of the site should be kept properly graded to enhance drainage of surface water away from the proposed construction areas during the earthwork phase of this project. We recommend that surface drainage be diverted away from the proposed building and pavements areas without significantly interrupting its flow. Other practices would involve sealing the exposed soils daily with a smooth -drum roller at the end of the day's work to reduce the potential for infiltration of surface water into the exposed soils. The key to minimizing disturbance problems with the soils is to have proper control of the earthwork operations. Specifically, it should be the earthwork contractor's responsibility to maintain the site soils within a workable moisture content range to obtain the required in -place density and maintain a stable subgrade. Scarifying and drying operations should be included in the contractor's price and not be considered an extra to the contract. In addition, construction equipment cannot be permitted to randomly run across the site, especially once the desired final grades have been established. Construction equipment should be limited to designated lanes and areas, especially during wet periods to minimize disturbance of the site subgrades. It will likely be necessary to utilize tracked equipment during grading operations particularly if the subgrade soils exhibit elevated moisture conditions. 13 Report of Subsurface Exploration and Geotechnical Engineering Analysis Marine Mart at Courthouse Bay MCB Camp Lejeune, North Carolina ECS Project No.: 22.15452 6.0 CLOSING Our geotechnical evaluation of the site has been based on our understanding of the site, the project information provided to us, and the data obtained during our exploration. The general subsurface conditions utilized in our evaluations have been based on interpolation of subsurface data between the borings. If the project information provided to us is changed, please contact us so that our recommendations can be reviewed and appropriate revisions provided, if necessary. The discovery of any site or subsurface conditions during construction which deviate from the data outlined in this exploration should be reported to us for our review, evaluation and revision of our recommendations, if necessary. The assessment of site environmental conditions for the presence of pollutants in the soil and groundwater of the site is beyond the scope of this geotechnical exploration. 14 APPENDIX B SPT BORING LOGS AND SOIL CLASSIFICATION SYSTEM, DESCRIPTION AND TERMINOLOGY Unified Soil Classification System (ASTM Designation D-2487) Major Division Group Symbol Typical Names Classification Criteria m eS yz GW Well -graded gravels and gravel - sand mixtures, little or no fines GP Poorly graded gravels and gravel - sand mixtures, little or no fines GM Silty gravels, gravel -sand -silt mixtures GC Clayey gravels, gravel -sand -clay mixtures SW Well -graded sands and gravelly sands, little or no fines SP - Poorly graded sands and gravelly sands, little or no fines SM Silty sands, sand -silt mixtures SC Clayey sands, sand -clay mixtures ML Inorganic silts, very fine sands, rock flour, silty or clayey fine sands CL Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays, lean clays OL Organic silts and organic silty clays of low plasticity MH Inorganic silts, micaceous or diatomaceous fine sands or silts, elastic silts CH Inorganic clays of high plasticidy, fat clays OH Organic clays of medium to high plasticity C„ = Dbp/Dlo Greater than 4 $ 0 C== (D3D)"(DtDXD60) Between 1 and 3 13 .a B Not meeting both criteria for GW U Vu- Atterberg limits plot below "A" line or index less than 4 plasticity Atterberg limits plot above "A" line Dand plasticity index greater than 7 is .y t C„ = DbdDlo Greater than 6 C:= (D30)2/(DtoxD60) Between 1 and 3 w zz6 2. Not meeting both criteria for SW �a H Atterberg limits plot below "A" line or g plasticity index less than 4 y o Atterberg limits plot above "A" line •7 and plasticity index greater than 7 Notc Win, mpevm[e rypro>rimMe INI>a limit.ML and Pl wmbi .. for nLLmd wils(®phmay ddwmivcd). ASTM1)2487. ■■.■N■MMM■. NEENNEEMPHErms ■■■EENNER0, .■.■.EM",.. o ro m w ro m m ro m w tw Do LIQUID OMM, LL Plasticity chart for the classification of fine-grained soils. Tests made on fiaction finer than No. 40 sieve Highly organic soils Pt Peat, muck and other highly Fibrous organic matter; will organic soils char, bum, or glow MAY 2006 F UNIFIED SOIL CLASSIFICATION SYSTEM CLIENT BIS Frucon Engineering, Inc. PROJECT NAME Marine Mart at Courthouse Bay JOB # BORING # S1DD;T 22-15452 B-1 1 of 1 ARCHITECT -ENGINEER Mickie Redhage, P.E. �LLP CAR® SITE LOCATION MCB Camp Le'eune, North Carolina CAUMATIM PENMONHTER I 2 'O s `' a a+ PLASTIC WATER IIQUM LIMIT T CONTENT R L1MLT R A z ^� g BE DESCRIPTION OF MATERIAL. ENGIISH UNITS BOTTOM OF CASING W- LOSS OF CIRCULATION Loo z K X 0 G ROCS QUALM DESIGNATION h RECOVERY ROD%— — — REC.% 20X-4011 1OX--S0*-100 ,o zo PE�� ATON ro+ SURFACE ELEVATION 97.48 0 5 1 15 20 25 3 TOPSOIL DEPTH 8" 95 $ (2-2-1) 4: (2-2-2) 7 (2-34) 2.1.1 11 6-I-6) 5 (1-2-3) 2 (I-I-N) 3:(2-r2) 1. SS 18 10 Loose to Very Loose, Brown, Silty, Fine to Medium SAND, (SM) 2 SS 18 10 Loose, Tan, Fine SAND, (Sp) 90 3 SS 18 8 Medium Dense to Loose, Brown to Dark Brownish Gray, Silty, Fine SAND, (SM) with Roots 85 4 SS 18 8 5 SS 18 7 Very Loose, Gray, Silty, Fine SAND, (SM) 80 75 6 SS 18 12 Soft, Gray, Sandy CLAY (SC—CL) with Sand Seams END OF BORING ® 25.0' 70 7 8 SS ST 18 24 16 4 THE STRATIFICATIDN LDES REPRESENT THE APPRLIGHATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL 7vL 3.0' WS OR ® BORING START® 12/21 09 TWL.(BCR) JWL(ACR) BORING COMPLETED 12 21 09 GAVE IN DEPTH o �n 7.4' RIG D-25 FOREMAN DRILIING METHOD Mud Rotary CLIENT BIS Frucon En ineerin , Inc. roe g BORING g SHEEN 22-15452 B-2 1 1 OF 1 FE7 PROJECT NAME ARCEDTECT-ENGINEER Marine Mart at Courthouse Ba Mickie Redhoge, P.E. SrrE LOCATION MCB Camp Le'eune, North Carolina -0-. CALIBRATE PENMWMBYER I 2 s 4 5+ PLASTIC WATER LIQUID UNITS CONTENT % LBO R A DESCRIPTION OF MATERIAL ENGL[3H UNITS BOTTOM OF CASING LOSS OF CIRCULATION IOU z X 0 ROCS QIAi2TY DffiGNAT[ON h RECOVERY ROD%— — — REC.X 20%-40%=60Xr80Xrl 00 ® ST P mpu'NON Flo SURFACE ELEVATION 98.71 BO BO 40 60+ 0 TOPSOIL DEPTH 8"' 4: (2-2-2) 1 SS 18 14 Very Loose, Brown, Silty, Fine SAND, (SM) 5 95 8 (3--s-6) 2 SS 18 12 Loose to Medium Dense, Tan, Fine SAND, (Sp) 11 (4-5-6) 3 SS 18 12 90 4 SS 18 12 12 (4-6-6) 1 85 Very Loose, Brown, Silty, Fine SAND, (SM) 5 SS 18 7 3 :(I-I-2) 15 80 Very Loose, Gray, Silty, Fine SAND, (SM) 6 SS 18 14 2 (2-I-I) 20 75 Very Soft, Gray, Clayey, Fine SAND, (CL) 7 SS ',18 15 �K) 25 END OF BORING ® 25.0' 70 THE STRATIFICATION LINES REPRESENT THE APPRO%IMATE BOUNDARY LIES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL :9vL 3.0' Ws OR ® BORING STARTED 12 21 09 WL(BCR) jrWL(ACR) BORING COMPLETED 12 21 09 CAVE IN DEPTH e TWL 8.8' FUG D-25 FoRENAN RS DRIUNG METHOD Mud Rotary CLIENT BIS Frucon Engineering, Inc. JOB # 2-15452 BORING # B-3 SHUT2 1 OF 4 PROJECT NAIES Marine Mari at Courthouse Bay ARCHITECT —ENGINEER Mickie Redhage, P.E. �LLP csarz® SITE LOCATION MCB Cam Le'eune, North Carolina -0- CALIBRAT® PBNoMLr1ffit 1 B Toxs/FT. 4 5+ PLASTIC WATER LIQUID LOCT X CONTENT X LOW X ROCK QUALITY DESIGNATION B RECOVERY ROD%— — — REC.X 20X-40X-60 F-8O%-100 ® STAND PENETRATION�� 10 ?A SO 40 50+ e z DESCRIPTION OF MATERIAL EN01141{ UNITS BOTTOM OF CASING &-- LOSS OF COMMULATION 100 z pC - SURFACE ELEVATION 98.68 O 5 1 15 20 TOPSOIL DEPTH 6" 95 90 85 80 75 70 3:(2-1-2) 5 (2-2-I) 8 (rs) 11 (4-4-7) 4: (2-2-2). 2 0-I-I) 1 (i.-I-O) ; 57.5 19 36 A: ❑I{o-o o) 37.8 ----------- 1 SS 18 12 Very Loose to Medium Dense, Tan, Fine SAND, (SP) t2ss 18 10 �I 3 SS 18 10 4 SS 18 12 Very Loose, Dark Gray, Silty, Fine SAND, (SM) 5 SS 18 8 6 SS 18 6 Very Soft, Dark Gray, Sandy CLAY, (CL) NNJ 7 SS IS 12 Very Loose, Gray, Clayey, Fine SAND, (SC) 8 SS 18 6 3------------ — CONTINUED ON NEXT PAGE. THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETVEEN SOIL TYPES DN-SITUTHE TRANSITION MAY BE GRADUAL Y*L 6.0' WS OR ® BORING STARTED 12 21 /09 TWL(BCR) 1►,WL(ACR) BORING COMPLETED 12 21 09 CAVE IN DEPTH 0 TWL 9.0' RIG D-25 FOREMAN IRS DRILLING METHOD Mud Rotary CLIENT BIS Frucon Engineering, Inc. JOB # BORING # SHEET 22-15452 B-3 2 of 4 zz PROJECT NAME ARCHITECT -ENGINEER �g� Marine Mart at Courthouse Bay Mickie Redhoge, P.E. SITE LOCATIorf MCB Cornp Le'eune, North Carolina -0- CAUMUTED PPTONS�OMETER 1 B s 4 6+ PLASTIC WATER LIQUID LIMB % CONTENT S LIUIT % G z DESCPIPTION OF MATERIAL ENGLSH UNITS BOTTOM OF CASING 093 1OF CIRCULATION 100 z X 0 ROCK QUA[1TY DESIGNATION k RECOVERY ROD%— — — REC.% 20%40%-60%--SOX-100 (D STANDARD�P PENETRATION SURFACE EMATION 98.68 - 10 20 so 40 so+ 3 Very Loose, Gray, Clayey, Fine SAND, (SC) 65 9 SS is 8 3 60 10 SS 18 10 4: (1-2-2): 4 55 Firm, Light Gray, Sandy CLAY, (CL) 11 SS 18 IS 5 (2-2-3) 4 Loose, Light Gray, Fine SAND, (SP) 50 12 SS L8 10 9 (3=3-6) 50 45 13 SS 1.8 11 10 (5=4-6) 55 Medium Dense to Dense, LI ht Gray, Silty, Fine SAND, (SM� With Weathered Limestone 40 21 (12-e-12) 14 SS 18 16 60 — — — — — — — — — — — — ------- CONTINUED ON NEXT PAGE. THE STRATInCA'rIDN LINES REPRESENT THE APPRDXIMATE BOUNDARY LIDS BETWEEN SOIL TYPES IN -SITU THE TRANSITIDN MAY BE GRADUAL YOrL 6.0' es OR ® BORING STARTED 1 2/21 09 TWL(BCR) 1,W1(ACR) BORING COMPLETED 1 2 2 1 09 CAVE IN DEPTH o �ENL 9.0, RIG D-25 FORMAN RS DRILLING METHOD Mud Rotary CLIENT BIS Fruccn Engineering, Inc. JOB # BORING # SHEET 2-15452 B-3 3 OF 4 in: PROJECT NAME:ARCHITECT-ENGINEERMarine Mart at Courthouse Bay Mickie Redhage, P.E. SITE LOCATION MCB Corn Le'eune, North Carolina -0- CALIBRATED PEITtn'<�OMRTER 1 B '"" s T 4 s+ PLASM WATER LIQUID LM X CONTENT X LMTT X P60�— z yS _ DESCRIPTION OF MATERIAL ENG11SH UNITS BOTTOM OF CASING W-LOSS OF CIRCULATION 100 ` z Qp55 X A ROCK QUALM DESIGNATION & RECOVERY ROD%— — — REC.X 20X--4OX-60 i—SOX�100 R�PEt TION SURFACE ELEVATION 98.68(D 10 Bo so 40 B0+ Medium Dense to Dense, Li ht Gray, Silty, Fine SAND, (SM� with Weathered Limestone 35 15 SS 18 15 .28 6 30 16 SS IS 16 (II-u-1H) :38 7 25 17 SS 18 14 (15-20-22). 42, 7 Medium Dense, Dense, and Very Dense, Gray, Silty, Fine SAND, (SM) 20 (12-20-23) 43: 18 SS 18 15 80 15 19 SS 18 15 24 (7-9-15) 85 is 10 20 SS 18 16 (11-25-3e). 64 90 — — — — — — — — — — — — — —=—=------ - CONTINUED ON NEXT PAGE. THE STRAMcAnON LINES REPRESENT THE APPROXIMATE BOUNDARY LMS BETWEEN SOL. TYPES IN -SITU THE TRANSITION MAY BE GRADUAL 7WL 6.0' WS OR ® BORING STARTED 12/21 /09 TWL(BCR) J�WL.(ACR) BORING COMPLETED 12 21 09 CAVE IN DEPTH O AWL 9.0, I10 D-25 FOREMAN IRS DFILJNG METHOD Mud Rotary CLIENT BIS Frucon Engineering, Inc. JOB # BORING # 31D.R' 22-15452 1 B-3 4 of 4 PROJECT NAME ARCRITECT—ENGINEER MELLP Marine Mart at Courthouse Bay Mickie Redhage, P.E. SITE LOCATIOlf MCB Camp Le'eune, North Carolina -0- CAIMUT� I OMETER 1 B e 4 6+ PLASTIC WATER LIQUM LBIT R CONTENT % LDDT % XA ROCS QUALITY DESIGNATION 8 RECOVERY DESCRD'T10N OF MATERIAL ENGLI3H UNITS 5E3 z BOTTOM OF CASING W- IDSS OF CIRCULATION 100 z s `s ROD%— — — REC.X 20Xr-40%-60% — 8O%-1 OO ® STANDARD �TION SURFACE ELEVATION 9H.6H 9 10 BO 80 40 60+ Medium Dense, Dense, and Very Dense, Gray, Silty, Fine SAND, (SM) 5 21 $$ 18 16 (31-39-49), 88 9 0 22 SS 18 16 (30-39-50), 89 10 END OF BORING ® 100.0' -5 10 -10 110 -15 11 2 12 — - THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETVEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL 7wL 6.0' fIS OR ® BORING STARTED 1 2/21 /09 - TWI.(BCR) :=WL(ACR) BORING COMPLETED 12 21 09 CAVE IN DEPTS • TWL 9.0, RIG D-25 FOREMAN RS DRILLING METHOD Mud Rotary CLIENT BIS Frucon Engineering, Inc. JOB # 22-15452 BORING # 1 B-4 3f)EEf 1 OF 1 �1 PROJECT NAME ARCHITECT -ENGINEER Marine Mart at Courthouse Bay Mickie Redhoge, P.E. CAR® SITE LOCATION MCB Caim Le'eune, North Carolina -0- CAUERArE PM 40►¢= I B 3 4 5+ PLASTIC WATER IIQUED UMT X CONTENT % LWT X A c z DESCRIPTION OF MATERIAL ENGIdSH UNITS BOTTOM OF CASING �1039 OF CBtCULATION 100 E z FFI X A ROCK QUALITY DESIGNATION & RECOVERY RQD%— — — REC.X Y0%40X-60X-80% —100 ® STANDARD PENETRATION SURFACE ELEVATION 98.24 OB0 s0 40 50+ 0 TOPSOIL DEPTH 6" 4: (2-2-2)SAND, 18 12 Very Loose, Brown, Silty, Fine (SM) 95 t2S 18 12 4: (2-2-2). 5 Loose, Tan, Fine SAND, (Sp) 3 SS 18 10 6 (2-24) 90 4 SS 18 9 9 (3-3­6) 1 85 Very Loose, Brown, Silty, Fine SAND, (SM) 5 SS 18 8 2 (2-I-I) 15 80 Very Loose, Gray, Silty, Fine SAND, (SM) 6 SS 18 10 3:(2-2-I) 20 75 7 SS 18 8 2 (I-t-t) 25 END OF BORING ® 25.0' 70 3 — — THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETVEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL 7WL 2.0' WS OR ® BORING STARTED 1 2/21 /09 TWL(BCR) TWI.(ACR) BORING COMPLETED 1 2 21 09 CAVE IN DEPTH O TWL 9.2' RIG D-25 FOREMAN RS DRILLING METHOD Mud Rotary CLIENT BIS Frucan Engineering, Inc. JOB BORING A SHEET 2 2-15452 B-5 1 of 1 PROJECT NAM" ARCHITECT -ENGINEER �LLP Marine Mart at Courthouse Bay Mickie Redhage, P.E. SAP SITE LOCATION MCB Carnp Le'eune, North Carolina CAUERAr� OMETER I 2 S 4 5+ PLASTIC WATER UQUED uMIT X CONTENT X LHUT X DESCRIPTION OF MATERIAL ENGLISH UNITS X G ROCK QUAfl'fT OBffiGNA& RECOVERY o d z BOTTOM OF CASING L939 OF CIRCULATION 100 z a .4® - 'Flo RODX— 6 REC.EC.X 20X-40X-07fr-80X-700 sTAND PENWMTION 20 30 40 50+ SURFACE ELEVATION 99.59 0 TOPSOIL DEPTH 5" 3 :(z-z I): 1 SS 18 9 Very Loose to Medium Dense, Tan and Orangish Brown, Fine SAND, (SP-SM) with Silt t 18 10 5 95 6 3--" 15.6 3 SS 18 12 12 (4-6-6) 1 90 14 (4-18-81 4 SS 18 12 Loose, Dark Brownish Gray, Silty, Fine SAND, (SM) 5 SS IB 8 15 85 S (2-3-zJ Very Loose, Gray, Silty, Fine SAND, (SM) 6 SS 18 10 80 1 0-I-0) 20 75 4: (2-2-21 7 SS 18 14 25 END OF BORING ® 25.0' 70 3 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETVEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE GRADUAL YRL 2.5' WS OR ® BORING STARTED 12/21 /09 TWL(BCR) TW4ACR) BORING COMPLETED 12 21 09 CAVE IN DEM YWL 1 0.4' RIG D-25 POREMAN RS DRILIJNG METHOD Mud .Rotary CLIENT BIS Frucon En ineerin , Inc. JOB 41 BORING # SHEET 22-15452 B-6 1 OF 1 PROJECT NAME ARCHITECT-ENGDNEEB �LLP Marine Mart at Courthouse Bay Mickie Redhoge, P.E. SITE LOCATIO:Y Cam Le'eune, North Carolina -0- CALIBRATED PENEETtPU STER TONS/ffMCB 1 B 3 4 6+ PULST[C WATER LIQUID LIMIT R CONTENT X LIIaT X a d z _ DESCRIPTION OF MATERIAL ENG11SH UNITS BOTTOM OF CASING IAS4 OF CIRCULATION 100 z pppF R X G ROCK QUALITY DESIGNATION & RECOVERY ROD%— — — REC.X 20%-40X-6OXr-8071r100 ® STANDAR�PENTRATION SURFACE ELEVATION 97.81 O 10 EO 90 40 60+ TOPSOIL DEPTH 6" 18 12 5 (2-3 2) Loose, Brown, Silty, Fine SAND, (SM)95 tS1 18 9 Very Loose to Medium Dense, Tan and Brownish Gray, Fine SAND, (SP-SM) with Silt 5 4 (z z-2) 20.7 3 SS 18 12 10 (3-4 ) 90 4 SS 18 12 1 85 Loose, Brown, Silty, Fine SAND, (SM) 5 SS 18 10 7 (I -I-{) 15 80 Very Loose to Loose, Gray, Silty, Fine SAND, (SM) 6 SS 18 12 4i (2-2-2) 20 75 7 SS I8 13 :7 (4-4-3) 25 END OF BORING ® 25.0' 70 3 —' — THE STRATIFICATION LINES REPRESENT THE APPR"ATE BOUNDARY LINES BETWEEN SOIL TYPES IN -SITU THE TRANSITION MAY BE MA➢UAL YWL 2.5' WS OR ® BORING STARTED 12/21 /09 T"CR) TWI(ACR) BORING COMPLETED 12 21 09 CAVE IN DEPTH o TwL 9.3' BIG D-25 FUBIaGN RS DRUIM0 METHOD Mud Rotary Project Number: Project Name 22 - 15452 Marine Mart at Courthouse Bay ECS Carolinas, LLP Wilmington, North Carolina Laboratory Testing Summary Project Engineer: wEG Principal Engineer: wMS Date: January 15, 2010 Summary By: wEG EwwMEIM0I0fflNU-M=�MwMM • - a- e. Summary Key: SA = See Attached Hyd = Hydrometer UCS = Unconfined Compression Soil Su = Undrained Shear Strength S = Standard Proctor Con = Consolidation UCR = Unconfined Compression Rock ND = Not Detected M= Modified Proctor DS = Direct Shear LS = Lime Stabilization OC = Organic Content GS = Specific Gravity CS = Cement Stabilization 0 CMoisture Content Worksheet o� Project Name Marine MartBatyCourthouse Project # 22-15452 Date 12/31/2009 Sample ID Wet Soil + Tare Dry Soil + Tare Tare # Tare Weight Water Dry Soil Moisture Content (/a) B-3, S-7 123.40 81.36 P-106 8.31 42.04 73.05 57.5 B-3, S-8 306.69 224.83 P-33 8.22 81.86 1 216.61 37.8 B-5, S-2 378.07 328.07 P-116 8.40 50.00 319.67 15.6 B-6, S-2 342.76 285.31 P-29 8.22 57.45 277.09 20.7 LIQUID AND PLASTIC LIMITS TEST REPORT 60 Dashed line indicates the approximate upper limit boundary for natural soils SOIL DATA NATURAL SYMBOL SOURCE SAMPLE DEPTH WATER PLASTIC LIQUID PLASTICITY USCS NO. CONTENT LIMB LIMIT INDEX • B-3 S-7 23.5-25 57.5 19 38 19 Tested By: Particle Size Distribution Report %+3" 1.- .___.._ Coarse Fine Coarse Madlum Fine I slit Clav SIEVE SIZE PERCENT FINER SPEC.' PERCENT PASS? (X=NO) $1200 24.7 (no specification provided) Source of Sample: B-3 Depth: 28.5-30 Sample Number: S-8 Material Description Gray, Clayey Sand Atterberg Limits PL= LL= Pie: Coefficients D90= D85= D60= 050= D30= D15= D10= Cue: CC= USCS= Classification AASHTO= Remarks Date: 12/31/09 ECS CA OLINAS, LLP Cllent: BIS Frucon Engineering, Inc. 7211 Ogden Business Park sun. 201 Project: Marine Man at Courthouse Bay W9minoon, NC 26411 LLP PR (910) 686-9114 —_ CAROLINAB P.M: (010) bar ea66 Prolect No: 15452 Figure Tested By: KEL % e3' Particle Size Distribution Report Gmwl SINE SIZE PERCENT FINER SPEC! PERCENT PASS? (X=NO) #200 11.9 (no specification provided) Sourr.e of Sample: B-5 Depth: 3.5-5 Sample Number: S-2 0 Material Descriotlon Orangeish Brown, Fine Sand with Silt Atterberg Limits PL= LL= PI= Coefficients D90= D85= D60= D50= D30= D15= D10= Cu= cc= Classification USCS= AASHTO= Remarks Date: 12/31/09 ECS CAROLINAS, LLP Client: BIS Frucon Engineering, Inc. C 7211 Ogden Susir4 Park Sane 201 Project: Marine Man at Courthouse Bay Wdminglon, NC 28411 r LLP Ph:(910)88e-9114 <.AROLINABPB%'(g1g)eea-geea ProlectNo: 15452 Figure Tested Ey Particle Size Distribution Report t pp QQ gg pp l i 100 90 80 70 W 60 Z U- Z 50 U W 40 a 30 20 10 O 0 100 10 1 0.1 0.01 0.001 GRAIN SIZE - mm. %i3� %Gravel %Sand %Fines Coarse Fine Coarse Medium Fine Silt Clay 8.2 SIEVE PERCENT SPEC.' PASS? Tested By: KEL �ZAnalyficale ~.pecelabs.mrn ProjeoC Marine Marl 22.15451 Pace Project No.: 9260504 Pace Analytical Services, Inc. 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 ANALYTICAL RESULTS Pace Analytical Services, Inc. 9800 Kncey Ave. Suite 100. Huntersville, NC 28078 (704)875-9092 Sample: B1S3 Lab ID: 9260504001 Collected: 12124/0912:00 Received: 12/30/09 12:00 Matrix: Solid Resu'ts reported on a 'dry-welght" basis Parameters Results Units Report Limit DF Pera4lt Moisture Analytical Method: ASTM D2974-87 Perce nt Moisture 21.1 % 0.10 1 45003213 Sulfide Soil Analytical Method: SM 4500-S2D Sulfide ND mg/L 0.12 1 9045 PH Soil Analyfical Method: EPA 9045 PH at 25 Degrees C 4.6 Sid. Units 0.10 1 4500 Chloride in Soil Analytical Method: SM 4500-CI-E Chloride 610 mg/kg 587 1 ASTIR D516.90 Sulfate Soil Analytical Method: ASTM D516-90 Sulfate 1090 mg/kg 598 1 Dato: 011131201012:11 PM Prepared Analyzed CAS No. Qual REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc.. 01/06/10 08:35 01/12/1020:47 H1,M0 01/12/10 12:00 H3 01/09/1015:28 16887-00-6 MO 01/11/10 14:22 14808-79-8 Page 4 of 10 � eAnalytical e e pecetabs= Pace Analytical Services, Inc. 2225 Riverside Dr. Asheville, NC 28804 (828)264-7176 QUALITY CONTROL DATA Pace Analytical Services, Inc. 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Project: Marine Mart 22.15451 Pace Project No.: 9260504 QC Balch: PMST/2966 Analysis Method: ASTM D2974-87 QC Batch Method: ASTM D2974-87 ,Analysis Description: 'Dry Weight/Peroent Moisture Associated Lab Samples: 9260504001 SAMPLE DUPLICATE: 386968 9260576013 Dup Parameter Units Result Result RPD Qualifiers Perofmt Moisture % 15.0 15.1 1 SAMPLE DUPLICATE: 386969 Parameter Peramt Moisture Dale: 01/13/201012:11 PM 9260623001 Dup Units Result Result % 21.6 21.6 RPD Qualifiers REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, Inc.. Ictoo heh 0 Page 5 of 10 Pace Analytical Services, Inc. Pace Analytical Services, Inc. � a malytical a 2225 Riverside Dr. 9800 Kincey Ave. Suite 100 w .ParslatM corn Asheville, NC 28804 Huntersville, NC 28078 (828)254.7176 (704)075-9092 QUALITY CONTROL DATA Proje,:t: Marine Mart 22.15451 Pace Project No.: 9260504 QC Batch: WET/11074 Analysis Method: SM 4500-S2D QC Batch Method: SM 4500-520 Analysis Description: 4500S21) Sulfide Soil Assoialed Lab Samples: 9260504001 METHOD BLANK: 389467 Matrix: Water Assoaaled Lab Samples: 9260504001 Blank Reporting Parameter Units Result Limit Analyzed Qualifiers Sulfide mg/L NO 0.10 01/12/1020:47 LABORATORY CONTROL SAMPLE: 389468 Spike LCS LCS % Rec Parameter Units Conc. Result %Rec Limits Qualifiers Sulfide mg/L .5 0.50 100 90-110 MATRIX SPIKE SAMPLE: 389470 9260504001 Spike MS MS % Rec Parameter Units Result Conc. Result % Rec Limits Qualifiers Sulfide mg/L NO .6 NO 17 75-125 MO SAMPLE DUPLICATE: 389469 9260504001 Dup Parameter Units Result Result RPD Qualifiers Sulfide mg/L NO NO Dale: 01/13/201012:11 PM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except In full, without the wdtten consent of Pace Analytical Services, Inc.. elaci Page 6 of 10 �IzAnaiytical e nascpacelabs.= Pace Analytical Services, Inc. 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 QUALITY CONTROL DATA Pace Analytical Services, Inc. 9800 Kincey Ave. Suite 100 Hunlersville, NC 28078 (704)075-9092 Projecd: Marine Mart 22.15451 Pace Project No.: 9260504 QC Batch: WET/11066 Analysis Method: EPA 9045 QC Batch Method: EPA 9045 Analysis Description: 9045 pH Associated Lab Samples: 9260504001 SAMPLE DUPLICATE: 389193 Parameter pH at 25 Degrees C Dale: 01/13/201012:11 PM 9260504001 Dup, Units Result Result Std. Units 4.6 4.6 RPD Qualifiers 0 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in lull, without the written consent of Pace Ana"cal Services, Inc.. hi'elac� a Page 7 of 10 �ZAnalytical sew4*w1ebs.= Projea: Marine Mart 22.15451 Pace Project No.: 9260504 QC Batch: WETA/6569 QC Ealch Method: SM 4500-CI-E Ass0ated Lab Samples: 9260504001 METHOD BLANK: 388755 Associated Lab Samples: 9260504001 Parameter Units mg/kg Chloride LABORATORY CONTROL SAMPLE: Parameter Chic ride MATRIX SPIKE SAMPLE: Parameter Chloride SAMPLE DUPLICATE: 388804 Parameter Chloride IBM MF #1FfB]Fbf[riP7ff1;i51 Units mg/kg 388757 Units mg/kg Pace Analytical Services, Inc. 2225 Riverside Dr. Asheville, NC 28804 (828)254-7176 QUALITY CONTROL DATA Analysis Method: SM 450G-CI-E Analysis Description: 4500 Chloride Matrix: Solid Blank Reporting Result Limit Analyzed Qualifiers ND 50.0 01/09/1015:28 Pace Analytical Services, Inc. 9800 Kincey Ave. Suite 100 Hunlersville, NC 28078 (704)875-9092 Spike LCS LCS % Rec Conc. Result %Rec Limits Qualifiers 200 201 100 90-110 9260504001 Spike Ms MS %Rec Result Conc. Result - % Rec Limits Qualifiers 610 4690 2870 48 75-125 MO 9260504001 Dup Units Result Result mg/kg 610 702 RPD Qualifiers 14 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except In full, without the written consent oppoff 1Pam Analytical Services, Inc.. 11 'cool ^a 1 1 Page 8 of 10 75ce Analytical a v Pecelsbs.a Project: Marine Mart 22.15451 Pace Project No.: 9260504 Pace Analytical Services, Inc. 2225 Riverside Dr. Asheville, NC 28804 (a28)254-7176 QUALITY CONTROL DATA QC Batch: WETA/6572 Analysis Method: ASTM D516-90 QC Batch Method: ASTM D516-90 Analysis Description: ASTM D516-90 Sulfate Soil Associated Lab Samples: 9260604001 METHOD BLANK: 388910 Matrix: Solid , Associated Lab Samples: 9260504001 Blank Reporting Parameter Units Result Limit Analyzed Qualifiers Sulfate mg/kg NO 500 01/11/1014:20 Pace Analytical Services, Inc. 9800 Kincey Ave. Sulte 100 Hunlersville, NC 28078 (704)0759092 LABORATORY CONTROL SAMPLE: 388911 Spike LCS LCS % Rae Parameter Units Cone. Result % Rae Limits Qualifiers Sulfa':e mg/kg 2000 2000 100 9D-110 MATRIX SPIKE SAMPLE: Parameter 388912 , Units 9260504001 Result Spike MS MS %Rec Cane. Result %Rec Limits Qualifiers Sulfate mg/kg 1090 2340 3410 99 75-125 SAMPLE DUPLICATE: 388963 - 9260504001 Dup Parameter Units Result Result RPD Qualifiers Sulfate mg/kg 1090 959 12 Date 01/13/201012:11 PM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the wdtten consent of Pace Analytical Services, Inc.. C� a6. Page 9 of 10 �ZAna lytical a aw rpscelebs.= QUALIFIERS Project: Marine Mart 22.15451 Pace Project No.: 9260504 DEFINITIONS Pace Analytical Services, Inc. 2225 Riverside Dr. Asheville; NC 28804 (828)254-7176 Pace Analytical Services, Inc. 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875.9092 OF - Dilution Factor, if reported, represents the factor applied to the reported data due to changes in sample preparation, dilution of the sample aliquot, or moisture content. NO - Not Detected at or above adjusted reporting limit. J - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. MOIL -Adjusted Method Detection Limit. S - Surrogate 1,2-Dipheny1hydrazine (8270 listed analyte) decomposes to Azobenzene. Consistent with EPA guidelines, unrounded data are displayed and have been used to calculate % recovery and RPD values. LCS(D) - Laboratory Control Sample (Duplicate) MS(D) - Matrix Spike (Duplicate) DUP - Sample Duplicate RPD - Relative Percent Difference NC - Not Calculable. Pace Analytical is NELAP accredited. Contact your Pace PM for the current list of accredited analytes. U - Indicates the compound was analyzed for, but not detected. LABORATORIES PASI-A Pace Analytical Services - Asheville PASI-C Pace Analytical Services -Charlotte ANALYTE QUALIFIERS H1 Analysis conducted outside the EPA method holding time. H3 Sample was received outside EPA method holding time. MO Matrix spike recovery and/or matrix spike duplicate recovery was outside laboratory control limits. Dabf: 011131201012:11 PM REPORT OF LABORATORY ANALYSIS Page 10 of 10 This report shall not be reproduced, except in full, wthout the wnaen consent of Paw Analytical Services, Inc.. Season High Water Table Evaluation and Infiltration Test Marine Mart at Courthouse Bay Camp Lejeune, Onslow County, North Carolina ECS Project No. 22.15452 January 5, 2010 Location Depth Soil Description 1-1 0-18" Gray Fine SAND 18"-70" Tan Fine SAND) Seasonal High Water Table was estimated to be at 48 inches below the existing grade elevation. Groundwater was encountered at 70 inches below the existing grade elevation. The infiltration test was performed at a depth of 24 inches below current grade. The infiltration rate was 0.103 inches per minute (6.2 inches per hour). General Conditions The analysis, conclusions, and recommendations submitted in this report are based on the investigation previously outlined and the data collected at the points shown on the attached location plan. This report does not reflect specific variations that may occur between test locations. The borings were located where site conditions permitted and where it is believed representative conditions occur, but the full nature and extent of variations between borings and of subsurface conditions not encountered by any boring may not become evident until the course of construction. If variations become evident at any time before or during the course of construction, it will be necessary to make a re-evaluation of the conclusions and recommendations of this report and further exploration, observation, and/or testing may be required. This report has been prepared in accordance with generally accepted soil and foundation engineering practices and makes no other warranties, either expressed or implied, as to the professional advice under the terms of our agreement and included in this report. The recommendations contained herein are made with the understanding that the contract documents between the owner and foundation or earthwork contractor or between the owner and the general contractor and foundation, excavating and earthwork subcontractors, if any, shall require that the contractor certify that all work in connection with foundations, compacted fills and other elements of the foundation or other support components are in place at the locations, with proper dimensions and plumb, as shown on the plans and specifications for the project. Further, it is understood the contract documents will specify that the contractor will, upon becoming aware of apparent or latent subsurface conditions differing from those disclosed by the original soil investigation work, promptly notify the owner, both verbally to permit immediate verification of the change, and in writing, as to the nature and extent of the differing conditions and that no claim by the contractor for any conditions differing from those anticipated in the plans and specifications and disclosed by the soil studies will be allowed under the contract unless the contractor has so notified the owner both verbally and in writing, as required above, of such changed conditions. The owner will, in turn, promptly notify this firm of the existence of such unanticipated conditions and will authorize such further investigation as may be required to properly evaluate these conditions. Further, it is understood that any specific recommendations made in this report as to on -site construction review by this firm will be authorized and funds and facilities for such review will be provided at the times recommended if we are to be held responsible for the design recommendations. APPENDIX F PROCEDURES REGARDING FIELD LOGS, LABORATORY DATA SHEETS AND SAMPLES Procedures Regarding Field Logs, Laboratory Data Sheets and Samples In the process of obtaining and testing samples and preparing this report, procedures are followed that represent reasonable and accepted practice in the field of soil and foundation engineering. Specifically, field logs are prepared during performance of the drilling and sampling operations which are intended to portray essentially field occurrences, sampling locations, and other information. Samples obtained in the field are frequently subjected to additional testing and reclassification in the laboratory by more experienced soil engineers, and differences between the field logs and the final logs exist. The engineer preparing the report reviews the field and laboratory logs, classifications and test data, and his judgment in interpreting this data, may make further changes. Samples are taken in the field, some of which are later subjected to laboratory tests, are retained in our laboratory for sixty (60) days and are then discarded unless special disposition is requested by our client. Samples retained over a long period of time, even if sealed in jars, are subject to moisture loss which changes the. apparent strength of cohesive soil generally increasing the strength from what was originally encountered in the field. Since they are then no loncer representative of the moisture conditions initially encountered, an inspection of these samples should recognize this factor. It is common practice in the soil and foundation engineering profession that field logs and laboratory data sheets not be included in engineering reports because they do not represent the engineer's final opinions as to appropriate descriptions for conditions encountered in the exploration and testing work. On the other hand, we are aware that perhaps certain contractors submitting bids or proposals on work may have an interest in studying these documents before submitting a bid or proposal. For this reason, the field logs will be retained in our office for inspection by all contractors submitting a bid or proposal. We would welcome the opportunity to explain any changes that have been and typically are made in the preparation of our final reports, to the contractor or subcontractors, before the firm submits the bid or proposal, and to describe how the information was obtained to the extent the contractor or subcontractor wishes. Results of the laboratory tests are generally shown on the boring logs or described in the extent of the ireport, as appropriate. The descriptive terms and symbols used on the logs are described on the attached sheet, entitled General Notes. ECS CAROLINAS, LLP. 7211 Ogden Business Park, Suite 201 Wilmington, NC 28411 (910) 686-9114 • Fax (910) 686-9666 m S❑IL CLASSIFICATION LEG ND FILL - FILL ALL TYPE(POSS/PROB) SM - SILTY SAND GW - WELL GRADED GRAVEL SP - POORLY GRADED SAND ® GM - SILTY GRAVEL SC - CLAYEY SAND GP - POORLY GRADED GRAVEL ® ML - LOW PLASTICITY SILT GC - CLAYEY GRAVEL ® CL - LOW PLASTICITY CLAY SW - WELL GRADED SAND ® MH - HIGH PLASTICITY SILT ® CH - MGM PLASTICITY CLAY mOH - MGM PLASTICITY ORGANIC SILTS AND CLAYS y.; ;.',ti OL - LOW PLASTICITY ORGANIC SILTS AND CLAY ulPT - PEAT s, as y, r y• r s ! p ! r r •uv a , s er ectx EOB O 25Z E EL Ma EL 7M. xrH i SURFACE MATERIALS TOPSOIL ■ ASPHALT GRAVEL CONCRETE ❑ VOID y4 Y yy ® v am f r r r r r f . r r r r ECBJP a EEL 74.0 EL 731 9.7118 EO L 0 Ma nZi Et ner r "nu L N"m NDa To mmm REPRESERT STf OPM PEIE MTEN TEST l=mpl= IN 0�) xm PER F= e N7H MO mSTMlZS NTf Tp Sru r 3 VERTr,•u CIITMI�S MTf TO SUIE r r EOBO raav E<asz ROCK TYPES IGNEIXJS j♦ METAMORPHIC ® SEDIMENTARY SYMBOL LEGEND y WATER LEVEL SYMBOL WATER LEVEL - BEFGRE CASING REMOVAL WATER LEVEL - AFTER CASING REMOVAL y WATER LEVEL - AFTER 24 HOURS � a � V ago Z w YI H �, _Z J O CL V W V ECS REVISIONS DRAFrD* WEG See Note o. 22.15452 2of2 ovivio 4F,#;F .._ 4 , 7FP- 13,64V R 11*2 0ifieem�u GF L °: f�ar '_. . 8-2 W4 f e � i wrowoo { DENOTES APPROXIMATE LOCATION OF BENCH jHOLE)ELE _ ��MARK (EXIS'{-1' " � -VATION 100' .N �l7 3L' cc DENOTES AAPRO +., _— (f -- V LOCATION OF SOIL TE51'—- 1 �'-- BORING DENOTES APPROXIMATE LOCATION • 4 + Sti f •�,� OF HAND AUGER 8ORIN6 AND d%% INFILTRATION TEST jl tti SCALE (IN FEET) 20 41 40 0 REFERENCE: SITE MAP PROVIDED BY HIS FUCRON ENGINEERING INC >P ELS E l h S - _ � r� � cu�Txlir.•� �. + 'i j _ LLP - ' - Lct I" FIGURE 1 / + SITE MAP / MARINE MART AT COURTHOUSE J BAY +{ j ONSLOW COUNTY i MCB CAMP LEIEUNE, NORTH / CAROLINA f PROJECT NO.22-15452 4 DRAWN BY/DATE WEG/01-05-09 CHECKED BY/DATE /(� l((5/id ENAME: STPEMAP