Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8080301_HISTORICAL FILE_20121106
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 C)a,03o 1 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS © HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2012 t 10IP YYYYMMDD ", Natural Resources Beverly Eaves Perdue Governor November 6, 2012 Division of Water Quality Charles Wakild, P. E. Director Commanding Officer MCB Camp Lejeune c/o Captain John Carson, Public Works Officer Building 1005 Michael Road . Camp Lejeune, NC 28547 Subject: Stormwater Permit No. SW8 080301 Special Operations Training Ground (S.O.T.G.) — Overhead Baffle at High Density Commercial Infiltration Basin Project Onslow County Dear Capt. Carson: Dee Freeman Secretary The Wilmington Regional Office received a complete modified Stormwater Management Permit Application for the Special Operations Training Ground (S.O.T.G.) on November 1, 2012. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211, Session Law 2006-246 and Title 15A NCAC 2H.1000, as applicable. We are forwarding Permit No. SW8 080301 dated November 6, 2012, for the construction, operation, and maintenance of the subject project. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010. The law extends the effective period of any stormwater permit that is set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177 which grants an extra year for a total of four (4) years extension. Accordingly, this permit, which was set to expire on April 29, 2018, is now in effect until December 29, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. The modifications covered by this permit include the following: • The previously approved gravel lot within drainage area 6 was not constructed. The plans for this drainage area have changed such that an existing small arms range will be redeveloped in a way that a portion of the area will now be included within drainage area 6. This results in an increase in drainage area and reduction in impervious area for drainage area 6. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150E of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX: 910-350-20041 DENR Assistance: 1-877-623-6748 NorthCarolina Internet: w .ncvvaterquality.org , 1�n//� An Equal Opportunity 1 Affirmative Action Employer � � a'ia { Nal State Stormwater Management Systems Permit No. SW8 080301 If you have any questions, or need additional information concerning this matter, please contact Christine Nelson at (910) 796-7215. Sincerely, �� Charles Wakdd, P.E., Director Division of Water Quality GDS/can: S:\WQS\Stormwater\Permits 8 Projects\2008\080301 HD\2012 11 permit 080301 cc: Lee Pennypacker, NAVFAC - Mid Atlantic Wilmington Regional Office Page 2 of 9 State Stormwater Management Systems Permit No. SW8 080301 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune Special Operations Training Ground (S.O. T. G.) Dr. G. W Garner St., Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of six (6) infiltration basin in compliance with the provisions of Session Law 2008-211, Session Law 2006-246 and 15A NCAC 2H .1000, as applicable, (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until December 29, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. The six stormwater controls, identified as infiltration basins 1A, 1B, 3, 4, 5, and 6, have been designed to handle 12,447, 1,670, 12,933, 20,552, 18,775, and 7,848 square feet of impervious area, respectively 3. These basins must be operated with a 50' vegetated filter, designed to pass the peak flow from the 10 year storm in a diffuse and non -erosive manner. 4. The tract will be limited to the amount of built -upon area indicated in Section 1.8 on page 3 of this permit, and as shown on the approved plans. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 3 of 9 State Stormwater Management Systems Permit No. SW8 080301 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 7. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. 8. The following design criteria have been permitted for the infiltration basins and must be provided and maintained at design condition: Infiltration Infiltration Infiltration Infiltration Infiltration Infiltration Design Criteria Basin #1A Basin #1B Basin #3 Basin #4 Basin #5 Basin #6 a. Drainage Area: acres 0.42 0.10 0.66 0.47 0.63 0.68 -Onsitesubjedto15ANCAC2H.1000,ft2: 18,455 4,470 28,740 20,552 27,327 15,472 -Onsite subject to SL 2008-211, It': None None None None None 14,149 -Offsite, ft2: None None None None None None b.Total Impervious Surfaces, ft : 12,447 1,670 12,933 20,552 18,775 7,848 -Buildings, ft2: 1,311 870 3,450 0 18,855 5,640 -Parking/Streets, ft2: 11,136 800 0 20,552 0 2,208 -Sidewalks/Concrete, ft2: 0 0 9,483 0 0 0 c. Design Storm, in. 3.68 3.68 3.68 3.68 1 3.68 3.68 d. Difference in the pre- and post - development 1-yr, 24-hr runoff, ft3: 3,454 463 3,613 5,7L5,2332,143 -Pre-development 1-yr, 24-hr runoff, ft3: 285 69 443 317449 -Post-develo ment 1- r,24-hrrunoff,ft33,739 532 4,056 6,02,592 e. Basin De th, ft: 1.20 0.90 1.42 1.41.6 f. Bottom Elev., FMSL: 28.10 28.10 26.58 26.20.90 g. Bottom Surface Area, ft2: 4,556 664 3,173 5,12,435 h. B ass Weir Elevation, FMSL: 28.80 28.80 27.58 27.22.10 1. Permitted Storage Volume, ft3: 3,458 465 3,624 5,714 1 5,252 3,400 j. Pre -development 1-yr 24-hr discharge, 0.01 0.01 0.05 0.05 0.01 0.01 ft3/s7 k. Type of Soil: Ba meade Maryn Ba meade Ba meade Ba meade Ba meade I. Expected Infiltration Rate, in/hr: 3.94 5.91 5.91 5.91 6.69 2.61 m.Seasonal High Water Table, FMSL: 26.08 26.10 24.10 24.10 23.00 18.80 n. Draw Down Time, hrs: 2.3 1.7 2.3 2.3 2.7 6.4 o. Receiving Stream / River Basin: New River / White Oak p. Stream Index Number: 19- 27 19-31 q. Water Body Classification: "SC" -within ''/2 mi of and draining to SR / SA „SA„ waters It. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times, provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The signed and approved Operation and Maintenance Agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. Page 4 of 9 State Stormwater Management Systems Permit No. SW8 080301 4. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 12. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 5 of 9 State Stormwater Management Systems Permit No. SW8 080301 III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form to the Division of Water Quality, signed by both parties, and accompanied by the appropriate documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and.Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Page 6 of 9 State Stormwater Management Systems Permit No. SW8 080301 Permit modified and reissued this the 61h day of November 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 7 of 9 State Stormwater Management Systems Permit No. SW8 080301 Camp Lejeune - Special Operations Training Ground (S.O.T.G.) Stormwater Permit No. SW8 080301 Onslow County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 8 of 9 State Stormwater Management Systems Permit No. SW8 080301 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Page 9 of 9 DWQ USE ONLY Date Received Fee Paid Permit Number O - ,?'/ v _Wal Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This fornt may be photocopied far use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): at Special Operations Training Ground (S.O.T.G tone Bay JP-1425, Overhead Baffle at Small Arms Rangel 2. Location of Project (street address): G W Carver Street; USMCB Camp Leleune City:_ Jacksonville County: Onslow Zip: 28547 3. Directions to project (from nearest major intersection): Traveling north on US 17 (Wilmington Hwy), turn right on to NC 210 and travel 1.8 miles Turn left on to Rifle Ranee Road and enter MCB Camp Leleune. Show ID at Gate and then continue approximately 1 mile Turn right and continue on Rifle Range Road for approximately 0.3 mile and unto right on to Booker T. Washington Blvd. Continue approximately 0.5 mile and turn right on to Dr. GW Carver Street Continue approximately 0.1 mile to the end of the street. Project site on the left. 4. Latitude: V' 35' 12.04" N Longitude: 077' 26' 31.82" W of the main entrance to the project. H. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification . ❑ Renewal w/ Modificationt tRenemals with nmdifications also requires SWU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number SW080301 , its issue date (if known) 12/11 /2008 and the status of construction: ❑Not Started ❑Partially Completed* ® Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other this application is being submitted as the result of a previously returned application or a letter from DWQ questing a state stormwater management permit application, list the stormwater project number, if signed, and the previous name of the project, if different than currently al Project Requirements (check applicable blanks; information on required state permits can be by contacting the Customer Service Center at 1-877-623-6748): Major Industrial Stormwater ®Sedimentation/Erosion Control: 1.37 ac of Disturbed Area 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/ Permit Number, issue date and the type of each permit: N/A Form SWU-101 Version 06Aug2012 Page I of 6 5. Is the project located within 5 miles of a public airport? MNo "Yes If yes, see S.L. 2012-200, Part Vl: http://portal.ncdenr.org/web/wq/ws/su/statesw/ru les laws III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization: United States Marine Corps (USMQ Signing Official & Title: 14T r�:� ("AT jro% C,nrso el b.Contact information for person listed in item la above: Street Address: Bldg 1005 Michael Road City: Tacksonville State: NC Zip: 28547-2521 Mailing Address (if applicable): -9! p Public Works Officer; Bldg 1005 Michael Road City: Jacksonville State: NC Zip: 28547-2521 Phone: ('90to ) 451-2213 Fax: ('991 1/0 ) 451-2927 Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/i Signing Official & b.Contact information for person listed in item 2a above: Street Address: State: Mailing Address (if Phone: ( ) Fax: Email: Zip: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Mr. David Towler / United States Marine Corps Signing Official & Title: Storm Water Management Officer b. Contact information for person listed in item 3a above: Mailing Address: 1005 Michael Road City: Jacksonville State: NC Zip: 28547 Phone: ( 910 ) 451-3238 ext3284 Email: david.towler©usmc.mil 4. Local jurisdiction for building permits: Fax: ( 910 ) 451-2927 OCT 1 8 2012 Form SWU-101 Version 06Aug2012 Page 2 of 7 Point of Contact Lee Pennypacker Phone #: (757 ) 322-4056 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the slormwater runoff will be treated. The modification is due to changes in the drainage area characteristics of Drainage Area No. 6. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Dale: ❑ Other: Dale: b.If claiming vested rights, identify the regulations) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 2.96 acres 5. Total Coastal Wetlands Area: None acres 6. Total Surface Water Area: None acres 7. Total Properly Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area': 2.96 acres ` Total Project area shall he calculated to exclude the fiilhrwin the normal pool of imppounded structures, the area between the hanks of streams and rivers, the area below the Normal High Water (NM line or Mean High Water (MHW) line, and coastal wetlands landward %(rrom the NHW (or MHI) line. The resultant project area is used to calculate overall Percent built upon area (B L(A). Non -coastal wetlands landward of the NHW (or MHW) line may he included in the total Project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 58 % 9. How many drainage areas does the project have? 6 (For high density, count 1 for each Proposed engineered Stormwater BMP. For low density and other Projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. NO 0 1 2012 Form SWU-101 Version 06Aug2012 Page 3 of 7 Basin Information Drainage Area 6 Drainage Area 5 Drainage Area 4 Drainage Area 3 Receiving Stream Name New River/ New River/ New River/ New River/ White Oak White Oak White Oak White Oak Stream Class "SC" - within "SC" - within "SC" - within "SC" - within 1/2 mi of and 1/2 mi of and 1/2 mi of and 1/2 mi of and draining to draining to draining to draining to SR SA waters SR SA water SR of SA water SR it SA water Stream Index Number * 19-31 19-31 19-31 19-31 Total Drainage Area (so 29,621 27,327 20,552 28,740 On -site Drainage Area (so 29,621 27,327 20,552 28,740 Off -site Drainage Area (so 0 0 0 0 Proposed Impervious Area*" (so 7,848 18,775 20,552 12,933 % Impervious Area`* total 26 69 100 45 Impervious— Surface Area Drainage Area 6 Drainage Area 5 Drainage Area 4 Drainage Area 3 On -site Buildings/ Lots (so 5,640 18,775 20,552 3,450 On -site Streets (so 2,208 0 0 0 On -site Parkin (so 0 0 0 0 On -site Sidewalks (so 0 0 0 0 Other on -site (so 0 0 0 9,483 Future (so 0 0 0 0 Off -site (SO 0 0 0 0 Existing BUA**" (so 0 0 0 0 Total (so: 7,848 18,775 20,552 12,933 *Stream Class and Index Number can be determined at: http.Vlportal.ncdenr.org/web/wg/ps/nu/dassi cations Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. *** Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to he removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Existing conditions were determined by means of physical survey in conjuclion with project design. Areas were determined using AutoDesk Civil Design 3D (2010) and computed using NCDENR form SWQ401-InfiltraLion Basin-Rev.1 Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable stale slormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from htt,2://12ortaI.ncdenr.org/web/w2/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available fromhttp://12ortal.ncdenr.orp/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://porlal.ncdenr.org/web/wqtows/su/maw.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package fromhttp://portal.iicdenr.ore/web/wq/ws/su/statesw/forms does. Initials 1. Original and one copy of the Stormwaler Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below)+�C� Form SWU-101 Version 06Aug2012 Page 4 of 7 nod Q 1 Z��Z Supplemental Information: Addendum to Basin Descriptions for Storm Water Permit Modification Application SW8 080301 Basin Information Drainage Area 1A Drainage Area 16 Receiving Stream / River Basin New River New River Water Body Classification SA SA Stream Index Number * 19-27 19-27 Drainage Area (sf) 18,455 4,470 Existing Impervious Area (sf) 12,447 1,670 Proposed Impervious Area ** (sf) 0 0 %ImperviousArea(total) 67 37 Impervious* Surface Area Drainage Area 1A Drainage Area 1B On -site Buildings / Lots (sf) 1,311 870 On -site Streets (sf) 0 0 On -site Parking (sf) 11,136 800 On -site Sidewalk (sf) 0 0 Other on -site (sf) 0 0 Future (sf) 0 0 Off -site (sf) 0 0 Existing BUA *** (sf) 0 0 Total (sf) 12,447 1,670 ocT 1 8 2012 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to _ http:/ /www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages). describing the stormwater treatment/management for /10 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the �Ip— receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy).. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: T a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. in. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify /v elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHINT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: N 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC N Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hn / /www.secretary.state.nc.us/Corporations/CSearch.aspx ti tom_' Y ED OCT 1 8 2012 Form SWU-101 Version 06Aug2012 Page 5 of 7 VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http: / / portal.ncdenr.org/ web/ wq/ ws/su /statesw/ forms_ciocs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer: Lee Pennypacker Consulting Firm: Naval Facilities Engineering Command, Mid -Atlantic Mailing Address: 9482 Maryland Avenue City: Norfolk State: VA Zip: 23505 Phone: ( 757 ) 452-4052 Email: Qranville.pennvpacke@navv.mil Fax: ( 757 ) 452- IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or hype name of person listed in Contact Information, item 2a) , certify that own the property identified in this permit application, and thus give permission to (print or hjpe name of person listed in Contact Information, item la) with (print or hjpe name of organization listed in Contact Information, item to) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. i.- T yEND OCT 1 8 2012 Form SWU-101 Version 06Aug2012 Page 6 of 7 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated .agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: I, a Notary Public for the State of County of do hereby certify that personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or hype name of person listed in Contact Information, item 1a) Gar I P. Ya L' / Wh V W • C ' 1^ certify that the information included on this permit application form is, to the best of my knowl dge�d that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules uger 15A NCAC 2H .1000 and any other applicable state stormwater requirements. Date: IS ocT2o1Z I, / ( // a Notary Public for the State of Z419 /l l"'. County of 11 do h/ee��reby certify that ��ii � /�� 6% personally appeared before me thisday of 0/ and ac��wle e due eexecuution of the application for a stormwater permit. Witness my hand and official seal, ETTEImi ctyro 'naa> SEAL My commission expires Form SWU-101 Version 06Aug2012 Page 7 of 7 R1�,C:1EgV]E;� OCT 1 S 2012 BY: MEMORY TRANSMISSION REPORT FILE NO. 348 DATE 11.06 15:28 TO : 8919104512927 DOCUMENT PAGES 10 START TIME 11.06 15:31 END TIME 11.06 15:34 PAGES SENT 10 STATUS OK *** SUCCESSFUL TX NOTICE TIME :11-06-'12 15:34 FAX N0.1 :910-350-2018 NAME :DENR Wilmington *** au ar Ne,<n c..oue n.wr<m.a< er so�*.o.mmr ..a N.<a'.1 ne.eapee. wumlae<aa li.ple.a onfe. Bsvc.+y En.+n Yarv/ua. Gova ruor FAX COVER 3�ET ps Fs�+nsnacarm.ry FN<: (9101350-2009 Serif 6�o.3a/ 127 Cu�fln al O�ive Pa[Y<n siOn. W/Im In gtn n. NC 28iO3 � (9tU) 796-7213 � M Equal OV VUT%airy /1Ti�%n ativa ACU un Fu%p loyy Beverly Eaves Perdue, Governor State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office FAX COVER SHEET Date: _. - To: Fax: Re S;vF DfZ2ea/ 1,1-i . 19 Dee Freeman, Secretary No. Pages (excl. cover): From: Jo Casmer Phone: (910) 796-7336_ _ Fax: (910)350-2004 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 9 An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT TIME :11-06-'12 15:31 FAX NO.1 :910-350-2018 NAME :DENR Wilmington FILE NO. 347 DATE 11.06 15:28 TO B 917574443364 DOCUMENT PAGES 10 START TIME 11.06 15:28 END TIME 11.06 15:31 PAGES SENT 10 STATUS OK *** SUCCESSFUL TX NOTICE seaae 9r xorsa. ca.ausa DeWNm�ea yr 8ovlroameat vva Nvaur�l Resource - Wllmingioa Re01oa�1 ORIC� )��+ Ny Sam P�rAie. Governor FAX CO\/E:A SHEET /Xi PKvma�gee rearry Pnx: /r �� % S� �✓�` � Pad[: (91U1350-20D9 !2-1 Cnea�n pl givc 6.ncnslnn. Wll m ingfn n. NC 26901 � (910) 196-7]13 � M rqu al Di�IH. m1•�iry AlT e.naYivc Avn.in P.rn In oycY State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Dee Freeman, Secretary Date: // Z� —�v To: Co: Fax: Re: No. Pages (excl. cover) From: Jo Casmer hone: (910) 796-7336 Fax: (910)350-2004 G�ioU� d 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 . An Equal Opportunity Affirmative Action Employer �t November 1, 2012 To: North Carolina Department of Environment and Natural Resources Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Reply: Request for Additional Information (dated October 24, 2012) Stormwater Project No, SW8 080301 Special Operations framing Ground (SOTG) — Overhead Baffle at Small Arms Range Modification Onslow County Dear Ms. Nelson, Per your request, please find the attached document which contains the following information in response to your query: A. Revised Project Narrative describing the proposed renovation project at the Special Operations Training Ground (S.O.T.G.), P-1425 Overhead Baffle at Small Arms Range, Square Bay. The proposed "FUTURE" Additional Impervious Area was removed from paraggrap . 1.4. Although initial calculations concluded additional storage capacity was present at Infiltration Basin No. 6, the existing Level Spreader would not support any "FUTURE" Impervious Area. B. Revised Stormwater Application. C. Revised Infiltration Basin Supplement Form SW401 (Rev. 5, 11 Apr2011). D. New Level Spreader— Vegetated Filter Strip (LS-VFS) Supplement SW401 — LS-VFS — (29June2012 — Rev.10). E. New Watershed / Pond Routing Calculations. Responding to your itemized comments, I have attempted to answer each of your comments which is located below each question, in BOLD font. Please update the information presented in Section IV.1 of the application to be consistent with the other application documents. Please be careful on the amount of information presented in this section as too many specifics and numbers will require this page to be updated when a number changes. This section is intended for only a brief description of the project that usually covers the number and types of BMPs and possibly a sentence describing the changes proposed with the modification. Per recommendation, Section IVA has been revised. 2. Please verify the percent of impervious area presented in Section IV.8 of the application is correct. Percent Impervious area in Section IV.8 has been revised and confirmed. Note: The previously identified "FUTURE" Impervious Area has been removed due to a lack of capacity at the existing Level Spreader. Refer to LS-VSF for suppQrt'n�-dQ�cn 1\OV 0 1 2012 BY:- -- - z 't 3. Please verify the sum of the impervious areas presented in Section IV.10 of the application and on various other application documents. The total BUA is presented as 12,385 sq. ft, however the sum of the BUA is 12,383 sq ft (5040 + 2208 + 5135). All values checked, corrected and confirmed in Section IV10. 4. Please ensure the information presented on the supplement is consistent with the information presented in the calculations. For instance, the bottom and top/storage surface area for the infiltration basin is presented on the supplement as 2,450 and 2,848 sq. ft., respectively. However, the calculations appear to indicate that these same surface areas (at the bottom and storage elevation) are 2,435 and 3,231 sq. ft., respectively. All values checked, corrected and confirmed on Infiltration Basin Supplement Form. Since the conditions of the drainage area to basin 6 are changing, please provide an updated level spreader and filter strip supplement and associated calculations. Please refer to the attached Level Spreader — Vegetated Filter Strip (LS-VFS) Supplement Form and Pond Model Routing calculations as requested. I hope everything meets to your satisfaction. Please don't hesitate to contact me should you require additional information or clarification. Thank you for your understanding and allowing us to answer your questions regarding our previous submittal. Sincerely, Lee Pennypacker Civil Engineer Naval Facilities Engineering Command Mid -Atlantic Norfolk, Virginia 23511 P1425 Overhead Baffle at Small Arms Range in Square Bay at the Marine Corps Base Camp Lejeune Jacksonville, NC FY13 MILCON PROJICI' P1425 WO # - 1148518 Storm Water Permit SW8 080301 Modification Application (Rev. 1) November 1, 2012 1, Naval Facilities Eryjinccring Command NAVFAC MID-A7'LAN'1'IC A MCNC IN'r - 1 Ov 0 1 2012 Submittal includes: • P-1425 Project: Narrative Stormwater Permit Application • NOAA Precipitation Frequency Charts, Stones Bay • Existing Infiltration Basin (6) Supplement and Calculations • Proposed Infiltration Basin (6) Supplement and Calculations • Level Spreader — Vegetated Filter Strip (LS-VFS) Supplement • Watershed / Pond Routing Model NARRATIVE The purpose of FY-13 MILCON Project P-1425 is to upgrade the existing Small Arms Range at the Special Operations Training Ground, MCB Camp LeJeune, NC with improved ballistic capabilities and enhanced safety measures. The project is located at the end of Dr George Washington Carver Street in the Stone Bay area of Camp Lejeune Marine Corps Base, Jacksonville, North Carolina. Refer to P-1425 Storm Water & Erosion -Sedimentation Control Plan, sheet G-001 for Vicinity and Location maps. 1.1 EXISTING CONDITIONS The range site is approximately 0.68 acre (approx.) that is bordered by dense trees along the western, southern and eastern boundaries. A large clear zone is present to the north east and small buildings are located along the northern perimeter. Wetlands exist within five hundred feet of the south eastern border. The existing range construction consists of two timber containment walls, stabilized by steel connecting plates, concrete foundations and steel tie -back system, into 10-foot high earthen berms running along the outside of the north and south containment walls. The range floor is comprised of gravel and there a steel "bullet trap" structure is located at the back end of the range, resting on a concrete slab and foundation. The existing terrain is graded to channel storm water runoff from the north and east sides of the range to swales leading to Infiltration Basin # 6 for treatment. 1.2 DEMOLITION The existing facility will be demolished and properly disposed of in accordance with all Federal, State and local guidelines. Prior to any demolition, construction entrances shall be installed in accordance with NCDENR requirements. All steel, timber and concrete structures will be completely demolished and hauled away. The earthen berm material will be excavated to the appropriate local grade, transported and deposited to a nearby stock pile location. Refer to Refer to P-1425 Storm Water & Erosion -Sedimentation Control Plan sheets for location and details. 1.3 NEW SITE WORK The new range facility includes new concrete foundations, slabs and pavement corridor. The corridor will be crowned with a +1% grade down the middle to shed storm water runoff to the range walls on the north and south sides. A new Overhead Baffle System will be constructed that includes: structural steel columns/frames, high velocity ballistic panels suspended from the walls / ceiling and a new steel projectile containment / ventilation system will be constructed at the back end of the range. Two steel canopies will be erected on either side of the range entrance, to provide shelter for weapons loading and unloading. Drain ports (scuppers) will be installed along the floor line of the ballistic paneled walls to accommodate storm water runoff. The surrounding site will be positively graded such to allow for "sheet drain" (over -land flow) runoff without causing erosion. N�OV 0 1 2012 1.4 ENVIRONMENTAL PERMITTING A field survey conducted by NAVFAC personnel in January 2012 concluded the total permitted drainage area for Infiltration Basin #6 in Storm Water Permit SW8 080301 was in error. NAVFAC contacted AECOMM (formerly EarthTech, the Engineer of Record) and their review confirmed NAVFAC's findings. Infiltration Basin #6 was designed to accommodate a future gravel lot to be constructed east of the existing Small Arms Range. This lot was never constructed and NAVFAC is requesting a portion of the proposed gravel lot's impervious area be re -allocated to the proposed new Small Arms Range that is to be constructed next calendar year. The below table outlines our intent and provides specific details for this request. Nomenclature 2008 Design Data 2012 Re -Allocation Date Total Drainage Area: 15,472 29,621 Proposed Impervious Area: 12,194 7,848 Available Future Imperious Area: 0 5,138 Total Impervious Area: 12,194 7,848 Proposed Percent Impervious: 79% 26% Basin 6 Design Capacity (CF): 3,400 3,400 Proposed Capacity Used (CF): 3,383 1,996 Remaining Capacity (%): > 1 % —24% Available Future Capacity (CF): 17 800 Impervious Treatment, Old Range (SF): 3,505 Impervious Treatment, New Range (SF): 4,946 The existing range was originally constructed in 1985/86 and complies with existing federal and state storm water requirements. This proposed design uses approximately 76% of Infiltration Basin No. 6's storage capacity and could accommodate some future Impervious expansion; however the existing Level Spreader will not this. Please refer to the P-1425 Storm Water & Erosion - Sedimentation Control Plan, the Infiltration Basin Supplement, Level Spreader Supplement and associated stormwater calculations enclosed with this submittal. RECEIVED NOV 0 1 Z012 BY:----- 2.0 STORM DRAINAGE / STORMWATER MANAGEMENT Refer to P-1425 Storm Water & Erosion -Sedimentation Control Plan sheets 2.1 SITE RUNOFF All paved surfaces and grading will be constructed to prevent water pooling and encourage sheet flow runoff. Final site grading along the northern wall will be at +1.0% (+/- 0.5%) and 2% to 3.5% along the east side and southern wall. The floor slab will be constructed with a +1.0% crown down the middle to shed runoff to the walls and scuppers will be placed along the both walls at floor level to transport runoff into rock -filled receiving basins to reduce flow velocities and minimize erosion. Runoff from the north and east sides will sheet flow to the existing swales and transported to Infiltration Basin #6 for treatment. Runoff from the south side will sheet flow off site as before. 2.2 STORM DRAINAGE Rainfall intensity values are taken from Regional IDF Curves (Sneads Ferry) as follows: Time of Concentration = 5 min. (conservative) Rainfall Intensity = 3.64"/hour 1-year 24-hour storm Rational Runoff Coefficients (C) are taken from the North Carolina Department of Environmental Resources as follows: Asphalt: 0.95 Concrete: 0.95 Gravel: 0.95 Lawns, sandy soil 0.15 Wooded 0.15 2.3 STORMWATER MANAGEMENT WATER QUALITY ANALYSIS The existing BMP (Infiltration Basin 6) is designed to treat the first 1.5" of impervious runoff within the watershed for a l-year, 24-hour storm event. It has a storage capacity of 3,400 cubic - feet; of which the new range will produce an additional 2143 cubic -feet of runoff. Draw -down time is calculated to be 6.4 hours. NOV 0 1 2012 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Sneads Ferry, North Carolina, t US* 1� Icy ; Coordinates: 34.5846,-77.4410 V� Elevation: Oft* source: Google Maps POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, S. Lin, T_ Parzybok, M.Yekta, and D. Riley NOM, National Weather Service, Silver Spring, Maryland PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) 1 2 5 10 25 50 100 200 500 1000 5.92 7.01 8.18 9.14 10.3 11.2 12.1 T 13.1 14.2 15.2 5-min (5.50 6.41) (6.50 7.57) (7.57 8.82) (8.44 9.85) 1 (9.48 11.1) 1 (10.3 12.1) 1 (11.1 13.1) 1 (11.8 14.1) 1 (12.7 15.4) 1 (13.5 16.5) 4.72 5.60 6.55 7.31 8.23 8.95 9.as 1o.3 11.3 12.0 10-min (4.39 5.11) 1 (5.21 6,05) 1 (6.06 7.06) 1 (6.75 7.88) 1 (7.56 8.85) 1 (8.18 9.63) 11 (8.78 10.4) 1 (9.37 11.2) 1 (10.1 12.2) (10.6 13.0) 3.94 4.70 5.52 6.16 6.96 7.66 8.13 8.70 9.44 10.0 15-min (3.66 4.26) 1 (4.36 5.07) 1 (5.11 5.95) 1 (5.69 6.64) 1 (6.39 7.48) 1 (6.91 8.13) 1 (7.40 8.76) 1 (7.88 9.40) 1 (8.46 10.2) 1 (8.89 10.9) 2.70 3.24 3.92 4.47 5.15 5.69 6.23 6.77 7.51 8.10 30-min (2.51 2.92) (3.01 3.50) (3.63 4.23)1 (4.12 4.81) 1 (4.73 5.54) 1 (5.20 6.12) 1 (5.67 6.71) (6.13 7.31) (6.73 8.13) (7.20 8,80) 1.68 2.04 2.52 2.91 3.43 3.85 4.29 4.76 6.39 5.91 60-min (1.56 1.82) 1 (1.89 2.20) 1 (2.33 2.71) (2.69 3.13) (3.15 3.69) (3.53 4.15) 1 (3.91 4.62) (4.30 5.13) (4.83 5.83) (5.25 6.42) 1.03 1.25 1.69 1.87 2.27 2.60 2.95 3.34 3.88 4.34 2-hr (0.954 1.11) 1 (1.16 1.35) 1 (1.47 1.71) 1 (1.73 2.01) 1 (2.08 2.44) 1 (2.37 2,79) 1 (2.68 3.18) (3.00 3.59) (3.46 4.19) (3.84 4.70) 0.738 0.898 1.16 1.36 1.67 1.93 2.22 2.54 3.01 3.41 3-hr (0.686 0.798) (0.835 0.973) (1.06 1.24) (1.25 1.47) 1 (1.53 1.80) 1 (1.76 2.08) 11 (2.01 2,40) (2.27 2.74) 1 (2.66 3,25) 1 (2.98 3.70) 0.461 0.548 0.701 0.834 1.03 1.19 1.38 1.58 1.88 2.14 6-hr (0.417 0.492) (0.506 0.599) (0.644 0.765) (0.764 0.908) (0.934 1.11) 1 (1.08 1.30) 1 (1.23 1.49) 1 (1.40 1.71) 1 (1.64 2.04) 0.264 0.321 0.413 0.493 0.611 0.715 0.830 0.959 1.15 1.32 12-hr (0.242 0.292) (0.293 0.354) (0.376 0.454) (0.447 0.543) (0.550 0.671) (0.639 0.782) (0.736 0.907) (0.840 1.05) (0.994 1.26) (1.12 1.45) 0.152 0.185 0.239 0.286 0.354 0.415 0.482 0.557 0.870 0.767 24-hr (0.139 0.167) (0.170 0.203) (0.219 0.262) (0.260 0.312) (0.321 0.388) (0.372 0.453) (0.428 0.526) (0.488 0.609) (0.576 0.735) (0.650 O.B47) 0.088 0.107 0.137 0.163 0.203 0.238 0.276 0.319 0.385 0.442 2-day (0.080 0.098) (0.097 0.118) (0.124 0.152) (0.147 0.181) (0.182 0.224) (0.211 0.263) (0.243 0.305) (0.277 0.354) (0.327 0.429) (0.369 0.495) 0.062 0.075 0.096 0.114 0.140 0.163 0.188 0.215 0.259 0.296 3-day (0.057 0.069) (0.069 0.083) (0.087 0.106) (0.103 0.125) (0.126 0.154) (0.145 0.179) (0.166 0.207) (0.188 0.238) (0.221 0.287) (0.249 0.331) 0.049 0.069 0.076 0.089 0.109 0.125 0.144 0.164 0.195 0.223 4•day (0.D45 0.054) (0.054 0.066) (0.069 0.083) (0.081 0.098) (0.098 0.119) (0.112 0.138) (0.127 0.158) (0.143 0.180) (0.168 0.216) (0.189 0.249) 0.032 0.0397F 0.049 0.067 0.069 0.080 0.090 0.102F 0.119 0.133 7-day (0.030 0.036) (0.036 0.043) (0.045 0.054) (0.052 0.063) (0.063 0.076) (0.072 0.087) (0.081 0.099) (0.090 0.112) (0.104 0.131) (0.115 0.148) 0.026 0.030 0.037 0.043 0.052 0.059 0.067 0.075 0.087 0.097 10-day (0.023 0.028) (0.028 0.033) (0.034 0.041) (0.040 0.047) (0.047 0.057) (0.054 0.065) (0.060 0.073) (0.067 0.082) (0.076 0.096) (0.084 0.107) 0.017 0.020 0.024 0.028 0.033 0.037 0.041 0.046 0.052 0.057 20-day (0.015 0.018) (0.018 0.021) (0.022 0.026) (0.026 0.030) (0.030 0.035) (0.034 0.040) (0.037 0.045) (0.041 0.050) (0.046 0.057) (0.050 0.063) 0.014 0.016 0.020 0.022 7F 0.026 0.029 0.032 0.035 0.039 0.042 30-day (0.013 0.015) (0.015 0.017) (0.018 0.021) (0.021 0.024) (0.024 0.028) (0.027 0.031) (0.029 0.034) (0.032 0.038) (0.035 0.042) (0.038 0.046) 0.011 0.014 0.016 0.018 0.021 IF 0.024 0.026 T 0.029 0.032 0.035 45-day (0.011 0.012) (0.013 0.015) (0.015 0.018) (0.017 0.020) (0.020 0.023) (0.022 0.026) (0.024 0.028) (0.026 0.031) (0.029 0.035) (0.031 0.039) 0.010 o.o12 o.014 0.016 O.o19 0.020 0.022 o.624 0.027 0.029 60-day (0.010 0.011) (0.012 0.013) (0.014 0.016) (0.015 0.017) (0.017 0.020) (0.019 0.022) (0.021 0.024) (0.022 0.026) (0.024 0.029) (0.026 0.931) cipitation frequency (PF) estimates in this table are based on frequency analysis of partial duraton series (PDS).�aj iTbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for as given Fduratlon and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at up or bgyOQ{ Iaryinol chi(44�,g,agains http://hdse:nws.noaa.gov/hdse/pfds/pfds_printpage.html?Iat=34.5846&Ion=-77.4410&data=intensity&units=english&sores=pds[l l/1/2012 8;2 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Sneads Ferry, North Carolina," US' Coordinates: 34.5846,-77.4410 Elevation: Oft'''.;, ' source: Google Maps POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Veda, and D. Riley NOM, National Weather Service, Silver Spring, Maryland PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)' Duration Average recurrence Interval(years) 1 2 5 10 25 50 100 ���� 200 500 1000 0.493 0.584 0.682 0.762 5-mIn 0.861 0.936 1.01 1.09 1.19 1.27 (0.458 0.534) (0.542 0.631) (0.631 0.735) (0.703 0,821) (0.790 0.926) (0.857 1.01) (0.922 1.09) (0.985 1.18) (1.06 1.28) 0.787 0.934 1.09 1.22 1.37 1.49 1.61 1.72 1.88 1.99 10-mIn (0.732 0.852) (0.868 1.01) 1 (1.01 1.18) 1 (1.13 1.31) 1 (1.26 1.48) (1.36 1.61) (1.46 1.73) (1.Sfi 1.86) (1.68 2.03) (1.77 2.16) 0.984 1.17 1.38 1.54 1.74 1.89 2.03 2.18 2.36 2.60 15-mIn (0.915 1.07) 1.35 1 (1.09 1.27) 1.62 1 (1.28 1.49) 1.96 1 (1.42 1.66) 2.23 1 (1.60 1.87) 2.58 1 (1.73 2.03) 2.84 (1.85 2.19) 3.12 (1.97 2.35) 3.39 (2.12 2.56) 3.76 (2.22 2.72) 4.05 30-mIn (1.25 1.46) (1.51 1.75) (1.82 2.12) (2.06 2.41) (2.37 2.77) (2.60 3.06) (2.84 3.36) (3.07 3.66) (3.37 4.07) (3.60 4.40) 1.68 2.04 2.52 2.91 3.43 3.86 4.29 4.75 5.39 5.91 60-min (1.56 1.82) (1.89 2.20) (2.33 2.71) (2.69 3.13) (3.15 3.69) (3.53 4.15) (3.91 4.62) (4.30 5.13) (4.83 5.83) (5.25 6.42) 2.06 2.60 3.17 3.74 4.53 5.20 5.91 6.67 7.76 8.69 2-hr (1.91 2.21) (2.32 2.70) (2.94 3.42) 1 (4.16 4.88) (4.74 5.59) (5.35 6.36) (6.00 7.18) (6.92 8.37) (7.68 9.40) 2'22 F 3.44 5.01 5.81 6.67 7.63 9.03 70.2 3-h7r (2.06 2.40) 1 (3.19 3.72) 1 (4.59 5.40) (5.28 6.26) (6.03 7.19) (6.83 8.22) (7.98 9.76) (8.95 11.1) 2.70 3.28 4.20 4.99 6.14 7.14 8.24 9.45 11.2 12.8 6-hr (2.50 2.95) (3.03 3.59) (3.86 4.58) (4.58 5.44) (5.59 6.67) (6.45 7.75) (7.38 8.93) (8.37 10.2) (9.83 12.2) (11.1 13.9) 3.18 3.87 4.97 6.95 7.37 8.62 10.0 11.6 13.9 16.9 12•hr (2.91 3.51) 1 (3.53 4.27) 1 (4.53 5.47) 1 (5.39 6.54) 1 (6.63 8.08) (7.70 9.43) (8.86 10.9) (10.1 12.6) (12.0 15.2) (13.5 17.4) 3.64 4.43 6.73 6.84 8.61 9.95 11.6 13.4 16.1 18.4 24-hr (3.35 4.01)- (4.07 4.88) (5.26 6.29) (6.25 7.50) (7.70 9.30) (8.92 10.9) (10.3 12.6) (11.7 14.6) (13.8 17.6) (15.6 20.3) 4.24 5.13 6.59 7.84 9.74 17.4 13.3 15.3 18.5 21.2 2-day (3.86 4.69) (4.67 5.68) (5.97 7.29) 1 (8.72 10.8) (10.1 12.6) (11.7 14.7) (13.3 17.0) (15.7 20.6) (17.7 23.8) 4.48 6.42 6.92 8.19 10.1 11.7 13.5 15.5 18.6 21.3 3-day (4.08 4.95) (4.93 5.99) (6.28 7.64) (7.40 9.03) (9.05 11.1) (10.4 12.9) (11.9 14.9) (13.5 17.2) (15.9 20.7) (17.9 23.8) 4.72 5.70 7.25 8.54 10.4 12.0 13.8 15.7 18.8 21.4 4-day (4.30 5.20) (5.20 6.30) (6.59 7.99) (7.73 9.40) (9.38 11.4) (10.8 13.2) (12.2 15.2) (13.8 17.3) (16.2 20.8) (18.2 23.9) 5.45 6.57 8.26 9.65 11.7 13.4 16.2 17.1 20.0 7 -day 22.4 (5.01 5.97) 1 (6.03 7.18) (7.56 9.03) 1 (8.81 10.5) 1 (10.6 12.7) (12.1 14.6) (13.6 16.6) (15.2 18.8) (17.4 22.0) 6.05 7.26 8.99 10.4 12.6 14.2 16.1 18.0 20.9 23.2 10-day (5.57 6.63) 1 (6.68 7.95) 1 (8.26 9.84) 1 (9.54 11.4) 1 (11.4 13.6) (12.9 15.5) (14.4 17.5) (16.0 19.7) (18.3 23.0) (20.1 25.7) 8.01 9.63 11.6 13.3 15.7 17.7 19.8 22.0 25.1 27.6 20-da y (7.43 8.67) (8.84 10.3) (10.7 12.6) (12.3 14.4) (14.4 16.9) (16.1 19.1) (17.9 21.4) (19.7 23.8) (22.2 27.4) (24.1 30.3) 9.86 11.7 14.1 16.0 18.6 20.7 22.8 25.1 28.1 30.6 30-day (9.22 10.6) (11.0 12.6) (13.2 15.1) (14.9 17.1) (17.3 20.0) (19.1 22.2) (21.0 24.6) (22.9 27.0) (25.4 30.5) (27.3 33.2) 12.4 14.7 77.5 19.8 23.0 25.6 28.3 31.1 35.0 45-day 38.1 (11.5 13.4) (13.7 15.9) (16.3 18.9) (18.4 21.4) 1 (21.2 25.0) (23.6 27.8) (25.9 30.8) (28.2 33.8) (31.3 38.2) (33.7 41.8) 15.0 17.7 20.9 23.4 26.8 29.5 32.2 34.9 60-day 38.6 41.4 (14.1 16.1) (16.6 19.0) (19.5 22.3) (21.9 25.0) (24.9 28.7) (27.4 31.5) (29.7 34.5) (32.1 37.5) (35.1 41.7) (37.4 45.0) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration sense (PDS). 77�"''``F�T'vED Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that preci itaB'Uortrfr�quencslltimates ((or a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Esti ates atlupper lloulds'melltot h4://hdsc.nws.noaa.gov/hdsctpfds/pfds_printpage.html?lat=34.5946&Ion=-77.4410&data=depth&units=cnglish&series-pds[I I/I/2012 8: 9251) Existing Infiltration Basin (6) Supplement and Calculations Submitted by Earth Tech: "Special Operations Training Ground at Stone Bay, Marine Corps Base, Camp LeJeune, North Carolina" 2008 N0V 0 1 zw Permit (to be provided by DWO) ��� �U4 W n rEH STORMWATER MANAGEMENT PERMIT APPLICATION FORM a�E NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT'.INFORMATION Project Name USMCB Camp Lejeune- S.O.T.G. Contact Person Bryan M. Dick, PH Phone Number 919-854-6252 Date 4/18/2008 Drainage Area Number 6 11. DESIGN INFORMATION Site Characteristics Drainage area 15,472.00 R' Impervious area 12,194.00 gZ Percent impervious 0.79 Design rainfall depth 3.7 in Peak Flow Calculations Is prelpost control of the l-yr 24-hr peak Bow required? Y (Y or N) 1-yr, 24-hr runoff depth 3.7 in I-yr, 24-hr intensity 0.9 irdhr Pre -development 1-yr, 24-hr runoff volume Hi ft'lsec Post -development 1-yr, 24-hr runoff volume 0 09 ft'/sec Pre/Post 1-yr, 24-hr peak Bow control 0.1 fl'Isec Storage Volume: Non -SR Waters Minimum design volume required ft' Design volume provided fit, Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA 3.7 in 239 tt' 3622 tt' 3383 it 3,400 it Baymeade 2.61 in/hr 1880 fmsl 0.27 days 4 1 2090 fmsl 22.10 fmsl 22.50 fmsl 67 It 36 It 2,435 fit' OK OK OK N0V 0 1 2012 Form SW401-InGttmtion Basin-Rev.1 Parts 1. a 11. Design Summary, Page 1 of 2 Additional Information Total runoff volume captured by basin 0.93 ac-in OK Length of vegetative filter for overflow 50 it OK Distance to structure 122 it OK Distance from surface waters 80 it OK Distance from water supply well(s) NA it OK Separation from impervious soil layer NA it OK Naturally occuring soil above shwt 1.7 it OK Bottom covered with 4-ln of clean sand? N (Y or N) OK Recorded drainage easement provided? NA (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Pretreatment device provided Y Permit No. (to be provided by DWO) Nov 0 1 2012 Form SW401-Infiltration Basin-Rev.1 Parts I. & II. Design Summary, Pape 2 of 2 Infiltration Basin 6 Dmin a Area (So 15472 Imp Area so 1 12194 A Drainage Area Ac 0.355198 (Is) Imp Fraction 0.79 (Ro)Rainfall Depth Per State SWP(in) 3.7 Designed By: BMD Date: 4/18/2008 Step 1: Determine Runoff Volume Simple Method a. Rv=.OS+.9(Ia) =Rv(post)=05+.967 = 0.76 Rv(pre)=.05+.9.0 = 005 V=3630xRDxRpxA b Post V=3630'37*0.76'.3552 V (Post) = 3622 of Pre V=3630'3.7'0.05'.3552 V (Pre)= 239 cf Min. Treatment Vol Post - Pre= 3384d Treatment Vol in Ac-in 0.93 ac-in Step 2: Determine Surface Area- Min. K Infiltration Rate in/hr 2.61 T Intended Days to Infiltrate(days) 2 a. = A=3384/(2'(3.66'2)) Mln SA of Basin = 324.1 sf A = a*<x*r) Step 3. Determine Dimensions Design Storage Elevation 22.10 Flow Spider - Inlet Elevation 22.30 Bottom Elevation 2090 Flow Splitter- Bypass Flow Oullel 21.60 Flow Splitter- Outlet to Basin Elev. 21.60 Top of Berm Elevation 22.50 Max Excavation Depth -0.33 ' Must set invert to min of 0.4 above existing Storage Depth 1.20 Surface Area Required (Avg of Top and Bottom SA) 2820 Target Area 2820 sf Top Width @ Storage Elev 43.6 Top Length @ Storage 14.1 Actual Area Top = 3231 sf Bottom Width 36.4 Bottom Length 66.9 Actual Area Bottom = 2435 at Avg Surface Area = 2833 sf 4. Calculation of Volumetric Flow Rate of Infitration and Drawdown O from Infiltration: 'O is actually the Darcian Flow Rate Area (so (K) in/hr O (Infiltration) = 0.15 cfs Q=A-(K)- Conversion = cfs 2435 261 Example Calculation of Q: Surface rea=4556 sf (K)=3.94in/hr 3.94in lfr Ihr 4556 sf --=0.42cfs hr 12in 3600s DraN Drawdown Time for Design Vol Volume O Hours oays Example Calculation: Q = 0.42cfs V = 3458cf 3400 0.16 9.a o.z7 V 3458fP Is Ihr 3 •=2.lhrs=.089days Q l 0.42 fi 3600s NOV 0 1 2012 Proposed Infiltration Basin (6) Supplement and Calculations Submitted by Naval Facilities Engineering Command, Mid -Atlantic (NAVFAC MIDLANT): P-1425 Overhead Baffle at Small Arms Range, Square Bay Marine Corps Base Camp LeJeune, Jacksonville, NC" 2012 NGv 01 NQ Infiltration Basin 6 Development Pip Pnst DrainfleArea S 29621 1 29621 CURRENT Imp Areas 4,558 1 7,84 FUTURE Imp Areas 0 A Drainage Area Ac 0.68 0.68 (IA) Imp Fraction 0.15 0.26 (Ro)Rainfall Depth Per State SWP in 3.64 3.64 Step 1: Determine Runoff Volume Simple Method Designed By: GLP Date: 10/17/2012 a. Runoff Coefficient Rv= 0.05+0.9'h = 0.05+ Off '(0.284/0.680) = 0.43 b. 1.5' Runoff Volume Vis.= 3630'Ro Rv'A = 3630'1.5'0.05'.68 = 1576,87 cf c Runoff Volume Rv=Rv(post)=.05+.9'Ip = 0.29 Rv(pre)= 05+.9'h = 0.19 cL \ Post V=3630'3.64'0.76'.68 V (Post) = 2592 cf l Pre V=3630-3.64-0.05'.68 V (Pre) = 449 cf Min. Treatment Vol(Post •Pre o 2143 c/ Treatment Vol in Ac-in 0.59 ac-m Step 2: Determine Surface Area. Min, K Infiltration Rate in/hr 261 IT Intended Days to Infiltrate (days) 2 a. Step 3. Determine Dimensions Elevation 22.10 i 20.90 = A=1959/(2'(3.66'2)) Flow Splifter- Inlet Elevation Flow Splitter - Bypass Flow OuOi Storage Depth Surface Area Required (Avg of Top and Bottom SA) Top Width @ Storage Elev 430 Top Length @ Storage Elev Bottom Width 364 Bottom Length 4. Calculation of Volumetric Flow Rate of Infiltration and Drawtlown O from infiltration: 'O is actually the Darcian Flow Rate Drawdown Time for Treatment Volume Avg Desired Width for Basin 40 ff Length=SAAvidth Top SA Adjustments for Top and Bottom z:1 = 3 Vert Distance = 0.6 T20 1.20 1785 74.1 66.9 Min SA of Basin= 205.2 sf Target Area 1785 at Actual Area Top = 3231 st Actual Area Bottom = 2435 sf Avg Surface Area = 2833 sf Area (sf) (K)in/hr 0(infiltration)= 0.15 c/s 2435 2.61 Drawtlown Time for Design Vol Volume c O Hours Da 3400 0.16 6.4 0.27 45 If Offset in Horizontal = CFIVED NOV 0 1. 2012 1.8 3.6 Watershed / Pond Routing Model NOV 0 1 2012 Hydraflow Table of Contents Exist Basin 6.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2010 by Autodesk, Inc. v9.25 Thursday, Nov 1, 2012 Watershed Model Schematic..................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 -Year SummaryReport ......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Post Development................................................................. 4 Hydrograph No. 2, Reservoir, Basin #6 Routing...................................................................... 5 Pond Report - Existing Infiltration Basin#6......................................................................... 6 2 - Year SummaryReport ......................................................................................................................... 7 HydrographReports................................................................................................................... 8 Hydrograph No. 1, SCS Runoff, Post Development................................................................. 8 Hydrograph No. 2, Reservoir, Basin #6 Routing...................................................................... 9 10 -Year SummaryReport ....................................................................................................................... 10 HydrographReports................................................................................................................. 11 Hydrograph No. 1, SCS Runoff, Post Development............................................................... 11 Hydrograph No. 2, Reservoir, Basin #6 Routing.................................................................... 12 100 - Year SummaryReport ....................................................................................................................... 13 HydrographReports................................................................................................................. 14 Hydrograph No. 1, SCS Runoff, Post Development............................................................... 14 Hydrograph No. 2, Reservoir, Basin #6 Routing.................................................................... 15 OFReport.................................................................................................................. 16 M1_ NUV U 1 2012 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD®Civil 3D02010 by Autodesk, Inc. v9.25 gyl origin Description SCS Runoff Post Development 2 Reservoir Basin #6 Routing 1._ FIVED LNOV 0 1 2012 13Y:---- Project: Exist Basin 6.gpw Thursday, Nov 1, 2012 2 Hydrograph Return Period Rep y ra ow Hydrographs Extension for AutoCAD @ Civil 3DO 2010 by Autodesk, Inc. v9.25 Hyd. Hydrograph Inflow Peak Outflow lets) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 0.760 1.153 ----- ------- 2.498 ---- -- --- --- 5.370 Post Development 2 Reservoir 1 0.025 0.120 ---- -- ----- 1.480 ------ ---- 4.633 Basin #6 Routing ��.��VFD NUV 0 2012 Proj. file: Exist Basin 6.gpw Thursday, Nov 1, 2012 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3DO2010 by Autodesk, Inc. v9.25 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.760 3 726 2,670 -- -- --- Post Development 2 Reservoir 0.025 3 1068 958 1 21.61 2,014 Basin #6 Routing s s FD NOV p 1 2012 gY: Exist Basin 6.gpw Return Period: 1 Year Thursday, Nov 1, 2012 4 Hydrograph Report HydraOow Hydrographs Extension for AutoCAD® Civil 3D®2010 by Autodesk, Inc. v9.25 Thursday, Nov 1, 2012 Hyd. No. 1 Post Development Hydrograph type = SCS Runoff Peak discharge = 0.760 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 3 min Hyd. volume = 2,670 cuft Drainage area = 0.680 ac Curve number = 71* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 7.00 min Total precip. = 3.64 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(0.180 x 98) + (0.500 x 61)] / 0.680 0 180 Hyd No. 1 Post Development Hyd. No. 1 -- 1 Year 360 540 720 900 1080 1260 1440 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 1620 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D®2010 by Aulodesk, Inc. v9.25 Thursday, Nov 1, 2012 Hyd. No. 2 Basin #6 Routing Hydrograph type = Reservoir Peak discharge = 0.025 cfs Storm frequency = 1 yrs Time to peak = 1068 min Time interval = 3, min Hyd. volume = 958 cuft Inflow hyd. No. = 1 - Post Development Max. Elevation = 21.61 ft Reservoir name = Existing Infiltration Basin #6 Max. Storage = 2,014 cuft Storage Indication method used. Exfiltration extracted from Outflow Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 180 360 Hyd No. 2 Basin #6 Routing Hyd. No. 2 -- 1 Year 540 720 900 — Hyd No. 1 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 1080 1260 1440 1620 1800 1980 2160 ® Total storage used = 2;0]4.cuft Time (min) ! Rr-! `x7' FIVED NOV 0 1 2012 i t3Y: Pond Report s Hydraflow Hydrographs Extension for AutoCAO® Civil 3DO 2010 by Autodesk, Inc. v9.25 Thursday, Nov 1, 2012 Pond No. 1 - Existing Infiltration Basin #6 Pond Data Pond storage is based on user -defined values. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cult) 0.00 20.90 n/a 0 0 1.20 22.10 n/a 3,400 3,400 1.60 22.50 We 1,121 4,521 Culvert / Orifice Structures Weir Structures [A] [Bl [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 2.92 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 21.60 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.330.00 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect --- --- --- Length (ft) = 0.00 0.00 0.00 0.00 Multistage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 2.610.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: CUNeNOMILe oualo are analyzed under Inlet (Ic) and outlet (w) control. Weir risers checked for onrice wnJitions (Ic) and submergence (a). Stage / Storage / Discharge Table Stage Storage Elevation CIvA Ch,B CIvC PrfRsr WrA WrB WrC WrD Exfil User Total ft cult ft cfs cfs cfs cfs cfs cfs cis cfs cfs cfs cfs 0.00 0 20.90 --- --- -- --- 0.00 --- - --- 0.000 -- 0.000 1.20 3,400 22.10 -- --- --- --- 3.44 --- -- --- 0.000 --- 3.438 1.60 4,521 22.50 -- -- --- --- 8.30 - 0.000 --- 8.302 VED evd N12 Hydrograph Summary Report HydraBow Hydrographs Extension for AutoCAD®Civil 3DO2010 by Autodesk, Inc. v9.25 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 1.153 3 726 3,925 ---- ---- ----- Post Development 2 Reservoir 0.120 3 798 2,212 1 21.64 2,106 Basin #6 Routing I NOV 0 1 2012 (:3Y: Exist Basin 6.gpw Return Period: 2 Year Thursday, Nov 1, 2012 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DV 2010 by Autodesk, Inc. v9.25 Hyd. No. 1 Post Development Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 3 min Drainage area = 0.680 ac Basin Slope = 0.0 % Tc method = User Total precip. = 4.43 in Storm duration = 24 hrs Composite (Area/CN) = [(0.180 x 98) + (0.500 x 61)] / 0.680 Q (Cfs) 2.00 1.00 w 0 180 360 Hyd No. 1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Development Hyd. No. 1 -- 2 Year 540 720 900 1080 Thursday, Nov 1, 2012 = 1.153 cfs = 726 min = 3,925 cult = 71" = 0 ft = 7.00 min = Type III = 484 Q (cfs) 2.00 1.00 0.00 1260 1440 1620 i TVED min) R NOV 0 1 2012 BY: Hydrograph Report 9 Hydraflow Hydrographs Extension for AutoCAD® Civil 31382010 by Autodesk, Inc. v9.25 Thursday, Nov 1, 2012 Hyd. No. 2 Basin #6 Routing Hydrograph type = Reservoir Peak discharge = 0.120 cfs Storm frequency = 2 yrs Time to peak = 798 min Time interval = 3 min Hyd. volume = 2,212 cuft Inflow hyd. No. = 1 - Post Development Max. Elevation = 21.64 ft Reservoir name = Existing Infiltration Basin #6 Max. Storage = 2,106 cuft Storage Indication method used. Exfiltration extracted from Outflow Basin #6 Routing Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 2.00 2.00 1.00 1.00 k 000 nnn 0 180 360 Hyd No. 2 540 720 900 1080 1260 1440 1620 1800 1980 2160 — Hyd No! 1 ® Total storage used = 2,]; .06 Time (min) �.c � 7ED I NOV 0 2012 10 Hydrograph Summary Report Hydraflow, Hydrographs Extension for AutoCAD®Civil 3D®2010 by Autodesk, Inc. v9.25 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph Description 1 SCS Runoff 2.498 3 726 8,306 ----- -- ---- Post Development 2 Reservoir 1.480 3 735 6,593 1 21.89 2,786 Basin #6 Routing "=r FTVED NOV 0 1 2012 Exist Basin 6.gpw Return Period: 10 Year Thursday, Nov 1, 2012 11 Hydrograph Report Hydraftow Hydrographs Extension for AutoCAD® Civil 3DO 2010 by Autodesk, Inc. v9.25 Hyd. No. 1 Post Development Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 3 min Hyd. volume Drainage area = 0.680 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 6.84 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(0.180 x 98) + (0.500 x 61)] 10.680 Q (Cfs) 3.00 ` 11,7 1.00 Post Development Hyd. No. 1 -- 10 Year 0.00 ' ' ' ' ' 0 180 360 540 720 900 1080 Hyd No. 1 Thursday, Nov 1, 2012 = 2.498 cfs = 726 min = 8,306 tuft = 71* = Oft = 7.00 min = Type III = 484 Q (Cfs) 3.00 2.00 1.00 0.00 1260 1440 1620 r"'EIVE ime (min) i NOV 6 1 2012 1BY: Hydrograph Report 12 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Thursday, Nov 1, 2012 Hyd. No. 2 Basin #6 Routing Hydrograph type = Reservoir Peak discharge = 1.480 cfs Storm frequency = 10 yrs Time to peak = 735 min Time interval = 3 min Hyd. volume = 6,593 cuft Inflow hyd. No. = 1 - Post Development Max. Elevation = 21.89 ft Reservoir name = Existing Infiltration Basin #6 Max. Storage = 2,786 cuft Storage Indication method used. Exfiltration extracted from Outflow Basin #6 Routing Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 000 nnn 0 180 360 Hyd No. 2 540 720 900 1080 1260 1440 1620 Time (min) Hyd No. 1 Total storage used = 2,786 cut ED ivi; v ZO12 13 Hydrograph Summary Report Hydraflow, Hydrographs Extension for AutoCAD®Civil 3D®2010 by Autodesk, Inc. v9.25 Hyd. No. Hydrograph type (origin) Peak flow (CIS) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total slrge used (curt) Hydrograph Description 1 SCS Runoff 5.370 3 726 18,098 ----- ----- ----- Post Development 2 Reservoir 4.633 3 729 16,386 1 22.21 3,708 Basin #6 Routing F IVED i i NOV 0 1 2012 1i3y: Exist Basin 6.gpw Return Period: 100 Year Thursday, Nov 1, 2012 14 Hydrograph Report HydraBow Hydrographs Extension for AutoCAD® Civil 3D® 2010 by Autodesk, Inc. v9.25 Thursday, Nov 1, 2012 Hyd. No. 1 Post Development Hydrograph type = SCS Runoff Peak discharge = 5.370 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 3 min Hyd. volume = 18,098 cult Drainage area = 0.680 ac Curve number = 71* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 7.00 min Total precip. = 11.60 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = ((0.180 x 98) + (0.500 x 61)]10.680 Q (cfs) 6.00 4914 4.00 3.00 2.00 1.00 0.00 0 180 Hyd No. 1 Post Development Hyd. No. 1 -- 100 Year 360 540 720 Q (Cfs) 6.00 5.00 4.00 [t;Id11 Fa417 MR1111 -- 0.00 900 1080 1260 1440 1620 ____-4ime (min) NOV 0 1 2012 Hydrograph • Report 15 Hydrallow, Hydrographs Extension for AutoCAD® Civil 3D®2010 by Autodesk, Inc. v9.25 Thursday, Nov 1, 2012 Hyd. No. 2 Basin #6 Routing Hydrograph type = Reservoir Peak discharge = 4.633 cfs Storm frequency = 100 yrs Time to peak = 729 min Time interval = 3 min Hyd. volume = 16,386 cult Inflow hyd. No. = 1 - Post Development Max. Elevation = 22.21 ft Reservoir name = Existing Infiltration Basin #6 Max. Storage = 3,708 cuff Storage Indication method used. Exfltration extracted from Outflow Basin #6 Routing Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 180 360 540 720 900 1080 1260 1440 1620 — Hyd No. 2 — Hyd No. 1 ® Total storage used--3=7Q8 ayft`�lJ a (min) I �I NOV � 1 20,12 Hydraflow Rainfall Report 16 Hydra0ow Hydrographs Extension for AutoCADG Civil 3D®2010 by Autodesk, Inc. v9.25 Thursday, Nov 1, 2012 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 0.0000 0.0000 0.0000 -- 2 69.8703 13.1000 0.8658 ---- 3 0.0000 0.0000 0.0000 ------ 5 79.2597 14.6000 0.8369 ----- 10 88.2351 15.5000 0.8279 ---- 25 102.6072 16.5000 0.8217 --- 50 114.8193 17.2000 0.8199 --- 100 127.1596 IT8000 0.8186 --- File name: Sneads Ferry Precip Table. OF Intensity = B I (Tc + D)AE Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc = time in minutes. Values may exceed 60. Preci . file name: O:\NC IPT NUCLEUS\ICivihH dra6ow\IDF\Pl425 SOTG. c Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.64 4.43 0.00 0.00 6.84 0.00 0.00 11.60 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff -1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NoV o ? 2012 NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Governor Director October 24, 2012 Commanding Officer MCB Camp Lejeune c/o Captain John Carson, Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 28547 Subject: Request for Additional Information Stormwater Project No. SW8 080301 Special Operations Training Ground (SOTG) - Overhead Baffle at Small Arms Range Modification Onslow County Dear Capt. Carson: Dee Freeman Secretary The Wilmington Regional Office received a modified Express Stormwater Management Permit Application for the Special Operations Training Ground (SOTG) to modify the Overhead Baffle at the Small Arms Range on October 18, 2012. A preliminary review of that information has determined that the application is not complete. The following Information is needed to continue the stormwater review: ✓1. Please update the information presented in Section IV.1 of the application to be consistent with the other application documents. Please be careful on the amount of information presented in this section as too many specifics and numbers will require this page to be updated when a number changes. This section is intended for only a brief description of the project that usually covers the number and types of BMPs and possibly a sentence describing the changes proposed with the modification. /2. Please verify the percent of impervious area presented in Section IV.8 of the application is correct. /. Please verify the sum of the impervious areas presented in Section IV.10 of the application and on various other application documents. The total BUA is presented as 12,385 sq. ft, however the sum of the BUA is 12,383 sq ft (5040 + 2208 + 5135). V 4 Please ensure the information presented on the supplement is consistent with the Information presented in the calculations. For instance, the bottom and top/storage surface area for the infiltration basin is presented on the supplement as 2,450 and 2,848 sq. ft., respectively. However, the calculations appear to indicate that these same surface areas (at the bottom and storage elevation) are 2,435 and 3,231 sq. ft., respectively. V'5. Since the conditions of the drainage area to basin 6 are changing, please provide an updated level spreader and filter strip supplement and associated calculations. / ,/ 6. Due to the minor nature of these comments, the express additional information fee has been waived for this request for additional information. 7. Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One NorthCarojina Phone: 910-796-72151 FAX: 910-350-20041 DENR Assistance: 1-877-623-6748 Internet v .nmaterquality.org _ Natf/r llf/ Captain John Carson October 24, 2012 Stormwater Application No, SW8 080301 Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to November 2, 2012, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If the project is returned, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7323 or email me at christine.nelson@ncdenr.gov. Sincerely, C, t -t.\_� � Christine Nelson Environmental Engineer GDS/can: S:\WQS\StormWater\Permits & Projects\2008 \080301 HD\2012 10 addinfo 080301 cc: Lee Pennypacker, Naval Facilities Engineering Command, Mid -Atlantic Wilmington Regional Office Page 2 of 2 Nelson, Christine From: Nelson, Christine Sent: Wednesday, October 24, 2012 10:58 AM To: Thomas Bradshaw (thomas.bradshaw@usmc.mil) , 'Cu Rant, MaryAnn V CIV NAVFAC MIDLANT, IPTNC';'granville.pennypacke@navy.mil' Cc: Russell, Janet Subject: request for additional info - SOTG Overhead Baffle mod Attachments: 2012 10 addinfo 080301.pdf All, I have attached a pdf of the request for additional information for the SOTG permit (SW8 080301) modification for the small arms range area. Please let me know ASAP if you have any questions as I will be on vacation starting around noon on Friday and will be returning to the office on Weds. Copies of this letter will also be sent in the mail. Thanks, Christine Christine Nelson Environmental Engineer State Stormwater Program NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 Phone:910-796-7323 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Nelson, Christine From: Pennypacker, Granville CIV NAVFAC MIDLANT, CI [granville.pennypacke@navy.mil] Sent: Wednesday, October 17, 2012 1:41 PM To: Nelson, Christine; thomas.bradshaw@usmc.mil; Towler CIV David W; Hall, Rhonda Cc: DuRant, MaryAnn V CIV NAVFAC MIDLANT, IPTNC Subject: Camp LeJeune, S.O.T.G Stone Bay SW and ES permit Express Review Attachments: P1425 PERMIT _DWGS_C-301.pdf; P1425 SW -Mod narrrative and calcs.pdf; SW Mod supplement.docx; P-1425 SSW-SWU-101-Application-20120806-DWQ-SPU.docx Good Afternoon All, I appreciate the time you gave yesterday afternoon to meet with Mary Ann and I and go over the Express Storm Water and E-S Permit Review. I apologize again for the problem with plan sheet C-301 and am forwarding you the revised sheet (showing all point elevations). Also attached are the changes we talked about regarding the SW submittal. I hope the attached files meet with your satisfaction. Please let me know if I missed anything or you need additional information. Thanks again for your time. Regards, Lee Granville "Lee" Pennypacker NAVFAC MIDLANT, Capital Improvements Hydrographics Division, BMCI43 9080 Virginia Avenue, Bldg CEP-188 Norfolk, Virginia 23511 (757) 444-0903; FAX: (757) 444-3364 North Carolina IPT Lafayette River Annex Bldg C. Room 2024 Norfolk, Virginia 23511 (757) 322-4052 granville.pennypacke(@navy.mil 1 De8o3o t North Carolina Department of Environment and AGFWA. Natural Resources NCDENR Request for Express Permit Review For DENR Use ONLY ONLY Reviewer `.3 ��,�p �-.{.�1� '' � ��" 4 Submit: 1 0 — `(0 Time: 2 . Oa deem,: l FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (PDF rile) and vicinity map (same items expected in the applicatioi ap ckage of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828.296.4698;alison.davidson(&,ncdenr.00v • Fayetteville or Raleigh Region -David Lee 919-791.4203; david.lee mcdenr.eov • Mooresville & Winston Salem Region - Patrick Grogan 704-235-2107 or Patrick.propan(p ncdenr.gov • Washington Region -Lyn Hardison 252-948-3842 or Ivn.hardisont7p ncdenr oov • Wilmington Region -Janet Russell 910-796-7302 or ianetrussell(e)ncdenr.00v • Wilmington Region -Cameron Weaver 910-796.7303 or cameron.weavenPricdenr oov NOTE: Project application received after 12 noon will be stamped in the following work day. Permits of Reauesl SW _ SW _ SW_ SW SW_ Project Name: P1425 OVERHEAD BAFFLE AT SMALL ARMS RANGE, SQUARE BAY County: ONSLOW I Cc o�l'1 Applicant: USMC Company: USMC Address: BLDG 1005 MICHAEL RD City: CAMP LEJEUNE, State: NC Zip: 28542 Phone: 910-451-2213, Fax: 910-451-2927, Email: carl:h.baker@usmc.mil �Lz Av1 Physical Location:END OF DR. G. W. CARVER ST., SPECIAL OPERATIONS TRAINING GROUND AT STONE BAY (SQUARE BAY) Project Drains into SA waters — Water classification NSW (for classification see-hfto://h2o,enr,state.nc.usibims/reports/reportsWB.html Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? Y, within''/2 mile and draining to class SA waters N or within 1 mile and draining to class HQW waters? N Engineer/Consultant: LEE PENNYPACKER Company: NAVFAC MIDLANT MCNC IPT�+ �F�V�' D Address: 6506 HAMPTON BLVD, LRA BUILDING C City: NORFOLK, State: VA Zip: 23508-1278 Phone: 757-322-4052. Fax: 757-322-8280, Email: pranville.pennvpacker@navv.mil OCT U 4 2012 SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWO, ❑ DCM, ® DLR, ❑ OTHER: _ BY: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Welland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ® General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ® High Density -Infiltration 1 #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ #Treatment Systems / ®MOD:❑ Major ® Minor ❑ Plan Revision ❑ Redev. Exclusion SIN 080301 (Provide permit#) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 1_4 acres to be disturbed.(CK It (for DENR use)) SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ❑ Yes ® No Buffer Impacts: ® No ❑ YES: —acre(s) Wetlands Delineation has been completed: ❑ Yes ® No Isolated wetland on Property ❑ Yes ® No US ACOE Approval of Delineation completed: ❑ Yes ® No 404 Application in Process wl US ACOE: ❑ Yes ® No Permit Received from US ACOE ❑ Yes ® No DENR use Fee Split for multiple permits: (Check# ) TotalFeeAmount SUBMITTAL DATES Fee i SUBMITTAL DATES Fee LAMA $ Variance I[]Maj; El Min) $ SW (❑ HD, ❑ LD, ❑ Gen) I $ 401: $ LQS I $ Stream Deter,_ $ NCDENR EXPRESS June 2011 Russell, Janet From: Pennypacker, Granville CIV NAVFAC MIDLANT, Cl [granville.pennypacke@navy.mil] Sent: Thursday, October 04, 2012 1:32 PM To: Russell, Janet Cc: DuRant, MaryAnn V CIV NAVFAC MIDLANT, IPTNC Subject: Express SW & E-S permit application Attachments: P1425 REQUEST FOR EXPRESS SW PERMIT MOD.docx Good Afternoon Ms. Russell, MaryAnn Durant and I would like to meet with you and your staff regarding an Express Permit application for a Storm Water modification and apply for a new Erosion & Sedimentation Permits. The proposed project is located in the Stones Bay section of US Marine Corps Base Camp Lejeune, NC. If possible we would like to meet with you the afternoon of October 16 or October 17. Please advise if this is acceptable or if another date/time would be more suitable. Regards, Lee Granville "Lee" Pennypacker NAVFAC MIDLANT, Capital Improvements Hydrogr'aphics Division, BMCI43 9080 Virginia Avenue, Bldg CEP-188 Norfolk, Virginia 23511 (757) 444-0903; FAX: (757) 444-3364 North Carolina IPT Lafayette River Annex Bldg C. Room 2028 Norfolk, Virginia 23511 (757) 322-4052 Rranville.pennypacke(@navv.mil' OQ0.�o3o Sco�� (J 1 For DENR Use ONLY Reviewer: AGR North Carolina Department of Environment and Submit:q, ^� to P� Natural Resources o NCDENR Request for Express Permit Review Tons: 1 �-- Confirm: FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative, site plan (PDF rile) and vicinity man (same items expected in the application ap ckaae of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296.4698;alison.davidson(abncdenr.pov Enter Related \`, Permits of Request `�'N1A • Fayetteville or Raleigh Region -David Lee 919-7914203; david.lee(ci ncdenr.gov • . Mooresville & Winston Salem Region - Patrick Grogan 704-235.2107 or Patrick.groaan(dr cdenr clov SW _ 3o or 3 • Washington Region -Lyn Hardison 252-948.3842 or Am.hardison(aDncdenroov SW — 'I or 6 • Wilmington Region -Janet Russell 910-796-7302or ianetrussell(aancdenrgov Sill • Wilmington Region -Cameron Weaver 910-796.7303 or cameron.weaveric0ccienroov SW _ NOTE: Project application received after 12 noon will be stamped in the following work day. — 5 Project Name' P1425 OVERHEAD BAFFLE AT SMALL ARMS RANGE. SQUARE BAY -County: ONSLOW Applicant: USMC Company: USMC Address: BLDG 1005 MICHAEL RD City: CAMP LEJEUNE, State: NC Zip: 28542-_ .T Phone: 91OA51-2213, Fax: 910-451-2927, Email: carl.h.baker@usmc.mil Physical Location:END OF DR. G. W. CARVER ST., SPECIAL OPERATIONS TRAINING GROUND AT STONE BAY (SQUARE BAY) Project Drains into SA waters — Water classification NSW (for classification see-http://h2o.enr.state.nc.us/bims/reports/reportsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? Y, within''/z mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? N Engineer/Consultant: LEE PENNYPACKER Company: NAVFAC MIDLANT MCNC IPT RECEIVED Address: 6506 HAMPTON BLVD, LRA BUILDING C City: NORFOLK, State: VA Zip: 23508-1278 Phone:757-619-1808, Fax:757-322-8280, Email: granville.pennvpacker@navy.mil JUL 2' G 201Z SECTION ONE: REQUESTING A SCORING MEETING ONLY KE coping Meeting ONLY E DWQ, ElDCM, E DLR. ❑ OTHER: _ BY ACTION TWO: CHECK ONLY THE PROGRAM IS) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls — Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear It or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance 251$tate Stormwater ® General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other 1l�/10 Low Density ❑ Low Density -Curb & Gutter It Curb Outlet Swales ❑ Off -site [SW _ (Provide permit #)] ❑ High Density -Detention Pond _# Treatment Systems E High Density -Infiltration _#Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —SW Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems / E MOD:❑ Major ❑ Minor E Plan Revision ❑ Redev. Exclusion SW 080301 (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront Quality E Erosion and Sedimentation Control Plan with 1 acres to be disturbed.(CK # (for DENR use)) THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ❑ Yes E No Wetlands Delineation has been completed: ❑ Yes E No US ACOE Approval of Delineation completed: ❑ Yes E No Received from US ACOE ❑ Yes E No For DE;NR Fee Split for multiple permits: (Check# 1 Buffer Impacts: E No ❑ YES: —acre(s) Isolated wetland on Property ❑ Yes E No 404 Application in Process w/ US ACOE: ❑ Yes E No Permit SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Mai; ❑ Min) $ SW (❑ HD, ❑ LD, ❑ Gen) $ 401: $ Los $ Stream Deter,_ $ NCDENR EXPRESS June 2011 F� PRE -DEVELOPMENT CONDITIONS GROUND COVER DESCRIPTION RUNOFF COEFFICIENT. C LAWN 0.15 0.15 PWOODS ASHPALT 0.95 CONCRETE 0.95 ROOFS 1.00 AREA / COMPOSITE C FACTOR AREA NO. TOTAL AREA (ACRES) AREA (ACRES) C = 0.15 AREA (ACRES) C = 0.95 COMPOSITE C DA-1 0.20 0.20 0.00 0.15 DA-2 0.46 0.36 0.11 0.33 DA-3 0.14 0.00 0.14 0.95 RUNOFF COEFFICIENT (SIMPLE METHOD); IMPERVIOUS AREA NO. AREA (ACRES) IMPERVIUOS AREA (IA) RUNOFF COEFFICIENT (RV). FOR FIRST 1.5' DA-1 0.20 0.00 0.00 DA-2 0.46 0.11 10.22 DA-3 0.14 0.14 10.95 RUNOFF VOLUME (SIMPLE METHOD); V=3630*RD+RV*A AREA N0. AREA (ACRES) RUNOFF (RV) FIRST 1.5' (RD) VOLUME (CF) DA-1 0.20 0.00 0 DA-2 0.46 0.22 543 DA-3 0.14 0.95 698 TOTAL 0.66 0.22 543 24-HR RUNOFF VOLUME 0 (CFS); O=CCI*A AREA NO. 1-YR 2-YR 10-YR 100-YR INCHES 3.64 4.42 6.83 11.50 DA-1 0.11 0.13 0.20 0.34 DA-2 0.56 0.68 1.05 1.76 DA-3 0.47 0.57 0.88 1.47 C z cwttic vAo (nsw sra,cnaw rnru srcmra uo m `p GPF �� � ..,� ]. PAnlw torso m wwi¢nw� nxsL C Rq '\ ''e s. wr¢ owvrtrz rinw vn pePza slmcnxu Pusl. ,� / > ewn mw mrxN (IdPq nnuneau nAws um mws 3 P¢ml .wwi vAwlwl ro wwcf wml uon airi = / P ALRYIi PAKWM SLCIM AS NVM AT GPI C- ,Y d1 YTI OEIK T PIQT C Stl. ] � � e. SYMM A'W ttY0 10 Y IS A$n1Vlr PAHXFM SECII'h IXGVX B AVO FEnL10E g6IIX4 W ACP m NNAI$ SWwN q1 S I Op Il.l rB0' ✓✓ �.^ Pp l d� /g- A{gyyi PAVEYEM 11flCLL YCIIM AS 9MwN ON V 111✓//_ It o-sm. xnlLL fFNCL AIONC PfAWEIN a zo%2o sC- WY ItONO A1pXs AW RTALL 4dM M 51A2i c-501. It. oxurz MP TO xwrc now sue. wra rwsx srt .wo I I / G nax sue cGocsnfPm ra sau-mnx Puxs ran LflAYS. .. } :�. / t / ' Ix. xn EI£Clnfµ sxrcc vua (nsrtn m EISInIL1L wwsl. •,y� �- LEGEND z 11 I . I I Aha 4 ( c Sp 13 �� ffTT*^� D C B CIVIL BASIS OF DESIGN 1.0 PROJECT INFORMATION 1.1 PROJECT DESCRIPTION AND LOCATION The project is located at the end of Dr George Washington Carver Street in the Stone Bay area of Camp Lejeune Marine Corps Base, Jacksonville, North Carolina. The project consists of demolishing the existing small arms range facility and erecting a new one that incorporates improved safety features. The project consists of civil earth works, structural demolition and construction and site grading for improved storm water management. 1.2 EXISTING CONDITIONS The 0.69 acre (approx.) project site is bordered by dense trees to the western, southern and eastern boundaries. A large clear zone is present to the north east and small buildings are located along the northern perimeter. Wetlands exist within five hundred feet of the south eastern border. Two earthen berms, stabilized by parallel timber containment walls on concrete foundations and incorporating a steel tic -back network, make up the range's firing corridor. The floor of the corridor is comprised of gravel and a concrete slab near the bullet trap. A steel structure and ventilation system supported on structural concrete slab/foundations make up the bullet trap apparatus. The terrain is graded to channel all site runoff to swales and ditches that lead into an existing BMP. 1.3 DEMOLITION The existing facility shall be demolished and properly disposed of in accordance with all Federal, State and local guidelines. Prior to any demolition, construction entrances shall be installed in accordance with NCDENR requirements. The earthen berm material will be excavated to the surrounding local grade, transported and deposited to a nearby stock pile location. All steel, timber and concrete structures shall be completely demolished and hauled away. 1.4 NEW SITE WORK Prior to the commencement of any new construction, all subgrade improvements shall be properly installed in accordance with design parameters. The range facility includes new concrete foundations, slabs and corridor pavement. The corridor will be crowned with a 1 % grade down the middle to shed storm water runoff. New structural steel and concrete panels will be erected along each side of the corridor to form the range walls. Adequate drainage ports will be constructed along the bottom of the walls to release runoff and prevent ponding. An Overhead Baffle System and Bullet Trap Apparatus will be constructed from structural steel and ballistic impact panels to ensure stray projectiles remain inside the facility and to absorb 100% of the projectile's energy. An exhaust ventilation system will be installed to evacuate smoke and fumes during live firing. At the range entrance, two canopies will be erected on either side of the corridor to provide shelter for weapons load/unloading events. Beyond the shelters and outside the range walls there will be benches to accommodate personnel waiting their turn to enter the range. The site surrounding the facility will be graded to direct runoff away from the range. The grass swale/ditch on the north side shall be regarded to transport runoff from the northern half of the new range. On the south side, the runoff shall be sheet -drained overland as existing. All "C IV +`) 3 1 P a g c JUL 2 G niz BY: disturbed soil will be adequately graded and over -seeded to ensure proper erosion control measures are observed. 1.5 ENVIRONMENTAL PERMITTING Existing Stormwater Management and Sediment & Erosion Control permits are in place but will need to be modified. The existing BMP (Infiltration Basin 6), constructed in 2008 t accommodate a never constructed grave of has am c treatment capacity to accommodate the planned do ' not rom the new range. A request to modity the existing storm water permit (SW8 080301) will be submitted to NUUNER for consideration by the 3"d week of July 2012 and is anticipated to be approved. Under this permit, the existing range sheds approximately 6,100 square -feet of untreated impervious runoff to the south. The new range will reduce the untreated runoff by 400 square -feet and use approximately 59% of the BMP's treatment capacity. 2.0 STORM DRAINAGE / STORMWATER MANAGEMENT 2.1 SITE RUNOFF Final site grading will be such to encourage sheet flow where practicable. The floor slab will be constructed with a crowned down the middle with a 1% slope to either wall. Scuppers will be placed along the floor to transport runoff to the outside of the range walls. Runoff on the north side shall sheet flow to the improved swale/ditch and transported to Basin 6 for treatment. Runoff from the southern wall will sheet flow off site as before. All paved surfaces and grading shall be constructed to prevent pending and encourage sheet flow. 2.2 STORM DRAINAGE Rainfall intensity values are taken from Regional IDF Curves (Sneads Ferry) as follows: Time of Concentration = 5 min. (conservative) Rainfall Intensity = 3.64"/hour I -year 24-hour storm Rational Runoff Coefficients (C) are taken from the North Carolina Department of Environmental Resources as follows: Asphalt: 0.95 Concrete: 0.95 Gravel: 0.95 Lawns, sandy soil 0.15 Wooded 0.15 2.3 STORMWATER MANAGEMENT WATER QUALITY ANALYSIS The existing BMP (Infiltration Basin 6) is designed to treat the first 1.5" of impervious runoff within the watershed for a 1-year, 24-hour storm event. It has a storage capacity of 3,400 cubic - feet; of which the new range will produce 1959 cubic -feet of runoff. Draw -down time is calculated to be 6.7 hours. Since the BMP's associated Level -Spreader is designed to hold the discharged flow rate below 1 cubic feet per second (cfs), for a volume 70% greater than what is being delivered by the range, it is anticipated it will be sufficient to meet this requirement will not require additional enhancements. This will be confirmed and documented prior to NCDNER's permit modification review. - -.- REC +"IVED 4Page JUL 2 0 2012 BY:�_