Loading...
HomeMy WebLinkAboutSW8080301_APPROVED PLANS_20121106STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 No301 DOC TYPE ❑ CURRENT PERMIT © APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 20 1211 0110 YYYYMMDD UEMLH USE UNLY Date Received Fee Paid Permit Number NC DEO Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 080301 2. Project name: Special Operations Training Ground 3. Project street address: XXX City: MCB Camp Leieune County: Onslow ZIP: 28542 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https://deg.nc.gov/about/divisions/energv- m ineral-land-resources/energy-mineral-land-rules/stormwate r-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https:Hdeg.nc.gov/about/divisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune 2. Signing Official's Name: Neal Paul 3. Signing Official's Title: Deputy Public Works Division 4. Mailing Address: MCB Camp Leieune 1005 Michael Rd, City: MCB Camp Leieune State: NC ZIP: 28547-2521 5. Street Address: City: State: ZIP 6. Phone: (910) 451-2213 Email: neal.paul@usmc.mil Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: MCT 1. A permit application processing fee of $505.00 payable to NCDEQ. MCT 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or I. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. MCT 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. MCT 4. O&M Agreements, Please select one: ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. MCT 5. Designer Certifications, Please select one: ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. MCT 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httos://www.sosnc.gov/online services/search/by title/ Business Registration Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CE TIIFFICATION I, � I t' the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the p r forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All i I 5rmati n provided on this permit renewal application is, to the best of my knowledge, c complete. Signature: Date: LO L NOTARIZATION: Mm County of a Notary Public for the State of do hereby certify that i ,obeY L_�) YJ d 2X personally appeared before me this the Zu day of 3L'L 20 2.2 , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, cor iQWionk tees 'I :L.OL5 % �►.s...........Nse, 'llitz OW Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 Y ON _ I L it ( ARMS (� - ( - � � �; � r s BAFFLE I SMALL T l r ! T M r u MARINE CORPS RASE CAMP LEJEUNE, JACKSONVILLE, NC NAVAL FACILITIES ENGINEERING COMMAND --- MID -ATLANTIC MARINE CORPS NORTH CAROLINA IPT, NORFOLK, VA EROSION-SEDIMATION & STORM WATER (SW8 080301) PERMIT APPLICATION SUBMISSION - OCTOBER 16, 2012 LVIJ/11IVIV Ivllll - VIxlvll v"l 11'v- INDEX OF DRAWINGS SHEET NO. SHEET SHEET TITLE 1 OF 17. G-OCT TITLE SHEEI, VICINITY AND LOCATION MAP 2 OF 12 6-001 LEGEND, NOTES AND ABBREVIATIONS 3 OF 12 C-100 EXISTING CONDITIONS AND DEMOLITION PLAN 4 OF 12 C-101 EROSION AND SEDIMENT CONTROL PLAN 5 OF 12 C-201 LAYOUT AND UTILITY PLAN 6 OF 12 C-301 GRADING AND DRAINAGE PLAN 7 OF 12 C-302 PRE -DEVELOPMENT DRAINAGE MAP 8 OF 12 C-303 POST -DEVELOPMENT DRAINAGE MAP 9 OF 12 C-401 EROSION & SEDIMENT CONTROL NOTES 10 OF 12 C-402 EROSION & SEDIMENT CONTROL DETAILS it OF 12 C-403 EROSION & SEDIMENT CONTROL DETAILS 12 OF 12 C-501 SITE DETAILS 61 APPROVED NORTH CAROLINA ENVIRONMENTAL MANAOE,MIIENT COMMISSION OF WATER QUALITY CA N /11/6/�1a, 0 OCT 1 8 2012 5 111 I U —cn E Z ¢ g�Q a �J 0A a u Q O z (/7Q V a F CO p OO 6�w 'JCC J LL ::) w aO w CO - z z p TO U 0 a0 > uw =Q ~ 6 ([ Q w wW = O w 'a5? z ma IN IZ LEGEND: EXISTING new CIVIL ABBREVIATIONS: A/C AIR CONDITIONING UNIT APPROX APPROXIMATE TC2055 \ MH MANHOLE LOP OF CORE OR CONCRETE (TC) ELLVAMI4 I BLDG BUILDING ELEVATION OF GUTTER PAVEMENT OR GROUND BOL BOLLARD mm 55­ BW BOTTOM OF WALL CONCRETE TOP OF WALL ELEVATOR \ CONIC DIP DUCTILE IRON PIPE 2055 EJB ELECTRIC JUNCTION BOX EMIT ELECTRIC MANHOLE SPOT EUVATgN .Y EP EDGE OF ASPHALT PAVEMENT FOC FIRE DEPARTMENT CONNECTION TOP OF WALL (TA) ELEVATION FES FLARED END SECTION „ ^ FEE FINISHED FLOOR ELEVATION UGIB OUn BITUMINOUS PAVEMENT J FH FIRE HYDRANT FL FLOW LINE FM SANITARY SEWER FORCE MAIN BOUMD ® TO FIBER OPTIC END GROUND ELEVATION LAW IN E WERE! BUILDING TIUEGI O KO CONTRACTINGIC OFFICER INV INVERT L/P CONCRETE LIGHT POLE CENTERLINE MTCH/BWUE MG MATCH EXISTING GRADE RIM POST INDICATOR VALVE CONCRETE (Coot) ROL PETROLEUM. OIL LUBRICANTS m P/P POWER POLE CONTOUR _ i - SCO SANITARY CLEANDUI SMH SANITARY MANHOLE EDGE OF WOODS ' - TBM TEMPORARY BENCHMARK TMH TELEPHONE MANHOLE RHCE ^ " „ T RED TELEPHONE PEDESTAL TOR TOP OF BANK GPAv[L .:., TSV TAPPING SLEEVE k VALVE TW TOP OF WALL WV WATER VALVE SCAN TOE OF ROPE (LO.$) ` MCP OF 8WK (TOO) IEEE OVERHEAD (ON.) ONE •. UNDERGROUND D.G.) ELEBERIC (FIFE) 1, RRE HNPAN IFHI WATER VALVE (WV.) ['I GUY WRE HEAWALL (HI I -' TELEPHONE (III.) PEOESIAL (PER) UmIIY POLE UTILITY POLE w/ [CHI RNER1 bN STRUCTURE SIhY'. F)PICAL OR, WET W' IT DEMOLITION NOTES I. CONTRACTOR SHALL REMOVE AND DISPOSE OF EXISTING MANMADE SURFACE FEATURES WITHIN THE LIMIT OF WORK INCLUDING BUILDINGS, STRUCTURES, PAVEMENTS, SLABS, CURBING, FENCES, UTILITY POLES, SIGNS, ETC. UNLESS INDICATED OTHERWISE ON THE DRAWINGS. REMOVE AND DISPOSE OF EXISTING UTILITIES, FOUNDATIONS, UNSUITABLE MATERIAL WITHIN THE PROPOSED BUILDING FOOTPRINT AND TEN FEET BEYOND AND BENEATH PROPOSED EXTERIOR COLUMNS, PER DRAWINGS AND SPECIFICATIONS. 2, EXISTING UTILITIES SHALL BE TERMINATED, UNLESS OTHERWISE NOTED, IN CONFORMANCE WITH STATE, LOCAL, BASE AND INOMDUAL UTILITY COMPANY STANDARDS, AND DETAILS. THE CONTRACTOR SHALL COORDINATE UTILITY SERVICE DISCONNECTS WITH THE UTILITY REPRESENTATIVES. 3. CONTRACTOR SHALL DISPOSE OF DEMOLITION DEBRIS IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, ORDINANCES AND STATUTES. UTILITY NOTES 1. EXISTING UTILITIES SHOWN ARE APPROXIMATE ONLY AND BAUD ON FIELD SURVEYS, AVNIABME RECORDS, VER&ll. INFORMATION AND/OR PHYSICAL FEATURES. PRIOR TO EXCAVATION (AT LEAST 72 HOURS OR THE MORE RESTRICTIVE MINIMUM NOTIFICATION PERIOD), THE CONTRACTOR SHALL CONTACT THE ROICC/OICC, PUBLIC WORKS DEPARTMENT, FEED AND STATION LOCATING SERVICE SUCH AS 'DIG54FE, MISS UNIIY, ETC.; TO ALLOW MARKING OF EXISTING BURIED DELUDES. ALL EXISTING UNDERGROUND UTILITIES IN THE WORK AREA MUST BE POSITIVELY IDENTIFIED RE A THIRD PARTY, INDEPENDENT, PRIVATE UTILITY LOCATING COMPANY, IN ADDITION TO ANY STATION LOCATING SERVICE SUCH AS 'DIGSAE, MISS UTMY, ETC.; AND COORDINATED WITH THE RDICC/OICC . PUBLIC WORKS DEPARTMENT AND FM. ANY MARKINGS MADE DURING THE MUTE INVESTIGATION MUST BE MNNTNNED THROUGHOUT THE CONTRACT. WHENEVER CONTRACT WORK INVOLVES CHIPPING, SAW CUTTING. OR CORE DRILLING THROUGH CONCRETE, BITUMINOUS ASPHALT OR OTHER IMPERVIOUS SURFACES, THE THIRD PARTY, INDEPENDENT, PRIVATE LOCATING COMPANY SHALL LOCATE UTILITY DEPTH BY USE OF GROUND PENETRATING RADM (GPR), X-RAY, GORE SCOPE, OR ULTRASOUND PRIOR TO THE START OF DEMOLITION AND CONSTRUCTION. OITAGES TO ISOLATE UTILITY SYSTEMS MUST BE USED IN CIRCUMSTANCES WHERE UTILITIES ARE UNABLE TO BE POSITIVELY IDENTIFIED. THE USE OF HISTORICAL DRAWINGS DOES NOT ALLEVIATE ME CONTRACTOR FROM MEETING THIS REQUIREMENT. THE CONTRACTOR SHALL TAKE THE NECESSARY PRECAUTIONS TO PROTECT ME EXISTING UTILITIES AND ANY DAMAGE TO THE MARES SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL BE REQUIRED AND AGREES TO COMPLY WITH ALL THE PROVISONS OF THE GOVERNMENT, STATE AND MUIY FOR UNDERGROUND DAMAGE PRVEMION AND HEREBY AGREES TO HOLD THE GOVERNMENT HARMLESS AGAINST AM" LOSS, DAMAGES AND CLAIMS OF ANY NATURE WHATSOEVER ARISING OUT OF FAJLURE TO COMPLY WITH SAID PROVISIONS. 2. THE LOCATIONS, SIZES, AND TYPES OF EXISTING UTILITIES ARE SHOWN AS AN APPROXIMATE REPRESENTATION ONLY. PRIOR TO ORDERING MATERIALS AND BEGINNING OF CONSTRUCTION THE CONTRACTOR SHALL VERIFY AND DETERMINE THE EXACT LOCATIONS, SIZES, AND ELEVATIONS OF POINTS OF CONNECTIONS TO EXISTING UTILITIES AND, SHALL CONFIRM THAT THERE ARE NO INTERFERENCES WITH THE EXISTING UTILITIES AND THE PROPOSED UTILITY ROUTES, INCLUDING ROUTES WITHIN THE PUBLIC RIGHTS -OF -WAY. 3. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, OR EXISTING CONDITIONS DIFFER FROM THOSE SHOWN SUCH THAT THE WORK CANNOT BE COMPLETED AS INTENDED. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IN ACCORDANCE WITH THE DIFFERING SITE CONDITION CLAUSE OF THE SPECIFICATIONS. 4. SET CATCH BASIN RIMS, AND INVERTS OF SEWERS, DRAINS, AND DITCHES IN ACCORDANCE WITH ELEVATIONS ON THE GRADING AND UTILITY PLANS. 5, RIM ELEVATIONS FOR DRAIN AND SEWER MANHOLES, WATER VALVE COVERS, GAS GATES, ELECTRIC AND TELEPHONE PULL BOXES, AND MANHOLES, AND OTHER SUCH ITEMS, ARE APPROXIMATE AND SHALL BE SET/RESET AS FOLLOWS: A PAVEMENTS AND CONCRETE SURFACES: FLUSH 8, ALL SURFACES ALONG ACCCESSIBLE ROUTES: FLUSH C. LANDSCAPE, LOAM AND SEED, AND OTHER EARTH SURFACE AREAS'. ONE INCH BELOW SURROUNDING AREA AND TAPER EARTH TO THE RIM ELEVATION. 6. THE LOCATION, SIZE, DEPTH, AND SPECIFICATIONS FOR CONSTRUCTION OF PROPOSED PRIVATE UTILITY SERVICES SHALL BE INSTALLED ACCORDING TO THE - REQUIREMENTS PROVIDED BY, AND APPROVED BY, THE RESPECTIVE UTILITY COMPANY. FINAL DESIGN AND LOCATION TO BE COORDINATED WITH THE CONTRACTING OFFICER. 7, MAKE ARRANGEMENTS FOR AND BE RESPONSIBLE FOR PAYING FEES FOR POLE LAYOUT NOTES TELEPHONE, TION ANDFOR ARM LAND ANY OTHER PRIVATES OF UTILITIES, WHETHER WORK IS PERFORMED BY THE CONTRACTOR OR BY THE UTILITY COMPANY. 1. SEE ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS AND DETAILS CONTIGUOUS TO THE BUILDING, INCLUDING SIDEWALKS, B. UTILITY PIPE MATERIALS SHALL BE IN ACCORDANCE WITH SPECIFICATIONS, UNLESS RAMPS, BUILDING ENTRANCES, STAIRWAY, ULUTY OTHERWISE NOTED ON PLAN. PENETRATIONS, CONCRETE DOOR PADS, LOADING DOCKS, BOLLARDS, ETC. 9. COORDINATE WITH ELECTRICAL CONTRACTOR AND FURNISH EXCAVATION, 2. ANY PROPERTY LINE MONUMENTATION DISTURBED DURING INSTALLATION, AND BACKFILL OF ELECTRICAL FURNISHED SBEWORK RELATED ITEMS SUCH AS PULL BOXES, CONDUITS, DUCT BANKS, LIGHT POLE SAES, AND CONSTRUCTION SHALL BE SET OR RESET By A PROFESSIONAL CONCRETE PADS. CONTRACTOR SHALL FURNISH CONCRETE ENCASEMENT OF DUCT LICENSED SURVEYOR. HANKS IF REQUIRED BY UTIUTY COMPANY AND AS INDICATED ON THE DRAWINGS. 10. EXCAVATE AND BACKFILL TRENCHES FOR (AS/PROPANE IN ACCORDANCE WITH GAS/PROPANE COMPANYS REQUIREMENTS. I1. ALL DRAINAGE AND SANITARY STRUCTURE INTERIOR DIAMETERS (4' MIN.) SHALL BE DETERMINED BY THE MANUFACTURER BASED ON THE PIPE CONFIGURATIONS SHOWN ON THESE PLANS, WE AND LOCAL MUNICIPAL STANDARDS, FOR MANHOLES THAT ARE 20 FEET IN DEPTH AND GREATER, THE MINIMUM DIAMETER SHALL BE 5 FEET. GENERAL NOTES: 1. UNLESS OTHERWISE INDICATED, ALL EXISTING STRUCTURES AND FACILITIES SHALL REMAIN. 2. ALL DIMENSIONS ARE TO FACE OF BUILDING, PACE OF CURB AND/OR EDGE OF PAVEMENT UNLESS OTHERWISE INDICATED. 3. SOD (CENTEPEDE) ALL DISTURBED PERVIOUS AREAS WITHIN THE LIMITS OF CONSTRUCTION UNLESS OTHERWISE SPECIFIED. 4. NO EARTHWORK SHALL BE PERFORMED UNTIL ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES ARE IN -PLACE. 5. ALL GRADE TRANSITIONS BETWEEN NEW AND EXISTING SHALL BE SMOOTH AND GRADUAL WITH NO SHARP OR ABRUPT CHANGES. 6, COORDINATE THE WORK OF ALL TRADES - VERIFY ALL FIELD CONDITIONS, QUANTITIES AND DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. ANY DISCREPANCIES SHALL BE PROMPTLY BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER. 7, EXECUTE ALL WORK WITH CARE TO PROTECT FROM DAMAGE All. ADJACENT EXISTING FEATURES THAT ARE TO REMAIN, ANY SUCH DAMAGE SHALL BE REPAIRED OR REPLACED TO MATCH THE ORIGINAL CONDITION AS APPROVED BY THE CONTRACTING OFFICER AT NO ADDITIONAL COST TO THE GOVERNMENT, 8, FINISHED GRADE OF TOP SOIL (AFTER COMPACTION) SHALL BE 0.5 inch TO I inch (MAXIMUM) BELOW TOP OF ABUTTING PAVEMENTS, SIDEWALKS AND CURBING. 9. PRIOR TO CONSTRUCTION, THE SITE SHALL BE SCANNED WITH ELECTROMAGNETIC AND SONIC EQUIPMENT AND THE GROUND SURFACE MARKED WHERE EXISTING UNDERGROUND UTILITIES ARE DISCOVERED. 10, EQUIPMENT AND TRUCK TRACK -TIRE CLEANING/FWSHING STATIONS SHALL. BE ESTABLISHED AS NECESSARY TO ENSURE THAT NO MUD OR DEBRIS SHALL MIGRATE FROM THE CONSTRUCTION 51TE TO THE BASE ROADS. 11. ALL HOLES, DEPRESSIONS, EXCAVATIONS, ETC. CREATED AS A RESULT OF DEMOLITION SHALL BE BACK -FILLED, GRADED AND SEEDED. 12. CONTRACTOR SHALL FIELD VERIFY THE ELEVATIONS OF ALL CONNECTIONS TO EXISTING UTILITIES PRIOR TO CONSTRUCTING UPSTREAM PORTIONS OF THE NEW UTILITIES. ANY DISCREPANCIES SHALL BE PROMPTLY BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER. 13, NO LEAD CONTAMINANTS WERE ENCOUNTERED IN SOIL BERMS WHEN TESTED. REFER TO SPECIFICATIONS FOR DETAILED INFORMATION ON LEAD IN CONSTRUCTION FOR AREAS SUCH AS THE BULLET TRAPS, ETC, 14. THERE ARE NO POTS WITHIN THE PROJECT SITE. IF CONTAMINATION IS SUSPECTED THROUGH VISUAL INSPECTION OR ODORS, STOP WORK IMMEDIATELY AND CONTACT 911, CONTRACTING OFFICER AND OMD/RCRS AT 910-451-1482. 15, THERE ARE NO KNOWN UST PROGRAM MONITORING WELLS WITHIN THE PROJECT AREA. IF WELLS ARE FOUND OR INADVERTENTLY DAMAGED, STOP WORK IMMEDIATELY AND CONTACT EMO/EQB AT 910-451-9017. 16. THERE ARE NO KNOWN GROUNDWATER MONITORING WELLS WITHIN THE PROJECT SITE, HOWEVER, IF AN UNMARKED WELL IS DISCOVERED AND INADVERTENTLY DAMAGED, STOP WORK AND IMMEDIATELY CONTACT THE ROICC FOR FURTHER INSTRUCTIONS. SURVEY NOTES: 1. NO WETLANDS WERE EVIDENCED ON THE SITE. 2. THE EXISTENCE, SIZE AND OR LOCATION OF UTILITIES ARE NOT GUARANTEED BY THIS SURVEY, UTILITIES SHOWN PRE BASED ON ABOVE GROUND STRUCTURES AND AVAILABLE UTILITY PLANS. THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. 1 ELEVATIONS 0.4E IN FEET AND REFER TO NORTH AMERICAN VERTICAL DATUM (NAVE) 1988 AND ARE BASED ON CAMP LEJEUNE CONTROL. 4. COORDINATES SHOWN REFER TO NORTH CAROLINA STATE PLANE COORDINATES (NAD 1983). 5, SURVEY CONDUCTED BY NAVFAC MIDLANT ON JANUARY 5, 2012. OCT 1 8 2012 FINAL DRAWINGS AZ� J� g SEE: spa wa B11=U)> o {o�'z na a Q �Fm t� x<w m m !p $JQ m O LL::) a a as a w ED w CD QW O w W Z o GOe 7* w g C w J3 W :a w0 6J JIIJ M m Li W � C 9 3 1 4 5 0 I PB A A a 2 3 1 2 3 m 5 GENERAL NOTES i. HORIZONTAL DATUM. NORTH CAROLINA STATE PLANE NAD83 (1986 ADJUSTMENT). VERTICAL DATUM: NAVDBB 2. REFER TO EROSION CONTROL SHEETS PRIOR TO DEMOLITION OR SITE PREPARATION, REFERENCE C-101 3. VERIFY WHAT UTILITY IS BEING MARKED AND REMOVE PIPE. IF DISCREPANCY EXISTS BETWEEN THIS PLAN AND FIELD INVESTIGATION, PROJECT ENGINEER SHALL BE CONTACTED. 4. SEE ELECTRICAL PLANS FOR DEMOLITION OF ELECTRIC AND COMMUNICATION FACILITIES. REMOVE NORTH SOUTH BERM MATERIAL AND RELOCATE TO STOCKPILE AREA NOTED ON EROSION k SEDIMENT CONTROL PLAN. ACTUAL LOCATION WILL BE DETERMINED BY KO. OOODENH AND REMOVE EXISITNG RANGE WOODEN STRUCTURE, REMOVE GRAVEL AND RGONG ANGE SUB. DEMOLISH AND REMOVE EXISTING LIGHT DUTY ASPHALT PAVEMENT. f 0 DEMOLITION KEYNOTES I. REMOVE AND REPLACE EXISTING ELECTRICAL PANEL. REFER TO ELECTRICAL PLANS FOR DEALS, 2. COORDINATE DEMOLITION OF NON -LETHAL RANGE STRUCTURE (WOODEN) WITH KO IF PRESENT AT TIME OF --- NOTICE TO PROCEED. 3. SAWCUT EXISTING ASPHALT PAVEMENT. 1 OCT 1 S 2012 BY: GRAPHIC SCALE 0 10 2D' 40' = 20W 4 5 D E FINAL DRAWINGS B Z I of zU)< o oFm 0 � '<w cc � Z LLD ED o o Qw w Luz g ws x¢ �T z ww > N < 0 J� w A >� VN a CL I r���� 4 - �VLT 11NC1 2 11P1_C'AL'S1Cfl,0N SIOCKPILE MAffRIAL ADJACENT PROJECT UNDER CONSTRUCTiON V Ln 3s BERM MATE L i STOCKPILE 000 GO 7 ON, I APPROX. LOCATION FOR STAGING AREA o A .0I. LL ;1000 �4 3s 7-- 1J. OCT -1-8 2012 I EROSION & SEDIMENT CONTROL LEGEND FNAL OR,,mNGs FINAL DRAWINGS EROSION CONTROL DEVICESAS PER NORTH CAROLINA EROSION p AND SEDIMENT CONTROL MNOSOOK A V N ce COMSTRUCTIONENTRANCE SF SIL FFENCE LIMITOFOISFUR&INCE EROSION & SEDIMENT CONTROL AREA LAND DISTURBANCE LOCATION AREA SO. ET ACRE OVERHEAD RAFFLE RANGE AREA 40,180 0.92 STAGING AREA 7,697 0,18 BERM MATERIAL STOCKPILE AREA 11.956 0.27 TOTAL 59.833 1.31 GRAPHIC SCALE 0 10' 20' 40' 1* = 20' W�- 5 101 E o <Uj -Lufr< 0 _j 0 LL J ul z Ld 0 <(D z LLI Z ws :c < CC cr ELI > 0 a -o L�o M 2 3 8 ❑ NEW WORK KEYNOTES n C u B OFV 11 i� 1 _ / I 3 OCT 1 S 2012 BY:- 0 1. KTR TO PROVIDE NEW FLAG POLE. 2. CONCRETE PAD (REFER TO TYPICAL SECTIONS AND DETAILS ON STRUCTURAL PLANS). 3. PAVILION (REFER TO ARCHITECTURAL PLANS). 4. PAVILION COLUMN (TYPICAL - REFER 10 ARCHITECTURAL PUNS). 5. 16'-8' HIGH RANGE WAU. (REFER TO STRUCTURAL. DIANE). 6, RANGE CONCRETE FLOOR SLAB (REFER TO STRUCTURAL PLANS). 7, BULLET TRAP TRENCH (REFER TO STRUCTURAL PUNS AND DETAILS SHEETS). 8 REMOVE EXISTING ASPHALT PAVEMENT AND REPLACE WITH LIGHT DUTY ASPHALT PAVEMENT SECTION AS SHOWN (REFER TO DETAIL ON SHEET C-501). 9, INSTALL 8HIGH FENCE ALONG PERIMETER OF 20X20 SLAB AW SPECIFICATIONS AND DETAIL SHOWN ON SHEET C-501, 10. CONCRETE RAMP TO RANGE FLOOR SLAB. MATCH FINISH SITE AND FLOOR SUB GRADES. REFER TO STRUCTURAL PLANS FOR DETAILS. 11. NEW ELECTRICAL SERVICE PANEL (REFER TO ELECTRICAL PLANS). 12. 4' WIDE SWING GATE. 13, ROCK BED. LOCATION OF 3" DIAMETER OPENING IN SOUTH WALL TO ACCOMMODATED RUNOFF. LOCATION OF 3" DIAMETER OPENINGS ALONG NORTH WALL ARE DIRECTLY OPPOSITE. INSTALL A I8-X24' ROCK BED, CENTERED AT EACH OPENING AND ADJACENT TO THE WALL IN ACCORDANCE WITH DETAILS ON SHEET C-501. TYPICAL FOR 29 WALL OPENINGS. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION. LEGEND RANGE CONCRETE FLOOR SLAB (REFER TO STRUCTURAL PLAN) CONCRETE PAD (REFER i0 STRUCTURAL PLAN) CONCRETE PAD (REFER TO STRUCTURAL PLAN) LIGHT DUTY ASPHALT GRAPHIC SCALE 0 10 20 40 = 20' _ 5 L9 FINAL DRAWINGS U oz "g g� Q zQ CIa z YU)a a 3� i� aQW -JQ Z Z LLLL- w Qd m z = p UJ a Q 0o SQ S wE IZ Q i= ww >> YQ 6 <NN w0 JN Wa6 �a z e d C S A m A I GENERAL NOTES 29.65\ � Y v 29.65 29.45 I / � a III � I I, 1 �1� \ �• _ j g �dB I 29.65 29.65 I I =46TM 32 =4632 IM-n.6s BM=29.6s TW I MATCH EgY9WC 1 e 2 W-463eM-m6s 2 n-29.65 2seo 29'W No 29.65 �PAKMFM \ r. p 2e.44 V __ 27 28 O � / I. SITE LOCATED WITHIN WHITE OAK RIVER BASIN. 2. EXISTING SITE DRAINAGE SYSTEM SHALL BE USED. NO CHANGES PROPOSED TO EXISTING SWA3ES, DITCHES, CULVERTS AND TREATMENT BASINS. !/ ❑ NEW WORK KEYNOTES \l T\ 1. INSTALL SOD WITHIN LIMITS Of DISTURBED AREA IN ACCORDANCE / WITH DETAILS ON SHEET C-403. Ldlhlhl2. FINISH GROUND ADJACENT TO RANGE CONCRETE SLAB SW4E BE2• BELOW SLAB ELEVATION. REFER TO TYPICAL SECTION ON '✓ SHEET C501 FOR DETAIL NW c GRASS SWALE n� 24RCP 1 N,m IIV OUT = 1560 i LEGEND 0 0 o UMDDFDISWR84ACE I[ I[ FINAL DRAWINGS qP II 12 LAND! V W➢ A S B IBBOIT mU) E cn E m ¢w JQ C9 LIE C3 I I" A Qcq o w lT] < LLi 2Q LU oc -- ISF GRAPHIC SCALE0 10' 20• 40'4 A I I Z 2 i7 C TEMPORARY GROUND COVER NM TEMgWIu% SEED MIX SHALL BE USED FOR NL AREAS EXPOSED GREATER THAN 15 OR WKING BAYS .AND SUBJECT M FURTHER DISTURBANCE. AN AERONAUT CENTER SHALL IAA£ ED SPRIGS OF BERMUDA OR SERICA LESPEDEZA PER WE SQUARE FC I. T PoRML WMML�MBD SPECIE RATE (IA/�REI MARCH 1 - SEPT I GERMAN MILLET 120 TEMNOMEY WINTER SEED MIX- SPECIFS RATE IT BIACRL1 SEPT I - MARGIN WINTER RYE (GUN) 200 KOBE LESPEDEZA 120 CRIMPINGSTREE&W MULCH CRIMPING SHALL BE REWIRED ON IRIS PRWECI FOR All SEEDING OPERATIONS PER MODERN. MINIMIZE AREA UNDER DSIURBANCE THAT REQUIRES CRIMPED STRAW. PROVIDE FINAL MQMG .AND PLACEMENT O SOD AS STUN AS ALLOYED. COORONIET SOD INSIALUMPOI WITH CONTRACTING OFFICER. SW Cµ BE PLACED ALL YEAR LONG (IF THE GRWND IS NOT FROZEN OR MUDDY). STRAW MULCH 10 BE OF SUFFICIENT LENGTH AND OU91W TO WITHSTAND THE CRIMPING MERRIER, AND PRGVOE ADEQUATE GROUND CUER. CRMPNG EQUIPMENT INCLUDING MWER OUNCE SHALL Y SRJECT TO THE APPROVAL O THE ENGINEER PRMMG TEXT MAXIMUM SPACING O CRIMPER &/TES STINT NOT EXCEED B INCHES (200 MAR). SOFT AMENDMENTS TO BE INCORPORATED INTO THE TOP 3 INCHES O WE IN AREAS WITH SLOES 2.1 ON RATHER APPLY FERTILIZER (10-10-10) AT A RATE OF TWO LB/ACRE • APPLY UWE (GROUND AGRICULTURAL LIMESTONE) Al A RATE of COLD LB/ACRE APPLY SUPERPHOSPHATE (0-19-0) Al A RATE OF 200 LB/ACRE MULCH APPLY 4,D, FB/ACNE CHAIN STRAW OR EQUIVALENT CDIER. ANCHOR MULCH WITH MANG. NEHFING CN BY TACKING WITH MPHSU ENULSION AT A PATE OF IM CK./ACRE WATER MNMUM O I' O RAINFALL A WEEK (IF NOT SUPPUED NATURALLY, mNMAGTON MAIL SUPPLY THE REMNNMC AMOUNT UNTIL GROUND CUJER Ply BEEN ESTABLISHED). PERMANENT GROUND COVER FRONT CENTIPEDE SDD FOR ALL DENJOM AREAS. GROUND COVER NOTE PURSUANT TO G S. 133-A57(2). THE ANGLE FOR GRADED SLOPES AND FALLS BULL BE NO GREATER THAN THE ANGLE THAT GN BE RETAINED BY AGETATM COVER OR OTHER ADEQUATE EROSON-CONTROL DEVICES OR STRUCTURES. IN MY MINT. SLOES LEFT EXPOSED ARE. BE PLANTED OR OTHERMSE TENSILE WITH TEMFORARY OR PERMANENT GROUND COVER, DEYGES. M STRIICRUNES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. I IM-5)(3), PROvISUNS FOR PERMANENT CRWNWOVER NE ILIEM TO RESTRAIN EROSION MUST BE MCOUPLSHED FO1 ALL DISTURBED AREAS AS SOWN BELOW) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. GROUND STABILIZATION THE PRIDES PERMIT (SECTOR L. 82) WS RECENTLY REFUSED THE REWIREMEWS FOR GROUND STMUZATON. STMILIZALON SHALL BE ACCOMPLSHED M FOLLOWS: PERIMETER DINES, SWA:ES, DITCHES AND SLOPES WITHIN Z DAYS HIGH BEREFT WATER (HI ZONES WITHIN Z HAYS STORES STEEPER THAN 31 WHEN 1 DI SLOPES 3:1 OR FATTER WITHIN IC DAIS ALL OTHER AREA W/ SLOPES FLATLY THAN TALI MUN 11 DAYS EROSION CONTROL SEQUENCE OF CONSTRUCTION I. INSTALL IEMPOMY CONSTRUCIKKI ENTRANCE. 2. INSTALL TEmMU,1 SILT FENCE AROUND THE PERIMETER O THE STE AS INDICATED ON THE EROSION k SEDIMENT CONTROL PLAN. 3, CLEAR MO GRUB THE SITE WITHIN LIMIT OF DISTURBANCE. RANCH GRADE ATE AND CONSTRUCT CHMMELS. d. INSTALL CONCREIT PAD. UTILITIES. AND S1lE WORK. 5. FINISH POPES AROUND SUBS UPON COMPLETION BE MUCH DUMB. LEAVE SLIGHTLY ROUGH MY NCEWIL X40 MULCH IMMEDIATELY. 6. COMPLETE ANAL GRACING. 1. CONROE FINAL GRADING OF THE GROUNDS. IOPNL CRITICAL AREAS AND PERMMENRY KGEIATE, LONESOME AND MULCH. B. INSPECT N1 EROSON AND SEDIMENT CONTROL PRACTICES WEEKLY ANT W11HIN 21 HOURS OF A 05 INCH- MEASURED RNNFALL EVENT. A MR WIGS SMALL BE INSTALLED TO MEASURE RAINFALL EVENTS. REPAIR ANY WAAGE IMMEDIATELY TO ER0510N AND SEDIMENT CONTROL MEASUURES. 9. INSPECT AND INSTALL ALL EROSION AND SEDIMENT COMEDY MEASURES IN ACCORDANCE WITH NCDENR'S NEW 41F INSPECTION PROMM FOR EROSION M9 SEDIMENIATIDN CONTROL. COPIES OF THE SELF INSPECTION REPORTS SHELL BE PR(MOD TO THE CONTRACTING OFFICER'S OFFICE. 10. AFTER SITE 6 STABILIZED, REMOVE ALL IIMPoMRY MEASURES AND INSIAIL CENTIPEDE SW ON DESIGNED AREAS. EROSION AND SEDIMENT CONTROL NOTES 1. UNLESS OTHERWSE RDCATED, ALL VEGETATIVE MO STRUCTURAL ENOSKKi AND SEDIMENT CONTROL PRACTICES WILL DE CONSTRUCTED AND MVNIµNED ACCORDING TO MINIMUM STANDARDS AND SPECIENA110NS OF THE NORTH CAROINA EW90N AND SEDIMENT CONTROL PLANNING DESIGN M MAL (RENTSED JUNE MEN). 2. APPLY PERMANENT OR IEUPJI4FY WE SIABRIZATIM TO ALL DENUDED OR DISTURBED AREAS WITHIN Z DAYS AFTER FMLL GRADE IS REACHED ON MY PORTION CF THE SITE. SOIL STARCIZADMI MUST ALSO BE APPLIED 10 DENUDED OR DISTURBED AREAS WHICH WY NOT W AT FLNLL GENE BUT WHICH WILL REMAIN UNDISTURBED FOR LONGER THAN HAYS- SOIL STABILIZATION MEASURES INCLUDE VEGETAIM ESTABLISHMENT, MULCHING ME THE EARLY MRIGTON OF GRAVEL BAY NATURAL W AREAS 10 BE PAKD. 3, ALL EROSON AND SEDIMENT CMIRU MEASURES ARE TO HE IM.TALLED PRIOR TO OR AS THE FIRST STEP IN CONSTRUCTION C. THE NPDES CONSTRUCT" PERMD REWIRES EMSM CONTROL IIENCES AND SIOM OUTFALLS BE INSPECTED WEEKLY (EN£RY Z CALENDAR DAYS) ME WITHIN 21 HORS OF A .5 INCH BAN PRENi D WILL BE THE RESPMSBLLFIY O THE CONTRACTOR TO CONDUCT THEY INSPECTIONS AND WO NINN RECORM UNTIL THE AREA HAS SR&UWON, ENOENT BY 95% VEGETATIVE GROWTH FOR AREAS MEETING SEEDING. 10 FACINATE UNFNL MONITORING AWYI WIDE IS REWIRED TO BE ON SITE, ADMIGNALLY THE CONTRACTOR IS RESPONSIBLE FOR CONDUCTING 'SELF INSPECTIONS' INDICTING THE DATE BMPX ARE INSTALLED AND STABILIZATION MEASURES (SEFDING/MULCMNG OR SW) ME INITIATED. THE Alf INSPECTION' REPORTS WILL BE "STAGED ALONG WIN THE 'NPDES' INSPECTION REPORTS. ONCE STABILIZATION WAS BEEN ACCOMPLISHED INSPECTION RECORDS ME 10 BE FORWARDED TO THE ONLRNMENT AND ALL TEMPORARY EROSION/YDMENTAIION CONI DEVCES REMWEO. THE CONIRALIOR IS RESPOIRAWE FOR MAINTAINING COMPLIANCE WITH ALL PERMITS AYD PLANS. ANY CHANGES MUST BE APPROVED BY THE STATE PRIOR TO EXECUTION. A COPY O THE EMMERT AND SEDIMENTATION CONTROL PLAN, LETTER OF MPRW4, AND NPOES CONSTRUCNON PERMIT HILL BE MAINTAINED BY THE CONTRACTOR AT THE CHME OFFICE IF SOIL 6 REMOVED FROM OR BROUGHT BRIBE, THE APPLICABLE SOLID WMTE MANAGEMENT REBUFF NUMBER, EROSION SEDIMENTATION PERMIT NUMBER OR MINE PERMIT NUMBER WILL BE DISCLOSED, 5 LIMN SITE ACCESS BY CONSTRUCTION VEHICLES TO ENTRANCES PROTECTED BY A STONE CONSTRUCTION ENTRANCE. SEDIMENT SHALL BE REMOED FROM PAVED AREAS ON A DAI-Y BASIS. 6, STOCKPILES O SOL AND OTHER EROMLE MATERIALS SHALL HE STABILIZED OR PROTECIED WHY SEDIMENT TRAPPING MEASURES THE CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STAMU AMN FOR STOCKPILES ON SITE AEI WELL AS FOR MATERIALS TRANSPORTED FROM THE PROJECT SITE Z. MI AND TAKE PMCMUWNS 10 CONTROL MST INQUONC (BUT HOT LIMITED 10) USE O WATER, MULCH. OR CHEMICAL DUST AMESMS AND CONTROL OF CONSTRUCTION SIZE TRAFFIC. B. FERMENT FROM O-WATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROACH) SEDIMENT DAPPING DENCE, OR SENT AND DSCWRGED IN A WANNER TERT ODES NOT ADVERSELY AFFECT ALVACENF PROPERTIES, WETLANDS , INFILTRATOR WINS. WATERWAYS OR THE STORM DRAINAGE SYSTEM. 9. THE CONTRACTOR 6 RESPONSIBLE FO IMTALUTION AND MAINTENANCE OF ANY ADDITIONAL CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED NECESSARY BY THE PLAN APPROVING AUTHORITY. 10TEMPORARYEROSION AND SEDIMENT CONTROL MEASURES ARE NOT TO BE REMOVED UNTIL ALL DSIUR&0 AREAS ME STABILIZED. AFTER STANRJZADDN IS COMPLETE ALL MEASURES SHALL BE REMOVED WITHIN 30 DAYS. (DAPPED SEDIMENT SHALL BE SPREAD ANO SEEDED. 11. ANY SEDIMENT THAT HAS BEEN TRANSPORTED BEYOND THE PROJECT UMHS SHALL BE REMOVED. RESPONSIBLE MANTCNANCE CONTACT: CONTRACTING OFFICER 12. ALL BORROW MATERAL SHALL BE PM,,D END, AN WPRGNEC B WORN PIT. ALL WE WASTE MACE BE TRANSPORTED OFF GOVERNMENT PROPERTY 10 AN APPROVED LMDF L EROSION AND SEDIMENT CONTROL NARRATIVE IN ORDER 10 PREVENT EROSION M9 CAPTURE SEDIMENTS WITHIN THE PROTECT, THE FOLLOWING PRACTICES STALL BE USED AND LOCATED AISROXWIELY AS SHORN ON EY PLAN I. CLEARING LIMITS SHALL BE MARKED BY FENCING OR OTHER MEANS ON THE GROUND. 2. ROCKED CONSTRUCTION ENTRANCE (CE) WILL BE PLACED AT ENTRANCES 10 SITE IMCATED ON THE PUN. 3. SET FENCE (SF) LMLL SE PLACED ALONG SLOPE CONTOURS AT THE LIMITS O CLEARING. IN SOME BASES PRO (2) ROWS OF SILT FENCE WAY BE REQUIRED AT THE CONTRACTING OFFICERS DSCRETON, 1. MULCH SQUALL BE SPREAD MR ALL REINED AREAS OF THE SITE WHEN THEY ME NOT BURG WORKED. MULCH SNAIL CONSIST CE AR-UJ STRAW MD CHIPPED SITE VEGETATION. 5. WAFER WILL NOT BE ALLOWED TB POINT DISCHARGE ONTO SLOPES. A ROCK -LINED MCN MAY SE NECESSARY 10 INTERCEPT AND DIRECT WATER 10 THE TEMPORARY SEDIMENT TRAP O BASIN. OCT l S 2012 I"I` : FINAL DRAWINGS 'UII En 02 �Q ¢� �Q W 9 i i J O£ SU)Q z PC YNam o ?� 4p �QW Jr ELI J< o _Z ILL Q ac Z BUTW m Z O LL N Q we =¢ cc cc O iJ wW j% o d LL SJ wp JTO Z,�� 1) 4 1 5 s F 3 2 1 3 4 1 5 J C p B PERMANENT SOD CONSTRUCTION NOTES: 1. RAKE SOIL SURFACE TO BREAK GROUND CRUST; LEAVE SURFACE UNIFORM AND WATER LIGHTLY. 2. LAY SOD IN A STAGGERED PATTERN WITH STRIPS BUTTED TIGHTLY AGAINST EACH OTHER. A 3. BUTTING - ANGLED ENDS CAUSED BY CUTTING MUST BE MATCHED CORRECTLY. 4. ROLL SOD TO PROVIDE FIRM SOIL CONTACT. 5, IRRIGATE UNTIL SOIL IS WET TO ABOUT 4" BELOW THE SOD. 6, KEEP SOD MOIST UNTIL SOD TAKES ROOT. NOTEa HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF NECESSARY TO ALLOW STAPLES TO SECURE THE CRITICAL POINTS ALONG THE CHANNEL SURFACE. .• IN LOOSE SOIL CONDITIONS. USE STAPLES OR STAKE LENGTHS GREATER THAN 6" TO PROPERLY ANCHOR THE BLANKETS. ,a FOR SODDED AREAS, PLACEMENT OF MATS SHALL BE BUTTED NIGHTLY AGAINST EACH OTHER WITH NO OVERLAP. FOR CONSTRUCTION NOTES REFER TO THIS SHEET. TYPICAL EROSION CONTROL MATTING GRADE OVER DITCH. _ (SHAPE TO FIT ACTUAL DITCH I - SECTION). I I� i A CRITICAL POINTS 1_ B A. OVERLAPS AND SEAMS B. PROJECTED WATER LINE C. CHANNEL BOTTOM/SIDE SLOPE VERTICES TYPICAL EROSION CONTROL SOD/MATTING DETAIL NOT TO SCALE Sad mmultirnaii arl•l'y-up n"eederc fu M-11iiuF and u "Locks at a FIFwu 6.12e:.0 deo-1 .J Inlo., lebe flkrild.a.v,Jafierit is unmllW Aelp+memtaln na vabJiv. Stuch w Ihz slwdcdwlnA'^valletia,. 2 Rake Me eall ulneethreark the .mo 1 b f - grant ITsri,Cled barrool.liordy rigarryd l led-dy lnfineln,u,b,M mJ to coal Me J vdzee „ul nwuiYN. wJ JMx,k. 1 _ _y othJ patternwell al each bglnlYagaifat Masonb trowel sharpened mason s r the rids 6elaedtoluck,lovn tin ends ---t---'�_� and lrimnecee. OKINCorrect Butti,g-angle eWscausedby Ueau:omatic Incprrecl sod Pon.,g ..at be matched conoctly. EROSION CONTROL MATTING INSTALLATION NOTES: 1. PREPARE SOIL BEFORE INSTALLING EROSION CONTROL MATTING (ECM), INCLUDING; REMOVAL OF DEBRIS, VEGETATIVE GROWTH, AND ERODIBLE MATERIAL; SCARIFY THE EXIST. DITCH SURFACE; SMOOTH EXIST. DITCH SLOPES AND BOTTOM BY FILLING IRREGULAR SURFACES AND VOIDS WITH TOPSOIL AND COMPACT THE SOIL WITHIN THE ECM LIMITS; APPLY LIME, FERTILIZER, AND SEED. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE MATTING IN A 6" DEEP X 6" WIDE TRENCH WITH APPROXIMATELY 12" OF MATTING EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE MATTING WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" PORTION OF MATTING BACK OVER SEED AND COMPACTED SOIL. SECURE MATTING OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OF THE MATTING. 3, ROLL CENTER MATTING IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. UNROLL MATTINGS WITH APPROPRIATE S10E AGAINST THE SOIL SURFACE, SECURELY FASTEN ALL MATTING TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS REQUIRED BY THE MANUFACTURER. 4, PLACE CONSECUTIVE MATTINGS END OVER END (SHINGLE STYLE) WITH A 4"-6" OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" APART AND 4" ON CENTER TO SECURE MATTINGS. 5. ANCHOR FULL LENGTH EDGE OF MATTINGS AT TOP OF SIDE SLOPES WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" APART IN A 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. OVERLAP APPROXIMATELY 4" AND STAPLE. 7. PLACE A DOUBLE ROW OF STAPLES STAGGERED 4" APART AND 6" (10 ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL AT 33' TO 40' INTERVALS. B, ANCHOR THE TERMINAL END OF THE MATTINGS WITH A ROW OF STAPLES/STAKES APPROXIMATELY 6" APART IN A 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. n^^11 I/r t\ L II Roll sod! inannedomelySo Water to a CeptM1 We' Nox eathe IM. is nc son, 01. (lrm Cmlael as aas the sad I. taUhihaU To wks,Set .in Mestir. tab. mb mntin.a the mover nigh 123'), watering as needed. nv a.,iv l'vp >uvun aPan oeil aem ve-:l y1. ..-1. In ,nh.m-1- -1 lase Men h'a' a.mtlJ v':111 ao.tirn,v f'eFiiJn 1 y M1' '.I 1 kh l.• h P "Plxh ry k d aW hni� .ph.n I, 1ker m.. Ia'n eeni likr ralland .rye_ hoer as MI 41RJsldu allla, M1 J 41, 1' nv '1 1 1! 'hot'J :.... .Ifl @,Iw1y,k,lvd ,. s men erq.Ad„Yk tai lam[ea J,me ,..pRe.avvl.. ,.,kr Yepe. t pc Fyv" `: I,eyrner. u,'aR [,v n✓x,a n.,'tr'a pnnlem v'nrt .. A, -all -I., deaa, area i. u.ml,I vnl. nAl vJ to pn. kte,�,m Alin N014 onpl' anise Me vil n.n J iaMa Mim 0[ W Y Aeel",.a, n:a, lane or a Jepk nl „rbe, uNI Nc orl, take, rue. 1T1, n Ir J .. mJ , eoarb h kir. a me avl- -on,e nJkav+ eo-reel. e. M-onk Nou1J m he a h oa evil Nc Wi, tml} o-ea-M::l n k, .Waa,a x„ern.-�.d Imn�lu , m,ihear eh,mel ImmF Imevin, iMeJUC p ealoc n(mo[wa, .-if aW elmNmR it. Iw la"link , mnkL the k IL -o' pine t"r, , 1. ahe ul vnl ul Pelw h, 1 a,4_,ib,Y has n. Gru,.l l(lumai,. The vrinR„Iw Mablelow�dwM he han dearr [. ENin NeeEaleel J,+ipn,.,Horao La"r Z.lal "vle'ins l^vlvn,lirnl,i n,l. Jn,,, i.,iw ll�n. uim iln Luvxl!"ul, w{amf na Mi,t lt: pmrn,. [Jp':,,AVIJ Ixa, tixM1tls'I,y,tM lfie,vc Flaw �-- Lay sod anoaa the Use pegsor stables W[.elan add Wor ly sl tat Ene Ms of strips amin nde center, or every, it the Wnps ale long. When ready to mow. drive pegs or slaple511mh alh Me Wcund. ; _ -_._._..Peat Of- t sup. SOD INSTALLATION�py, _ S �JL/C ._' ^ In criXel areas, secure NOT TO SCALE OCT S Q q- q w_x�_ .T-.�E'? sod with netting and Cd O 201L staple.. BY: FINAL DRAWINGS S F� Sz J YUQQ ca m Q Q W ILL 7) �C3 ED ow ¢¢ DO S r ma ok L A 3 1 2 3 m 5 2 3 5 L C E 1 1 1 1 r � � � .� �LI III- :� •��_� ���.I��''�,_� CORNER EXLENS10N\ ARM FENCENOTES 1. FENCE TO BE INSTALLED AS INDICATED ON SITE PUN. 2. GATE POST TO BE 4' O.D. GALVANIZED STEEL PIPE, 3. CORNER POST TO BE 3" O.D. GALVANIZED STEEL PIPE. 4. LINE POST TO BE 2 1/2- O.D. GALVANIZED STEEL PIPE. 5. FENCE SHALL HAVE AT LEAST ONE GROUND AND SHALL BE INSTALLED AT EVERY POINT WHERE POWER LINES OF 23DO VOLTS OR MORE CROSS FENCE AND AN ADDITIONAL GROUND 150 Ff. EACH SIDE OF THIS POINT. 6. ALL WELD POINTS SHALL BE CLEANED AND PAINTED WITH POWDERED ZINC PRIMER. 2. GATES SHALL HAVE HEAVY DULY HINGES AND LOCKING DEVICES. 8. SPLICES SHOULD ONLY OCCUR AT CROSSRNLS. 9. REFER STRUCTURAL PLANS AND SPECIFICATIONS FOR CONCRETE TYPE/STRENGHT USED FOR FENCE POST FOUNDATION. 10, CAP TOPS FOR UPRIGHTS SHALL EITHER HAVE A CONTINUOUS WELD OR HAVE "SET SCREWS" SO THEY CANNOT BE REMOVED. IL POST SETTINGS TO BE DESIGNED BY FENCE MANFACTURER TO MEET PROPER WIND LOADS, SEE SHEET S-001 FOR WIND LOAD REOUIREMENTS. 18" rr12-1 24 WALL OUTLET ROCK TRENCH PLAN VIEW NOT TO SCALE CHAIN LINK FENCE DETAILS NOT TO SCALE Y-CONFIGURATION BARB WIRE NOT TO SCALE ALUMINUM 3/16"X 5.5" COMMERCIAL GRADE ALUMINUM EDGING -r P(W1 DIAMETER Cp ER MT VARIES 0-2' MAX w 3 > 3 TYPICAL DITCH SECTION NOT TO SCALE - WALL OUTLET ROCSCALE K BEDTYPICAL SECTION 3/16'X 5.5' COMMERCIAL GRADE ALUMINUM EDGING TACK COAT MINIMUM 2.0 INCHES OF ASPHALT CONCRETE, INCEST TYPE SF-9.5A MINIMUM 8.0 INCHES OF AGGREGATE BASE MATERIAL, SIZE NCOOT TYPE ABC", COMPACTED TO AT LEAST 98X OF THE. MODIFIED PROCTOR (ASTM D 698). COMPACTED SUBGRADE (SEE SPECS FOR REDS.) LIGHT DUTY ASPHALT PAVEMENT NOT TO SCALE 8" X 8" THICKENED BASE MATERIAL AT I:I SLOPE, SAWED PAVEMENT CUTS. REPLACE WITH 2" LIGHT DUTY ASPHALT. MATCH EXISTING GRADE (TYPICAL) DO NOT DISTURB EXISTING AGGRAGATE BASE MATERIAL. LIGHT DUTY ASPHALT PAVEMENT SAWCUT NOT TO SCALE ROAD 8' SHOULDER 6" SURFACE COURSE COMPACTED SUBGRADE NOTE: REFER TO TYPICAL PAVEMENT SECTION TYPICAL SHOULDER SECTION (ASPHALT PAVEMENT) NOT TO SCALE :RANGE CONCRETE SLAB & FI _. I TYPICAL SECTION OCT 1 S 2012 NOT TO SCALE A FINAL DRAWINGS U GO oz �� cr �Q �Q 5�G wQ Fo. €ai¢ Ya �Hm Y� �U aQLu CC 0 JQ LL:r) a B- o w ED z p LLJ Go, 0 w LL Z Q ws CC EC �J W j> Q J w0 J i% CL C An 2 3 0 5 E i 3 PRE -DEVELOPMENT CONDITION ANALYSIS ti Z INFILTRATION BASIN 6 4 PRE -DEVELOPMENT CONDITIONS GROUND COVER DESCRIPTION RUNOFF COEFFICIENT, C LAWN 0.15 WOODS 0.15 ASHPALT 0.95 CONCRETE 0.95 ROOFS 1.00 AREA / COMPOSITE C FACTOR AREA NO. TOTAL AREA (ACRES) AREA (ACRES) C = 0.15 AREA (ACRES) C = 0.95 COMPOSITE C DA-1 0.20 0.20 0.00 0.15 DA-2 0.46 0.36 0.11 0.33 DA-3 0.14 0,00 0.14 0.95 RUNOFF COEFFICIENT (SIMPLE METHOD); IMPERVIOUS AREA NO. AREA (ACRES) IMPERVIOUS AREA (IA) RUNOFF COEFFICIENT (RV), FOR FIRST 1.5" DA-1 0.20 0.00 0.00 DA-2 0.46 0.11 0.22 DA-3 0.14 0.14 0.95 RUNOFF VOLUME (SIMPLE METHOD); V=3630*RD*RV*A AREA NO. AREA (ACRES) RUNOFF (RV) FIRST 1.5" (RD) VOLUME (CF) DA-1 0,20 0.D0 0 DA-2 0.46 0.22 543 TOTAL 0.66 0.22 543 24-HR RUNOFF 0 (CFS); Q=C*I*A AREA NO. 1-yR 2-YR 10-YR 100-YR INCHES 3.64 4.42 6.83 11.50 DA-1 0.11 0.13 0.20 0.34 DA-2 0.56 0.68 1.05 1.76 DA-3 0.47 0.57 0.88 1.47 1■■■■r FINAL DRAWINGS n tz w uv o. 9n • V901 ..e.nm eo ow.oi B.�HBBit �U o 2 E �g 5E� zQ �¢Oo� a S (/JQ 20Do uQW p `JQ o U z lL D lL C3 w DO n z_ pW o z Q w z Wa c wB U a OCT 1 S 2012 �< 6�1Lo wo J S jIC QS N . � &z mCL GRAPHIC SCALE ®ax=a-e�x 0 IC20' 40' 12633845 I' 20' v 7 w 13 C-302 R y� 5i P 3 F d I 9 4� 2 'e