NORMS & TUNSTALL
CONSULTING ENGINEERS P.C. —
1127 Floral Parkway, Suite 400
Wilmington, NC 28403
(910) 343-9653
(910) 343-9604 Fax
John S. Tunstall, P.E.
September 10, 2013
Ms. Christine Nelson, Environmental Engineer
NC DENR
Division of Energy, Mineral and Land Resources
Surface Water Protection
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
1429 Ash -Little River Road
Ash, NC 28420
(910) 287-5900
(910) 287-5902 Fax
J. Phillip Norris, P.E.
RECD SEp 12 2013
Re: Notice of Inspection — Non Compliant, Request for Additional Information, and
Check Return
Pike Electric
Permit No. SW8 040130 JE
Brunswick County, NC
N&T Project No. 13019 SEP 12 2013
Dear Ms. Nelson:
We are responding to your letter of August 28, 2013 regarding the subject project as follows:
1. We have been asked to respond to your letter by the new property owner, C.W. and
Carol Properties, Inc.
2. In response to "Inspection" item 1, we are enclosing two (2) copies of a revised site plan
that reflects the existing and proposed conditions on the site. This revised plan shows
that the site remains in compliance with the allowable impervious area reflected in the
permit of 121,188 SF. As such, we see no need to modify the permit other than a name
and ownership change as has been previously applied for by the new owners.
3. In response to "Inspection" item 2, the new owner has agreed to correct the curve in the
outlet pipe. This will be accomplished prior to September 30, 2013.
4. In response to "Inspection" item 3, the new owner has agreed to remove the cattails
prior to September 30, 2013.
5. In response to "Transfer — Request for Additional Information and Check Return", we
are enclosing a letter from the new owner, C.W. and Carol Properties, Inc. indicating
their wishes to accept the permit as is and accepting the responsibility for obtaining
compliance to the permit. Also enclosed is documentation of property transfer. Thank
you for returning the $40.00 check.
Ms. Christine Nelson / NC DENR
September 10, 2013
Page 2
Please let us know if you have any questions or comments regarding our response. Thank
you for your assistance on this project.
Sincerely,
NORRIS & TUNSTALL
CONSULTING ENGINEERS, C.
J. hill orris, P. .
13019 09-10-13-s-sw-response-Itr
cc: C.W. Hamilton
A
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Energy, Mineral, and Land Resources
Tracy E. Davis, PE, CPM
Director
August 28, 2013
Mr. Gary Walden, Assistant Vice President
Pike Electric, Inc.
PO Box 868
Mt. Airy, NC 27030
Pat McCrory, Governor
John E. Skvarla, III, Secretary
Subject: Notice of Inspection — Non Compliant, Request for Additional Information,
and Check Return
Pike Electric
Permit No. SW8 040130
Brunswick County
Dear Mr. Walden:
Inspection
On August 23, 2013, the Wilmington Regional Office of the Division of Energy, Mineral and
Land Resources (DEMRL) inspected Pike Electric in Brunswick County to determine the status
of compliance with the State Stormwater Management Permit Number SW8 040130 issued on
May 7, 2004. DEMLR file review and site inspection revealed that the site is not compliant with
the terms and conditions of this permit. Please find a copy of the completed form entitled
"Compliance Inspection Report" attached to this letter, which summarizes the findings of the
recent inspection.
As indicated in the attached inspection report, the following deficiencies must be resolved:
Please submit a modification to the project for approval of the revised built -upon area. It
was noted that the access road layout has been revised without prior approval from the
Division. Per Section 11.10 of the permit, the permittee shall submit and have received
approval for revised plans, specifications, and calculations prior to the construction, for
any modification to the approved plans, including, but not limited to: "Any revision to any
item shown on the approved plans, including the stormwater management measures,
built -upon area, details, etc".
2. Please demonstrate that the outlet structure and pipe discharge is functioning as
intended and that the required temporary storage volume is available in the pond. It was
noted during the inspection that the outlet pipe had a curve that could prevent the pond
from appropriately discharging the temporary storage volume.
3. Please maintain the pond in accordance with the approved operation & maintenance
(O&M) agreement. Section 111.5 of the O&M agreement requires cattails to be removed
when they cover 50% of the basin surface area. During the inspection it was noted that
cattails covered the majority of the basin surface area.
Per Section 111.1 of the permit, the permittee is responsible for compliance with all permit
conditions until such time as the Division approves the transfer request. Please inform this
Office in writing before September 30, 2013, of the specific actions that will be undertaken and
the time frame that will be required to correct the deficiencies. Failure to provide the requested
information, or to respond to this letter by the due date, may initiate enforcement action
including the assessment of civil penaltieup to $25,000 per day. If a written plan of action is
not submitted to this office by Septembe 2013 then DEMLR staff will re -inspect the site and
issue a Notice of Violation if the listed deflcl ncies have not been addressed.
,i0y�
Wilmington Regional Office
127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: (910) 796-7215 / Fax: (910) 350-2004
Additionally, on August 13, 2013 a Name/Ownership Change Form was received along with a
check for $40. In order to process the transfer of this project, the site must be found in
compliance with the permit. If the proposed permittee, C. W. and Carol Properties, Inc wishes
to accept the permit with the outstanding compliance issues, then a letter must be provided
indicating that they accept responsibility for obtaining compliance in accordance with the state
stormwater permit.
Once the site is found in compliance or the proposed owners provide a letter accepting
responsibility for the compliance issues, the following information must be submitted in order to
transfer the permit:
1. Legal documentation of the property transfer to the new owner or a sales contract or
purchase agreement indicating the proposed permittees intent to purchase the property.
According to the Divisions records, this project has not been transferred before. The first
transfer of a stormwater permit is free. Accordingly, Check No. 1836 in the amount of $40 is
being returned.
If you have any questions, please contact me at the Wilmington Regional Office, telephone
number (910)-796- 7215 or christine.nelson@ncdenr.gov.
Sincerely,
Christine Nelson
Environmental Engineer
Enc: Compliance Inspection Report
GDS\can: S:\WQS\Stormwater\Permits & Projects\2004\040130 HD\2013 08 CEI_deficient addinfo 040130
cc: Alesia Carol Hamilton, C.W. and Carol Properties
Georgette Scott, Wilmington Regional Office Stormwater Supervisor
WiRO Stormwater File
Compliance Inspection Report
Permit: SW8040130 Effective: 05/07/04 Expiration: 05/07/18 Owner: Floyd S Pike Electrical Cont
Project: Pike Electric
County: Brunswick 820 Ocean Hwy W US 17
Region: Wilmington
Shallotte NC 28459
Contact Person: Robert B Ratliff Title: Phone: 910-789-2171
Directions to Project:
From intersection of NC 211 and US 17, travel South on US 17. Site is approx. 1.75 miles South of NC 211, west of US 17. Turn right
into site off US 17 across Brunswick Electric Membership Corporation. _
Type of Project: State Stormwater - HD - Detention Pond
Drain Areas: 1 - (Doe Creek (Big Doe Creek)) (03-07-59) (C;Sw,HQW)
On -Site Representative(s)
Related Permits:
Inspection Date: 11/01/2013 Entry Time: 01:30 PM
Primary Inspector: David W Cox
Secondary Inspector(s):
Reason for Inspection: Follow-up
Permit Inspection Type: State Stormwater
Facility Status: ❑ Compliant Q Not Compliant
Question Areas:
N State Stormwater
(See attachment summary)
Exit Time: 02:00 PM
Phone: 910-796-7215
Inspection Type: Transfer Renewal
Page: 1
Permit: SW8040130 Owner - Project: Floyd S Pike Electrical Cont
Inspection Date: 1110112013 Inspection Type: Transfer Renewal Reason for Visit: Follow-up `-
Inspection Summary:
This permit is being transferred as is, per the 09/11/2013 letter and revised plan showing the new location and buildings.
File Review
Is the permit active?
Signed copy of the Engineer's certification is in the file?
Signed copy of the Operation & Maintenance Agreement is in the file?
Copy of the recorded deed restrictions is in the file?
Comment: Proposed permittee requested September 11, 2013 in writing that this is
being taken as is. The Department of Tranportation required a turn out for this property.
Although the entrance impervious is slightly larger and located at the west end of the
property .
Operation and Maintenance
Are the SW measures being maintained and operated as per the permit requirements?
Yes No NA NE
Yes No NA NE
■DDD
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ D D 0 D
upon request?
Comment: The whole entire is currently under an extensive clean up.
Page:2
September 11, 2013
Ms. Christine Nelson, Environmental Engineer
NC DENR
Division of Energy, Mineral and Land Resources
Surface Water Protection
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
Re: Pike Electric Permit Transfer
Permit No. SW8 040130
Brunswick County, NC
N&T Project No. 13019
Dear Ms. Nelson:
We wish to accept the subject permit with the outstanding compliance issues. We accept
responsibility for obtaining compliance in accordance with the subject State Stormwater
Permit. We request that the permit be transferred to C.W. and Carol Properties, Inc.
Sincerely,
Compliance Inspection Report
Permit: SW8040130 Effective: 05/07/04 Expiration: 05/07/18 Owner: Floyd S Pike Electrical Cont
Project: Pike Electric
County: Brunswick 820 Ocean Hwy W US 17
Region: Wilmington
Shallotte NC 28459
Contact Person: Robert B Ratliff Title: Phone: 910-789-2171
Directions to Project:
From intersection of NC 211 and US 17, travel South on US 17. Site is approx. 1.75 miles South of NC 211, west of US 17. Turn right
into site off US 17 across Brunswick Electric Membership Corporation.
Type of Project: State Stormwater - HD - Detention Pond
Drain Areas: 1 - (Doe Creek (Big Doe Creek)) (03-07-59 ) (C;Sw,HOW)
On -Site Representative(s):
Related Permits:
Inspection Date: 08/23/2013 Entry Time: 11:40 AM
Primary Inspector: Christine Nelson
Secondary Inspector(s):
Reason for Inspection: Other
Permit Inspection Type: State Stormwater
Facility Status: ❑ Compliant E Not Compliant
Question Areas:
® State Stormwater
(See attachment summary)
Exit Time: 12:15 PM
Phone: 910-796-7215
Inspection Type: Transfer Renewal
Page: 1
Permit: SW8040130 Owner - Project: Floyd S Pike Electrical Cant
Inspection Date: 08/23/2013 Inspection Type: Transfer Renewal Reason for Visit: Other
Inspection Summary:
Please modify the permit to reflect the additional impervious areas.
Please ensure the outlet structure is functioning as designed.
Please maintain the pond by removing the overgrowth of cattails.
Page: 2
i Permit: SW8040130 Owner - Project: Floyd S Pike Electrical Cont
Inspection Date: 08/23/2013 Inspection Type: Transfer Renewal Reason for Visit:
Other
File Review
Yes No
NA
NE
Is the permit active?
®❑
❑
❑
Signed copy of the Engineer's certification is in the file?
®❑
Cl
❑
Signed copy of the Operation &.Maintenance Agreement is in the file?
®❑
❑
❑
Copy of the recorded deed restrictions is in the file?
❑ ❑
®
❑
Comment:
Built Upon Area
Yes No
NA
NE
Is the site BUA constructed as per the permit and approval plans?
Cl ®
❑
❑
Is the drainage area as per the permit and approved plans?
0110
Is the BUA (as permitted) graded such that the runoff drains to the system?
❑ ❑
❑
Comment: The access road has been revised such that additional impervious area
has been constructed without prior approval from the Division. A modification will be
necessary.
SW Measures
Yes No
NA
NE
Are the SW measures constructed as per the approved plans?
❑ 0
❑
❑
Are the inlets located per the approved plans?
0000
Are the outlet structures located per the approved plans?
❑ ❑
❑
❑
Comment: The outlet structure and pipe needs to be evaluated to ensure it is
functioning as intended. The outlet pipe has an upward curve that could prevent the
pond from appropriately discharging.
Operation and Maintenance
Yes No
NA
NE
Are the SW measures being maintained and operated as per the permit requirements?
❑ ■
❑
❑
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWO ❑ ❑
❑
■
upon request?
Comment: Please maintain the pond in accordance with the approved operation &
maintenance agreement. Section 111.5 requires cattails to be removed when they cover
50% of the basin surface.
Other Permit Conditions
Yes No
NA
NE
Is the site compliant with other conditions of the permit?
v ❑
❑
❑
Comment:
Other WQ Issues
Yes No
NA
NE
Is the site compliant with other water quality issues as noted during the inspection?
®❑
❑
❑
Comment:
Page: 3