Loading...
HomeMy WebLinkAbout20150438 Ver 1_More Info Received_20150618 (2)2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary (T) W1 ❑ P ❑ T ❑ Yes ❑ Corps 2g. Total wetland impacts ®P ❑ T ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps temporary impacts) proposed on the site, then complete this ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps 3d. 3e. ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps Impact number - ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps DWQ — non -404, width ® No ❑ DWQ 2g. Total wetland impacts ®P ❑ T Sewer crossing g wannanoa River ® PER 2h. Comments: 8 21 3. Stream Impacts Tributary 33 ❑ INT ❑ DWQ If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. wannanoa River ® PER ® Corps 3 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ❑ T Sewer crossing g wannanoa River ® PER ® Corps 8 21 Tributary 33 ❑ INT ❑ DWQ S2 ® P FIT Sewer crossing g wannanoa River ® PER ® Corps 3 10 Tributary 33 ❑ INT ❑ DWQ S3 ❑ P ® T Sewer crossing Tributary of Swannanoa River ❑ PER ®INT ® Corps F] DWQ 3 20 Tributary 33 S4 ❑ PET Sewer crossing Tributary of Swannanoa River ❑ PER ®INT ® Corps F1 DWQ 1 10 Tributary 33 S5 ❑ PET Sewer crossing g wannanoa River ® PER ® Corps 5 19 Tributary 33 ❑ INT ❑ DWQ S6 ®P ❑ T Sewer crossing g wannanoa River ® PER ® Corps g 10 Tributary 33 ❑ INT ❑ DWQ S7 ®P ❑ T Sewer Installation Swannanoa River ® PER ® Corps 10 89 Tributary 33 ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 179 3i. Comments: Locations S3, S4 and S5 are crossings of a tributary of Swannanoa Tributary 33. These are intermittent streams and stream banks will be restored with jute netting or coir matting. At crossings S1, S2, and S6, stream banks will be restored using Class I Rip -Rap. Stream Impact S7 is not a crossing, but a sewer installation parallel to Swannanoa River Trib 33. In crossing locations where 3.0 ft. of cover cannot be achieved between top of pipe and stream channel bottom, concrete encasement will be installed around the new sewer pipe. Locations for stream impacts are as follows: Stream Impact S1: 35.607869, - 82.357335; Stream Impact S2: 35.609564, - 82.355753; Stream Impact S3: 35.609676, - 82.355421; Stream Impact S4: 35.610322, - 82.354476; Stream Impact S5: 35.610597, - 82.354087; Stream Impact S6: 35.608638, - 82.356195; Stream Impact S7: 35.607754, - 82.357953. Page 6 of 12 PCN Form — Version 1.3 December 10, 2008 Version