Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20150623 Ver 1_Application_20150624
STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAT L. MCCRORY ANTHONY J. TATA GOVERNOR SECRETARY June 24, 2015 Wilmington Regulatory Field Office US Army Corps of Engineers 69 Darlington Ave. Wilmington, North Carolina 28403 ATTN: Ms. Liz Hair NCDOT Coordinator Dear Madam: Subject: Application for Section 404 Individual Permit and Section 401 Water Quality Certification for the proposed replacement of Bridge No. 116 on NC 24-210 (Rowan St.) over CSX, Norfolk Southern Railroads, and Hillsboro St., and existing Culvert (No. C258) with Intersection Improvements over Cross Creek in Cumberland County. Federal Aid Project No. BRNHS-0024(24), TIP No. B-4490. Debit $570.00 from WBS 33727.1.1. The North Carolina Department of Transportation (NCDOT), Division of Highways, in consultation with the Federal Highway Administration (FHWA), proposes to replace Bridge Number 116, on NC 24-210 (Rowan Street) over the CSX Railroad, Norfolk Southern Railroad and Hillsboro Street in downtown Fayetteville. The purpose of this letter is to request approval for a Section 404 Individual Permit and Section 401 Water Quality Certification. In addition to the cover letter, this application package includes the following for B-4490: ENG Form 4345, stormwater management plan, permit drawings, roadway plans, and DMS acceptance letter. 1.0 Purpose and Need The purpose for this project, as identified in the Environmental Assessment (EA), is to replace Bridge Number 116 on NC 24-210 (Rowan Street) and to relocate existing Rowan Street in support of the Fayetteville Northwest Gateway Plan and the proposed North Carolina Veterans Park. The proposed project is intended to address the following needs: •NCDOT Bridge Maintenance Unit records indicate Bridge Number 116 has a sufficiency rating of 7 out of a possible 100. The bridge is considered structurally deficient and therefore eligible MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 TELEPHONE: 919-707-6100 FAX: 919-212-5785 WEBSITE: WWW.NCDOT.ORG LOCATION: CENTURY CENTER, BUILDING B 1020 BIRCH RIDGE DRIVE RALEIGH NC 27610 for FHWA’s Highway Bridge Replacement and Rehabilitation Program. • Without reconfiguring the intersections of NC 24 (Rowan Street), Bragg Boulevard, NC 210 (Murchison Road) and West Rowan Street the level of service is expected to range from E to F in the design year (2030). • In 2007, the City of Fayetteville approved the Northwest Gateway downtown redevelopment plan. Portions of existing NC 24-210 (Rowan Street) right of way is within the proposed limits of the North Carolina Veterans Park. Relocating the bridge to the north and reconfiguring the existing intersections would allow this right of way to be reused for the park. 2.0 Project Description The project involves replacing existing Bridge Number 116 on NC 24-210 (Rowan Street) to the north of its current location and reconfiguring the intersections of SR 3147 (West Rowan Street) with NC 24/SR 3828 (Bragg Boulevard), and NC 210 (Murchison Road) with SR 3147 (West Rowan Street) at NC 24-210 (Rowan Street) into a single, signalized intersection. 3.0 Summary of Impacts Waters of the U.S.: Proposed permanent impacts to jurisdictional areas total 857 feet (85 feet of the 857 is from bank stabilization) of permanent stream impacts. 4.0 Summary of Mitigation The proposed construction of B-4490 will impact 772 feet of permanent stream impacts that will require mitigation from the USACE. See attached DMS acceptance letter for additional information. 5.0 Project Schedule Currently, B-4490 has a review date of October 27, 2015 and is scheduled to let December 15, 2015; it will be available for construction shortly thereafter. The let date, however, may advance as additional funds become available. 6.0 NEPA Document Status The FHWA and NCDOT completed the EA November 22, 2011 in compliance with the NEPA guidelines. The EA explains the purpose and need for the project, provides a description of the alternatives considered, and characterizes the social, economic, and environmental effects. Following the EA the Finding of No Significant Impact (FONSI) was completed by the FHWA and NCDOT on December 19, 2012. The EA and FONSI were approved and circulated to federal, state, and local agencies. This document is posted on the NCDOT website at https://connect.ncdot.gov/resources/Environmental/Pages/default.aspx, under Quick Links > Environmental Documents. 2 6.1 Independent Utility B-4490 is in compliance with 23 CFR Part 771.111(f) which lists the FHWA characteristics of the independent utility of a project. The project meets the criteria for independent utility as discussed below: • The project has logical termini and independent utility and is of sufficient length to address environmental matters on a broad scope; • The project is usable and a reasonable expenditure of funds, even if no additional transportation improvements are made in the area; and • The project does not restrict consideration of alternatives for other reasonably foreseeable transportation improvements. 7.0 Resource Status The project is located in the Cape Fear River basin and lies within Hydrologic Unit 03030004 (Subbasin 03-06-15). This project lies in the southeastern portion of North Carolina within the coastal plain physiographic province. The project crosses Cross Creek. Wetland and stream delineations were completed September 30, 2009. Jurisdictional areas within the project study area were field reviewed by the USACE (Ronnie Smith) on September 16, 2010, and a preliminary jurisdictional determination was given on September 20, 2010. 7.1 Wetland Delineations A wetland identification and preliminary assessment analysis for the study area was performed and summarized in the 2009 Natural Resources Technical Report (NRTR). The wetland within the study area was delineated based on the 1987 U.S. Army Corps of Engineers (USACE) Wetland Delineation Manual and a preliminary design was prepared to avoid and minimize wetlands to the maximum extent possible. 7.2 Stream Delineations The stream channels within the project study area were identified, evaluated, and classified using the NCDWQ stream identification form and the Cowardin classification system. Water quality information for the streams within the project study area was derived from available sources provided through the NCDENR. 7.3 B-4490: Characterization of Jurisdictional Sites 7.3.1 Wetlands There was one wetland type found within the project study area based on the NC Wetland Assessment Method (NC WAM): Small Basin Wetland. More detailed information about this wetland can be found in the EA and NRTR which includes figures showing the wetland within the project area. 3 7.3.2 Streams The Best Usage Classification for the Cross Creek and the UT to Cross Creek on the project is “C”. Details for the jurisdictional streams within the project area are provided in the EA and NRTR. There are no waters within the project vicinity classified as High Quality Waters (HQW). Neither Water Supplies (WS-I: undeveloped watersheds or WS-II: predominately undeveloped watersheds), nor Outstanding Resource Waters (ORW) occur within 1.0 mile of the project area. Streams within the B-4490 project area are not designated as North Carolina Natural or Scenic Rivers, or as National Wild and Scenic Rivers. Additionally, these waters are not listed on the 2014 303(d) list of impaired waters due to sedimentation or turbidity. 7.4 Impacts to Jurisdictional Resources No impacts to wetlands are proposed. Proposed impacts to jurisdictional surface waters for B- 4490 are summarized below in Table 1. Table 1. B-4490 Surface Water Impacts Permit Drawing Site Number Waterbody Labeled in CE Permanent (ft) Permanent (ac.) Temporary (ft) Temporary (ac.) USACE Mitigation Required (2:1) 1 Cross Creek 709 0.40 63 0.08 Yes 1 Cross Creek 85 No 2 UT to Cross Creek 63 <0.01 Yes Total: 857* 0.40 63 0.08 * Includes 85 linear feet of impacts from bank stabilization at Site 1; mitigation required by the USACE exceeds the amount required by NCDWQ. Permanent Impacts: Proposed permanent impacts to jurisdictional streams are 857 linear feet. Temporary Impacts: There will be 63 linear feet of temporary impacts to jurisdictional streams due to culvert installations. Utility Impacts: There are no jurisdictional impacts resulting from utility relocations on this project. 8.0 Protected Species The United States Fish and Wildlife Service (USFWS) list seven federally protected species for Cumberland County as of the December 26, 2012 listing (Table 3). A No Effect call was made for all seven species due to lack of habitat. 4 Table 3. Federally Protected Species in Cumberland County Common Name Scientific Name Federal Status Habitat Biological Conclusion American alligator Alligator mississippiensis T(S/A) No No Effect Red-cockaded woodpecker Picoides borealis E No No Effect Saint Francis’ satyr butterfly Neonympha mitchellii francisci E No No Effect American chaffseed Schwalbea americana E No No Effect Michaux’s sumac Rhus michauxii E No No Effect Pondberry Lindera melissifolia E No No Effect Rough-leaved loosestrife Lysimachia asperulaefolia E No No Effect E - Endangered; T(S/A) – Threatened due to similarity of appearance. The US Fish and Wildlife Service has developed a programmatic biological opinion (PBO) in conjunction with the Federal Highway Administration (FHWA), the US Army Corps of Engineers (USACE), and NCDOT for the northern long-eared bat (NLEB) (Myotis septentrionalis) in eastern North Carolina. The PBO covers the entire NCDOT program in Divisions 1-8, including all NCDOT projects and activities. The programmatic determination for NLEB for the NCDOT program is “May Affect, Likely to Adversely Affect”. The PBO provides incidental take coverage for NLEB and will ensure compliance with Section 7 of the Endangered Species Act for five years for all NCDOT projects with a federal nexus in Divisions 1-8, which includes Cumberland County, where TIP B-4490 is located. 8.1 Bald and Golden Eagle Protection Act (BGPA) In the July 9, 2007 Federal Register (72:37346-37372), the bald eagle was declared recovered, and removed (de-listed) from the Federal List of Threatened and Endangered wildlife. This delisting took effect August 8, 2007. After delisting, the Bald and Golden Eagle Protection Act (Eagle Act) (16 U.S.C. 668-668d) became the primary law protecting bald eagles. There is no habitat for the bald eagle, In addition, the NCNHP database (updated January 2015) does not indicate any occurrences of bald eagle within 1.0 mile of the study area. 8.2 Moratoria No in-water work moratoria have been requested for this project. 9.0 Cultural Resources The State Historic Preservation Office has reviewed the project for archaeological resources. In a letter dated June 17, 2008, the State Historic Preservation Office stated that no known archaeological sites exist within the project study area and recommended no archaeological survey be conducted for the project. A copy of the State Historic Preservation Office’s letter is included in Appendix A of the EA. 5 Four historic properties or districts within the study area are eligible for or listed on the National Register of Historic Places. The proposed project will require the use of land from one eligible district, the Orange, Chatham, and Moore Streets Historic District. The State Historic Preservation Office concurred the proposed project will have “no adverse effect” on the historic district. 10.0 FEMA Compliance The project has been coordinated with appropriate state and local officials and the Federal Emergency Management Agency (FEMA) to assure compliance with FEMA, state, and local floodway regulations. 11.0 Mitigation Options The NCDOT is committed to incorporating all reasonable and practicable design features to avoid and minimize jurisdictional impacts, and to provide full compensatory mitigation of all remaining, unavoidable jurisdictional impacts. Avoidance measures were taken during the planning and NEPA compliance stages; minimization measures were incorporated as part of the project design. 11.1 Avoidance and Minimization All jurisdictional features were delineated, field verified and surveyed within the corridor for B-4490. Using these surveyed features, preliminary designs were adjusted to avoid and/or minimize impacts to jurisdictional areas. NCDOT employs many strategies to avoid and minimize impacts to jurisdictional areas in all of its designs. Many of these strategies have been incorporated into BMP documents that have been reviewed and approved by the resource agencies and which will be followed throughout construction. All wetland areas not affected by the project will be protected from unnecessary encroachment. Individual avoidance and minimization items are as follows: • Best Management Practices for Construction and Maintenance Activities will be adhered to. • No staging of construction equipment or storage of construction supplies will be allowed in wetlands or near surface waters. • NCDOT and its contractors will not excavate, fill, or perform land clearing activities within Waters of the U.S. or any areas under the jurisdiction of the USACE, except as authorized by the USACE. To ensure that all borrow and waste activities occur on high ground, except as authorized by permit, the NCDOT shall require its contractors to identify all areas to be used to borrow material, or to dispose of dredged, fill or waste material. Documentation of the location and characteristics of all borrow and disposal sites associated with the project will be available to the USACE on request. • Proposed culverts will be buried 1 ft. to provide for fish passage. • Special Sediment Control Fence will be used were applicable. • Bank stabilization at outlets of culverts will not impact the stream bed. 6 • The backfill for the culverts will native material. • The backfill in the culverts will be smoothed flat to allow for easier passage by wildlife. • The existing culvert near the outlet of the proposed culvert will be removed resulting in 90 linear feet of stream being day-lighted. 11.2 Compensation The NCDOT has avoided and minimized impacts to jurisdictional resources to the greatest extent possible as described above. The unavoidable impacts to Waters of the U.S. will be offset by compensatory mitigation provided by NCDENR, Division of Mitigation Services. 12.0 Indirect and Cumulative Effects Based upon the results of the analysis and the Indirect and Cumulative Effects Screening Matrix, there is a low to moderate concern for indirect and cumulative effects as a result of STIP Project B-4490. It seems possible that the proposed project could generate some minor indirect land use effects within the FLUSA, albeit somewhat dependent upon the state of the economy. The completion of B-4490 is unlikely to create land use impacts that are inconsistent with planning goals within the FLUSA. The proposed STIP Project B-4490 is included in existing local planning documents including; the Draft 2030 Growth Vision Plan, Fayetteville Renaissance Plan, and the Northwest Gateway Plan. When considered with the policies established in these planning initiatives and local ordinances implemented through Fayetteville’s UDO, this project is consistent with plans for future commercial development, parkland development, and medium and high-density residential development and will enhance a key entryway into downtown Fayetteville that connects the downtown core to surrounding developable areas as well as community focal points within the FLUSA, including Fort Bragg, FSU, local parks, greenways, and tourist attractions. Analysis of the State and local development regulations suggests that the policies and regulations currently in place will mitigate the potential impacts of the minor project related development shifts. Because few indirect impacts are anticipated, the cumulative effect of this project, when considered in the context of other past, present and future actions, and the resulting impact on the notable human and natural features, should be minimal. Therefore, contribution of the project to cumulative impacts resulting from current and planned development patterns is expected to be minimal. Qualitative analyses of the probable development patterns in the Future Land Use Study Area suggests that STIP Project B-4490 will have little to no effect on future stormwater runoff or water quality in the watersheds encompassed by the project. No additional indirect and cumulative effects studies are recommended. 7 13.0 Essential Fish Habitat The project will not impact any essential fish habitat afforded protection under the Magnuson -Stevens Act of 1996 (16 U.S.0 1801 et seq.). 14.0 Regulatory Approvals Section 404: Application is hereby made for a USACE Individual 404 Permit as required for the above -described activities. Section 401: We are requesting a Section 401 Water Quality Certification from NCDWR. We are providing this application to the NCDWR, for their approval. Authorization to debit the $570 Permit Application Fee from WBS Element 33727.1.1 is hereby given. A copy of this permit application will be posted on the NCDOT Website at https://connect.ncdot.gov/resources/Environmental/Pages/default.aspx, under Quick Links > Permit Applications. A copy of the EA and FONSI are also available at the above website address under Quick Links > Environmental Documents. Thank you for your assistance with this project. If you have any questions or need additional information, please contact Chris Manley at cdmanley@ncdot.gov or (919) 707-6135. Sincerely, Richard W. Hancock, P.E., Manager Project Development and Environmental Analysis Unit cc: NCDOT Permit Application Standard Distribution List. 8 U.S. ARMY CORPS OF ENGINEERS APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT 33 CFR 325. The proponent agency is CECW-CO-R. OMB APPROVAL 0710-0003 EXPIRES: 28 FEBRURUARY 2013 Public reporting for this collection of information is estimated to average 11 hours per response, inc uding the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of the collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters, Executive Services and Communications Directorate, Information Management Division and to the Office of Management and Budget, Paperwork Reduction Project (0710-0003). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of the proposed activity. PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by Federal law. Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned. (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPLICATION COMPLETE (ITEMS BELOW TO BE FILLED BY APPLICANT) 5. APPLICANT'S NAME First - Richard Middle -W. Last - Hancock, P.E. Company - NCDOT-PDEA E-mail Address - 8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required) First - Middle - Last - Company - E-mail Address - 6. APPLICANT'S ADDRESS: Address- 1598 Mail Service Center City - Raleigh State - NC Zip - 27699 Country -USA 9. AGENT'S ADDRESS: Address - City - State - Zip - Country - 7. APPLICANTS PHONE NOs. w/AREA CODE a. Residence b. Business c. Fax 919-707-6135 10. AGENTS PHONE NOs. w/AREA CODE a. Residence b. Business c. Fax STATEMENT OF AUTHORIZATION 11. I hereby authorize, to act in my behalf as my agent in the processing of this application and to furnish, upon request, supplemental information in support of this permit application. SIGNATURE OF APPLICANT DATE NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (see instructions) B-4490 13. NAME OF WATERBODY, IF KNOWN (if applicable) Cross Creek and its UTs 14. PROJECT STREET ADDRESS (if applicable) Address NC 24 City Fayetteville State NC Zip- 28301 15. LOCATION OF PROJECT Latitude: oN 35.060270 Longitude: oW-78.887311 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) State Tax Parcel ID Municipality Section - Township - Range - ENG FORM 4345, OCT 2012 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 3 17. DIRECTIONS TO THE SITE The North Carolina Department of Transportation (NCDOT), Division of Highways, in consultation with the Federal Highway Administration (FHWA), proposes to replace Bridge Number 116, on NC 24-210 (Rowan Street) over the CSX Railroad, Norfolk Southern Railroad and Hillsboro Street in downtown Fayetteville. For additional information please see attached vicinity map and cover letter. 18. Nature of Activity (Description of project, include all features) The nature of activity for this project includes replacement of the structurally deficient bridge and reconfigure intersections. For additional information please see attached cover letter. 19. Project Purpose (Describe the reason or purpose of the project, see instructions) The purpose for this project is to replace the structurally deficient bridge and reconfigure intersections. For additional information please see attached cover letter. USE BLOCKS 20-23 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 20. Reason(s) for Discharge A portion of Cross Creek will be placed in a culvert. For additional information please see attached cover letter and permit drawings. 21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Type Type Amount in Cubic Yards Amount in Cubic Yards Amount in Cubic Yards See attached cover letter & permit drawings. 22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) Acres or Linear Feet 857 linear feet of permanent stream impacts; 63 linear feet of temporary stream impacts 23. Description of Avoidance, Minimization, and Compensation (see instructions) Best Management Practices for Construction and Maintenance Activities will be adhered to. Mitigation will be provided by NCDMS. For additional information please see attached cover letter and Mitigation acceptance letter. ENG FORM 4345, OCT 2012 Page 2 of 3 24. Is Any Portion of the Work Already Complete? r—Yes X No IF YES, DESCRIBE THE COMPLETED WORK 25. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (if more than can be entered here, please attach a supplemental list). a. Address- Please see list provided via email. City - State - Zip - b. Address - City - State - Zip - c. Address - City - State - Zip - d. Address - City - State - Zip - e. Address - City - State - Zip - 26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. AGENCY TYPE APPROVAL IDENTIFICATION DATE APPLIED DATE APPROVED DATE DENIED NUMBER N/A Would include but is not restricted to zoning, building, and flood plain permits 27. Application is hereby made for permit or permits to authorize the work described in this application. I certify that this information in this application is complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant. 6 -24-2ois Q. n i IGNATU�2E OF APPLA f�T , f 6.. DATE SIGNATURE OF AGENT DATE 1 yr h� ,(/(/ Kyn �l.0 The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, OCT 2012 Page 3 of 3 (Version 2.0; Released April 2014) 33727.1.1 TIP No.:B-4490 County(ies):Cumberland Page 1 of 1 TIP Number:Date: Phone:Phone: Email:Email: County(ies): CAMA County? No Design/Future:Year:2035 Existing:Year: Threatened/Endangered Species?No Comments: No N/A No Wetlands within Project Limits? None Supplemental Classification: Urban Commercial/ Residential Cross Creek 18-27(3) 0.599 miles Project Description Proposed Project Cape FearRiver Basin(s): City/Town: Typical Cross Section Description: Surrounding Land Use: General Project Narrative: (Description of Minimization of Water Quality Impacts) No patkinson@ncdot.gov Raleigh, N.C. 27610 Address: CumberlandFayetteville Paul Atkinson, P.E. 1020 Birch Ridge Drive WBS Element: Bridge ReplacementWBS Element: Craig Freeman, P.E.NCDOT Contact: 919-707-6707 1020 Birch Ridge Drive Raleigh, N.C. 27610 Contractor / Designer: 919-707-6721 NCDOT Hydraulics Unit North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS Project Type: NCDOT Hydraulics Unit Address: General Project Information B-449033727.1.1 Impairments: Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.) Replace Bridge No. 116 over CSX RR, Norfolk Southern RR and Hillsboro St. on NC 24/210. Replace existing culvert C258(3@ 12' x 9' RCBC) under NC 24/210 and existing culvert(3 @ 12' x 9' RCBC) under SR 3147(West Rowan St.) with 3 @ 14' x 9' RCBC with 1'sill at the inlet and outlet of barrels 1 & 2 and a 2' sill at the inlet and outlet of barrel 3.Realign NC 24/210 (Bragg Blvd. and Murchison Rd.) and SR-3828. Existing site is fully developed/urbanized. N/ABuffer Rules in Effect: None 34,813 2-12' and 1-14' travel lane with 10' shoulders and 5' sidewalk in each direction with variable width median. Total pavement 76'. Waterbody Information 2015 NCDWR Stream Index No.: NRTR Stream ID: Annual Avg Daily Traffic (veh/hr/day): Existing Site Project Length (lin. miles or feet): ac. Surface Water Body (1): Class CNCDWR Surface Water Classification for Water Body ac. 2-12' travel lanes in each direction for a total pavement width of 48'+/-.(typ.) 47,596 cafreeman2@ncdot.gov Project Includes Bridge Spanning Water Body?Deck Drains Discharge Over Buffer?Dissipator Pads Provided in Buffer?N/A Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative)(If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative) SIT E 1 S I T E 2 ParkStreetRowancCSXRailroad%BUS401(24210 (210N(210 (87 GillespieSt.RowanSt.23112311 (210S RailroadCSXRailroadCSX3828314738263825382838271404St.Walters RowanW.St.St.Rankin RussellSt.Orange St.St.GreensboroChanceSt.North St.UnderwoodSt.W oodsideAve.Bradford Ave.BransonSt.ArsenalAve.FountainheadLn.ChathamSt.MooreLamonBargesLn.Ray Ave.TurnersLn.Arch St.Union St.AnnSt.CoolSprings BlueSt.WashingtonDr.St.CumberlandFrinkSt.BrunerSt.St.DurhamGorhamAlleyMaidenLn.BowSt.St.FranklinSt.WebbSt.St.Mechanic DrakeSt.Hillside Ave.AthensAve.McGilvarySt.W eisegerSt.PershingSt.Hinsdale Ave.CarolinaAve.MonticelloAve.McAllisterBelmontAve.ClarendonSt.SpringSt.MyrtleSt.St.MyroverDavisSt.BryanSt.BrandtsDavieSt.CashwellSt.Ln.IreneAve.GraySt.TillinghastSt.Hay 4 5 7 8 9 1 0 6 11 12 13 14 15 16 A N D H I L L S B O R O S T R E E T O N N C 2 4 / 2 1 0 10204020102040202 48 4 DHVDTV ======10553 40 %%MPH ADTADT% * D O N O T U S E F O R C O N S T R U C T I O N P R E L I M I N A R Y P L A N S 000PROFILE (HORIZONTAL) 3 3 7 2 7 . 1 . 1 B R N H S - 0 0 2 4 ( 2 4 ) P R O J E C T L E N G T H S T A T E S T A T E P R O J E C T R E F E R E N C E N O . S T A T E P R O J . N O . F . A . P R O J . N O . DE S C R I P T I O N N O . T O T A L S H E E T S N . C . SH E E T 1 DESIGN DATA S I G N A T U R E : S I G N A T U R E : P . E . P . E . GRAPHIC SCALES PLANSPROFILE (VERTICAL) H Y D R A U L I C S E N G I N E E R E N G I N E E R R O A D W A Y D E S I G N L O C A T I O N : T Y P E O F W O R K : 09/08/99 B - 4 4 9 0 D I V I S I O N O F H I G H W A Y S S T A T E O F N O R T H C A R O L I N A 000CONTRACT:TIP PROJECT:B-4490 VICINITY MAP PROJECT END PROJECT BEGIN T O H W Y 3 0 1 / B U S 9 5 TO BYP 401 MU R C H ISO N R D DURHAM ST- Y11- T I M H A Y E S , P E R I G H T O F W A Y D A T E : L E T T I N G D A T E : 2 0 1 2 S T A N D A R D S P E C I F I C A T I O N S P R O J E C T E N G I N E E R P R O J E C T D E S I G N E N G I N E E R P L A N S P R E P A R E D B Y : P L A N S P R E P A R E D F O R : D I V I S I O N O F H I G H W A Y S R a l e i g h N C , 2 7 6 1 0 1 0 0 0 B i r c h R i d g e D r . N C D O T C O N T A C T : L I C E N S E N O . F - 0 1 6 5 R A L E I G H , N C 2 7 6 0 1 S U I T E 1 5 0 0 4 3 4 F A Y E T T E V I L L E S T R E E T 34,8132015203547,596 D E C E M B E R 1 5 , 2 0 1 5 D E C E M B E R 3 1 , 2 0 1 3 B R I D G E N O . 1 1 6 O V E R C S X R R , N O R F O L K S O U T H E R N R R , B R E N D A M O O R E , P E , C P M ARTMEN N A S O H DEP T O F T R A S P OR T T IO N T ATE O F N R T C AROLINA PRINCIPAL ARTERIAL FUNC CLASS = URBANREGIONAL TIER G R A D I N G , P A V I N G , D R A I N A G E , R E T A I N I N G W A L L , A N D S T R U C T U R E (* TTST 1% +DUAL 2%)OF THE CITY OF FAYETTEVILLE.THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIE S NAD 83/ NSRS 2007 -Y1-WASHINGTON DR ST BR U N NER -Y11A- -Y 3- -L- B R A G G B L V D - Y 2- R O W A N S T B R A G G B LV D - Y12- -Y6- CSX RR CSX RR-Y7- BRAGG BLVD -Y3- CSX RR MARTIN LUTHER K ING FRWY RALEIGH ST CSX RR -Y4-NORFOLK SOUTHERN RR HILLSBORO ST RAY AVE -Y9- CHATHAM ST -Y8- - L - RAY AVE -Y10- - L - S T A . 2 8 + 8 0 + / - B E G I N B R I D G E - L - S T A . 3 0 + 4 4 + / - E N D B R I D G E - L - S T A . 3 4 + 3 5 + / - B E G I N B R I D G E - L - S T A . 3 5 + 6 0 + / - E N D B R I D G E ST HILLSBORO ST W ALTE R INTERSECTION WITH -Y3-SUPERELEVATION ALONG -L- THROUGH THE EXCEEDING MAXIMUM GRADE ON -L- AND THE DESIGN EXCEPTIONS WILL BE REQUIRED FOR See Sheet 1-A For Index of Sheets (Not Included in R/W Plans) D A V I N W A L L A C E , P E B R N H S - 0 0 2 4 ( 2 4 ) B R N H S - 0 0 2 4 ( 2 4 ) R W P . E . U T I L I T I E S C U M B E R L A N D C O U N T Y NOT TO SCALE - L - S T A . 4 4 + 0 0 . 0 0 E N D T I P P R O J E C T B - 4 4 9 0 R O W A N S T TO THE LIMITS ESTABLISHED BY METHOD II.CLEARING ON THIS PROJECT SHALL BE PERFORMED R O WA N S T R O WA N S T 3 3 7 2 7 . 2 . F S 1 3 3 7 2 7 . 2 . F S U 1 ROW PLANS-L- STA. 12+35.00 BEGIN TIP PROJECT B-4490L E N G T H S T R U C T U R E T I P P R O J E C T B - 4 4 9 0 = 0 . 0 5 5 M I L E S L E N G T H R O A D W A Y T I P P R O J E C T B - 4 4 9 0 = 0 . 5 4 4 M I L E S T O T A L L E N G T H T I P P R O J E C T B - 4 4 9 0 = 0 . 5 9 9 M I L E S W E T L A N D A N D S U R F A C E W A T E R I M P A C T S P E R M I T R:\Hydraulics\PERM ITS_Environm ental\Drawings\B-4490_rdy_tsh.dgnsjsykes11/19/2014 S H E E T 1 O F 1 4 P E R M I T D R A W I N G R:\Hydraulics\PERM ITS_Environm ental\Drawings\B4490_Hyd_prm _wet_2.dgncafreeman211/24/2014 GRAPHIC SCALE 0’40’40’SSSURFACE WATER DENOTES IMPACTS IN TSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY 3:1 NATURALd2:1FILTER FABRIC NATURALGROUND3:1BGROUNDb3:1 NATURAL (NOT TO SCALE)2:1FILTER FABRIC NATURALGROUND3:1BGROUNDb DETAIL OFLOOD BENCH @ INLET-L- ELEV. 84.0’KEY-IN1 FTKEY-IN1 FTd = MIN. 1.00 FT.B = 28FT - 32FT VAR.b = 5FT - 14FT VAR.EMBANKMENT EXISTING STREAM TIE TO FLOOD BENCH SLOPE=0.19%DDE = APPROX. 500 CY EST. 100 TONS OF CLASS I RIP RAP d ( Not to Scale)RIP RAP AT EMBANKMENT DETAIL J10’min.1.0’min.1.0’ Geotextile= 50syType of Liner= 138 TONS,CL I Rip-Rap GEOTEXTILE PIPE OUTLET 18" RCPFROM STA. 17+50 TO STA. 17+82 -L- LTSTA. 17+70 -L- LT 2 S i t e 1 S H E E T 2 O F 1 4 P E R M I T D R A W I N G 14 1 6 1 5 1 7 1 8 10 10 1 1 1 2 1 3 CR CR C R CR C R CR CR C O N C 1SBLKBUS BST SOIL W 6 0 6 1 6 2 6 3 6 5 7 3 74 7 7 7 8 13 2 B U S 1 S B L K B R A G G B LV D 79’ B ST C O N C 72" CONC 72 " CONC B S T 30" C & G 24" C&G 2 4 " C & G 48" CONC BST S S S S 30" RCP 24" RCP 18" RCP 18" RCP 18" R C P 24" RCP 18" RCP 18" RCP S S 15" RCP15" RCP 2 4 " R C P 1 5 " R C P MH C B MH C B C B C B C B CBCB CB MH MH CB CB 15" RCP 15" R C P 15" RCP 15" RCP 4 8 " R C P DI D I 18 " R C P EI P EIP E XI S T I N G R/ W EXISTING R/W EXISTING R/W E X IS T IN G R /W EXISTING R/W EOI S I Z E & T Y P E U N K N O W N C B S SOIL J A M E S E . G A R D N E R M H F A Y E T T E V I L L E C I T Y O F 7 5 7 6 W D O L L C E D M U N D G E O R G E C H A R L E S W I L L I A M S J R . C O N C B S T M H C B B S T 1 S B L K B U S 1 S B L K B U S EOI EOI EOI EOI W HHHHHH S I Z E & T Y P E U N K N O W N METERPOW ER EOI CB CB C B C B C B C B C B C B C B CB D I 18 " RC P - IV 18" RCP-IV 18 " RC P - IV 1 8 " R C P - I V J B w / M H 15" RCP-IV 18 " RC P - IV 18" RCP-IV R E T A I N S E E D E T A I L J R I P R A P A T E M B A N K M E N T E X I S T T B E X I S T T B R E M O V E M H RE T A I N R E M O V E M H R E T A I N REMOVE DI R E M O V E M H R E M O V E C B R E M O V E C B R E M O V E D I R E M O V E M H R E M O V E P I P E RETAIN R E T A I N RE T A I N R E T A I N R E M O V E C B R E T A I N S E E D E T A I L O F L O O D B E N C H @ I N L E T T B W E T B 2 4 " R C P R E T A I N C O N V E R T T O J B 18" RCP-IV J B w / M H 2 4 " R C P - I V C B R C P - I V 1 5 " T O J B W M H C O N V E R T M H R E M O V E w / M H T B J B 1 5 " R C P - I V 2 4 " R C P R E M O V E 2 0 + / - L F 24" R CP-IV R E M O V E C B F L O W A B L E F I L L F I L L W I T H F L O W A B L E F I L L F I L L W I T H F L O W A B L E F I L L F I L L W I T H F L O W A B L E F I L L F I L L W I T H F L O W A B L E F I L L F I L L W I T H F L O W A B L E F I L L F I L L W I T H J B w / M H C O N V E R T T O F L O W A B L E F I L L F I L L W I T H F I L L W I T H F L O W A B L E F I L L FLOWABLE FILL FILL WITH 4 2 " RC P - IV R E M O V E P I P E RCP-IV24" C B C B P 18" RCP-IV 15" RCP-IV T B D I C B 18" RCP-IV 14 1 6 1 5 1 7 1 8 10 10 1 1 1 2 1 3 H Y D R A U L I C S R O A D W A Y D E S I G N E N G I N E E R E N G I N E E R R / W S H E E T N O . S H E E T N O . P R O J E C T R E F E R E N C E N O . $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99 D O N O T U S E F O R C O N S T R U C T I O N P R E L I M I N A R Y P L A N S B - 4 4 9 0 - D R1- S T A. 1 0 + 8 0. 0 0 M A T CH LI N E S E E S H E E T 1 5 NAD 83/ NSRS 2007 5 -L- STA. 13+40.00MATCH LINE SEE SHEET 4 -L- STA. 18+50.00 MATCH LINE SEE SHEET 6 - Y 1- S T A. 1 1 + 8 0. 0 0 I N S E T I N T HI S S H E E T M A T C H LI N E S E E -Y1- STA. 1 1 + 8 0. 0 0 MATCH LI N E P L A N S P R E P A R E D B Y : I N S E T " A " M A T C H L I N E S E E S H E E T 1 2 1 3 4 5 7 8 6 -Y1- P O C S t a . 1 1 + 5 0 . 0 0 BEG I N C O N S T R U C T I O N -Y1- PC Sta. 11+42.00 -Y1- PT Sta. 12+63 .8 9 - Y 2 - P T S t a . 1 1 + 9 6 . 4 3 -Y1- POT Sta. 13+44.99 -L- POC Sta. 14+87.16 = - Y 2 - P O T S t a . 1 0 + 0 0 . 0 0 - L - P O C S t a . 1 7 + 7 5 . 0 0 = - D R 1 - P O T S t a . 1 0 + 0 0 . 0 0 - Y 2 - P O C S t a . 1 1 + 3 6 . 7 4 = - Y 2 - P O T S t a . 1 3 + 0 0 . 0 0 - Y 2 - P C S t a . 1 0 + 3 3 . 9 5 - Y 2 - P O T S t a . 1 2 + 3 4 . 0 0 E N D C O N S T R U C T I O N FF F F C F F F F F C F F F F R:\Hydraulics\PERM ITS_Environm ental\Drawings\B4490_Hyd_prm _wet_3con.dgncafreeman211/24/2014 GRAPHIC SCALE 0’40’40’SSSURFACE WATER DENOTES IMPACTS IN TSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY 3:1 NATURALd2:1FILTER FABRIC NATURALGROUND3:1BGROUNDb3:1 NATURAL (NOT TO SCALE)2:1FILTER FABRIC NATURALGROUND3:1BGROUNDb DETAIL OFLOOD BENCH @ INLET-L- ELEV. 84.0’KEY-IN1 FTKEY-IN1 FTd = MIN. 1.00 FT.B = 28FT - 32FT VAR.b = 5FT - 14FT VAR.EMBANKMENT EXISTING STREAM TIE TO FLOOD BENCH SLOPE=0.19%DDE = APPROX. 500 CY EST. 100 TONS OF CLASS I RIP RAP d ( Not to Scale)RIP RAP AT EMBANKMENT DETAIL J10’min.1.0’min.1.0’ Geotextile= 50syType of Liner= 138 TONS,CL I Rip-Rap GEOTEXTILE PIPE OUTLET 18" RCPFROM STA. 17+50 TO STA. 17+82 -L- LTSTA. 17+70 -L- LT 2 S i t e 1 S H E E T 3 O F 1 4 P E R M I T D R A W I N G 14 1 6 1 5 1 7 1 8 10 10 1 1 1 2 1 3 CR CR C R CR C R CR CR C O N C 1SBLKBUS BST SOIL W 6 0 6 1 6 2 6 3 6 5 7 3 74 7 7 7 8 13 2 B U S 1 S B L K B R A G G B LV D 79’ B ST C O N C 72" CONC 72 " C ONC B S T 30" C & G 24" C&G 2 4 " C & G 48" CONC BST S S S S 30" RCP 24" RCP 18" RCP 18" RCP 18 " R C P 24" RCP 18" RCP 18" RCP S S 15" RCP15" RCP 2 4 " R C P 1 5 " R C P MH C B M H C B C B C B C B CBCB CB MH MH CB CB 15" RCP 15" R C P 15" RCP 15" RCP 4 8 " R C P DI D I 18" R C P EI P EIP E XI S T I N G R/ W EXISTING R/W EXISTING R/W E X IS T IN G R /W EXISTING R/W EOI S I Z E & T Y P E U N K N O W N C B S SOIL J A M E S E . G A R D N E R M H F A Y E T T E V I L L E C I T Y O F 7 5 7 6 W D O L L C E D M U N D G E O R G E C H A R L E S W I L L I A M S J R . C O N C B S T M H C B B S T 1 S B L K B U S 1 S B L K B U S EOI EOI EOI EOI W HHHHHH S I Z E & T Y P E U N K N O W N METERPOW ER EOI CB CB C B C B C B C B C B C B C B CB D I 18 " RC P - IV 18" RCP-IV 18 " RC P - IV 1 8 " R C P - I V J B w / M H 15" RCP-IV 18 " RC P - IV 18" RCP-IV RE T A I N S E E D E T A I L J R I P R A P A T E M B A N K M E N T E X I S T T B E X I S T T B R E M O V E M H R E T A I N R E M O V E M H R E T A I N REMOVE DI R E M O V E M H R E M O V E C B R E M O V E C B R E M O V E D I R E M O V E M H R E M O V E P I P E RETAIN R E T A I N R E T A I N R E T A I N R E M O V E C B R E T A I N S E E D E T A I L O F L O O D B E N C H @ I N L E T T B W E T B 2 4 " R C P R E T A I N C O N V E R T T O J B 18" RCP-IV J B w / M H 2 4 " R C P - I V C B R C P - I V 1 5 " T O J B W M H C O N V E R T M H R E M O V E w / M H T B J B 1 5 " R C P - I V 2 4 " R C P R E M O V E 2 0 + / - L F 24" R CP-IV R E M O V E C B F L O W A B L E F I L L F I L L W I T H F L O W A B L E F I L L F I L L W I T H F L O W A B L E F I L L F I L L W I T H F L O W A B L E F I L L F I L L W I T H F L O W A B L E F I L L F I L L W I T H F L O W A B L E F I L L F I L L W I T H J B w / M H C O N V E R T T O F L O W A B L E F I L L F I L L W I T H F I L L W I T H F L O W A B L E F I L L FLOWABLE FILL FILL WITH 4 2 " RC P - IV R E M O V E P I P E RCP-IV24" C B C B P 18" RCP-IV 15" RCP-IV T B D I C B 18" RCP-IV 14 1 6 1 5 1 7 1 8 10 10 1 1 1 2 1 3 H Y D R A U L I C S R O A D W A Y D E S I G N E N G I N E E R E N G I N E E R R / W S H E E T N O . S H E E T N O . P R O J E C T R E F E R E N C E N O . $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99 D O N O T U S E F O R C O N S T R U C T I O N P R E L I M I N A R Y P L A N S B - 4 4 9 0 - D R1- S T A. 1 0 + 8 0. 0 0 M A T CH LI N E S E E S H E E T 1 5 NAD 83/ NSRS 2007 5 -L- STA. 13+40.00MATCH LINE SEE SHEET 4 -L- STA. 18+50.00 MATCH LINE SEE SHEET 6 - Y 1- S T A. 1 1 + 8 0. 0 0 I N S E T I N T HI S S H E E T M A T C H LI N E S E E -Y1- STA. 1 1 + 8 0. 0 0 MATCH LI N E P L A N S P R E P A R E D B Y : I N S E T " A " M A T C H L I N E S E E S H E E T 1 2 1 3 4 5 7 8 6 90 90 100 1 0 0 100 110110110 -Y1- PT Sta. 12+6 3 .8 9 - Y 2 - P T S t a . 1 1 + 9 6 . 4 3 -Y1- POT Sta. 13+44.99 -L- POC Sta. 14+87.16 = - Y 2 - P O T S t a . 1 0 + 0 0 . 0 0 - L - P O C S t a . 1 7 + 7 5 . 0 0 = - D R 1 - P O T S t a . 1 0 + 0 0 . 0 0 - Y 2 - P O C S t a . 1 1 + 3 6 . 7 4 = - Y 2 - P O T S t a . 1 3 + 0 0 . 0 0 - Y 2 - P C S t a . 1 0 + 3 3 . 9 5 - Y 2 - P O T S t a . 1 2 + 3 4 . 0 0 E N D C O N S T R U C T I O N FF F F C F F F F F C F F F F R:\Hydraulics\PERM ITS_Environm ental\Drawings\B4490_Hyd_prm _wet_4.dgnsjsykes11/19/2014 SSSURFACE WATER DENOTES IMPACTS INGRAPHIC SCALE 0’40’40’44 Sit e 1 Site 1 S H E E T 4 O F 1 4 P E R M I T D R A W I N G 19 2 0 2 1 2 2 2 3 19 20 21 C R C R C R CR C R CR CR C R 4 7 5 0 5 1 5 2 5 3 5 4 5 5 5 6 5 7 58 59 8 2 1 1 3 1 3 4 CONC 1 S B K B U S S OI L 1 S M B U S CONC CON C 3 0 " C & G 3 0 " C & G 1SBLKBUS C O N C C O N C CONC BST S 15" RCP 15" RCP 24" RCP 12" DI12" DI 24" RCP 18" RCP CB DI C B C B M H 15" RCP 4 2 ’ C O N C H W 4 2 ’ C O N C H W CUL1CUL2CUL3CUL4CUL5CUL6CE1HW1CUL7CU L 8 C U L 9 C U L 1 0C U L 1 1 C U L 1 2 C E 2 H W 2 CULVERT #1 CONC RETAINING WALL A / G S S L I N E EIP EXISTING R/W EXISTING R/W E X IS T IN G R / W EXISTING R/W EXISTING R/W EXISTING R/W 5 ’ C O N C H W CONC RETAINING WALL SIZE & TYPE UNKNOWN WOODS W Y A N E Q U I C K U T L E Y R E N T A L S , L L C S.C. RA N K I N E S T N C D O T B A R E F O O T R O S S I E EXISTING R/W R O S A L I N D W . W A I T M A N B S T B S T B S T CROSS CREEK EXISTING R/W H H H H H SIZE & TYPE UNKNOWN 48" RCP CB CB C B C B C B C B C B C B C B 1 8 " R C P - I V 1 8 " R C P - I V 1 8 " R C P - I V 1 8 " R C P - I V 15" RCP-IV 1 5 " R C P - I V R E M O V E C B R E M O V E C B R E M O V E P I P E 18" CSP TB R E M O V E P I P E 24" RCP-IV 24" RCP-IV C B R E M O V E D R A I N A G E S Y S T E M RETAIN 42" RCP-IV 3 6 " R C P - I V 24" RCP-IV 1 5 " R C P - I V H W 48" RCP-IV SEE DETAIL O - SHEET 5 FLOOD BENCH @ INLET C B C B 15" RCP-IV REMOVE EXISTING RCBCGRADE TO DRAIN E L E V . 9 3 . 0 P R O P O S E D E L E V . 9 3 . 5 P R O P O S E D E L E V . 9 4 . 0 P R O P O S E D 19 2 0 2 1 2 2 2 3 19 20 21- Y 3 - S T A. 2 1 + 8 0 . 0 0 M A T C H L I N E S E E S H E E T 1 3 MATCH LINE SEE SHEET 15 - Y 3- S T A. 1 8 + 4 0. 0 0 M A T C H LI N E S E E S H E E T 1 2 NAD 83/ NSRS 2007 6 -L- STA. 23+50.00 MATCH LINE SEE SHEET 7 -L- STA. 18+50.00MATCH LINE SEE SHEET 5 H Y D R A U L I C S R O A D W A Y D E S I G N E N G I N E E R E N G I N E E R R / W S H E E T N O . S H E E T N O . P R O J E C T R E F E R E N C E N O . $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99 D O N O T U S E F O R C O N S T R U C T I O N P R E L I M I N A R Y P L A N S B - 4 4 9 0 5 9 1 1 1 2 1 4 1 3 1 0 1 5 1 6 - Y 3 - P T S t a . 1 9 + 4 2 . 4 8 -Y3- PC Sta. 21+83.04 -L- PT Sta. 18+96.8 7 - Y 3 - P O T S t a . 1 9 + 8 4 . 7 1 - L - P O T S t a . 2 1 + 5 0 . 0 0 = F F F F F F F F C C C C C C C F F F F R:\Hydraulics\PERM ITS_Environm ental\Drawings\B4490_Hyd_prm _wet_5con.dgnsjsykes11/19/2014 SSSURFACE WATER DENOTES IMPACTS INGRAPHIC SCALE 0’40’40’44 Sit e 1 Site 1 S H E E T 5 O F 1 4 P E R M I T D R A W I N G 19 2 0 2 1 2 2 2 3 19 20 21 C R C R C R CR C R CR CR C R 4 7 5 0 5 1 5 2 5 3 5 4 5 5 5 6 5 7 58 59 8 2 1 1 3 1 3 4 CONC 1 S B K B U S S OI L 1 S M B U S CONC CON C 3 0 " C & G 3 0 " C & G 1SBLKBUS C O N C C O N C CONC BST S 15" RCP 15" RCP 24" RCP 12" DI12" DI 24" RCP 18" RCP CB DI C B C B M H 15" RCP 4 2 ’ C O N C H W 4 2 ’ C O N C H W CUL1CUL2CUL3CUL4CUL5CUL6CE1HW1CUL7CU L 8 C U L 9 C U L 1 0C U L 1 1 C U L 1 2 C E 2 H W 2 CULVERT #1 CONC RETAINING WALL A / G S S L I N E EIP EXISTING R/W EXISTING R/W E X IS T IN G R / W EXISTING R/W EXISTING R/W EXISTING R/W 5 ’ C O N C H W CONC RETAINING WALL SIZE & TYPE UNKNOWN WOODS W Y A N E Q U I C K U T L E Y R E N T A L S , L L C S.C. RA N K I N E S T N C D O T B A R E F O O T R O S S I E EXISTING R/W R O S A L I N D W . W A I T M A N B S T B S T B S T CROSS CREEK EXISTING R/W H H H H H SIZE & TYPE UNKNOWN 48" RCP CB CB C B C B C B C B C B C B C B 1 8 " R C P - I V 1 8 " R C P - I V 1 8 " R C P - I V 1 8 " R C P - I V 15" RCP-IV 1 5 " R C P - I V R E M O V E C B R E M O V E C B R E M O V E P I P E 18" CSP TB R E M O V E P I P E 24" RCP-IV 24" RCP-IV C B R E M O V E D R A I N A G E S Y S T E M RETAIN 42" RCP-IV 3 6 " R C P - I V 24" RCP-IV 1 5 " R C P - I V H W 48" RCP-IV SEE DETAIL O - SHEET 5 FLOOD BENCH @ INLET C B C B 15" RCP-IV REMOVE EXISTING RCBCGRADE TO DRAIN E L E V . 9 3 . 0 P R O P O S E D E L E V . 9 3 . 5 P R O P O S E D E L E V . 9 4 . 0 P R O P O S E D 19 2 0 2 1 2 2 2 3 19 20 21- Y 3 - S T A. 2 1 + 8 0 . 0 0 M A T C H L I N E S E E S H E E T 1 3 MATCH LINE SEE SHEET 15 - Y 3- S T A. 1 8 + 4 0. 0 0 M A T C H LI N E S E E S H E E T 1 2 NAD 83/ NSRS 2007 6 -L- STA. 23+50.00 MATCH LINE SEE SHEET 7 -L- STA. 18+50.00MATCH LINE SEE SHEET 5 H Y D R A U L I C S R O A D W A Y D E S I G N E N G I N E E R E N G I N E E R R / W S H E E T N O . S H E E T N O . P R O J E C T R E F E R E N C E N O . $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99 D O N O T U S E F O R C O N S T R U C T I O N P R E L I M I N A R Y P L A N S B - 4 4 9 0 5 9 1 1 1 2 1 4 1 3 1 0 1 5 1 6 90 90 90 90 - Y 3 - P T S t a . 1 9 + 4 2 . 4 8 -Y3- PC Sta. 21+83.04 -L- PT Sta. 18+96.8 7 - Y 3 - P O T S t a . 1 9 + 8 4 . 7 1 - L - P O T S t a . 2 1 + 5 0 . 0 0 = F F F F F F F F C C C C C C C F F F F S S S U R F A C E W A T E R D E N O T E S I M P A C T S I N T S T S I M P A C T S I N S U R F A C E W A T E R D E N O T E S T E M P O R A R Y G R A P H I C S C A L E 0 ’ 4 0 ’ 4 0 ’ R:\Hydraulics\PERM ITS_Environm ental\Drawings\B4490_Hyd_prm _wet_6.dgnsjsykes11/19/2014 FLOOD BENCH @ OUTLET DETAIL N-Y3- ELEV. 82.6’3:1 NATURALGROUNDd (NOT TO SCALE)2:1 NATURALGROUND3:1BbKEY-IN 3:1 NATURALGROUNDd (NOT TO SCALE)2:1FILTER FABRIC NATURALGROUND3:1Bb1 FT KEY-INd = MIN. 1.0 FT.B = 23FT - 34FT VAR.b = 0FT - 17FT VAR.PROTECTION CONCRETE SLOPE3 FTFLOOD BENCH SLOPE=0.19%DDE = APPROX. 800 CY EST. 290 TONS OF CLASS I RIP RAPSTA. 25+00 -Y3- LT.STA. 25+00 -Y3- LT. S i t e 1 S i t e 1 S H E E T 6 O F 1 4 P E R M I T D R A W I N G 36 2223 2 4 2 5 2 6 2 7 1514CHH W P HH P 1 84 85 86 89 90 9 1 93 94 95 96 97 9 8 S CONC C O N C 30" C&G 30" C&G BST B S T 4 8 " C O N C 72" CHL CONC T O P = 8 9. 8 0 ’ I N V = 8 4 . 3 8 ’ INV=86.57’TOP=91.77’ I N V = 8 7 . 3 4 ’ T O P = 9 1. 3 5 ’ T O P = 9 0 . 6 8 ’ I N V = 8 6 . 9 9 ’ I N V = 8 2 . 6 4 ’ 36" RCP 18" RCP 18" RCP 18" RCP 36" RCP 54" RCP I N V = 8 3. 3 1’ 15 " R C P 15" RCP 15 " R C P 15" CM P I N V = 8 4 . 5 4 ’ INV=88.14’24" RCP 24" RCP 36" RCP 36" RCP 54" RCP 15 " R C P J B C B D I J B C B C B C B C B DI CB CB 15 " R C P CB C U L 1 C U L 2 CU L 3 C U L 4 CU L 5 CU L 6 C E 1 HW 1 C U L 7 C U L 8 CU L 9 C U L 10 CU L 11 C U L 12 C E 2 HW 2 4 8 ’ CONC HW BK PLANTER C O N C R E T A I N I N G W A L L E I P E X I S T I N G R / W EX IST ING R /W EXISTING R / W EX IS T IN G R /W EOIIN CONDUIT M T L L T M T L L T M T L L T M T L L T C O N C R E T AI NI N G W A L L BRAGG BLVD 79’ BST WOOD S WOODS W O O D S EDWARD B. SEIFERT C U L V E R T # 2 4 5 ’ C O N C H W F A Y E T T E V I L L E C I T Y O F C B C B C B C B IN V = 8 7 . 1 1 ’ CONC 8887MTL CANOPY1SMTLBUS C O N C EOI H H H H C HH W P HH H H H H H H H H P IN CONDUIT V A U L T P O W E R M E T E R P O W E R C A B I N E T P O W E R M E T E R P O W E R H H CB C B C B C B C B CB 18" RCP-IV 36" RCP-IV36" RCP-IV F S J B w / M H D I 1 8 " C S P CL B RIP RAP S E E D E T A I L E DIRETAIN S E E D E T A I L B S P E C I A L L A T E R A L V D I T C H T B T B W E W E E X I S T T B E X I S T T B 36" R C P 36" R C P 24" RCP-IV24" RCP-IV E L E V . = 8 5 . 5 ’ A T F L O W L I N E T O P R O P O S E D D I T C H T I E E X I S T I N G D I T C H REMOVE CB R E T A I N R E T A I N R E T A I N R E T A I N R E T A I N R E T A I N R E T A I N R E M O V E P I P E R E M O V E C B R E M O V E D I R E T A I N D E V E L O P M E N T P L A N S O F A D J A C E N T P R O P E R T Y P E R P A R K V I E W R E M O V E D D U R I N G D E V E L O P M E N T D I T C H I N V E R T = 8 3 . 9 R E M O V E P I P E R E M O V E C B R E M O V E C B R E M O V E C O N V E R T T O D I C O N V E R T T O J B C O N C R E T AI N G W A L L C O N V E R T T O J B R E T A I N R E T A I N R E T A I N O F A D J A C EN T P RO P ERTY P RO P O S ED U N D E R C O N S TRU C TIO N G R A D E T O D R AI N RETAIN JB w/MH T B J B C O N V E R T T O J B W / M H C O N V E R T T O J B W / M H 15 " R C P I V D R A I N G R A D E T O DRAINGRADE TO R E T A I N D E T A I L N @ O U T L E T S E E F L O O D B E N C H D E T A I L N O U T L E T S E E @ F L O O D B E N C H 113 LF OF PIPE REMOVE APPROX. DRAIN GRADE TO E X T E N D 1 8 " R C P C O L L A R A N D R E M O V E C B CB 18" RCP-IV R E M O V E E X I S T I N G R C B C 18" RCP-IV DI D / L E L E V . = 9 0 . 8 ’ D / L E L E V . = 9 0 . 6 ’ D / L E L E V . = 9 0 . 0 ’ D/L E L E V . = 9 1 . 0 ’ GRADE TO DRAIN DRAIN GRADE TO DRAIN GRADE TO DRAINGRADE TO15" RCP-IV JB w/MH S E E D E T A I L S S P E C I A L L A T E R A L D I T C H CONVERT to JB S T A . 2 5 + 0 0 - Y 3 - L T . T O D I C O N V E R T SEE DETAIL U SPECIAL LATERAL DITCH15" RCP-IV P R O T E C T I O N C O N C R E T E S L O P E T O E W A L L C O N C R E T E 2223 2 4 2 5 2 6 2 7 1514 -Y3- STA. 27+20.00MATCH LINE SEE SHEET 14 1 3 N A D 83/ N SR S 2007 -Y3- STA. 21+80.00MATCH LINE SEE SHEET 6 MA TCH LIN E SEE SH EET 16 -DR1- STA. 13+75.00MATCH LINE SEE SHEET 15 H Y D R A U L I C S R O A D W A Y D E S I G N E N G I N E E R E N G I N E E R R / W S H E E T N O . S H E E T N O . P R O J E C T R E F E R E N C E N O . $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99 D O N O T U S E F O R C O N S T R U C T I O N P R E L I M I N A R Y P L A N S P L A N S P R E P A R E D B Y : B - 4 4 9 0 4 2 44 -Y3- PC Sta. 21+83.04-D R 1 - P O T S t a . 1 5 + 1 0 . 6 1 EN D C O N S T R U C T I O N -Y3- PT Sta. 26+64.16 F FF F F F F F C C C S S S U R F A C E W A T E R D E N O T E S I M P A C T S I N T S T S I M P A C T S I N S U R F A C E W A T E R D E N O T E S T E M P O R A R Y G R A P H I C S C A L E 0 ’ 4 0 ’ 4 0 ’ R:\Hydraulics\PERM ITS_Environm ental\Drawings\B4490_Hyd_prm _wet_7con.dgnsjsykes11/19/2014 FLOOD BENCH @ OUTLET DETAIL N-Y3- ELEV. 82.6’3:1 NATURALGROUNDd (NOT TO SCALE)2:1 NATURALGROUND3:1BbKEY-IN 3:1 NATURALGROUNDd (NOT TO SCALE)2:1FILTER FABRIC NATURALGROUND3:1Bb1 FT KEY-INd = MIN. 1.0 FT.B = 23FT - 34FT VAR.b = 0FT - 17FT VAR.PROTECTION CONCRETE SLOPE3 FTFLOOD BENCH SLOPE=0.19%DDE = APPROX. 800 CY EST. 290 TONS OF CLASS I RIP RAPSTA. 25+00 -Y3- LT.STA. 25+00 -Y3- LT. S i t e 1 S i t e 1 S H E E T 7 O F 1 4 P E R M I T D R A W I N G 2223 2 4 2 5 2 6 2 7 1514CHH W P HH P 1 84 85 86 89 90 9 1 93 94 95 96 97 9 8 S CONC C O N C 30" C&G 30" C&G BST B S T 4 8 " C O N C 72" CHL CONC T O P = 8 9. 8 0 ’ I N V = 8 4 . 3 8 ’ INV=86.57’TOP=91.77’ I N V = 8 7 . 3 4 ’ T O P = 9 1. 3 5 ’ T O P = 9 0 . 6 8 ’ I N V = 8 6 . 9 9 ’ I N V = 8 2 . 6 4 ’ 36" RCP 18" RCP 18" RCP 18" RCP 36" RCP 54" RCP I N V = 8 3. 3 1’ 15 " R C P 15" RCP 15 " R C P 15" CM P I N V = 8 4 . 5 4 ’ INV=88.14’24" RCP 24" RCP 36" RCP 36" RCP 54" RCP 15 " R C P J B C B D I J B C B C B C B C B DI CB CB 15 " R C P CB C U L 1 C U L 2 CU L 3 C U L 4 CU L 5 CU L 6 C E 1 HW 1 C U L 7 C U L 8 CU L 9 C U L 10 CU L 11 C U L 12 C E 2 HW 2 4 8 ’ CONC HW BK PLANTER C O N C R E T A I N I N G W A L L E I P E X I S T I N G R / W EX IST ING R /W EXISTING R / W EX IS T IN G R /W EOIIN CONDUIT M T L L T M T L L T M T L L T M T L L T C O N C R E T AI NI N G W A L L BRAGG BLVD 79’ BST WOOD S WOODS W O O D S EDWARD B. SEIFERT C U L V E R T # 2 4 5 ’ C O N C H W F A Y E T T E V I L L E C I T Y O F C B C B C B C B IN V = 8 7 . 1 1 ’ CONC 8887MTL CANOPY1SMTLBUS C O N C EOI H H H H C HH W P HH H H H H H H H H P IN CONDUIT V A U L T P O W E R M E T E R P O W E R C A B I N E T P O W E R M E T E R P O W E R H H CB C B C B C B C B CB 18" RCP-IV 36" RCP-IV36" RCP-IV F S J B w / M H D I 1 8 " C S P CL B RIP RAP S E E D E T A I L E DI G O O D C O N D I T I O N U N L E S S O T H E R W I S E N O T E D N O T E : A L L E X I S T I N G P I P E S T O B E R E T A I N E D A R E I N RETAIN S E E D E T A I L B S P E C I A L L A T E R A L V D I T C H T B T B W E W E SLOPE CAPACITY OF SYSTEM EXISTING PIPE REMOVED TO IMPROVE E X I S T T B E X I S T T B 36" R C P 36" R C P 24" RCP-IV24" RCP-IV E L E V . = 8 5 . 5 ’ A T F L O W L I N E T O P R O P O S E D D I T C H T I E E X I S T I N G D I T C H REMOVE CB R E T A I N R E T A I N R E T A I N R E T A I N R E T A I N R E T A I N R E T A I N R E M O V E P I P E R E M O V E C B R E M O V E D I R E T A I N D E V E L O P M E N T P L A N S O F A D J A C E N T P R O P E R T Y P E R P A R K V I E W R E M O V E D D U R I N G D E V E L O P M E N T D I T C H I N V E R T = 8 3 . 9 R E M O V E P I P E R E M O V E C B R E M O V E C B R E M O V E C O N V E R T T O D I T O P W I D T H = 5 ’ S . S . = 2 : 1 D E P T H = 1 . 0 ’ G R A S S E D V - D I T C H C O N V E R T T O J B C O N C R E T AI N G W A L L C O N V E R T T O J B R E T A I N R E T A I N R E T A I N O F A D J A C EN T P RO P ERTY P RO P O S ED U N D E R C O N S TRU C TIO N G R A D E T O D R AI N RETAIN JB w/MH T B J B C O N V E R T T O J B W / M H C O N V E R T T O J B W / M H 15 " R C P I V D R A I N G R A D E T O DRAINGRADE TO R E T A I N D E T A I L N @ O U T L E T S E E F L O O D B E N C H D E T A I L N O U T L E T S E E @ F L O O D B E N C H 113 LF OF PIPE REMOVE APPROX. DRAIN GRADE TO E X T E N D 1 8 " R C P C O L L A R A N D R E M O V E C B CB 18" RCP-IV R E M O V E E X I S T I N G R C B C 18" RCP-IV DI D / L E L E V . = 9 0 . 8 ’ D / L E L E V . = 9 0 . 6 ’ D / L E L E V . = 9 0 . 0 ’ D/L E L E V . = 9 1 . 0 ’ GRADE TO DRAIN DRAIN GRADE TO DRAIN GRADE TO DRAINGRADE TO15" RCP-IV JB w/MH S E E D E T A I L S S P E C I A L L A T E R A L D I T C H CONVERT to JB S T A . 2 5 + 0 0 - Y 3 - L T . T O D I C O N V E R T SEE DETAIL U SPECIAL LATERAL DITCH15" RCP-IV P R O T E C T I O N C O N C R E T E S L O P E T O E W A L L C O N C R E T E 2223 2 4 2 5 2 6 2 7 1514 -Y3- STA. 27+20.00MATCH LINE SEE SHEET 14 1 3 N A D 83/ N SR S 2007 -Y3- STA. 21+80.00MATCH LINE SEE SHEET 6 MA TCH LIN E SEE SH EET 16 -DR1- STA. 13+75.00MATCH LINE SEE SHEET 15 H Y D R A U L I C S R O A D W A Y D E S I G N E N G I N E E R E N G I N E E R R / W S H E E T N O . S H E E T N O . P R O J E C T R E F E R E N C E N O . $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99 D O N O T U S E F O R C O N S T R U C T I O N P R E L I M I N A R Y P L A N S P L A N S P R E P A R E D B Y : B - 4 4 9 0 4 2 44 9 0 9 0 9 0 90 9 0 90 9 0 1 1 0 -Y3- PC Sta. 21+83.04-D R 1 - P O T S t a . 1 5 + 1 0 . 6 1 EN D C O N S T R U C T I O N -Y3- PT Sta. 26+64.16 F FF F F F F F C C C 0 NATURALGROUNDNATURALGROUND EMBANKMENT EXISTING STREAM TIE TO FLOOD BENCH SLOPE=0.86%DDE = APPROX. 500 CY EST. 100 TONS OF CLASS I RIP RAP Ground NaturalGroundNatural 110TB RT C P R O P . R O A D W A Y L5 0 5 0 100 1 0 0 1 0 0 S K E W = 4 2 . 2 3 @ 1 4 ’ X 9 ’ R C B C G . P . E L = 9 4 . 6 4 ’ L S T A . - L - 1 9 + 2 6 . 4 2 50 YR WSE= 1 0 0 . 3 ’ 100 YR WSE = 1 0 1 . 4 0 ’ S = 0 . 1 9 % C I N V = 8 1 . 8 T O B E R E M O V E D E X I S T . 3 @ 1 2 ’ X 9 ’ R C B C 9080EXISTING BED70 100 CS K E W = 4 2 . 2 3 @ 1 4 ’ X 9 ’ R C B C G . P . E L = 9 4 . 6 4 ’ L S T A . - L - 1 9 + 2 6 . 4 2 S = 0 . 1 9 % C I N V = 8 1 . 8 L P R O P . R O A D W A Y TB LT3:1 NATURALd2:1VAR.B GROUNDb3:1 NATURAL (NOT TO SCALE)2:1VAR.B GROUNDb FLOOD BENCH @ INLET-L- ELEV. 84.0’KEY-IN1 FTKEY-IN1 FTd = MIN. 1.00 FT.B = 28FT - 32FT VAR.b = 5FT - 14FT VAR.d G r o u n d N a t u r a l 1 ’ CLASS I R I P R A P K E Y E D I N 1 F T BENCH S L O P E 2 : 1 BANK S L O P E S 3 : 1 N E B A R R E L S W B A R R E L N E B A R R E L S I L L H E I G H T = 2 F T . S W B A R R E L S I L L H E I G H T = 1 F T . 2 ’ 9 ’ 1 4 ’ 1 4 ’ 1 4 ’ ( N O T T O S C A L E ) C U L V E R T S I L L I N L E T / O U T L E T TE X T I L E G E O - GEOTEXTILE P R O F I L E 1 0 0 : 1 S C A L E engineer and may be subject to permit conditions.and provide a flat surface for animal passage. Native Material is subject to approv a l b y t h e used to line the high flow culvert barrel(s), Native Material should be placed on t o p t o f i l l v o i d s rap may be used to supplement the Native Material in the high flow culvert barr e l ( s ) . I f r i p r a p i s material that is excavated from the stream bed may be used to line the low flow c u l v e r t b a r r e l . R i p excavated from the stream bed or floodplain at the project site during culvert con s t r u c t i o n . O n l y Backfill Proposed Culvert with Native Material. Native Material consists of material t h a t i s R:\Hydraulics\PERM ITS_Environm ental\Drawings\B-4490_Hyd_csr_profile_8and9.dgncafreeman26/15/2015 N C D O T D I V I S I O N O F H I G H W A Y S P R O J E C T : 3 3 7 2 7 . 1 . 1 ( B - 4 4 9 0 ) C U M B E R L A N D C O U N T Y H I L L S B O R O S T R E E T O N N C 2 4 / 2 1 0 N O R F O L K S O U T H E R N R R A N D B R I D G E N O . 1 1 6 O V E R C S X R R , VERTICAL SCALE 0’10’10’0’ 5 0 ’ 50’ M ATCHLINE A M ATCHLINE A M ATCHLINE A HORIZONTAL SC A L E S H E E T 8 O F 1 4 (DATE 03-2012)OHW 85.0’ 6 / 1 5 / 1 5 C P R O P . R O A D W A Y L S=0.19% C INV=81.005050100 1 0 0 SKEW=30.7 3 @ 14’X9’ RCBC G.P. EL=93.80’L STA. -Y3- 22+47.3 0 T B L T T B R T S=0.19% C INV=81.0L P R O P . R O A D W A Y T O B E R E M O V E D E X I S T . 3 @ 1 2 ’ X 9 ’ R C B C E X I S T I N G B E D SKEW=30.7 3 @ 14’X9’ RCBC G.P. EL=93.80’L STA. -Y3- 22+47.3 0 C 1 1 0 1 0 0 9 0 8 0 7 0 100:1 SCALEPROF I L E 3:1 NATURALGROUNDd (NOT TO SCALE)2:1 N A T U R A L G R O U N D 3:1BbKEY - I N 3:1 NATURALGROUNDd (NOT TO SCALE)2:1 N A T U R A L G R O U N D 3:1Bb1 FT KEY-IN -Y3- ELEV. 82.6’d = MIN. 1.0 FT.B = 23FT - 34FT VAR.b = 0FT - 17FT VAR.FLOOD BENCH SLO P E = 0 . 1 9 % DDE = APPROX. 80 0 C Y EST. 290 TONS OF C L A S S I R I P R A P FLOOD BENCH @ OUTLETGEOTEXTILEPR O T E C T I O N CO N C R E T E S L O P E 3 F T G r o u n d N a t u r a l G r o u n d N a t u r a l G r o u n d N a t u r a l 1 ’ C L A S S I R I P R A P K E Y E D I N 1 F T B E N C H S L O P E 2 : 1 B A N K S L O P E S 3 : 1 N E B A R R E L S W B A R R E L N E B A R R E L S I L L H E I G H T = 2 F T . S W B A R R E L S I L L H E I G H T = 1 F T . 2 ’ 9 ’ 1 4 ’ 1 4 ’ 1 4 ’ ( N O T T O S C A L E ) C U L V E R T S I L L I N L E T / O U T L E T T E X T I L E G E O - HILLSBORO STREET ON NC 24/210 NORFOLK SOUTHERN RR AND BRIDGE NO. 116 OVER CSX RR, P R O J E C T : 3 3 7 2 7 . 1 . 1 ( B - 4 4 9 0 ) C U M B E R L A N D C O U N T Y H I L L S B O R O S T R E E T O N N C 2 4 / 2 1 0 N O R F O L K S O U T H E R N R R A N D B R I D G E N O . 1 1 6 O V E R C S X R R , 1 1 / 2 0 / 1 4 N C D O T D I V I S I O N O F H I G H W A Y S VERTICAL SCALE 0’10’10’ 0 ’ 5 0 ’ 5 0 ’ M ATCHLINE AMATCHLINE AMATCHLINE A H O R I Z O N T A L S C A L E R:\Hydraulics\PERM ITS_Environm ental\Drawings\B-4490_Hyd_csr_profile_8and9.dgn sjsykes 11/19/2014 S H E E T 9 O F 1 4 GRAPHIC SCALE 0’40’40’R:\Hydraulics\PERM ITS_Environm ental\Drawings\B4490_Hyd_prm _wet_10.dgnsjsykes11/19/2014 SSSURFACE WATER DENOTES IMPACTS IN S i t e 2 S H E E T 1 0 O F 1 4 P E R M I T D R A W I N G S H E E T 1 2 O F 1 4 S E E E N L A R G E M E N T S S 34 3 5 3 6 3 7 3 8 10 11 12 13 14 10 11 12 13 14 TYPE-III TYPE-III T Y P E - I I I T Y P E - I I I C A T - 1 4 8 " M T L 12’ CONC 12’ CONC 12’ GR 1S F D C O NC M T L L T 3 1 3 17 18 19 L T 6 0 " W R O U G H T I R O N 4 8 " C O N C 4 8 " C O N C 1S F D 48" C O N C 3 0 " C & G 3 0 " C & G G R O V E S T 7 8 ’ B S T 7’ GR 14 ’ B S T M H I S L O C K E D , N O I N V 1 8 " R C P 48" RCP EIP EIP E I P E X I S T I N G R / W EXISTING R/W 16’ C O N C H W 48" RCP M T L L T M T L L T MTL LT M T L L T W O O D S LALON L. BARNES JR. C H A R L E S T . H A I G H A L F R E D N . D A V I S L A W R E N C E G L I N D E M A N Q . J . S C A R B O R O U G H J R . RR R/W RR R/W RR R/W RR R/W RR R/W RR R/W R R R / W RR R/W R R R / W RR R/W R R R / W E X I S T I N G R / W E X I S T I N G R/ W EXISTING R/W SENSOR EOI EOI EOI EOI EOI H H H H H H H H TOP=98.10’INV=93.69’ C B 2GI 2 G I 2 G I 18" RCP-IV 18" RCP-IV 48" RCP-IV 18" CSP18" CSP 1 8 " R C P - I V 18" RCP-IV J B w / M H C L B R I P R A P CL B RIP RAP GRADE TO DRAIN S E E D E T A I L A L A T E R A L V D I T C H G RADE TO DRAIN GRADE TO DRAINGRADE TO DRAIN GRADE TO DRAINGRADE TO DRAINGRADE TO DRAINGRADE TO DRAIN2:1 RATIO FROM OUTLET TO END OF PADW= 2 X DL=4 X DWITHOUT DITCH.USE STANDARD RIP RAP PAD AT OUTLET R E T A I N RE T A I N J B W / S L A B L I D R E T A I N C L I R I P R A P 4 8 " R C P - I V CB 2 4 " R C P - I V 4 8 " R C P E X T E N D C O L L A R A N D CB R E T A I N W/ 2 ELBOWS 18" CSP 18" RCP-IV C B 1 5 " R C P - I V S E E D E T A I L T L A T E R A L V D I T C H 1 5 " R C P - I V 34 3 5 3 6 3 7 3 8 10 11 12 13 14 10 11 12 13 14 -L- STA. 38+40.00 MATCH LINE SEE SHEET 10 NAD 83/ NSRS 2007 9 -L- STA. 33+40.00MATCH LINE SEE SHEET 8 H Y D R A U L I C S R O A D W A Y D E S I G N E N G I N E E R E N G I N E E R R / W S H E E T N O . S H E E T N O . P R O J E C T R E F E R E N C E N O . $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99 D O N O T U S E F O R C O N S T R U C T I O N P R E L I M I N A R Y P L A N S P L A N S P R E P A R E D B Y : B - 4 4 9 0 29 29 3 0 3 1 3 2 3 3 E X. R / W - Y8 - + 9 0 + 2 5 - Y8 - -Y6- POT Sta. 12+48.60 -L- POT Sta. 34+92.18 = - Y 7 - P O T S t a . 1 2 + 6 3 . 3 3 - L - P O T S t a . 3 5 + 2 3 . 4 0 = -L- PT Sta. 33+58.66 -Y7- POT Sta. 10+00.00-Y6- POT Sta. 10+00.00FFF F FF F FF F GRAPHIC SCALE 0’40’40’R:\Hydraulics\PERM ITS_Environm ental\Drawings\B4490_Hyd_prm _wet_11con.dgnsjsykes11/19/2014 SSSURFACE WATER DENOTES IMPACTS IN S H E E T 1 1 O F 1 4 P E R M I T D R A W I N G S i t e 2 S H E E T 1 2 O F 1 4 S E E E N L A R G E M E N T S S 34 3 5 3 6 3 7 3 8 10 11 12 13 14 10 11 12 13 14 TYPE-III TYPE-III T Y P E - I I I T Y P E - I I I C A T - 1 4 8 " M T L 12’ CONC 12’ CONC 12’ GR 1S F D C O NC M T L L T 3 1 3 17 18 19 L T 6 0 " W R O U G H T I R O N 4 8 " C O N C 4 8 " C O N C 1S F D 48" C O N C 3 0 " C & G 3 0 " C & G G R O V E S T 7 8 ’ B S T 7’ GR 14 ’ B S T M H I S L O C K E D , N O I N V 1 8 " R C P 48" RCP EIP EIP E I P E X I S T I N G R / W EXISTING R/W 16’ C O N C H W 48" RCP M T L L T M T L L T MTL LT M T L L T W O O D S LALON L. BARNES JR. C H A R L E S T . H A I G H A L F R E D N . D A V I S L A W R E N C E G L I N D E M A N Q . J . S C A R B O R O U G H J R . RR R/W RR R/W RR R/W RR R/W RR R/W RR R/W R R R / W RR R/W R R R / W RR R/W R R R / W E X I S T I N G R / W E X I S T I N G R/ W EXISTING R/W SENSOR EOI EOI EOI EOI EOI H H H H H H H H TOP=98.10’INV=93.69’ C B 2GI 2 G I 2 G I 18" RCP-IV 18" RCP-IV 48" RCP-IV 18" CSP18" CSP 1 8 " R C P - I V 18" RCP-IV J B w / M H C L B R I P R A P CL B RIP RAP GRADE TO DRAIN S E E D E T A I L A L A T E R A L V D I T C H G RADE TO DRAIN GRADE TO DRAINGRADE TO DRAIN GRADE TO DRAINGRADE TO DRAINGRADE TO DRAINGRADE TO DRAIN2:1 RATIO FROM OUTLET TO END OF PADW= 2 X DL=4 X DWITHOUT DITCH.USE STANDARD RIP RAP PAD AT OUTLET R E T A I N RE T A I N J B W / S L A B L I D R E T A I N C L I R I P R A P 4 8 " R C P - I V CB 2 4 " R C P - I V 4 8 " R C P E X T E N D C O L L A R A N D CB R E T A I N W/ 2 ELBOWS 18" CSP 18" RCP-IV C B 1 5 " R C P - I V S E E D E T A I L T L A T E R A L V D I T C H 1 5 " R C P - I V 34 3 5 3 6 3 7 3 8 10 11 12 13 14 10 11 12 13 14 -L- STA. 38+40.00 MATCH LINE SEE SHEET 10 NAD 83/ NSRS 2007 9 -L- STA. 33+40.00MATCH LINE SEE SHEET 8 H Y D R A U L I C S R O A D W A Y D E S I G N E N G I N E E R E N G I N E E R R / W S H E E T N O . S H E E T N O . P R O J E C T R E F E R E N C E N O . $$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99 D O N O T U S E F O R C O N S T R U C T I O N P R E L I M I N A R Y P L A N S P L A N S P R E P A R E D B Y : B - 4 4 9 0 29 29 3 0 3 1 3 2 3 3 E X. R / W - Y8 - + 9 0 + 2 5 - Y8 - 9 0 9 0 100 100100 100 1 0 0 1 0 0 100 100 100 100 1 0 0 1 1 0 1 1 0 110 1 2 0 1 2 0 -Y6- POT Sta. 12+48.60 -L- POT Sta. 34+92.18 = - Y 7 - P O T S t a . 1 2 + 6 3 . 3 3 - L - P O T S t a . 3 5 + 2 3 . 4 0 = -L- PT Sta. 33+58.66 -Y7- POT Sta. 10+00.00-Y6- POT Sta. 10+00.00FFF F FF F FF F GRAPHIC SCALE 0’20’20’ Site 2 -L- S S SURFACE W ATER DEN O TES IM PACTS IN R : \ H y d r a u l i c s \ P E R M I T S _ E n v i r o n m e n t a l \ D r a w i n g s \ B 4 4 9 0 _ H y d _ p r m _ w e t _ 1 2 _ E n l a r g e m e n t . d g n s j s y k e s 1 1 / 1 9 / 2 0 1 4 PLAN VIEW DIVISION OF HIGHWAYS SHEET 12 OF 14 CUMBERLAND COUNTY PROJECT: 33727.1.1 (B-4490) NC 24/210 RR AND HILLSBORO STREET ON BRIDGE #116 OVER CSX RR, NORFOLK 10/16/01 NCDOT S S 35 36 1 2 1 2 TYPE-III 4 8 " R C P 16’ CO N C HW48" RCP RR R/W R R R/ W RR R/W R R R / W RR R/W E O I E O I 2G I 4 8 " R C P - I V 18" RCP-IV JB w/M H G R A D E T O DRAIN G R A D E T O D R A I N RETAIN JB W /SLAB LID 48" RCP-IV 24" RCP-IV 48" RCP EXTEN D CO LLAR AND RETAIN 35 36 1 2 1 2 F GRAPHIC SCALE 0’20’20’ Site 2 -L- S S SURFACE W ATER DEN O TES IM PACTS IN R : \ H y d r a u l i c s \ P E R M I T S _ E n v i r o n m e n t a l \ D r a w i n g s \ B 4 4 9 0 _ H y d _ p r m _ w e t _ 1 3 _ E n l a r g e m e n t _ c o n . d g n s j s y k e s 1 1 / 1 9 / 2 0 1 4 PLAN VIEW DIVISION OF HIGHWAYS SHEET 13 OF 14 CUMBERLAND COUNTY PROJECT: 33727.1.1 (B-4490) NC 24/210 RR AND HILLSBORO STREET ON BRIDGE #116 OVER CSX RR, NORFOLK 10/16/01 NCDOT S S 35 36 1 2 1 2 TYPE-III 4 8 " R C P 16’ CO NC HW48" RCP RR R/W R R R/ W RR R/W R R R / W RR R/W E O I E O I 2G I 4 8 " R C P - I V 18" RCP-IV JB w/M H G R A D E T O DRAIN G R A D E T O D R A I N RETAIN JB W /SLAB LID 48" RCP-IV 24" RCP-IV 48" RCP EXTEN D CO LLAR AN D RETAIN 35 36 1 2 1 2 9 0 100 F WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 L Sta 17+54 to 19+62 3@14'x9'RCBC 0.11 0.05 190 1 Y3 Sta 20+40 to 24+90 3@14'x9'RCBC 0.29 519 1 Y3 Sta 25+82 to 26+47 3@14'x9'RCBC 0.02 63 1 L Sta 18+00 Lt. BANK STABILIZATION 75 1 Y3 Sta 26+00 Lt. BANK STABILIZATION 10 2 L Sta 35+75 Lt. 48" RCP < 0.01 63 TOTALS*: 0.40 0.08 857 63 0 *Rounded totals are sum of actual impacts NOTES: The existing culvert at Y3 Sta 25+00 LT. will be removed resulting in 90 LF of the stream being day -lighted. Revised 2015 6 15 SHEET NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS Revised June 15, 2015 Cumberland County TIP # B-4490 WBS # 33727.1.1 14 OF 14 s L 0 0 L Ii 0 0 O V co 0 00 0< tl Ln� MHO OWN N"D10 a W E4 C See Sheet 1-A For Index of Sheets See Sheet 1-B For Symbology Sheet NOT TO SCALE TO BYP 401 BEGIN TIP PROJECT B-4490 -L- STA. 9+74.93 DESIGN EXCEPTIONS WILL BE REQUIRED FOR EXCEEDING MAXIMUM GRADE ON -L- AND THE SUPERELEVATION ALONG -L- THROUGH THE INTERSECTION WITH -Y3- \ STATE OF NORTH CA I'WLINA DIVISION OF HIGHWAYS CUMBERLAND COUNTY LOCATION: BRIDGE NO. 116 OVER CSX RR, NORFOLK SOUTHERN RR, AND HILLSBORO STREET ON NC/24-210 TYPE OF WORK: GRADING, PAVING, DRAINAGE AND STRUCTURES BEGIN BRIDGE END BRIDGE -L- STA. 28+89.67 1 W to 0 0 to 0 -L- STA. 30+46.17 BEGIN BRIDGE -L- STA. 34+43.06 END BRIDGE -L- STA. 35+72.31 W a cc s4. sy„ 99 0 END CONSTRUCTION -L- STA. 42+75.00 ROWAN ST L- STATE STATE PROJECT REFERENCE NO. ENE. TOTAL SHEETS N.C. B-4490 1 STATE PROD. NO. P. A.PROJ.NO. DESCPJAPION 33727.1.1 BRNHS-0024(24) P.E. 33727.2.FS1 BRNHS-0024(24) RW 33727.2.FSU1 BRNHS-0024(24) UTILITIES TO HWY 30VBUS 95ow— END TIP PROJECT B-4490 -L- STA. 44+00.00 PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION GRAPHIC SCALES 20 10 0 20 40 PLANS 20 10 0 20 40 PROFILE (HORIZONTAL) 2 0 4 8 PROFILE (VERTICAL) DESIGN DATA ADT 2015 = 34,813 ADT 2035 = 47,596 DHV = 10 % D = 55 % T = 3 % * V = 40 MPH (* TTST 1% + DUAL 2%) FUNC CLASS = URBAN PRINCIPAL ARTERIAL REGIONAL TIER PROJECT LENGTH LENGTH ROADWAY TIP PROJECT B-4490 = 0.595 MILES LENGTH STRUCTURE TIP PROJECT B-4490 = 0.054 MILES TOTAL LENGTH TIP PROJECT B-4490 = 0.649 MILES PLANS PREPARED BY: PARSONS BRINCKERHOFF 434 F'AYETTEVILLE STREET SLTVE 1500 RALEIALEIGH. NC 27601 LICENSE NO. F-0165 PLANS PREPARED FOR: DIVISION OF HIGHWAYS 1000 Birch Ridge Dr. Raleigh NC, 27610 2012 STANDARD SPECIFICATIONS RIGHT OF WAY DATE: DECEMBER 31, 2013 LETTING DATE: DECEMBER 15, 2015 TIM HAYES, PE HYDRAULICS ENGINEER P.E. PROJECT ENGINEER ERIC MISAK PROJECT DESIGN ENGINEER SIGNATURE: NCDOT CONTACT: BRENDA MOORE, PE, CPM ROADWAY DESIGN ENGINEER SIGNATURE: P.E. 02/03/15 Note: Not to Scale *S.U.E = Subsurface Utility Engineering STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS PROJECT REFERENCE NO. B-4490 SHEET NO. I—B BOUNDARIES AND PROPERTY: State Line County Line Township Line City Line Reservation Line Property Line Existing Iron Pin Property Corner Property Monument u EiP Parcel/Sequence Number Existing Fence Line Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence Existing Wetland Boundary Proposed Wetland Boundary EJ ECM X X X Existing Endangered Animal Boundary Existing Endangered Plant Boundary Existing Historic Property Boundary Known Soil Contamination: Area or Site EPP EPP Potential Soil Contamination: Area or Site BUILDINGS AND OTHER CULTURE: Gas Pump Vent or U/G Tank Cap Sign Well Small Mine Foundation Area Outline Cemetery Building School Church Dam HYDROLOGY: Stream or Body of Water 0 s 0 w NT I I t Hydro, Pool or Reservoir Jurisdictional Stream Buffer Zone 1 Buffer Zone 2 Flow Arrow is BZ 1 BZ 2 Disappearing Stream Spring Wetland Proposed Lateral, Tail, Head False Sump Ditch 0 » > > m CONVENTIONAL PLAN SHEET SYMBOLS RAILROADS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled 11111111 CSX TRANSPORTATION 0 MILEPOST 35 SWITCH RIGHT OF WAY: Baseline Control Point Existing Right of Way Marker Existing Right of Way Line Proposed Right of Way Line Proposed Right of Way Line with Iron Pin and Cap Marker Proposed Right of Way Line with Concrete or Granite R'W Marker Proposed Control of Access Line with Concrete C/A Marker Existing Control of Access Proposed Control of Access Existing Easement Line Proposed Proposed Proposed Proposed Proposed Proposed Proposed Temporary Construction Easement - Temporary Drainage Easement Permanent Drainage Easement Permanent Drainage /Utility Easement Permanent Utility Easement Temporary Utility Easement Aerial Utility Easement • 0 w A w ® W Proposed Permanent Easement with Iron Pin and Cap Marker ROADS AND RELATED FEATURES: Existing Edge of Pavement Existing Curb Proposed Slope Stakes Cut Proposed Slope Stakes Fill Proposed Curb Ramp Existing Metal Guardrail Proposed Guardrail Existing Cable Guiderail Proposed Cable Guiderail Equality Symbol Pavement Removal VEGETATION: Single Tree Single Shrub Hedge Woods Line E TDE PDE DUE PUE TUE AUE C F cR� r r r D. a 5 n2n 0 Orchard Vineyard EXISTING STRUCTURES: MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End MINOR: Head and End Wall Pipe Culvert Footbridge Wall - 0 V/neyard SONS CONC ww ( / CONC HW \ Drainage Box: Catch Basin, DI or JB Paved Ditch Gutter Storm Sewer Manhole Storm Sewer UTILITIES: POWER: Existing Power Pole Proposed Power Pole Existing Joint Use Pole Proposed Joint Use Pole Power Manhole Power Line Tower Power Transformer EiCB 10. U/G Power Cable Hand Hole H-Frame Pole Recorded U/G Power Line Designated LUG Power Line (S.U.E.*) TELEPHONE: Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Booth b Telephone Pedestal Telephone Cell Tower U/G Telephone Cable Hand Hole Recorded U/G Telephone Cable Designated U/G Telephone Cable (S.U.E.*) Recorded U/G Telephone Conduit Designated U/G Telephone Conduit (S.U.E.*y Recorded U/G Fiber Optics Cable Designated U/G Fiber Optics Cable (S.U.E.1- iC WATER: Water Manhole Water Meter Water Valve Water Hydrant Recorded U/G Water Line 0 Designated U/G Water Line (S.U.E.* Above Ground Water Line TV: TV Satellite Dish TV Pedestal TV Tower U/G TV Cable Hand Hole Recorded U/G TV Cable Designated U/G TV Cable (S.U.E.*) Recorded U/G Fiber Optic Cable Designated U/G Fiber Optic Cable (S.U.E.*) GAS: Gas Valve Gas Meter Recorded U/G Gas Line A/G water 0 TV Designated U/G Gas Line (S.U.E.*) Above Ground Gas Line SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line A/G Gas Above Ground Sanitary Sewer Recorded SS Forced Main Line SS A/G Sanitary Sewer FSS Designated SS Forced Main Line (S.U.E.*) - - - -Fss- - - - MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line U/G Tank; Water, Gas, Oil Underground Storage Tank, Approx. Loc. A/G Tank; Water, Gas, Oil Geoenvironmental Boring U/G Test Hole (S.U.E.*) Abandoned According to Utility Records End of Information • 0 VUTL AATUR E.O.I. 1 I'ri 7 a 005 2-0 0,0,GN oar- NmcD / , , a 0 Sta. 8+00.00 Z N CC W F J Z FI F CC ROJ E T 4.93 coNG B14490 a a a 0 0 a BEGIN T -L- STA. a a 0 a 30" C&G 5 6r18'417E tA 30 C&C // // BST —L— CURVE DATA 6,Z6 P/ Sto 11+89.76 A = /0° 25' 53.3" (RTl D = 3" 34' 5/.6" L = 291.30' T = 146.05' R = 1,600.00' DS = 40 MPH SE = exist. RO = exist. P/ Sto 16+18.86 A = 20' 07' 11.6" (LT) D = 3' 34' 5/.6" L = 56/.85' T = 283.85' R = 1,600.00' DS = 40 MPH SE =2.0X. RO = 100' = REQUIRES DESIGN EXCEPTION LJ&T of FAYETTEVILLE,LLC 08 6541 PG 681 X ^ �X 600" CHL X / SIZE & TYPE UNKNOWN E01—— ---W—TO, UTILITY OWNER - - — — ABANDONED ACCORDING \ S 0 SIGN BRAGG BLVD 30"C&G\ +75.61 68.00 GRASS MEDIAN ISBLKBUS 30. EEG /2.49' PROPOSED \___5' SIDEWALK +56 EX.R/W VALUE PLACE FAYETTEVILLE BRAGG LLC DB 7317 PG 18 P8 7 PG 8 CB BST PROJECT REFERENCE NO. B-4490 RAN SHEET NO. ROADWAY DESIGN ENGINEER PRELINIIN DO NOT USE FO SHEET NO. HYDRAULICS ENGINEER RY PLANS CONSTRUCTION PLANS PREPARED BY: PARSONS BRINCKERHOFF 434 EAYEITEA'II.I.H. STREET 51ITE 1500 RALEIGH, NC 27601 LICENSE NO. F-0165 VAIL FAMILY LIMITED PARTNERSHIP DB 4594 PC 225 +72.65 EX.R/W -PROPOSED 5' SIDEWALK +05 68' 1 2'-9" C&G (MED.) EXISTING R. RETAIN —L— PRC Sto.13+35.0/ --O i5"RCP 300' TAPER EET No. 17 FOR -L- PROFILE 02/23/2015 PARCEL 05- COMBINED PARCELS 5 AND 39 INTO PARCEL DETAIL 0 FLOOD BENCH @ INLET (NOT TO SCALE) -L- ELEV. 84.0' TIE TO EXISTING STREAM EMBANKMENT b = 5FT - 14FT VAR. B = 28FT - 32FT VAR. d - MIN.1.00 FT. EST. 100 TONS OF CLASS I RIP RAP DDE = APPROX.500 CY FLOOD BENCH SLOPE=0.19% STA.17+70 -L- LT DETAIL J RIP RAP AT EMBANKMENT ( Not to Scale) Type of Liner= 138 TONS,CL 1 Rip -Rap Geotestile- 504y FROM STA. 17+50 TO STA. 17+82 -L- LT -L- CURVE DATA P/ Sto 16+18.86 = 20' 07' 11.6" (LTJ D = 3' 34' 51.6" L = 561.85' T = 283.85' R = 1,600.00' SE = 2.0% RO = 100' DS = 40 MPH = REQUIRES DESIGN EXCEPTION -Yl- CURVE DATA Lu • P/ Sto /2+09.77 ti Q 0 = 62' 2/' 15.4" (RTJ D = 51' 09' 25.0" L = 121°89' T = 67.77' R = 112.00' SE = n/o RO = n/a -Y2- CURVE DATA G°) -/ PI Sta I1+24J9 A = 62° 03' 54.7" (RT) D = 38' 11' 49.9" L = 162.49' T = 90.25' R = 150.00' SE = n/a RO = n/o PROPOSED 5' SIDEWALK BEGIN RETAINING WALL °l STA. +40.29 +02 - L- Pd. Sta. 14+87J6 - Yl- POT Sta.13+4499 VALUE PLACE FAYETTEVILLE BRAGG LLC DB 7317 PG 18 P8 7 PG 8 2'-6" C&G +44.28 EX.R/W 7'40i +41.09 EX.R/W/ / -Y1- POC St 1+50.00 50' TRANSITION TO EXISTING +51. EX. R/W FILL WI \ FLOWABLE /00' REMOV \ SIDEWALK CHARLES WILLIAMS R. DB 8226 PG 716 \ PB 7 PG 143 \ L Y2- RETAIN `l REMOVE SIDEWALK +40 X. R/W \ PLANS PREPARED BY PARSONS BRINCKERHOFF 134 EA11:171EVII,IJ; STW:I�1 SUITE 1500 RALEIGH, NC 20601 LICENSE NO. E-0165 MATCH LINE SEA, SHEET 12 INSET A PROPOSED 5' SIDEWALK F ISBLKBUS RIP RAP AT EMBANKMENT — _ SEE DETAIL J CITY OF FAYETTEVILLE\ DB 6988 PG 738 FILL WITH -_FLOWABLE FILL L WITH FLO BLE FILL \\\s To' e REMOVE \vim/ � �42-./PC SItO°%0+3 \ p Ro1N 111111111 e+q\ \ 9«� /20' FILL WITH FLOWABLE FILL / 1 -Y2- PT Sta. 11+ +44 +32,26 \\\ END CONSTRUCTIONEX.R 23.34' -Y2- POT Sta.12+34.00 POT Sto. 13+00.00 \ w, ,st2 � 1 11Y RET - _ LP I �" + ustaixt cc_j°� � -��� R/W � 30 `\ .I F'•OM EDGE esifilarniakAV 34 /i Ex s .IDEWALK �+ �0'/z/ FACE OF - CURB +72 5.75' FROM EDGE REVEWALK 8-4490 RAN SHEET NO. ROADWAY DESIGN ENGINEER to.II 3..74 = ta.10+00 44, SHEET NO. 5 HYDRAULICS ENGINEER O1. SEE SHEET No. 17 FOR -L- PROFILE 40. SEE SHEET No. 22 FOR -Y1- & -Y2- PROFILE SEE SHEET No. 25 FOR -DR1- PROFILE 02-23-20/5 PARCEL 5 - COMBINED PARCELS 5 AND 39 12-50-2014 PARCELS 9 AND 4/ - COMBINED PARCELS 9 AND 41 CO pc (0 • '0 00(V �vrl Nm�o -L- CURVE DATA PI Sto 16+18.86 = 20' 07' 11.6" (LT) D = 3' 34' 5/.6" L = 56/.85' T = 283.85' R = 1,600.00' DS = 40 MPH SE = 2.0 Z. R0 = 100' REQUIRES DESIGN -Y3- CURVE DATA P/ Sto 17+09.63 = 43° /3' 24.r (RT) D = 8° 48' 53.1" L = 490.35' T = 257.5/' R = 650.00' DS = 40mph SE = 4.02 RO = 124' EXCEPTION PDE —8e NC 24 & ROWAN ST. 9548 /2,/52 , {!7 28/3 3596 24,934 85,02/ 3683 4639 20/5 ADT 2035 ADT 42/7 526/ L 34,/73 46,956 18,352 23,48/ /2,157 15,548 -L- STA.18+6387 /6' RT FLOOD BENCH @ I SEE DETAIL 0 — SHEET NLET O OSED DORIS B. UTLEY 5' S PRO DEWALK DB 5323 PG 462 (MED.) ' N / i" ISMg ` sueK®�`A�1�IWRR 11 II11111111�1 i�illl�lIlil1`1'IIhR��.��11'liiiiililili :I:I�liliilililililila. m 201 verclIC 4ohnklik."11.\,...ix.4 N. NI.‘,1;1., NW � REMOVE CB SEA sAN kAIO i 00 '-C2L 77 SOIL -- WYANE OUICK DB 5096 PC 809 DB 7905 PG 58 TRACT 2 II +34.54 ISBKBUS 15,01� IY3 pi Sta-19+42.48 UTLEY RENTALS, LLCS9 DB 7905 PC 58 TRACT I 1 +58.32 2/ BEr 15,0 9' - L- POT Sto.21+50.00 = - Y3- POT Sto.19+847/ I I SIZE I all REMOVE DRAINAGE SYSTEM o'II 6' CAST IRON i' 11 rs TYPE UNZNOWN 01 - REMOVE EXISTING SIDEWALK �}S tic DETAIL B SPECIAL LATERAL V DITCH Nat to Scale) 77, STA. 22*00T STA. 255 —L— LT ROSALIND W. WAITMAN DB 5554 PG 248 \ +95.10 X. R/W PROJECT REFERENCE NO. SHEET NO. B-4490 6 RAN SHEET NO. HYDRAULICS ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PLANS PREPARED BY. PARSONS BRINCKERHOFF 434 EAYFTrrV11LE STREET SUITE, 1 00 RALEIGH NC 27601 LICENSE NO. F-0165 C PROPOSED 5' SIDEWALK ABANDONED ACCORDING TO UTILITY OWNER WEST ROWAN AT Y ET 13 SI ASE21 S80.00 1 FROM STA 19+5 N ti H = 0 N W WC) co N W Z44 44 H N J = J V — I — a 5 CR C8 18" RCP —IV TURN STORAGE PROPOSED` - 5' SIDEWALK ' DETAIL R SPECIAL LATERAL V DITCH ( Not to. Scale) Front Slope ? 1 1 +69 04 1F 1111E111E1111111111144 IIIIIIIIIIIIIIIIIIIIIIII STAMPED CONCRETE MEDIAN PROPOSED SIGNAL SEE SHEETS No. 17 & 18 FOR -L- PROFILE SEE SHEET No. 23 FOR-Y3- PROFILE N. EX.R/W EX.R/W PROJECT REFERENCE NO. SHEET NO. B-4490 7 +60 PROP.R/W ALEXANDER EVANS DB 3501PG 409 SPECIAL LATERAL V DITCH SEE DETAIL B PROPOSED 5' SIDEWALK POWER CABINET 18" RCP -IV PROPOSED 5' SIDEWALK 15" RCP -IV P&S ENTERPRISES INC DB 3613 PG 50 PB 20 PG 40 2'-9" C&G (MED.) 18" RCP -IV EX.R/W 35' rPt UN EX. R/W EX.R/W /20' LATERAL V DITCH SEE DETAIL A P&S ENTERPRISES DB 3118 PG 251 E +50.07 /20' REMOVE CB S 7P00'OO.'E EXISTING R/ HHHHHHHHHHHHHTHHHHHHHHHH 30 REMOVE CB �— //o / FILL WITH— FLOWABLE FILL w— d — — 6" CAST IRON REMOVE MH 500' LEFT TURN STORAGE +18,34 63,15' 2'-6" C&G GRASS MEDIAN 4, gCP \V 18" RCP -IV CL B RIP RAP _ — — _ /- /60' LANE SHIFT TAINING WAL 2- 4- STA. 12+96 : 0 a° 41.34' RT. P=�e PROPOSED 5' SIDEWALK PC 23999 +92,59 8.26' REMOVE CB ND CROWN POINT SH/FT —L— STA.27+50.00 E FILL WITH FLOWABLE FILL 2'-6" C&G _REMOVE MH w_ EMOVE CB \ CB 15" RCP -IV T5"-'CPAM GRAU 350 TL-3 T1 N m 03-27-20/4 _1 N -,\ REMOVE\ ISLAND v\ \ REMOVE CB \ CB T. e°// REMOVE MH REMOVE CB REMOVE PIPE REMOVE CB EMOVE PIPE FILL WITH FLOWABLE FILL 333' UNIFORM MEDIAN TAPER DETAIL B SPECIAL LATERAL V DITCH ( NoI I Seale) FROM STA. 22+00 TO STA. 25+00 -L- LT EXCAVATE EXISTING ROADWAY EMBANKMENT 48" CONC X DETAIL A LATERAL V DITCH I NM to Seale) Natural Ground ODE EXC.=560 CY 13' Min. D=1.5 Ft. b= 5 Ft. Fill Slope FROM STA. 25+00 TO STA. 27+50 -L- LT 60 N s \\\\q PROPOSED FILL WITH— FLOWABLE FILL \\° 5' SIDEWALK REMOVE CB \\ MH CB \ REMOVE PIPE—. \\\\\\ \PA \ LL �4— —rt\— FLOWABLEFIWITH FILL /60' \\ LANE SHIFT C RAN SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PLANS PREPARED BY. PARSONS BRINCKERHOFF 434 FAYETCEVIILE STREET SUITE 1500 RALEIGH, NC 27601 LICENSE NO. F-0165 N 0 0 STAMPED CONCRETE MEDIAN SEE SHEET No. 18 & 19 FOR -L- PROFILE oo 05-04-20/5 23 +85 2'-9" C&G (MED.) PROPOSED 5' SIDEWALK 333' UNIFORM Mt D/AN "TAPER CONVERT T +26 96 N H94 AOW 155P2 WILLIAM JOSEPH BAGGETT DB 8074 PG 824 Zg 5 +75.67 FROM STA. 30+00 TO STA. 33+00 -L- LT EX. R/W BEGIN RETAINING WALL #3 -Y4- STA. 13+90.40 89.01' LT. ,33zZ°\4�0 ONVERT TO JB E WILLIAM JOSEPH DAGGETT C3 DB 8074 PG 824 ARILWAIRMAIWIRIVW - L- -POT-Sta. 29+57.01= - Y4- POTS +7938 DB 8074 PG 824 B1.Oi TALLY INVESTMENTS LLC DB 7779 PG 868 ,3-IAO -L- PI St° 32+53.30 = 8° 38' 25.1" (RT) D = 4' 05' 33.2" L = 21L/2' T = 105.76' R = 1,400.00' DS = 40 MPH SE = R0 = 100' = REQUIRES DESIGN EXCEPTION o LATERAL V DITCH SEE DETAIL A E SL- PC Sto 31+47.54 � X O� \ 1W 2 SIZE & TYPE UNKNOWN P to., 9+79.46 - i- 49+12.30 \ 0 rCABINE RETAINING WALL #3 -Y4- STA. 17+44.80 7.52' LT. P9OF, \� T O PLANS PREPARED BY: PARSONS BRINCKERHOFF 134 4A10:l"IEVI I.LE STREET SUITE 1500 RALEIGH, NC 27601 LICENSE NO. F-0165 PROJECT REFERENCE NO. SHEET NO. B-4490 8 RAN SHEET NO. -Y5- 1, %c.. P/ Sta 15+26.96 1. A = 25° 39' 04.5" c!1 D = 10° 25' 02.7" L = 246.23' T = 125.22' R = 550.00' TALLY INVESTMENTS LLC DB 7779 PG 868 tl' SS LATERAL V DITCH - SEE DETAIL A kOWAN ryT 24 ST ABANDONED ACCORDING -PROPOSED 5' SIDEWALK 200' LANE SH/FT GRove \'\ ST '\ �1 F ---CiB RIP NC it ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION USE STANDARD RIP RAP PAD AT OUTL WITHOUT DITCH. L=4 X D W= 2 X D 2:1 RATIO FROM OUT IIIIIIIIIIIIIIIIIIIIIIIl I.WJJ.WJJJ.I.I STAMPED CONCRETE MEDIAN SEE SHEET No. 19 & 20 FOR -L- PROFILE 0 re ■ PROJECT REFERENCE NO. SHEET NO. 10+� 1�, DETAIL A DETAIL T -I'7 POT Sta. SPECIAL LATERAL 'V'DITCH B-4490 9 ; 1 II O LATERAL V DITCH I No110 scale) ( Not. Scale) RMI SHEET NO. -L- -Y7- 1 O 1 O 11 Sta.10 00.00 1 f 0 ` ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER POT P/ Sta 32+53.30 P/ Sta /8+02.27 Y6 I 1 0 = 8° 38' 25J" (RT1 ,A = 46' 34' 26.5" (LT1 II 1 II I D = 4 05' 33 Z. _ _ _ D = 9 /4' 28.5" I 1 11 1 11 - 1 Now.ol Fill Gann O. D ,a 1F. :lope Min. D=1.5 Ft. 1= 5 F.. DDE EXC.=151 CY NO °l 1 F° 'aa D 1` Slope Min. D=0.5 F. SFp .i L = 2/1.12' L = 503.98' II e 11 FROM STA.37+50 TO STA.38+50 -L- LT T = 105.76' T = 266.85' 11 1 FROM STA. 36+00 TO STA. 37+50 -L- LT. II R = 1,400.00' R = 620.00' I II 1 II ' m \ II�RO NOT USEI DO FO RY PLANSTION CONSTRUCTION DS = 40 MPH II 1 RO = 2.000' - II I I II 1 I 1� q3 AZ/ II 09 ,�-y1 5A �C ii I' 1• °° - REQUIRES DkSIGN kXCEPTION I I 1 1 I lI• rn END /Ae� 11 1 1 i, I 1 / s Dili II I � � 11 S / CHARLES T. HAIGH III I DB 3072 PG 57 PLANS PREPARED BY: PARSONS BRINCKERHOFF 431lFAvET' FSTI.I.F STREET 150 RETAINING WALL #4 i 114) II 1 lil R1LER" NC 2761 LICENSE NO F-0I55 II p5 III II p. BEGIN o01 O $ ', -Y6- STA. 11+05.98 II �- 41.27' RT. I i7o p 1 LALON L. BARNES JR. II 1 II 1 DB 5G20PC 511 1 RETAINING WALL #5 II II, II -Y7- STA. 11+43.50 0 II I I 41.03' LT. s5°}6'Z°W/ END RETAINING WALL #6 --"1 I! +98 5' II /50' I /50' +66.07 Jo. 147'30 29 I 1 II 1 II II I Ex.R/w -L- STA. 38+00.00 11 I AD8R92 PO DAVIS OFF. 59.5' /� Eye W \✓Q I 1 _ o +/0 3�Q LNDta. BR3DG 11 F F I II 1 o 1 1 11 1 r II o p. R AIN 1 e w`E«_ 2.31 II 1 I' E +� +04 °31'p0 E 11 40 T o I 11 1 I I 1 1 1 \�� II 11 I 1 1 II 1 I = 1 1 II 1 2.0' LAN POT Sta. 34+92J8 I 11 I I I ro 30' �' S' Z59 6 II I Fell , �: ® E _TDE / LATERALSEE IL HITCH 3I 1 ; 11 ®' Cti=„ - ��� TOF LAWRENCE GLINDEMANts II I I . ♦ - - - DB 5955 PG 587 24" RCP -I -- I I I J' veMH • - -o +13 I d a o +47 11 I m 117' 3 r�F` +23 ,90 g9' 34 32 O EFT - - POT Sta.121-48.60 I I 1I 1 L- PT 33+58.66 11 1 II I ! .4 TNc +W / 94 q4 E •. fr \ / 5 �y5 LATERAL V DITCH II I O 0 �° SEE DETAIL T 11 +00 O. J. SCARBOROUGH JR. DB 2118 P40 z I 1 1 II II ° 1 +82 EX. R/W PROPOSED _TDE 29 BEGIN 11 1 II 'EX.R/W EX. R/ ` 83' 11 APPROACH SLAB o II 1 a 69.50 _ II (D,. II I o o, = ` 'f WALLAINING N TDE = o W � ':. F II I ' -L- Sta. 34+19.06 0 1 I I1 1 d� ° II 1 j 6950 TING R'" .00) PR�lPdED ° HII 1 II CO 11 II AL iri �� 1 c° �_ II N N CD MATCH LINE SEE SHEET 8 -L- STA. 33+40.00 "I I 11 L1 II JB PROPOSED TYPE I -1i �I WAIN. ali a , $ 8 4 e�i, 5' SIDEWALK N , fi■-_ I5" RCP -IV i tiffilWIMML 8 iMI _iiMI11�i�17I II -• 2'-6"'NZ 1.7 11..•�II; I GI� II III1m !�I II riii�i=.1 t ,- II I I1 COLLAR AND EXTEND CB CPXG 2' 6" ill OC&G I- p o slur r II �I11 1 1 , 148" RCP NO II o I o i1 1 0 0 5" MONOLITHIC o ISLAND tv �o f` �I _ W C W • ®cB 1111= �I -II�e_ - L - 1 5° MONOLITHIC 1 i1 ISLAND (TYP.) I I. 1 // 36 �.�� 4 9 E 37 - L - - =� W o0 W Cr) . _■ ii�� tl ice. -: _ - :®� ®i CO _Egi= *ILZ r a1 ■ 11oI II 1 I 1 ® �1 \ 78" RCP -IV c•C&G O \=RETAIN _ 2G1�ONC-__________ _ C& � WQ � co rMED.I O ��1 ,, jl�� u III = 0 1 �y w I I' II 1 II 1 11 I II I .�\ �� II = -� �►to - - _ - - - 78' HST O GROVE 5 �1�� �' J 1 v III o \ ST -lito d_ 18" RCP IV \ 0 di" 'i►- hilL_______1 _1 , �I \ CB �g�ce ®II��R�_ `Y-��1M.I PWAIM ■J �_ I _I►1E._ _ gM�M� ROWAN ST ,-� i � TYPE -III BEGIN BRIDGE li, 3 L" �, 1 1 1 1 �cs , -- 11 N \i 11 `; s , F '� / PROPOSED 5' SIDEWALK > L- Sta. 34+43.06 so, BEGIN N N I �, N II 1 . 1 �� 48 °°N° N ��-\� - F-� - - �"_ --- x__x_-' MT T ; \ + RETAINING WALL #4 - 6°• RON°HT IR° MT T Y`6- STA. 13+77.98 Or 1 II _- I1,!-_.. - - LX�>< R R/W \ \ l P _ L.'R AROUND o 2 1 ,�-1+---- E D APPROACH Sa�1 - ' PPE OUTLETS WITH C ASS B STONE 1' THICK PROPOSED ; ; = 5' SIDEWALK -%=- -- E ROp -,;- - 200 SHIFT 41 +27 RT.Novi II 11 `" m , WOODS ;; EST 16 TONS ■ - L Sta. \\ Q '� _-T � _ \ q 1 - ` - - . - .. - - - y' •t` i RR R / W _ -- '.� 1 1 11 1 - RETAIN \ £ SEPARATED END SECTION OF EXISTING 48" AND 18" RCP - - -- -- �- 11 1 II I I \ ✓' AND MINOR SLOPE FAILURE TO BE CORRECTED oVJ / \\ DURING INSTALLATION OF ADJACENT PIPE - - - - - - . EXIT R/R/ ��_ II 1 II �X9D]\ \ � � 8 II 1 II SK x 33 4'H5T - d 1 Ii 1 ii i���a1;1/b1C Ea ; ; = --' 8�x s i II 1 II I END 1 �3 ;% RETAIN �� \ / �� " I II 1 1 II RETAINING WALL#�11 II I - 111111111111 STAMPED IIIIIIIIIIIIIIIIIIIIIIII � F F _I1' II h a -CI Y7 STA. 14+00.00 / ° 1 I 11 ' 1 11 11 ' 41. 03' LT. CL I RIP RAP it �+ 0 / ° ° a - I II 1 11 CL B RIP RAP x- $3 I °'EE MEDIAC°NCRN _------ .,. CL B RIP RAP _ SH�ELNo. 20 & 21 FOR -L- PROFILE 1 1yF�� 1 I� a 1 �� I 48' MTI. � F S� 2�1 e' f 11 9 +00- �= 8 1 EX, RAN.- - +25-Y- file k2\ 8rA 4+40-L- 3i 2 EX.R/W 32 +55 L EX.VII, ;CARBORO��H 35 DB 2118 15" RCP-IY 6BEGlN CONSTRUCTIOAN -Y8- POT Sto. 11+75.00 MARIONDB 2129 PGG 545 RGE JR. S e p10 oa' zo6. C. +53.93 5, Sai ,601- EX. R/W MTL LT PROPOSED 5' SIDEWALK REMOVE APPROX. 48 LF OF PIPE.. +75 ISBLK MARION C. GEORGE JR. DB 2125 PG 201 FILL WITH FLOWABLE FILL RE •"' 18" RCP -IV REMOVE CB +20:17 26.55' T4°19' 8" E -L- P/ Sta 41+42.09 L = 5' 07' 19.2" (LT) D = r 08' 45.3" L = 446.98' T = 223.64' R = 5,000.00' DS = 40 MPH SE = 2.OX RO = n/o S 64'40'38' E 42.78' 2'-6° C&G �J +07 X. R/W D0 NOT DISTURB ATM +00 40' BM81 /\ -BL- STA 34+85 32' LEFT / ELEV.106.57' +02 PROPOSED cbE 5' SIDEWALK T/E TO EXIST. 24" C&G —POC Sta. s9+8/ 69 -YB- POT Sto.13+78.06 —Fn - —xun H/C VAULT / POWER BOX /90' LANE SH/FT CITY OF FAYETTEVILLE DB 7684 PG 237 e} fl 0 © 0 DB 6555 PG 37 DB 6402 PG 425 PB 120 PG 165 PB 121 PG 185 NC 24/210 CHATHAM ST. 2015 ADT 770 2035 ADT 943 +90 60' 36' DR. BST LAFAYETTE BANK & TRUST CO. DB 2389 PG 523 MTL CANOPY 25BK BUS R=2' SAWCUT 2'-6" C&G 8° PVC 48. CONC T/E TO EXIST. CONCRETE ISLAND BST +57 EX. R/W N Ln ___ F C MTL LT RCP -IV FULL DI —7uT\FU DI LL RT 42+08.45 41+0825 REMOVE DI 0 LTOO 2.00 LT S.1 R=l' 42 41+08.34 4.16 RT 2'-6" C&G ——_ _ EXISTING R/W +59.27 ADJUST CB 100'LEFT TURN TAPER 6 I I j L 2 RETAIN EX. R/W 58 -L- POC Sto. 43+18.49 = cy -Y10- POT Sto.1O+00.00 N E E DO NOT IISTURB SIGN — _ 7UTL S RETAIN ' MTL LT +75 0 0 32.68' xa 1 ,3 I I -1_4 =i1 I I II 1 I 1 II N 1- TELEPHONE v ^-'I Ip +75 E4<f VAULT I 35.54' >7o3.5'X8' .5 C 0 11" POW D0 NOT DISTURB SIGN ca61r /66.05' UNIFORM TAPER TO EXISTING NC 24/210 & RAY AVE. , 2843 r 3452 870 /204 10444 1452 34,713 - L - - L - 34,913 47,496 47,696 1974 1859 2409 1 2/87 20/5 ADT °'y 4583 2035 ADT 1 5540 EX. R/W 60' ER ER AI END TIP PROJECT L- STA. 44 + 00.00 bl PROJECT REFERENCE NO. B-4490 RAN SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. /0 HYDRAULICS ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PLANS PREPARED BY: PARSONS BRINCKERHOFF 434 FArErEE:v111.E. STREET St TIT 1500 RALL1Q1. NC 27E01 ACENSE: NO. IJ1165 FREDERICK L GRAHAM DB 4652 PG 271 07 — —2UTL— `IS" RCP 1 0 ;1: If 1 II > I Q ot I(I RETAIN - - s 67' 28' 542',E 8" CAST IRON & TYPE UNKNOWN 60" CONC EXISTING R/W 2SBKBUS 20'BST DRIVE MTL LT 6+571NG R/W —X 8' PVC 70i6 01E PT Sta. 43+65.43 6 5 SIGH / TL LT MTL LT II 32BST DRIVE BST SH�ETcN . 21 FOR -L- PROFILE SHE�ET N . 24 FOR -Y8- PROFILE 02-23-2015 PARCEL 5 - COMBINED PARCELS 5 AND 39 INTO PARCEL 5 Z 2 W o � Q c CC No 12 w TVLJ LO ' Q ti J"w QIO w ▪ Z ? � J _IZ OsO CC ono c� NO CD LLj NNJ ww z�z CD• 11 w egg a>ogCC CC O w 0 gg -1-0 O U O riw-occ�c0 c\1 01c ticc) Li; MN N cv � 100 NR00 O Q Q Q �04• Fp � NE) NES w > 2422 g 1 O Q Q gzz4.1 j j j 20000 w000 v 0 cJ 0 EXISTING R/W 6" CAST IRON EXISTING R/W I 0 1 I LONNIE MELVIN DB 863 PG 13 \ ss AL TTA MCM N DB 495 PG 127 ENLI ti 30" C&G MURCHISON RD 40' BST 6 ISBLKBUS \ —f /0 -Y3- POT Sta. /0+00.00 j s MARY S. HARRIS DB 6040 PG 861 2gy`BST CURB ` \ J\W\ \ \\\q"BSr CURS \ \ Ss INEZ JONES cc5,�,, DB 495 w PG 171 0) o I5 POWER ME 7ER 0 ALVIN ELLIOTT DB 4588 PG 592 +80.92 ELLEN GLADDEN DB 6403 PG 374 0) 30.57' JIMMIE SMITH DB 3228 PG 518 \\\ 0) -Y3- PI Sta /7+09.63 = 43' /3' 242" (RT) D = 8° 48' 53.0" L = 490.35' T = 257.5/' R = 650.00' DS = 40 MPH SE = 4.0% RO = 124 RICHARD BROWN DB 500 PG 182 TRACT 1 2 "\\OUgHS7 w AN 0 \\ sr 0) KY..; I I I y--NE— RETAIN TALLEY INVESTMENTS LLC DB 7779 PG 868 +16.29 EX. R/W BEGIN CONSTRUCTION -YHA- POT Sta.10+73.27 +14.94 EX.R/W\ 2SFgUS RETAIN - Y3 - MURCHISON RD +39,37 29.86' +14191 -YHA- PI Sta /0+98.78 A = 55' 05' 13.9" (RT1 D = 143' 14' 22.0" L = 38.46' T = 20.86' R = 40.00' w z +53 40' +53 CB SIZE \KNOWN PLUG CB 5_RCP \REMOVE GRADE TO DRAIN R=60' pis FILL WITH FLOWABLE TB 1B v.MH REMOVE CB SIZE & TYPE UNKNOWN 3- POT Sto. /3+23.43 = -Y A- POT Sto. //+65.79 +15 46' COUNCIL & WILLIFORD PROPERTIRS. LLC DB 5754 PG 200 BEGIN CONSTRUCTION L 3- POT Sto.13+65.00 ISBLKBUS +05 EX. R/W . s 25=zos^e IV'9O RICHARD BROWN DB 500 PG 182 TRACT 2 BEGIN CONSTRUCTION -Y II- POT 90. 11+45.00 +45 -YHA- PT Sta. 11+16.38 EX. R/W 70 Iv REMOVE CB G l0 00o -PROP. SIDEWALK- R MO P U1 REMOVE PIPE A:TI ACCOR +45 2- 8 EX. R/W 30' 7'6457 30' DR. REMOVE CB PROPOSED 5' SIDEWALK - Y3- POT Staa 14+10.60 = - Y11- POT Sto! 12+31.02 PROJECT REFERENCE NO. SHEET NO. B-4490 // RAN SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PLANS PREPARED BY. PARSONS BRINCKERHOFF 434 FAYEYIEYD.1.E STREET SLITS 1500 RALEIGH. NC 27601 LICENSE NO. F-0165 +4 EMOVE B II II I II II II II I Ia II I IE 5 1 II II II yGl N p W W• mc C/) 40 -F oo W I- y uu 00 1-4 -.1 CO' a 00 E 36" Rep / / / / / // // // / / ▪ / a / / // • �/ / / RETAIN PLUG 2'-6" C&G 2/5' SHIFT +60 EX. R/W REMOVE PIPE m ROP. 5' SIDEWALK 18" RCP -IV +52./ 3 SEE SHEET No. 23 FOR -Y3- PROFILE SEE SHEET No. 25 FOR -Y11A- PROFILE SEE SHEET No. 25 FOR -Y11- PROFILE 02-23-2015 PARCEL 5 - COMBINED PARCELS 5 AND 39 INTO PARCEL 5 Z 2 W 121 o � Q OC kNx w W �O QLLj J QIO w ▪ Z J _IZ 0_o o ho 0 c,)o LLJ 2 CC 2 Pc ww z�z CD• 11 w egg aogcc cC Lu w co g �00 O U O w L(1w Vic[ tick ' K N N c9 0 0040 v00 O Q Q w > 2422 g 1 O Q Q Q gzzz 0 0 20 0 v 0 N C 0 0 m v 0 jtr Q�6 N0.0 rive �mcc EXISTING R/W 6" CAST IRON EXISTING R/W I 0 1 I LONNIE MELVIN DB 863 PG 13 uu ss AL TTA MCM N DB 495 PG 127 ti e 0 0 30" C&G MURCHISON RD 40' BST ISBLKBUS \ —f /0 -Y3- POT Sta. /0+00.00 j • MARY S. HARRIS DB 6040 PG 861 2gy`BST CURB ` \ /58 Ss \\\q"BSr CURS \ \ INEZ JONES cc5,�,, DB 495 w PG 171 0 40 �f0 POWER ME 7ER 0 ALVIN ELLIOTT DB 4588 PG 592 +80.92 ELLEN GLADDEN DB 6403 PG 374 30.57' JIMMIE SMITH DB 3228 PG 518 2 �'"�\\DUgHS7 AN 0 \\ sr ,Y..; I I I yc"--- RETAIN -Y3- PI Sta /7+09.63 = 43' /3' 242" (RT) D = 8° 48' 53.0" L = 490.35' T = 257.5/' R = 650.00' DS = 40 MPH SE = 4.0% RO = 124 RICHARD BROWN DB 500 PG 182 TRACT 1 TALLEY INVESTMENTS LLC DB 7779 PG 868 +16.29 EX. R/W BEGIN CONSTRUCTION -YHA- POT Sta.10+73.27 +14.94 EX.R/W\ 2SFgUS RETAIN - Y3 - MURCHISON RD +39,37 29.86' ISBLKO +/4191 -YHA- PI Sta /0+98.78 A = 55' 05' 13.9" (RT1 D = 143' 14' 22.0" L = 38.46' T = 20.86' R = 40.00' w z +53 40' +53 CB SIZE \KNOWN PLUG CB 5_RCP \REMOVE GRADE TO DRAIN R=60' FILL WITH FLOWABLE TB 1B v.MH REMOVE CB SIZE & TYPE UNKNOWN 3- POT Sto. /3+23.43 = -Y A- POT Sto. //+65.79 +15 46' COUNCIL & WILLIFORD PROPERTIRS, LLC DB 5754 PG 200 BEGIN CONSTRUCTION L 3- POT Sto.13+65.00 ISBLKBUS +05 EX. R/W 150.00, IV'9O RICHARD BROWN DB 500 PG 182 TRACT 2 BEGIN CONSTRUCTION -Y II- POT 90. 11+45.00 +45 -YHA- PT Sta. 11+16.38 EX. R/W 00 Iv REMOVE CB G l0 "o -PROP. SIDEWALK- R MO P U1 REMOVE PIPE A:TI ACCOR +45 2- 8 EX. R/W 30' 7'6457 30' DR. REMOVE CB PROPOSED 5' SIDEWALK - Y3- POT Staa 14+10.60 = - Y11- POT Sto. 12+31.02 PROJECT REFERENCE NO. SHEET NO. B-4490 // RAN SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PLANS PREPARED BY. PARSONS BRINCKERHOFF 434 FAYEfIEYD.1.E STREET SLITS 15110 RALEIGH. NC 27601 LICENSE NO. F-0165 +4 EMOVEB I II II I II II II II I Ia II I I 5 1 II II II yGl N p W W• mc C/) 40 °F oo W I- y uu 1-400 .1 -1 a p. 75 RE r 36" Rep / / / / / // // // / / ▪ / a / / // • � / / RETAIN PLUG 2'-6" C&G 2/5' SHIFT +60 EX. R/W REMOVE PIPE m ROP. 5' SIDEWALK 18" RCP -IV +52./ 3 SEE SHEET No. 23 FOR -Y3- PROFILE SEE SHEET No. 25 FOR -Y11A- PROFILE SEE SHEET No. 25 FOR -Y11- PROFILE ta Nco . Le N Q. cp I I IDA WAITMAN, HEIRS DB 525 PG 142 EXISTIN�R/W 92 -Y3- P/ Sto 17+09.63 A = 43° /3' 24.1" (RT) D = 8° 48' 53.0" L = 490.35' T = 257.5/' R = 650.00' DS = 40 MPH SE =4.07. RO = /24' SIU-HUA CHEN DB 5238 PG 168 DETAIL F HEAD DITCH ( Not to Scale) Natural Ground GRAM-0E09FM Min. EXCAVATION = 2,20d CUFT D= 1.5Ft. Natural Ground REMOVE EXISTING SIDEWALK xISTiNG STA. 18+40 -Y3- LT T B�,NSRS 4 41 TO EXISTING DITCH DIPAK RANAVAYA DB 7645 PG 469 LIM111=111711:10:1finnalddinining4i,t/iViiinhavddil wmIN � - -• 9 EXISTINGG R� � IJ• •j;•�l� / �ICI 20' DR. ODORIS B. UTLEY DB 5323 PG 462 1- 0 MATCH LINE SEE INSET "A" PROPOSED 5' SIDEWALK +75 46' 00.00' zci co v ti , B-4490 RM/ SHEET NO. ROSALIND W. WAITMAN DB 5554 PC 248 /2 HYDRAULICS ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PLANS PREPARED BY. PARSONS BRINCKERHOFF 434 FASEUFEVILLE STREET SUITE 1500 RALEIGH, NC 27601 LICENSE NO. F-0165 R/ MATCH LINE SHEET 12 0 INSET "A" inirrIElyyyIIEly Ii!iIiIiIiIi!iIiIiIiIi!I STAMPED CONCRETE MEDIAN SEE SHEET No. 23 FOR -Y3- PROFILE TREES TO BE RETAINED UNDER PHASE II OF THE NCVP NORTHING FASTING 476502.8458 2034525.015 476518.7045 2034526.593 476479.1409 2034340.427 476440.8508 2034337.479 476433.3099 2034354.026 476459.2435 2034271.233 476478.6964 2034214.141 476687.5827 2034002.614 476687.1758 2033992.321 476691.2470 2033985.945 PI Sta 24+31.13 A = 34° 27' 26.8" (LT) D = 7° 09' 43°1" L = 48/J2' T = 248.08' R = 800.00' RETAIN DS = 38 MPH SE = 3.5% RO = 147' TIE EXISTING DITCH TO PROPOSED DITCH AT FLOW LINE ELEV. =85.5' DETAIL N FLOOD BENCH @ OUTLe (NOT TO SCALE) sr CONCRETE SLOPE PROTECTION b = OFT - 17FT VAR. B = 23FT - 34FT VAR d = MIN.1.0 FT. 11 Cps 1d _ �� 2Q REMOVE 11 " - / I.I. / vAULe, -i // ��1.►�lilils KEY IN 3 FT EST. 290 TONS OF C DDE = APPROX. 80. FLOOD BENCH SLR' '6LL1.1.1.41,41 ilmi �■■1 _�_ wdmi.■■■■■■-- .- REMOVE C8 Q-�-�����_ ■[ ter■/ter■■��- �•_-. .r�IL%i■it■■i[■E ■[�_ii■■�- -.I-- - a■■■:5L~ _/ rani■■���� ■ �■[!�■■■�■■■■■4:iiiFal.! _� � --- rlll miiiiamai■i■■■■■■Ls_�ik112■■■ �s_5 .m=■m\N4_1ECIW[ IIMMENii■li■ENUMMENN!■■osammi4 gakMRi'IaGii------"ia■■■■■� snug �!■\ktkik% ma•�i!lllkkkkkl�kmummiEir- ■ ■■■■mme._ _i[■ ,rt■■■■■■■■Irislaimmo■ii■■■■■■�i■■i■■i■■■■■■ aL ELEv 90.0' 111Akkkkii�kC:Gkkk:imTom rAmmakkGkkkk��akkkkkko emomm:ikkmfm!urkkkkkkkkkkk■Cl2'.Iigam �■■■■■■■■■■■■■i PROPOSED rimuriam��■[■■mmar�aaan=:aiii■■■■■■■■■■1\i[■■ii■■YmkkkkkEr■A■■■■■■■■■■■■■i[■kkkkkkkkkkkkkkkkk■■� 5 S/DEWALK - mfflownsliwimp ■rI" n(!dA'Ci4lkkkk■■k/nk kkkk�T ■■■■■■■■ii7■■■■■YIw ? aiN131�1ii[■■\\■■[I�AP�1[R17 �ly6�l aili�1llRT.immi■■■:1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ummifcilli■■■■■■ \■■■ii.i I\■■■■Cammm a■■■\I■■■■■■■■■■■■■■G■■■i■■■■■i■■■■■ ump ■m-- .i[■■■■■■■■■III■Rim•-!_■■■■■■■■■■■■■■■■■■■■[11■■JCi[��■■■■i■■■■■■[i■■iessi--_ 1■��■■■■■■riQ■■■■■■rlii■■■■r■■■■■I■■■■■■■■■■■■■■■■■\ii■=i■■■■[■■■■■■■■■■■■■■■aF:hi■ ■■■■■■■■-- .■i■■■■■■■■■■■e■■itfll■r■■■■■L•7i■■`I■■ii\■IFii■■■ti1�F'r■[./■■■■■■■■■■■■■■■■i■[i►>,.■■_�■■i■■■■■■■■■■■■■1�■IGI<IT.UT�,.Sfk�R■!L•'%■■■■■�IIS■C�sE � �--_ _ ■■■■■■■■■■■[bpi■■■\1■■■■■T:fS�ili1■■■■■■■■■■riiii![['�V'1■■■■■■■■■C■■���-�. ■■■■■[7 _- \■■■■■[/Ci■■■■■■■■/■■■■■i■■■■■■■■■■■■■■■■■■■is\ ti1111__■\■■■■■■■■■■F,■i■,rillii�"Nw°[['e[',G oea i■i[it■■■■■■■■■■■[I!I■■■■■■■■■■■■■■■■■■■■■i■■■i�rt■�■■��11■»■rii■■■■■■■■iGC[i:Eg\■■�lfgC�ilSiE ie-�o■�■i■■ice ���■■■■S��■■■■■[i■ii1lA�JCii■■■■■■,L[■�- ' � \■■■■■ISifi1111■■■■■■!.[■■■■■■■■■■■■■!29■■■■■■■■■■■41 - �i■■■■i_f■I�pS■FZ&./_ia■I■■■■=■■■■■■■■■■3" 1■■■■■■■■■■1\■■■■■I11■■■■■■■■■■■■iilFl!111!1■■■■_■1\■�JC:i�■■■■■■■■■■■[!•Isis!!:■iI•■■■71■■i■1=■■■■■■■[I•--- �'- ■■■■■■■■■■■'■■■i■■■■■■■■■■■\r■■■■■■ii■■i■■i■■■i■■ biNJcii■■■■■11■[■..[■=- r■ v-_ yi■■■■■■■■■■■■■■■1-- ■■■■■ummo■m-- .■pGCla■■■■■■■■■■p v=i�i - - s �:1'i mummommommoo mmium■■i■■■■■■■■■wi:■■- -DRI- POT Sta.I5+105/ WOODS DETAIL U SPECIAL LATERAL DITCH ( Not Scale) FROM STA. 22+00 TO STA. 22+83 -Y3- RT �Ktl All II FLOOD BENCH OUTL 4R POSED DETAIL N /DEWA�L+-'K, W +60./8 E*R/W CONVERT TO JB - pllo O i0—Dr SEE DETAIL E i = _ �P EXISTING R e II RETAIN — — — — - — _P $Id — e DETAILS SPECIAL LATERAL DITCH ( Not ro Scale) FROM STA. 23+50 TO STA. 24+97 -Y3- RT Outside Ditch Traffic Flow �-5— S=GRADE TO DRAIN DETAIL E FALSE SUMP ( Not to Scale) CE Proposed Ditch STA.25+36 -Y3- REMOVED DURING DEVELOPMENT OF ADJACENT PROPERTY PER PARKVIEW DEVELOPMENT PLANS F, WOODS aQ B-4490 R'W SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. /3 HYDRAULICS ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PLANS PREPARED BY PARSONS BRINCKERHOFF 434 FAYETTEVILLE STREET SUITE 1500 RALEIGH, NC 27601 LICENSE NO. F-0165 11 ` RETAIN 1/ I +677 5/ 41 CITY OF E LA / 8412T \ DOPGI 737 'B II 6P' 100 ,/ �.�..... II 60 RETANF PROPOSED UNDER CONSTRUCTION OF ADJACENT PROPERTY 5 38 59 36i 0 0 O' IIEIEIPIEIEI'IEIEIEIyy IIIIIIIIIIIIIIIIIIIIIIII 0 W 0. W = N N + Wti W N CO W Z N J , = M V Q ' 5 STAMPED CONCRETE MEDIAN SEE SHEET No. 23 & 24 FOR -Y3- PROFILE 0 LD 0 PROPOSED 5' SIDEWALK +90 EX. R/ 0 CITY OF FAYETTEVILLE DB 7329 PG 300 PB 117 PG 100 -Y3- PC Sto.28+62.64 crlc EX. R/W pv� / E F I-11 � �/ �T/SQL -Y3- PI Sto 24+3/.I3 PI Sto 32+77.6/ = 34' 27' 26.8' (LT) = 49° 59' 42.4" (RT) D = 7° 09' 43.1" D = 6° 26' /5.8" L = 48/.12' L = 776.60' T = 248.08' T = 4/4.97' R = 800.00' R = 890.00' DS = 38 MPH SE = exist. SE = 3.5% RO = exist. RO = 147' CITY OF FAYETTEVILLE DB 7369 PG 841 PB 117 PG 100 zlu, oNE SHIFT 60 �E/ / of MN / IS" E. +21 / __-_____ 60' +2/ 5' J9' POSED (DEWALK 160' L DI EX R� o / — _ = REMOVED DURING DEVELOPMENT / OF ADJACENT PROPERTY PER PAR DEVELOPMENT PLANS PROPOSED UNDER CONSTRUCT! OF ADJACENT PROPERTY PER RKVI —DEKEirOyAEKIT PLANS REMOVED DURING DEVELOPMENT OF ADJACENT PROPERTY PER PARKVIEW DEVELOPMENT PLANS CONVERT TO JBW,MH V � / 0 0 CITY OF FAYETTEVILLE DB 7501PG 84 PB 39 PG 77 -4 NAD 83/NSRS 2007 j - Y3- PC Sto. 31+80.99 = - Y12- POT Sto. 4+59.67 END CONSTRUCTION -Y3- POT Sto. 0+50°00 9 0 VAULT +50.0 o 32' +50 EXR/ . W I +50 0 160' Wt. LT I — N E01 I — — —I/ LI IL 77/ 0 01Q / / PROJECT REFERENCE NO. B-4490 RAN SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. /4 HYDRAULICS ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PLANS PREPARED BY: PARSONS BRINCKERHOFF 434 E\VF: rEVII.I.E STREET sun, 1500 RAIEIGH, NC 27601 LICENSE NO. E-0165 CITY OF FAYETTEVILLE DB 5029 PG 454 32 I w -- I I I I I I I RCp I5" RCP CB �� e^ -TVro- - 1 _------_-_------ IB" RCP TO/ -Y3- I/�I � �"RZp �tT7—�TTL: 7/PLT —�_t6�i RCP GRAVEL OI ®MTL LT 0 0 STAMPED CONCRETE MEDIAN SEE SHEET No. 24 FOR -Y3- PROFILE PROJECT REFERENCE NO. SHEET NO. B-4490 /5 I II II II I I I II II 4Pd yA °2c 6�6 MpT O LINE E.E.SSHEEN mac li■■ laN�■iiii- �%?�G■■■C�EriY!■■ice-- ��■■va:ir■■11 .■�\��■■ ■�■�'■■■ice-� ��■■i�G!■!!■A!!■� ■■■■■■i'E■■E01 ��■iiiipii�iai■iaii■ii�' r ■!iiii.-- umm sesl-ii____Nmmo.mx �• o.i■■■■■■■mmum■lili■!■ ■■.imam■■■■■■■iiiiiiii■•f■■■17e-- 'go..ie=-•■■■■■■■■...!■iiii■iiEiirraJ■!■■■■lilf■ACii1'iiiII&IIIIIIIIIIIIIi plii■IRglirali!l71amat�El;i%■■illmini■■.G.i■ii■�■■e■r■■■■■■■■iiEiii■i■■ii■i■'J■N■QEIR■■■■■■■■N I■■■■1UNME■i■■■N VEMOMEMENNME MANNA -_ y" case IRON =3' S.C. RANKIN EST DB 468 PG 18 PROP. l'-6" CURB +00 EX. Raw +00 30' +00 40' CONC ONoULT �Eo1 ISVNBUS CANOPY S4.S5 _ s smut _..0!lissdaimon _vs-- pummommummg l»--- IMMEs .mENNEs •NEFU■■NiOWEL,Ep.■■■■En ■NEN WNW ice- �••E.■■i■■■ft-.EG- 'd'NP,...mrWINll■■■iN� NI E�119SdIlI ■■■■■■a■E■ME it Eil: ip.§1'— ■■■■[+ummu ■■I =—iiii �� ■m.s■■■■■■■ NMEN i WINMENiii■■N ■■ice■r-1■■■■■■■■■I ZEW eaNWEINNMENNMall ■ LL END CONSTRUCTION -DRI- POT Sto. /3+71.63 ro ISMTLBUS PROP. l GUARDRAIL l /� // // RETAIN / // 11 // /I // / k/ CITY OF FAYETTEVILLE DB 8403 PG 413 /I RAN SHEET NO. HYDRAULICS ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PLANS PREPARED BY. PARSONS BRINCKERHOFF 434 FAY4:Trrvu. E STREET SUITE 1500 RALEIGH, NC 27601 LICENSE NO. F-0165 MATCH LINE SEE SHEET 13 BST -- 'L820'08" E I40.09' No. 25 FO-DR1- PROFIL _ _ 48" CONC ROWAN ST \ REMOVE PIPE 26 MOVE CB _____z_ RETAIN TREE _REMOVE PIPE `-------- EXCAVATE EXISTING ROADWAY EMBANKMENT t.f C L.f RETAIN TREE / \\N i\ / -REMOVE CB \\\ TREES TO BE RETAINED UNDER PHASE II OF THE NCVP TREE NO. NORTHING EASTING DIAMETER (IN) 20 476502.8458 2034525.015 30 21 476518.7045 2034526.593 30 22 476479.1409 2034340.427 36 23 476440.8508 2034337.479 30 24 476433.3099 2034354.026 18 25 476459.2435 2034271.233 15 26 476478.6964 2034214.141 36 27 476687.5827 2034002.614 36 28 476687.1758 2033992.321 24 29 476691.2470 2033985.945 24 ✓S 1 \ J Z C II ` REMOVE PIPE 10 D II I I I I 00 dll a:l I 92„ II woods II y' I I II I 11 II II II 11 II II II 11 II II l/ II II 11 11 II I II II II 1/ 11 11 REMOVE /� 11 11 22 .11 RETAIN TREE RETAIN TREE 23 RETAIN TREE c 24 II 36" CO NC WOODS DETAIL I STANDARD 'V' DITCH ( Nato Scale) Nolan) Ground DDE EXC.=11 CY Natural Ground Min. D=1.5 Ft. FROM STA. 28+90 TO STA. 29+34 -Y3- 387' LT C REMOVE CB CL B RIP RAP EST. 2.4 TONS EXCAVATE EXISTING ROADWAY EMBANKMENT REMOVE CB NDARD V DITC\ SE TAIL I 48"CONC C 0 0 PROJECT REFERENCE NO. SHEET NO. B-4490 /6 RAN SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PLANS PREPARED BY. PARSONS BRINCKERHOFF 434 FAYEUFEVILLE STREET SIE E 1500 RALEIGH, NC 27601 LICENSE NO. F-0165 I\ I I \I 'li I I I III III 1 —L I I l l r_ 1 I 1 I , i I 1 21 / / I I RETAIN TREE I III I I 20 / I 0 00I I RETAIN TREE CO I I ...I II I � I I ///?///l/// ZI II ,I ro 1I IP I ' 1 III�Ii II II RETAIN/1/ II -t DI / IS'RCP _ __— / / 15" RCP -1 II /Di / / // I 1 II il-�- I / Ii I I \ /I ' I ' I I I IIil 1 II , I Iri I -IN -L- PROJECT REFERENCE NO. SHEET NO. B-4490 2A-2 PAVEMENT SCHEDULE Cl 1.5" TYPE S9.5B C2 3" TYPE S9.5B C3 VAR. DEPTH TYPE S9.5B D1 4" I19.0B D2 VAR. DEPTH I19.0B El 4" TYPE B25.0B E2 VAR. DEPTH TYPE B25.0B R1 2'-6" CONCRETE C&G R2 1'-6" CONCRETE C&G R3 2'-9" CONCRETE C&G R4 5" MONO. CONC. ISLAND S 4" CONCRETE SIDEWALK T EARTH MATERIAL U EXISTING PAVEMENT V1 1.5" MILLING ASPHALT PAVEMENT V2 3" MILLING ASPHALT PAVEMENT NI WEDGING DETAIL BOTTOM OF WALL EXISTING GROUND VARIES EXIST. GROUND EXIST. GROUND (SEE PLANS FOR RETAINING WALL LOCATION) USE INSET A IN CONJUCTION w/FYPICAL SECTION No. 3 AS FOLLOWS: FROM -L- STA. 13+40.29 (LT.) TO -L- STA. 14+08.43 (LT.) SEE INSET A EXIST. GROUND 12' 12' VARIES VARIES Nc,7 j l C2 V2 j l EXIST. j l 3'TO 7' 0'TO /5' I GRADE C2 /] V2 EXIST. POINT /0' 14' w/GR. 0.02 6" 2' c /0' l4' w/GR. 4'-6" 5'-G" 6 TYPICAL SECTION NO. 1 FROM-L- STA. 9+74.93 TO 12+35.00 -L- SAWCUT, E/' SAWCUT /4' /4' GRADE TO THIS LINE GRADE TO THIS LINE GRADE TO THIS LINE 12' 1 VARIES /2' /2 2' 6" GRADE POINT 0.02 GRADE TO THIS LINE TYPICAL SECTION NO. 2 FROM-L- STA. 12+35.00 TO 14+00.00 VARIES /5' - /6' GRADE POINT 0.02 -L- I VARIES >•I� VARIES, /2' F2' VARIES 0' - /2 C2 O /2 1 GRADE TO THIS LINE /4 1 VARIES /2' 1 2' ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER PI° ELIMINARY PLANS DO NOT USE FOR CONSTRUCTION EXIST. GROUND 14' w/GR. cc) 0 02 TYPICAL SECTION NO. 3 TRANSITION T.S. NO. 1 TO T.S. NO. 2 FROM -L- STA. 14+00.00 TO 14+50.00 -L- STA. 14 + 50.00 TO 18 + 63.87 /2' 6" -L- /6' VARIES 20' TO 8' TYPICAL SECTION NO. 4 /2' 12' GRADE TO THIS LINE GRADE TO THIS LINE /4 2' 6" /0' 0.02 SEER SECT/0/vs 4.•/ /In EXIST. GROUND EXIST. GROUND -L- STA. 18+63.87 TO 27+50.00 2'• 2' PROJECT REFERENCE NO. SHEET NO. B-4490 2A-3 PAVEMENT SCHEDULE Cl 1.5" TYPE S9.5B C2 3" TYPE S9.5B C3 VAR. DEPTH TYPE S9.5B D1 4" I19.0B D2 VAR. DEPTH I19.0B El 4" TYPE B25.0B E2 VAR. DEPTH TYPE B25.0B R1 2'-6" CONCRETE C&G R2 1'-6" CONCRETE C&G R3 2'-9" CONCRETE C&G R4 5" MONO. CONC. ISLAND S 4" CONCRETE SIDEWALK T EARTH MATERIAL U EXISTING PAVEMENT V1 1.5" MILLING ASPHALT PAVEMENT V2 3" MILLING ASPHALT PAVEMENT W WEDGING DETAIL TOE OF WALL E ✓./ SI . GROUND EXIST. GROUND TOP OF FILL 6" vARIE SEE EXIST. GROUND SEE INSET B BERM' INSET No. B (SEE PLANS FOR RETAINING WALL LOCATION) USE INSET No. B IN CONJUCTION w'IYPICAL SECTION No. 7 & 9 AS FOLLOWS: /0' /4' 14' w/GR. I H 5'-6" 2' 3 /2' GRADE TO THIS LINE /4' /2' 1 /2' C -L VARIES 6'TO 20' 1 /2' TYPICAL SECTION NO. 5 - L- STA. 27+50 TO 28+89.67 (BEGIN BRIDGE) - L- STA. 30+46.17 (END BRIDGE) TO 33+54.89 /2' CE -L- /2' 1 /2' 14' GRADE TO THIS LINE /4' 1• l4' w/GR. 5'-6" 4' _6" 2' 5'-6" re 1 0.02_ 1 1 GRADE R4 POINT t 0.02_ t t IIIII{ , 2'- F / /4' / / GRADE TO THIS LINE TYPICAL SECTION NO. 6 - L- STA. 28+89.67 (BEGIN BRIDGE) TO -L- STA. 30+46.17 (END /2' BRIDGE) /2' /2' GRADE TO TYPICAL SECTION NO. 7 THIS LINE -L- STA. 33+54.89 TO 34+43.06 (BEGIN BRIDGE) -L- STA. 35+72.31 (END BRIDGE) TO 36+00.00 14' * TRANSITION FROM TYPICAL SECTION 7 TO TYPICAL SECTION 9 FROM -L- STA. 36+00.00 TO 36+50.00 C -L- 1 5'-6" 2' /4' /2' /2' /' 4' /' /2' 12' /4' 2' 5'-6" /0' s >• >_ 1 s >_t 1 0.02 >_ GRAD PONT . .. I I 1 s >_ T >-s i >_ r t �� m 0.02 /0' 4'-6" 5'-6" - / / FROM -L- STA. 13+40.29 (LT.) TO -L- STA. 14+08.43 (LT.) / VARIES 5 CT ON5 SEE \\ EXIST. GROUND 0.02 6" - TYPICAL SECTION NO. 8 - L- STA. 34+43.06 (BEGIN BRIDGE) TO -L- STA. 35+72.31 (END BRIDGE) VARIES 43' TO 34' EXISTING VARIES C -L- >_ . VARIES 43' TO 37 EXISTING VARIES l' SAWCUT GRADE TO THIS LINE 0'TO 32' VARIES 22' TO 35' l' SAWCUT C2 r VARIES TYPICAL SECTION NO. 9 -L- STA. 36 + 50.00 TO 42 + 75.00 1 /0' 5'-6" 4'-6" 0.02 0 El GRAD DE To THIS LINE 4.-/ SEE ( 'NAX T/ONS EXIST. GROUND EXIST. GROUND EXIST. GROUND ROADWAY DESIGN ENGINEER PAVEMENT DESIGN ENGINEER PI° ]ELIMINARY PLANS DO NOT USE FOR CONSTRUCTION SEE INSET B PROJECT REFERENCE NO. SHEET NO. B-4490 2A-4 PAVEMENT SCHEDULE Cl 1.5" TYPE S9.5B C2 3" TYPE S9.5B C3 VAR. DEPTH TYPE S9.5B D1 4" I19.0B D2 VAR. DEPTH I19.0B El 4" TYPE B25.0B E2 VAR. DEPTH TYPE B25.0B R1 2'-6" CONCRETE C&G R2 1'-6" CONCRETE C&G R3 2'-9" CONCRETE C&G R4 5" MONO. CONC. ISLAND S 4" CONCRETE SIDEWALK T EARTH MATERIAL U EXISTING PAVEMENT V1 1.5" MILLING ASPHALT PAVEMENT V2 3" MILLING ASPHALT PAVEMENT W WEDGING DETAIL EXIST. GROUND EXIST. GROUND EXIST. GROUND 4: 411 EXIST. GROUND 4'-6 2' 10' 5'-6 GRADE TO THIS LINE VARIES -Y1-, -Y2- AND -Y8- VARIES 1 VARIES /0' 15'TO 16' `I5'TO 16' c SAWCUT /'SAWCUT 1 32' EXISTING GRADE TO TYPICAL SECTION NO. 10 THIS LINE -Y1- STA. 11 + 50.00 TO 12 + 91.01 -Y2- STA. 10+66.24 TO 12+25.00 -Y8- STA. 11 + 75.00 TO 13 + 29.31 20' TO 34' EXISTING VARIES C -Y3- I2' VARIES 20'TO 34 EXISTING VARIES 2' TO 30' TYPICAL SECTION NO. 11 GRADE TO ' -Y3- STA. 13 + 65.00 TO 16+00.00 THIS LINE -Y3- STA. 30+00.00 TO 30+50.00 * TRANSITION FROM TYPICAL SECTION NO. 11 TO TYPICAL SECTION 12 FROM 2' /0' 2' c /2' /2' 4'-6" 5'-6" H E a 0.02 6 Rl GRADE TO THIS LINE 3 /2' C -Y3- VARIES rI 2' TO 3' / c TYPICAL SECTION NO. 12 -Y3- STA. 16 + 50.00 TO 16 + 72.67 /2' VARIES A 1 3 C -Y3- VAhlt 8' - 20 3 6" E-- c VARIES l' SAWCUT GRADE TO THIS LINE EXIST. GROUND VARIES 2' /0' 5'-6' -Y3- STA.-L- 16+00.00 TO STA. 16+50.00 /2' /2' 1 GRADE TO El T THIS LINE TYPICAL SECTION NO. 13 - Y3- STA. 16+72.67 TO 19+29.42 - Y3- STA. 20+39.97 TO 28+00.00 * TRANSITION FROM TYPICAL SECTION NO. 13 TO TYPICAL SECTION 14 FROM -Y3- STA. 28+00.00 TO -Y3- STA. 28+50.00 VARIES c /0' GRADE TO THIS LINE 12 0.02 2' /0' 4,1 5'-6 0.02 6 GRADE TO THIS LINE 4'-6" p, 0.02 4,1 EXIST. GROUND EXIST.GROUND EXIST. GROUND ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER PI° ]ELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PROJECT REFERENCE NO. SHEET NO. B-4490 2A-5 PAVEMENT SCHEDULE Cl 1.5" TYPE S9.5B C2 3" TYPE S9.5B C3 VAR. DEPTH TYPE S9.5B D1 4" I19.0B D2 VAR. DEPTH I19.0B El 4" TYPE B25.0B E2 VAR. DEPTH TYPE B25.0B R1 2'-6" CONCRETE C&G R2 1'-6" CONCRETE C&G R3 2'-9" CONCRETE C&G R4 5" MONO. CONC. ISLAND S 4" CONCRETE SIDEWALK T EARTH MATERIAL U EXISTING PAVEMENT V1 1.5" MILLING ASPHALT PAVEMENT V2 3" MILLING ASPHALT PAVEMENT W WEDGING DETAIL 7N EXIST.GROUND 4:1 4'-6" 2' /0' 5'-6" 0.02 6" /2' 1 /2' 1 C -Y3- VARIES 8' - 20' c 6" /2' 1 GRADE TO THIS LINE E1 TYPICAL SECTION NO. 14 -Y3- STA. 28+50.00 TO 29+50.00 * TRANSITION FROM TYPICAL SECTION NO. 14 TO TYPICAL SECTION 11 FROM -Y3- STA. 29+50.00 TO -Y3- STA. 30+00.00 VARIES /2' o — 2' /0' 5'-6 4'-6" EXIST.GROUND EXIST.GROUND EXIST.GROUND GRADE TO THIS LINE 4:1 GRADE TO THIS LINE 4.1 2' 1 6'• C -Y11- I 2' -.II/2' 24' EXISTING SAWCUT ! /' SAWCUT c L GRADE POINT VARIES O 2' TYPICAL SECTION NO. 15 - Y11- STA. 11+45.00 TO 12+06.97 GRADE TO THIS LINE TYPICAL SECTION NO. 16 - DWI- STA. 10+16.45 TO 11+80.00 c /4' —DR1- 1 • 1 EXISTING SAWCUTI� 0 m IO 0.02 EXIST. j EXIST. a 4.1 EXIST.GROUND GRADE TO THIS LINE EXIST.GROUND 4:1 EXIST. GROUND ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER 0I° ]ELIMINARY PLANS DO NOT USE FOR CONSTRUCTION TYPICAL SECTION NO. 17 - DR1- STA. 11 + 80.00 TO 13 + 71.63 PROJECT REFERENCE NO. B-4490 SHEET NO. 2B-/ ROADWAY DESIGN ENGINEER DETAIL SHOWING BRIDGE IN RELATION TO PAVEMENT 2'-9" C&G (MED.) 2'-6" C&G PROPOSED 5' SIDEWALK Usl si- TYPE -Ill TTTTT T T T PROPOSED- 5' SIDEWALK T W7 ♦ ♦ 'Vr .♦ ♦ � `\ PROPOSED`♦ `♦ MONOLITHIC \\ ISLAND ♦ ♦ -ice EE, — VARIES 411. ---------- S 7r00'00.0"E -L- or- GRAU 350 TL-3 " %T.V a g s G BEGIN APPROACH SLAB -L- Sta. 28+63.87 BEGIN BRIDGE T Wk A "ENE= , \` -L- POT Sta. 29+79.46 =`♦ 00 -Y5- POC Sta. 15+12.30 ♦ 0 END BRIDGE 111 2 -L- Sta. 30+46.17 END T APPROACH SLAB -L- Sta. 30+71.90 T T 2'-9" C&G (MED.) -L- Sta. 28+89.67 ♦ ♦ ♦ ♦ 25' 0 L o 0 ti LL v P E]LIM1[NARY PLANS DO NOT USE FOR CONSTRUCTION JO co ♦ 1 1 1 TYPE -Ill PROPOSED 5' SIDEWALK 2'-6" C&G - L- POT Sta. 29+57.0/ = - Y4- POT Sta. 14+79.98 1 o Ln Q TYPE -Ill PROPOSED 5' SIDEWALK 2'-9" C&G (MED.) PROJECT REFERENCE NO. 8-4490 SHEET NO. 2B-2 ROADWAY DESIGN ENGINEER c Ir m DETAIL SHOWING BRIDGE IN RELATION TO PAVEMENT - L- POT Sta. 34+92.18 = - Y6- POT Sta. 12+48.60 PROPOSED 5' SIDEWALK TYPE -Ill T T� 2'-6" d. C&G N Ji%Ik!I Idd !RI:ICI:Iiuunneri....n•: 2'-6" C&G PROPOSED 5' SIDEWALK -L- 2'-9" C&G (MED.) 2'-6" C&G BEGIN APPROACH SLAB -L- Sta. 34+19.06 BEGIN BRIDGE -L- Sta. 34+43.06 T TTTT II II II II io I II TYPE -Ill CD In GRAU 350 TL-3 T p� II■ 5' MONOLITHIC / -L S 62°21'34.9"E ISLAND TYPE -Ill TTTT T T END BRIDGE -L- Sta. 35+72.31 END APPROACH SLAB -L- Sta. 35+96.31 PROPOSED RETAINING WALL PRE]LIMIINARY PLANS DO NOT USE FOR CONSTRUCTION PROPOSED 5' SIDEWALK I 1 � 1 N o I � - L- POT Sta. 35+23.40 = - Y7- POT Sta. /2+63.33 2'-6"I C&G 2'-6" C&G PROPOSED 5' SIDEWALK 1 PROJECT REFERENCE NO. 8-4490 ROADWAY DESIGN ENGINEER SHEET NO. 17 HYDRAULICS ENGINEER a a >73 d LL( 1 110 112 104 • • 119. 1 E E E I!7■G I V J!! JI`.1111 •.I •iris, i J ■fA •WI i] d■11 LGa■■11 y11 11 YYIII W YIIII IIIm....■. I EL=miL• =um MIL r- I Zan! . EP! ilibM MINIM I IL PM 11 .01 i ■ m C7 n■ca.li 1 RER7■I. OPAr KIEERA AmEWEVEZMAINEWEEMZENU PRE]LINIIIN DO NOT USE FO RY PLANS CONSTRUCTION ■ ME MICEESOMIP rllilrnlrarl 7.■E■LL7 NOMEMEWEIEAm ii1 i.11Ib UFEJ:SEHMdI,If1.1MCC N. _ 11 11 ana._..n 3u'cru6.uzeum n r o■cUE SAI •GWEJAAL•91111 110 106 102 98 94 90 +00 9 10+00 13 14 15+00 106 EN= I IMMO m.®® MENEM m "mm..m..m.. MIMIIMMEM MEMEMEMEMEMEMEMEME m.■■■...w mm■ mom m 102 �..i.m...■o....o.m.En............■ 113.202� � 98 74 m. o0Q1®®ICNIn MEMEMENEEMENEMEEMEMEMENE ®...YEMEM. ■■..M11�. 8 ..■■.. ■■■■■. MEM MMOMMEMOM m...■..■■...■ -L- WW=_E .■l..WEi J5. !e■m l m ..._ .mom gm ■I IMMIUMMUMBEME :OM 1 i m EVEUEEFEES !.■.JYGOII..II tfUllaleg. CULVERT HYDRAULIC DATA DRAINAGE AREA = DESIGN FREQUENCY = DESIGN DISCHARGE _ DESIGN HW ELEVATION = 100 YEAR DISCHARGE = 100 YEAR NW ELEVATION = OVERTOPPING FREQUENCY = OVERTOPPING DISCHARGE = OVERTOPPING ELEVATION = 25.90 50 4000 100.6 4250 /0/.53 2 (+) 1900 94.8 SQ.MI. YRS CFS FT CFS FT YRS CFS FT .■■■19JJ■T4 1.-11/.F iG If11]LF.[!1'e7 ■■■■In I.b1ir. ri.]■■I�d.] ki'1;1 11..1■Cim/A r1ruinI■DTII:JGIfr11■.J9■■NL•k'.1.nl.■111AdG .■■■1 1 ME41.l1' =J.1 J 1■1:71 l 1 D•ki ll.■fli 11 m■I 11■14h%G. min min_Illmm mm nIu mm mmErimm min mm I: //!9fILMAIT: 111 1 111 �11 um a 1111 .Gw.11 I iwnmwm= um a u11 q 1111 I1I 111 El III 1111 �11 III 1a1 11 1111 III 1111 II 1111 III 1111 II 1111 III 1111 II 1111 III■■.G■■1111 11 ■..■... _ 1111 III 1111 11 .. 1111 I 1111 I 1111 11 ■n■■■■1111 11 Minn 1 . III 1111 11 M.■■. 1111 11I■n■■■■1111 11 �.. 1111 I11 1111 11 ■ .■ �i-iIG�C�L'.UIIIIN■■■■1111 II ■■■ ■ ■. 1111 11 1111 11 ...�� .. 1111 II 1111 II ...■ .. ■.■ 1111 III 1111 II 111� III �II� II m m® •].r.1nIR•i!!1 JI_i 11.41n1►7■71;.r_■ AO -LE 110 106 102 98 94 90 86 82 78 74 15+00 16 17 18 19 20+00