HomeMy WebLinkAboutNCC231720_ESC Approval Submitted_20230606 Review Completed - Caliber Car Wash
CO City of Winston-Salem <noreply@geocivix.com>
(-j Reply OE) Reply All - Forward
To Matt Lowder Mon 5,/22/2023 3:35 PM
0 You forwarded this message on 5/22/2023 3:36 PM,
If there are problems with how this message is displayed, click here to view it in a web browser,
l'�J WINSTON-SALEM
�J NORM CAltoUN,
Application Type:04.02)Grading/Erosion Control Permit
Workflow:04.02)Gracing 8,Erosion Control
Project:Caliber Car Wash
A/P II:EN2300005
Acreage to be Disturbea: ..40
https://w inston-tali m.taeocivis-com/secure/proj ect/7proi ectd=934D4O
hello Caliber Clemmans Op Co,LLC.,
Thank you for submitting your protect to City of Winston-Salem.Review of the Erosion Control Plan for this protect has
been completed.The design is adequate to meet the ordinance standards and the plan has been approved.
Ee ayrare that this plan shall expire three(31 years folowirg the date of approval,if no land disturbing activity
^as been undertaken,as is required by Title 15A NCAC 4B.0129. Also,acceptance and approval of this plan is
conditioned upon compliance with Federal and State water quality laws,regulations,and rules.
If you have not already done so,please provide an original signed and notarized Financial Responsibility/Ownership
(FRO)form as applicable.This document is required prior to the issuance of the Grading/Erosion Control Permit.If this
has already been provided,then please disregard this statement. Reminder that a completed FRO farm is not required
in the instance where a project qualifies to use the Ilfl 489 Sketch Erosion Control Plan document
If this project will disturb more than 1 acre or is part of a larger common plan of development,the Grading/Erosion
Control Permit cannot be issued until documentation is provided that coverage under the NCGO1 Construction
Storrttwater Permit(NPDCS)has been obtained. Please obtain coverage under the permit at the following website
(https;//edocs.deq.nceov/Forms/NCGO1.l131l. Once coverage is obtained,please upload a copy to the project
documents in the electron K plan review system.The GradinpfCrosmn Control Permit will not be issued until proof of
coverage under NCG01 is provided •••This approval email serves as the"Approval Letter'that must be
uploaded when filing the e-NOI application to obtain the NCGO1 Certificate of Coverage.••'
As outlined in the Unified Development Ordinances(UDO)of Winston-Salem/Forsyth County,Village of Clemmons,
Town of Lewisville,and Town of Walkertown,Erosion Control Division staff may periodically inspect sites of land
disturbing activity to determine compliance with the Erosion Control ordinances and the approved Erosion Control
Plan. No person shall willfully resist,delay,or obstruct an authorized representative,employee,or agent of the
Erosion Control Division while that person is inspecting or attempting to inspect a land disturbing activity under the
ordnance
Should you have any questions as you move forward please contact Matthew Osborne at 336-462-74SO or
matt hewo gicityaf ws.carat.
Winston-Salem North Carolina and Forsyth County
.01inLdurruh".uni
CIS Drntxl