Loading...
HomeMy WebLinkAbout20150622 Ver 1_Application_20150623Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 1 PIPE REPLACMENT PROPOSED 2 @ 78" DIA. - - - - - - -18 (A)4 (B)- - - - - - - - - - - TOTALS:0 0 0 0 0 0 0 18 (A)4 (B)0 Notes: (A) THE 18 FEET OF PERMANENT IMPACTS BREAKS DOWN AS FOLLOWS: THE PIPE BARREL(S) OF PROPOSED ARE THE SAME LENGTH AS EXISTING AT 56 FEET IN LENGTH, HOWEVER THERE IS 0.5 FEET OF HEADWALL ON THE INLET AND 0.5 FEET OF HEADWALL ON THE OUTLET PROPOSED. ALSO, ON THE OUTLET IS 10 FEET OF RIP RAP PAD SCOUR PROTECTION AND ON THE INLET THERE IS 7 FEET (REALLY APPROXIMATELY 6.5 FEET) OF PERMANENT EXCAVATION ON THE INLET. BOTH INLET AND OUTLET ENDS WOULD HAVE RIP RAP BANK STABILIZATION WITHIN THE PERMANENT IMPACT LENGTH. THE RIP RAP BANK STABILIZATION ON THE OUTLET WOULD TIE INTO THE RIP RAP SCOUR PAD IN THE STREAM BOTTOM. RIP RAP WOULD NOT FILL IN THE EXPANSE OF THE STREAM CHANNEL ON THE INLET BUT WOULD EXTEND BELOW THE ORDINARY HIGH WATER MARK ALONG THE BANKS AND ON THE EDGES OF THE CHANNEL AT THE TOE OF THE BANKS. (B) THE 4 FEET OF TEMPORARY IMPACTS BREAKS DOWN AS FOLLOWS: THERE ARE TWO FEET ON THE INLET AND TWO FEET ON THE OUTLET; EACH OF THESE REPRESENT THE LENGTH WITHIN WHICH THE SHEET PILE WILL BE INSTALLED FOR WORKING IN THE DRY. SHEET PILE IS ABOUT 18 INCHES WIDE OUT TO OUT. SHEET 1 OF 1 6/22/2015 SDM WETLAND PERMIT IMPACT SUMMARY SURFACE WATER IMPACTSWETLAND IMPACTS SAMPSON COUNTY SHARE CAKE RD SR 1818 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS WBS # 3B.208211 Ward Swamp C Sw US 701 SR 1722 Suttontown Road Project LocationUT to Ward Swamp C Sw35.162731degN 78.334100degW SR 1818 Share Cake Road 1 8 1 7 1819 1740 1818 1 7 2 2 1737 1 7 2 4 1 7 7 8 1 8 4 3 1 7 1 1 1 8 4 5 1802 1714 16 36 1 7 3 8 1803 1820 Bradshaw Rd H o b b t o n H w y H o n r i n e R d W h it R d W Darden Rd SR#1778 S u t t o n t o w n R d B r i t t R d C arr C h urch R d K e n a n W e e k s R d Rosin Hill Rd W i l l i a m R K i n g R d H unter R d Carr Rd Gilmore Ln Roa no k e Rd Warwick Rd S i m m o n s R d S a r a L n H o b b t o n H w y 7 0 1 Pipe Replacement on SR 1818 at 0.4 miles west of US 701North of Clinton at Hobbton, Sampson County ¹ 0 1,500 3,000 4,500 6,000750Feet Ward Swamp C Sw US 701 SR 1722 Suttontown Road Project LocationUT to Ward Swamp C Sw35.162731degN 78.334100degW SR 1818 Share Cake Road 1 8 1 7 1819 1740 1818 1 7 2 2 1737 1 7 2 4 1 7 7 8 1 8 4 3 1 7 1 1 1 8 4 5 1802 1714 16 36 1 7 3 8 1803 1820 Bradshaw Rd H o b b t o n H w y H o n r i n e R d W h it R d W Darden Rd SR#1778 S u t t o n t o w n R d B r i t t R d C arr C h urch R d K e n a n W e e k s R d Rosin Hill Rd W i l l i a m R K i n g R d H unter R d Carr Rd Gilmore Ln Roa no k e Rd Warwick Rd S i m m o n s R d S a r a L n H o b b t o n H w y 7 0 1 Pipe Replacement on SR 1818 at 0.4 miles west of US 701North of Clinton at Hobbton, Sampson County ¹ 0 1,500 3,000 4,500 6,000750Feet