HomeMy WebLinkAboutRE_ _External_ RE_ _URL Verdict_ Neutral__Non-DoD Source_ RE_ Provisional Verification _ SAW-2022-01646 _ Hinton Oaks Industrial Park (North) _ Wake Stone Property Company _ KnigBaker, Caroline D
From: Thomas, Zachary T
Sent: Monday, June 5, 2023 10:38 AM
To: Bose Bratton; Bob Zarzecki
Cc: Phillips, George L CIV USARMY CESAW (USA)
Subject: RE: [External] RE: [URL Verdict: Neutral][Non-DoD Source] RE: Provisional Verification /
SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property
Company / Knightdale / Wake County
Hi All,
Unfortunately, I have meetings/site visits on these dates and will not be able to attend. If you will please notify DWR of
the surveyed information to satisfy condition #2 of the 401 certification, I will reach out with any questions after I am
able to review.
If you have any questions, please let me know.
Thank you,
Zach Thomas
Environmental Program Consultant, Division of Water Resources
North Carolina Department of Environmental Quality
Office: (919) 791-4255
zachary.thomas@deq.nc.gov
**DEQ is updating its email addresses to @deq.nc.gov in phases from May 1st to June 9th. Employee email
addresses may look different, but email performance will not be impacted.
Raleigh Regional Office
1628 Mail Service Center
Raleigh, NC 27699-1628
E
Email correspondence to and from this address is subject to the North Carolina Public Records Law
and may be disclosed to third parties.
From: Bose Bratton <bosebratton@wakestonecorp.com>
Sent: Thursday, June 1, 2023 4:40 PM
To: Bob Zarzecki <bzarzecki@sandec.com>; Phillips, George L CIV USARMY CESAW (USA)
<George.L.Phil lips@usace.army.mil>
Cc: Thomas, Zachary T <zachary.thomas@deq.nc.gov>
Subject: [External] RE: [URL Verdict: Neutral][Non-DoD Source] RE: Provisional Verification / SAW-2022-01646 / Hinton
Oaks Industrial Park (North) / Wake Stone Property Company / Knightdale / Wake County
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Lyle,
Thanks for suggesting the site visit times. The following work great for me:
6/13 — (2:00 — 3:00)
6/14 — (1:00 — 3:00)
6/16 — (11:00 — 3:00)
Do you have a preference on any of the above?
Bob, appreciate you being available as well.
Looking forward to getting this visit on the books.
Best,
Bose
Bose Bratton I Wake Stone Property Company
Vice President
PO Box 190 1 6821 Knightdale Blvd. 27545
C: 919-210-6991 1 0: 919-266-1100
bosebratton@wakestonecorp.com
From: Bob Zarzecki <bzarzecki@sandec.com>
Sent: Thursday, June 1, 2023 2:21 PM
To: Phillips, George L CIV USARMY CESAW (USA) <George.L.PhiIli ps@usace.armV.mi1>; Bose Bratton
<bosebratton@wakestonecorp.com>
Cc: Thomas, Zachary T <zachary.thomas@ncdenr.gov>
Subject: RE: [URL Verdict: Neutral][Non-DoD Source] RE: Provisional Verification / SAW-2022-01646 / Hinton Oaks
Industrial Park (North) / Wake Stone Property Company / Knightdale / Wake County
Thanks Lyle!
Bose — I can make any of the days/times that Lyle offered work. Just let me know what works best for
you all and I'll be there.
06/13 (800 — 300)
06/14 (800-300)
06/16 (800-300)
06/22 (800-300)
BOB ZARZECKI
Wetlands Department Manager/Vice-President/Principal
Soil & Environmental Consultants, PA
North Quarter Office Park
8412 Falls of Neuse Road, Suite 104
Raleigh, INC 27615
Office (919) 846-5900
Direct (919) 256-4517
Mobile (919) 270-2068
bzarzecki@sandec.com
Visit us at sandec.com
pil
This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information. This electronic
communication may not have passed through our standard review/quality control process. Design data and recommendations included herein are provided as a matter of
convenience and should not be used for final design. Rely only on final, hardcopy materials bearing the consultant's original signature and seal. If you are not the named
addressee (s), any use, dissemination, distribution or copying of this communication is prohibited. If you have received this electronic communication in error, please notify
the sender by return e-mail and delete the original communication from your system. Thank you.
APlease consider the environment before printing this email.
From: Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil>
Sent: Thursday, June 1, 2023 11:10 AM
To: Bose Bratton <bosebratton@wakestonecorp.com>; Bob Zarzecki <bzarzecki@sandec.com>
Cc: Thomas, Zachary T <zachary.thomas@ncdenr.gov>
Subject: RE: [URL Verdict: Neutral][Non-DoD Source] RE: Provisional Verification / SAW-2022-01646 / Hinton Oaks
Industrial Park (North) / Wake Stone Property Company / Knightdale / Wake County
Good Morning,
I am working on the formal verification and plan to get that in your inbox today.
I am in meetings all day tomorrow and have a workshop next week.
I have the following availability to meet onsite.
06/13 (800 — 300)
06/14 (800-300)
06/16 (800-300)
06/22 (800-300)
IT should be a quick site visit. Let me know what works best for you.
Lyle Phillips
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 588-9200
Fax: (919) 562-0421
Email: George.L.Phillips@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at https://regulatory.ops.usace.army.mil/customer-service-survey/. Thank you for taking the time to visit this
site and complete the survey.
From: Bose Bratton <bosebratton@wakestonecorp.com>
Sent: Thursday, June 1, 2023 9:32 AM
To: Bob Zarzecki <bzarzecki@sandec.com>; Phillips, George L CIV USARMY CESAW (USA)
<George.L.Phillips@usace.army.mil>
Cc: Thomas, Zachary T <zachary.thomas@ncdenr.gov>
Subject: [URL Verdict: Neutral][Non-DoD Source] RE: Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial
Park (North) / Wake Stone Property Company / Knightdale / Wake County
Good morning all,
Writing to confirm our surveyor has completed the staking of the permanent loss impacts.
Lyle, we'd like to schedule the preconstruction site inspection at your earliest convenience. When do you think you'll be
able to visit our site?
Best,
Bose
Bose Bratton I Wake Stone Property Company
Vice President
PO Box 190 1 6821 Knightdale Blvd. 27545
C: 919-210-6991 1 0: 919-266-1100
bosebrattonl@wakestonecorD.com
From: Bob Zarzecki <bzarzecki<@sandec.com>
Sent: Thursday, May 18, 2023 1:17 PM
To: Phillips, George L CIV USARMY CESAW (USA) <George.L.PhiIli ps@usace.army.mil>
Cc: Bose Bratton <bosebratton@wakestonecorp.com>; Thomas, Zachary T <zachary.thomas@ncdenr.gov>
Subject: RE: Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property
Company / Knightdale / Wake County
Lyle
Just following up with you on this. We'd like to get your official verification tear sheet so that we can
schedule the preconstruction site visit with you. The surveyors should have the permanent loss
impact limits staked any day.
BOB ZARZECKI
Wetlands Department Manager/Vice-President/Principal
Soil & Environmental Consultants, PA
From: Bob Zarzecki
Sent: Monday, May 8, 2023 5:29 PM
To: Phillips, George L CIV USARMY CESAW (USA) <George.L.PhiIli ps@usace.army.mil>;
bosebratton@wakestonecorp.com
Cc: Thomas, Zachary T <zachary.thomas@ncdenr.gov>
Subject: RE: Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property
Company / Knightdale / Wake County
Zach - I just got notice of the signed approvals. Thanks!
Lyle — Attached are the approvals for your files. Please let us know when Bose might expect to see
the USACE verification tear sheet. Thanks.
Bose — Hold on making any wetland mitigation payments as there will be an MRT form from the
USACE as well. I'll then send both approvals to DMS to request the invoice.
BOB ZARZECKI
Wetlands Department Manager/Vice-President/Principal
Soil & Environmental Consultants, PA
From: Bob Zarzecki
Sent: Friday, May 5, 2023 1:34 PM
To: Phillips, George L CIV USARMY CESAW (USA) <George.L.PhiIli ps@usace.army.mil>;
bosebratton(@wakestonecoro.com
Cc: Thomas, Zachary T <zachary.thomas@ncdenr.gov>
Subject: RE: Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property
Company / Knightdale / Wake County
Thanks Lyle!
BOB ZARZECKI
Wetlands Department Manager/Vice-President/Principal
Soil & Environmental Consultants, PA
From: Phillips, George L CIV USARMY CESAW (USA) <George.L.PhiIli ps@usace.army.mil>
Sent: Friday, May 5, 2023 1:30 PM
To: bosebratton@wakestonecorp.com; Bob Zarzecki <bzarzecki@sandec.com>
Cc: Thomas, Zachary T <zachary.thomas@ncdenr.gov>
Subject: Provisional Verification / SAW-2022-01646 / Hinton Oaks Industrial Park (North) / Wake Stone Property
Company / Knightdale / Wake County
Dear Bose Bratton and Bob Zarzecki,
This e mail serves to notify you that your proposed work may be authorized by the above referenced general
permit provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps
will provide you with a final general permit verification. Your proposed work shall not commence until after
the 401 Certification has been issued or waived AND until a final general permit verification has been
provided to you. Additional special conditions may be added to the final general permit verification.
The special conditions below will be included with the permit verification:
a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance
with the provisions outlined on the most recent version of the attached Compensatory Mitigation
Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this
form, are hereby incorporated as special conditions of this permit authorization.
b. A Pre -construction meeting whereby the permanent loss impact limits would be staked by a licensed
surveyor and reviewed in the field, including measuring the impact footprint. If the footprint of loss exceeded
0.031 acre, we would then rescind the use of NWP 39, and the applicant would then have the option to either
proceed via the Individual Permit process, or resubmit a request to use NWP 39 providing additional
avoidance and mitigation of impacts (below the impact limit threshold);
c. An as -built survey of the wetland fill showing the footprint of permanent loss impacts overlaid on the
stream/wetland delineation. If the footprint of wetland loss impacts exceeds 0.031 acre, we would then
rescind the use of NWP 39, and the applicant would then have the option to either proceed via the Individual
Permit process, or re -construct the crossings such that they fit NWP 39 impact limit thresholds.
d. The permittee shall inform the U.S. Army Corps of Engineers Wilmington District Raleigh Field Office Project
Manager of the date work within jurisdictional waters commenced. The discharge of dredged or fill material,
as proposed for a temporary haul road depicted as Impact Area 2 on the attached exhibits, may not be located
within waters of the United States after 03/01/2026 without specific written permission from the Corps.
Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers
regulatory program.
Lyle Phillips
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 588-9200
Fax: (919) 562-0421
Email: George. L.Phillips@usace.army.miI
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at https://regulatory.ops.usace.army.mil/customer-service-survey/. Thank you for taking the time to visit this
site and complete the survey.