Loading...
HomeMy WebLinkAboutWQ0035784_Additional Information Request_20230206ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director SEAN DWYER — DIRECTOR WALLACE LOFT LLC 5 BRYANT PARK — 28TH FLOOR NEw YORK, NEw YORK 10018 Dear Mr. Dwyer: NORTH CAROLINA Environmental Quality February 6, 2023 Subject: Application No. WQ0035784 Additional Information Request The Cottages of Boone WWTP Wastewater Irrigation System Watauga County Division of Water Resources' Central and Regional staff has reviewed the application package received November 22, 2022. However, additional information is required before the review may be completed. Please address the items on the attached pages no later than the close of business on March 8, 2023. Please be aware that you are responsible for meeting all requirements set forth in North Carolina rules and regulations. Any oversights that occurred in the review of the subject application package are still the Applicant's responsibility. In addition, any omissions made in responding to the outstanding items in Sections A through M, or failure to provide the additional information on or before the above requested date may result in your application being returned as incomplete pursuant to 15A NCAC 02T .0107(e)(2). Please reference the subject application number when providing the requested information. All revised and/or additional documentation shall be signed, sealed and dated (where needed), with an electronic response submitted to my attention at: https:Hedocs.deg.nc.gov/Forms/NonDischarge-Branch- Submittal-Form-Ver2. If you have any questions regarding this request, please contact me at (919) 707-3660 or Lauren.Plummer(ancdenr.gov. Thank you for your cooperation. 5111�oby: P -�Q xw w tA, ,ju�,.ghed n,Mn Mummer, Engineer III Division of Water Resources Enclosure cc: Winston-Salem Regional Office, Water Quality Regional Operations Section (Electronic Copy) Mark Brooks, PE — Brooks Engineering Associates, P.A. (Electronic Copy) Laserfiche File (Electronic Copy) E Q�� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 NORTH CAROHNA - oePemmencatE.W —rdalQuari /� 919.707.9000 Mr. Sean Dwyer February 6, 2023 Page 2 of 4 A. Cover/Response Letter: 1. The response letter dated August 22, 2022 indicates that the installation of the 90% pipe will reduce the tank volume to 49,274 gallons (Item H.1). However, Section V. Item I I.a of Form WWIS 06- 16 and the provided engineering calculations lists the flow equalization tank volume as 40,786 gallons. Please address this discrepancy and revise the application, if necessary, to reflect the equalization tank's volume upon installation of the 90% pipe. B. Application Fee: 1. Not applicable. C. Application (Form: WWIS-R 02-21): Mr. Sean Dwyer is listed as the Signature Authority in Section I, Item 3. Our office recently received a request on January 18, 2023, that Mr. Dwyer be removed from communications and replaced with (Mr./Ms.) Wen De Tam. Please confirm that (Mr./Ms.) Wen De Tam is to replace Sean Dwyer as the Owner/Director of Wallace Loft LLC and Signature Authority for this permit, and please verify that Mr. Dwyer is no longer affiliated with Wallace Loft LLC so that we may update our database. Section V. Item 1 lists Mr. Eric Youngs as the Operator in Responsible Charge (ORC). A review of our database shows that Mr. Youngs classification status is currently "invalid". Please have Mr. Youngs contact the Operator Certification group (URL: https:Hdeg.nc.gov/about/divisions/water- resources/operator-certification/wastewater-operator/staff-ww) to determine the necessary steps required to return to "active" status. Pursuant to 15A NCAC 08G .0200, the Permittee shall designate and employ a certified ORC and one or more back-up ORCs. The ORC and back-up ORC must be in good standing with the Water Pollution Control System Operators Certification Commission (WPCSOCC). The response regarding Attachment J — Civil Penalties and Outstanding Violations was answered as 'No". A Notice of Deficiency was issued January 9, 2023, that outlined deficiencies observed during the December 2022 inspection. On January 18, 2023, a Notice of Violation was issued related to compliance monitoring. Please provide an update regarding Wallace Loft LLC's response to these Notices. D. Application (Form: WWIS 06-16): Section IV. Item 7 lists 859 bedrooms contributing to a daily design flow of 105,000 GPD. The existing permit's facility description lists "894 bedrooms, five administrative/clubhouse employees, a fitness center, and a pool" contributing to the Cottages of Boone WWTP for a total daily design flow of 108,530 GPD. Please confirm that the current facility description is accurate, and if the current facility description is in error, then please update the daily design flow contributions in Section IV. Item 7 in accordance with 15A NCAC 02T .0114. 2. Section IV. Items 8 and 9 were unanswered. Please revise the application to include responses to these questions. Section V. Item 1 I.a. See Comment A. 1. Mr. Sean Dwyer February 6, 2023 Page 3 of 4 4. Section V. Item 1 I.c states that two Ultradynamic UV banks were installed with 4 bulbs per bank and a maximum disinfection capacity of 150 GPM. The existing permit lists dual 130 GPM Severn Trent UV disinfection systems. Were the Severn Trent units replaced? 5. The response to Section VIIL Item 4, is still answered "no" regarding intent to comply with 15A NCAC 02T .0506(c) for reduced irrigation setbacks. Based on the provided response letter this should have been changed to "yes". Please revise the application. E. Property Ownership Documentation: 1. No comments. F. Engineering Plans: 1. No comments. G. Specifications: The specifications for the proposed 90% outlet pipe do not appear to have been included within the signed and sealed "Engineer's Evaluation of Valve Installation Including Specifications & Calculations" letter. Specifications describing materials to be used, methods of construction (including required procedures for cutting into the tank sidewall), and means for ensuring quality and integrity of the finished product, including leakage testing are to be provided in accordance with 15A NCAC 02T .0504(c)(2). H. Engineering Calculations: 1. No comments. I. Site Map: 1. Both applications indicated that a Site Map meeting the requirements of 15A NCAC 02T .0504(d) was to be provided. This map was not included in the submitted documents. Please provide the updated site map as required. J. Power Reliability Plan: 1. No comments. Mr. Sean Dwyer February 6, 2023 Page 4 of 4 K. Operation & Maintenance Plan: 1. The Engineering Plans and Specifications documents referenced in the response letter are separate from the Operation & Maintenance (O&M) Plan. The provided O&M Plan is dated August 2013 and does not appear to be updated to include operation of the knife valve and proposed 90% outlet pipe. A revised O&M Plan meeting the requirements of 15A NCAC 02T .0507 is required. This document shall include, at a minimum, a description o£ a. Operation of the wastewater treatment, storage, and irrigation systems insufficient detail to show what operations are necessary for the system to function and by whom the functions are to be conducted. b. Anticipated maintenance of the wastewater treatment, storage, and irrigation systems. c. Safety measures, including restriction of access to the site and equipment. d. Spill prevention provisions such as response to upsets and bypasses, including how to control, contain, and remediate. e. Contact information for plant personnel, emergency responders, and regulatory agencies. L. Residuals Management Plan: 1. No comments. M. Additional Documentation: ➢ Existing Permit: 1. No comments. ➢ Engineer's Certification: 1. Our understanding is the knife valve is currently installed and operational. Please provide an Engineer's Certification for the knife valve using the enclosed form to certify its continued use.