Loading...
HomeMy WebLinkAbout20230759 Ver 1_Site Plan_20230601, Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.) Paul Wojoski Paul Wojoski DWR-401 & Buffer Permitting Branch DWR-401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 A. Applicant Information [15A NCAC 02H .OS02(a)] 1. Owner Information Name: Robert Clark Mailing Address: 7698 Red Robin Tri Denver, NC 28037 Telephone Number: (704)681-2319 Fax Number: NNA Address: a.-'+ • - • 2•..w1diza •. of 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: httr)://www.saw.usace.armv.mil/Portals/59/docs/reizulatorv/regdocs/Permits/SAMPLE AGENT ALITHORIZ ATION FORM.pdf) Name: Charlie Washburn Company Affiliation: Marine Construction LLC Mailing Address: PO Box 6400 Hickory, NC 28603 Telephone Number: 828-495-3040 Fax Number: N/A E-mail Address: office@?marineconstructionllc.com B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: BDrke Nearest Town: Connally Springs Lake/ river/ ocean adjacent to property: —Cage Rbgdhicg Property size (acres): 1.35 Acres Subdivision name or site address (include phase/lot number): _ Lot 47, Harbor Ridge Subdivision Section 2, 105 Beacon Ridge Dr. Directions to site - please include road names and numbers, landmarks, etc.: Included in packet Latitude (in decimal degrees) 35.779 Longitude (decimal degrees)-R1.512 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Residential, undeveloped 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): We o Stabilesthe gharaline with ri roman to prevent further_emsion 7. Will work be conducted from land? _)L From water? _ 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 374 sgft Temporary impacts in square feet: 0 sgft 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 74A sgft Temporary impacts (temporary clearing, construction corridor) in square feet: (Construction corridor= 1.g:zn sgft) 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): l at is wooded. We elan to remove 13 trees but will replant them 1 for 1 with Native Hardwood trees. 11. Sigripture Owner/Agent's Signature* [15A NCAC 02H .0502(f)] Date `Agent's signature is valid only if on authorization letter from the owner is provided. FORM: 55GP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Shoreline tUd GGeGrip N o c VfAAn� Plan View Full Lake IAc Fun Pood/ Normal Water Lsveq Existing Dock 30ftx7ft 3ftx150ft _�. Bel. Ulpord/NWL -moo 4 ftx 150 ft Above full pond/ NWL t ., no sm IN= IBM am 4'tX I $1 f4. Aboe, O« Pond 1 NWj- FORM: SSGP 02-2017 Page 3 of 4 • vim I me a Wilk a 0aet ��►�� I / bt / t( I tl4MY I in t • Ii� M� 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing f necessary FORM: SSGP 02-2017 Page 4 of 4