Loading...
HomeMy WebLinkAbout20130371 Ver 1_Certification of Completion_20150617D ������: ... �� JUN �g 7 2015 ��� NCDENR oer,R-wnTER►��� lina Department of Environment and Natural Resources TRANSPORTATION P N R Division of Water Quality Beverly Eaves Perdue Charies Wakild, P.E Governor Director DWQ Project No.• �i�%�.3 � 37 r County: /��-�ow+G �{ Applicant: /V� 1� 6T ProjectNar►ze: l.��:�.k,L �Z3 on s!Z iS6U (7ii�, t3.1� • I� Daie of Issuance of 401 Water QuaEity Certification: �� �U� Z�l.j � y55 �e Dee Freeman Secretary Certificate of Completion Upon completion of all work approved within the 401 WaterQuality Certification or appiicable Buffer Rules, and any subsequent modifcations, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water QuaEity, 165Q Mail Service Center, Raleigh, NC, 27b99-1650. This form may be retumed to DWQ by the applicant, the applicant's authorized agent, or the project engineer. it is not necessary to send certificates from al[ of these. Applican�tf'� erfificat}'on I, '1G�5 ��`�^ , hereby state that, to the best of my abilities, due care and diligence was used in the ohservation of the construction such that the construction was observed to be bui(t within substantial compliance and inEent of tfie 401 Water Quality CerEification and BufFer Rules, the approved pla�s and specifications, and other supporting materiaEs. Signature: i�G��`_ Date: / G J k,1� L.S� Agent's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the obse►vaEion of the construction such that the construction was observed to be built within substantial compliance and intenE of the 401 Water Quality Certification and Buffer Rules, the approved plans aad specifications, and other supporting materials. Signature: Date: Engineer's Certification Partial Finaf I, , as a duly registered Professional Engineer in ttte State of Nqrth Carolina, having been authorized to observe (periodicaily, weekly, Full time) the construction of the project,for the Permittee hereby.state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and 8uffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date f6t7 Mail Service Center, Raleigh, Nodh Ca�oHna 27fi99-1617 Location: 512 N. SaHs6ury St. Raleigh. NoRh Carolina 27604 Qpg Phane: 919-SO7-63Q01 FAX: 919-807-6492 4 Customer Servica:1-877�623-6748 NorthCarolina Infernet: wvuw.ncwaierquality.org ,/'� �j��uN� /�, , An Equal Oppodunily 1Af�rmative Actioo Employer f� v � �� �oi�