Loading...
HomeMy WebLinkAboutNC0024406_Bromide Reduction Evaluation Semi-Annual Report_20230530 4IN DUKE Belews Creek Steam Station ENERGY. Duke Energy Carolinas 3194 Pine Hall Road Walnut Creek,NC 27609 May 22, 2023 RECEIVED Sergei Chernikov, PhD MAY 2 6 2023 NC Department of Environmental Quality Division of Water Resources Complex NPDES Permitting Unit NCDEQ/DWR/NPDES 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Subject: Duke Energy Carolinas, LLC Belews Creek Steam Station -#NC0024406 - Bromide Reduction Evaluation Semi —Annual Report Dear Dr. Chernikov: As required by Condition A. (14) of the subject NPDES permit attached are three copies of the Semi-annual status report summarizing Duke Energy's efforts to reduce bromide discharge and potential subsequent Total Trihalomethane (TTHM) formation in downstream municipal water treatment systems. Should you have questions regarding this report, please contact Lori Tollie at 336-408-2591 or Lori.Tollie@duke-energy.com. Yours truly, Michael F. Lanning, General Manager Ill RRE CDG Belews Creek Steam Station Attachment Belews Creek Steam Station Bromide Reduction Evaluation NPDES Permit-NC0024406 Semi-Annual Progress Report May 2023 Pursuant to Condition A. (20) Bromide Reduction Evaluation of the NPDES Permit— NC0024406. Duke Energy submits this semi-annual progress report. This report is required to summarize on- going investigations focused on minimizing bromide discharge at Outfall 003, 006, and 111 as well as efforts aimed at reducing the formation of total trihalomethanes (TTHM) at downstream water treatment plants. • Duke Energy has worked cooperatively with the North Carolina Division of Water Resources (DWR), the Town of Madison and City of Eden to address the bromide/TTHM issues since being advised of the municipality's issues with TTHM formation. • Bromide itself is not a health concern in surface waters. There is no water quality standard for bromide and no NPDES permit limit. • Duke Energy has provided direct technical expertise and financial assistance to Madison and Eden to help address their respective TTHM issues. Town of Madison • No updated information new to report. City of Eden • No updated information new to report. Belews Creek Steam Station • Duke Energy has partnered with UNC-C and Electric Power Research Institute (EPRI) to perform a lysimeter pilot at Mayo Power Plant that is reviewing halide sequestration and encapsulation strategy from a long-term perspective. • Belews Creek is currently planning for 50% natural gas co-fire capabilities. Conversion to natural gas for Unit 1 was completed in 4th quarter of 2019. Conversion of Unit 2 was complete in the 4th quarter of 2020. This modification to the operation of the station is a result of other factors but is expected to have an added benefit of decreasing the mass of bromide discharges.