Loading...
HomeMy WebLinkAboutNCC231574_ESC Approval Submitted_20230524 ROY COOPER /4 ail: � .... Governor !„' � --.A 0' i ELIZABETH S.BISER \ e.,r* Secretary �wN+y1tl°'.= DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality March 24, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Buncombe County Schools ATTN: Mr. Clark Wyatt 175 Bingham Road Asheville, NC 28806 RE: Project Name: Avery's Creek Elementary School - Car Rider Improvements Acres Approved: 3.3 Project ID: BUNCO-2023-012 County: Buncombe City: Arden Address: 15 Park S Blvd River Basin: French Broad Stream Classification: C Submitted By: McGill Associates - Mr. Scott E. Burwell, P.E. Date Received by LQS: March 13, 2023 Plan Type: Institutional, Educational Dear Mr.Wyatt, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page.This plan approval shall expire three (3) years following the date of approval, if no land- disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater �D ,- North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Asheville Regional Office 12090 U.S.Highway 70 I Swannanoa,North Carolina 28778 Deparbnent /" 828296.4500 Letter of Approval with Modifications Buncombe County Schools ATTN: Mr. Clark Wyatt March 24, 2023 Page 2 of 5 Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land- disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee.You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, .4.\:„.4 0 'it,_ Mic ael Smit Assistant Regional Engineer Land Quality Section Letter of Approval with Modifications Buncombe County Schools ATTN: Mr. Clark Wyatt March 24, 2023 - Page 3 of 5 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet ec: Mr. Scott E. Burwell, P.E. Scott.Burwell@Mcgillengineers.com Ms. Natalie Croom, natalie.croom@mcgillengineers.com Regional Office file MODIFICATIONS Project Name: Avery's Creek Elementary School - Car Rider Road Project ID: BUNCO-2023-012 County: Buncombe For final plan approval, please provide the requested information below. 1. Please note that referencing Figure 8.06a of the Erosion and Sediment Control Planning and Design Manual for a round pipe flowing full with a tailwater condition (Tw< 0.5) the minimum length of a rip rap splash pad is 18'. The dimension given in plan sheet detail EC17 (Pipe Outlet Protection) is 8'. This may be a typographical error. Please review this dimension listed on plan sheet C-502. {G.S. 113A-57 (3)}. 2. Please include the 5 isolated inlet protection measures within the limits of disturbance shown on Initial and Intermediate Erosion Control Plan Sheets C-105 and C105 respectively. These are located along the western edge of the disturbed area. Please just enclose the small areas of the culvert inlet protection measures within the limits of disturbance. These small areas should not affect the overall disturbed area. {NCG01000}. 3. If used on the site, please show on the plans the locations all topsoil or subsoil stockpiles. Please show these structures on the plan surrounded by sedimentation fence, leaving an access for ingress for equipment. The silt fence should be located 5 feet from the toe of the stockpile. These structures should be located at least 50 feet from any stormwater inlet. If the stockpile is to remain inactive for more than 7 days, the structure should be stabilized. {G.S. 113A-57 (3)}. Letter of Approval with Modifications Buncombe County Schools ATTN: Mr. Clark Wyatt March 24, 2023 Page 4 of 5 4. Please add a note to the plans that any off-site borrow and/or waste required for the project must come from a site with an approved erosion control plan,a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash or debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. {15A NCAC 04B .0110). 5. Please provide on the plan sheet construction typicals a detail of the COIR baffles to be used in temporary sediment basin #1. {G.S. 113A-57 (3)}. 6. Please change callout on plan sheet C-104 to see plan detail of the temporary skimmer basin on sheet C-503. This detail is shown on plan detail sheet C-504. {G.S. 113A-57 (3)}. 7. Please change the references to contact Buncombe County Erosion Control throughout the Construction Sequences on plan sheet G-003 to NCDEQ at (828) 296- 4500. NCDEQ is the permitting authority for erosion and sediment control on this site. Buncombe County may be the permitting authority for post-construction stormwater devices on this site. {G.S. 113A-57 (3)). 8. Consideration should be given to avoiding Sericia Lespedeza as it is considered an invasive species, per NC State University/At&T University Cooperative Extension. The Extension recommends the following alternative native species: Switchgrass (Panicum virgatum), Splitbeard Bluestem (Andropogon ternarius), Beggarlice (Desmodium spp.), Partridge Pea (Chamaecrista fasciculata). {Comment} 9. Please change the references from Lincoln County to Buncombe County or NCDEQ shown in notes 5 and 13 listed under Erosion Control Notes on plan sheet G-003. {G.S. 113A-57 (3)). Letter of Approval with Modifications Buncombe County Schools ATTN: Mr. Clark Wyatt March 24, 2023 Page 5 of 5 10. Please add to the Construction Sequence and/or Erosion Control Notes on plan sheet G-003; a) That no major grading activities or basin construction are to take place during wet weather or periods of predicted wet weather, b) That the site must be"storm ready"before any extended breaks in construction activities including weekends, c) To file and electronic Notice of Termination (e-NOT) after a final close out inspection report is received from NCDEQ Land Quality Section Program Consultant. {G.S. 113A-57 (3), NCG01000) Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities sE