FACT SHEET FOR NPDES INDUSTRIAL INDIVIDUAL
STORMWATER PERMIT DEVELOPMENT
Basic Information for Permit Issuance and Renewals:
Permit Writer/Date Brianna Young 5/16/2023
Permit Number NCS000050
Owner/Facility Name SCM Metal Products,Inc/SCM Metal Products,
Inc.
SIC AICS Code/Category 3399 331420 /Primary Metal Products
Basin Name/Sub-basin number 001: Cape Fear/03-06-05
002 and 003:Neuse/03-04-02
Receiving Stream/HUC 001: UT to Northeast Creek/030300020605
002 and 003: Stirrup Iron Creek/030202010801
Stream Classification/Stream Segment 001: WS-V;NSW/ 16-41-1-17-(0.3)
002 and 003: C;NSW/27-33-4-2
Is the stream impaired [on 303(d) list]? No
Any TMDLs? No
Any threatened and/or endangered species? No
Any compliance concerns? See Section 2 below
Any permit mods since lastpermit? See Section 1 below
New expiration date 6/30/2028
Comments on Draft Permit? See Section 6 below
Section 1. Facility Activities and Process:
SCM Metal Products, Inc. is a facility that produces copper powder, copper oxide, tin powders,
antimony powder, and Cubond Brazing Paste for industrial applications. Flammable materials are stored
outside under roof and in secondary containment. Water in a bioretention cell infiltrates into the ground,
however, if there is ever any overflow, the water for the riser in the bioretention cell is piped to Outfall
SW001.
Significant changes at the facility since the last permit renewal include:
• Brazing manufacturing process was moved from an outside building into the main facility in
March 2013
• Most additives are stored indoors except some drums of flammable liquids (required to store
outdoors); Drums are stored on secondary containment pallets and covered with tarps.
• New process added April 2019: antimony ingots processed into antimony powder(crushing
ingots, grinding/milling and screening)
• Former drum crusher was decommissioned and removed in 2018; Empty drums are now
exchanged with the chemical vendor
• Catalyst process that was in the TL#3 room was decommissioned and all equipment was
removed in December 2021
• Tin,NuTin, and Bismuth processes commissioned in September 2022, producing tin powder, tin-
copper alloy powders, and bismuth powders through air atomization and screening.
o Tin manufacturing previously discontinued December 2013 (moved to another location)
Page 1 of 8
o Bismuth production will include the melting of bismuth ingot and air atomization of the
molten metal to create bismuth powder, and screening operations
o NuTin process will include the melting and air atomization of a 90/10 tin/copper mixture;
resulting powder will include dry handling operations such as screening
• There are plans to install a water copper process in the main production area and a continuous
belt reduction furnace during 2022 Q4
o As a part of this construction, the wastewater pretreatment system been moved to the
Brazing Manufacturing Process area. This will include moving the process tank outside,
near the current storage tank. This tank will be installed inside of a secondary
containment bunker.
o Per information provided 10/25/2022: The process tank being moved outside is part of
the non-process wastewater pretreatment system. This is similar to the large wastewater
storage tank that receives wastewater from the employee shower drains, restroom sinks,
and laboratory sinks. The water from these drains is collected in the large wastewater
storage tank, then pumped into the process tank. Wastewater from the smaller process
tank is then run through a series of 72 membrane filters, which is then run through a resin
bed filter prior to being discharged to the sanitary sewer. The location of the process tank
will be in close proximity to the existing large wastewater storage tank and located inside
a concrete secondary containment.
• Per email communication dated 9/22/2022, outfall SW003 was added in September 2011.
Outfall SW001:
Drainage area contains a parking area, storage pad, copper production warehouse, production plant
warehouse, a bioretention pond, new pallets storage, scrap materials, scrap metal,process equipment
storage, liquid hydrogen storage and loading/unloading operations, copper storage area, slag material from
melt furnace skimming operations,processing of antimony ingots into powder, air atomization of tin, tin-
copper alloy, and bismuth, dumpsters,trash compactor, oil drum storage building, ethylene glycol and SCM
mix storage,waste oil storage tank,maintenance shop, a cooling tower, oil storage building, and bulk storage
tanks for argon,propane, liquid oxygen, and liquid nitrogen.
Outfall SW002:
Drainage area contains the road providing access to the manufacturing areas of the plant parking lot,
administrative offices, loading/unloading area, and R&D lab area. The primary source of storm water
contamination in this area is through accidental spills that could occur during transport of raw materials
and wastes.
Outfall SW003:
Drainage area contains vegetated areas, a parking lot, the Microbond building,production of Cubond®
Brazing paste, storage of tin powders, a wastewater treatment tank, and a wastewater process tank. The
outfall is a settling device which retains rainwater to allow solids to settle prior to being discharged.
Why Industrial Sites with Stormwater are Subject to a Permit: Federal NPDES regulations define
stormwater discharge associated with industrial activity in 40 CFR §122.26 (b)(14) as: "the discharge
from any conveyance that is used for collecting and conveying storm water and that is directly related to
manufacturing,processing or raw materials storage areas at an industrial plant. The term does not
include discharges from facilities or activities excluded from the NPDES program under this part 122.
For the categories of industries identified in this section, the term includes, but is not limited to, storm
Page 2 of 8
water [sic] discharges from industrial plant yards; immediate access roads and rail lines used or traveled
by carriers of raw materials, manufactured products, waste material, or byproducts used or created by
the facility; material handling sites; refuse sites; sites used for the application or disposal of process
waste waters (as defined at part 401 of this chapter); sites used for the storage and maintenance of
material handling equipment; sites used for residual treatment, storage, or disposal; shipping and
receiving areas; manufacturing buildings; storage areas (including tank farms) for raw materials, and
intermediate and final products; and areas where industrial activity has taken place in the past and
significant materials remain and are exposed to storm water. For the purposes of this paragraph, material
handling activities include storage, loading and unloading, transportation, or conveyance of any raw
material, intermediate product, final product, byproduct or waste product. The term excludes areas
located on plant lands separate from the plant's industrial activities, such as office buildings and
accompanying parking lots as long as the drainage from the excluded areas is not mixed with storm
water [sic] drained from the above described areas."
Section 2. Monitoring Information and Compliance History:
• May 2012 to March 2022,benchmarks exceeded for:
o SW001: TSS Ix, Zinc 7x, Copper 23x
o SW002: Copper 23x
o SW003: TSS Ix, Copper 23x
• Copper was exceeded for every outfall for every sampling point provided, however, Tiered
Response was not implemented by the permittee.
• Pe an inspection letter dated 8/23/2011, SW001 is representative of all 3 outfalls
• On 11/4/2021, it's estimated 800 to 900 gallons of cooling water discharged to SW001 through
storm drains. The cooling water is non-contact cooling water that is treated with a corrosion
inhibitor at a concentration of 25ppm.
• Downstream of the discharge location,Northeast Creek(SW001 receiving stream) is impaired
for turbidity, copper, and zinc. During previous permit renewals, the City of Durham had
concerns about air emissions from this facility potentially contributing to the degradation of the
stream.
• Permit file history for previous permits shows DEQ staff concerns over copper at the facility and
implementing BMPs to prevent pollution to Northeast Creek.
o Lots of discussion and meetings between DEQ and SCM staff
• Per an email from Raleigh Regional Office staff(dated 12/13/2022),based on the December
2022 inspection, copper dust was everywhere, with a layer inside the facility(so much that the
RRO inspector asked if it was safe to breath in). RRO staff stated the biggest issue seemed to be
the copper getting tracked out by workers who are leaving doors open and running equipment
through the dust,but that all BMPs were being implemented at some level.
Section 3. Proposed Monitoring for Stormwater Discharges:
The Division considered potential pollutants from past and present industrial activities and data was
submitted for May 2012 to March 2022. Quantitative sampling included pH, TSS, copper, and zinc.
Parameters are based on potential pollutants in the drainage area, sampling results, and in some cases,
dependent upon future activities (e.g., ash removal through the drainage area). Below is a table of the
proposed monitoring for each outfall at the SCM Metal Products, Inc. site.
Page 3 of 8
Outfalls SW001, SW002, SWO03
Quarterly monitoring
Total Suspended Solids BASIS: Potential pollutant from drainage area and BMP effectiveness
(TSS) indicator.
Quarterly monitoring
H BASIS: Pollutant indicator and important to interpreting toxicity potential
p of metals.
Quarterly monitoring
Total Rainfall BASIS: Discharge potential indicator
Quarterly monitoring
Non-Polar Oil &Grease BASIS: Potential pollutant from lubricants; Method 1664 SGT-HEM
targets petroleum-based O&G
Quarterly monitoring
Monthly Oil Usage BASIS: Potential pollutant from drainage area
Quarterly monitoring
COD BASIS: Discharge potential indicator
Quarterly monitoring
Total Nitrogen BASIS: Discharge potential indicator
Quarterly monitoring
Antimony BASIS: Potential pollutant from drainage area
Quarterly monitoring
Total Copper BASIS: Potential pollutant from drainage area
Quarterly monitoring
Total Zinc BASIS: Potential pollutant from drainage area
Stormwater Benchmarks and Tiered Response: Rather than limits,North Carolina NPDES
Stormwater permits contain benchmark concentrations. Stormwater benchmarks are numerical action
levels for stormwater monitoring. Benchmarks are not effluent limits, and benchmark exceedances are
not permit violations. Benchmarks provide facilities a tool for assessing the significance of pollutants in
stormwater discharges and the effectiveness of best management practices (BMPs). Benchmark
concentrations are intended as guidelines for the facility's development and implementation of the
Stormwater Pollution Prevention Plan (SWPPP).
Benchmark exceedances require the permittee to increase monitoring, increase management actions,
increase record keeping, and/or install stormwater BMPs in a tiered program. The permit establishes a
tiered approach to specify actions the permittee must take in response to analytical results above
benchmark concentrations. The tiered structure of the permit provides the permittee and DEMLR wide
flexibility to address issues that may arise with one or more parameters and/or outfalls.
Page 4 of 8
Metals benchmarks are calculated to mimic acute water quality standards and with the guidance of
DWR. NC DWR follows established federal procedures for calculating acute standards when developing
the benchmarks. Just like the acute standards, metals benchmarks normally reflect one half of the
calculated Final Acute Value (the "1/2 FAV"). In most cases, translation into total recoverable values is
based on an assumed hardness of 25 mg/L and a total suspended solids (TSS) concentration of 10 mg/L.
Acute standards protect aquatic life from negative impacts of short-term exposure to higher levels of
chemicals where the discharge enters a waterbody. The Stormwater Permitting Program applies this
approach because of the ephemeral nature of rainfall events.
The Division may evaluate results to determine if a smaller suite of parameters for some outfalls is
adequate to characterize potential pollution or BMP effectiveness. For example, one or more metals or
other parameters may serve as an adequate tracer for the presence of ash pollution during disturbance or
ash removal in specific drainage areas at this site. For parameters that do not have a stormwater
benchmark, the Division may develop a benchmark value if appropriate toxicity data become available
or if rising trends in concentrations suggest a persistent source.
A summary of the benchmarks in the draft permit, and their basis, is below:
Parameter Benchmark Basis
Total Suspended 100 mg/L National Urban Runoff Program(NURP) Study, 1983
Solids TSS
H 6 s.u. —9 s.u. NC Water Quality Standard(Range)
Non-Polar Oil & Review of other state's daily maximum benchmark
Grease 15 mg/L concentration for this more targeted O&G;NC WQS that
EPA Method 1664 does not allow oil sheen in waters
SGT-HEM
COD 120 mg/L BPJ; Generally found at levels 4x BOD5 in domestic
wastewaters
Total Nitrogen 30 mg/L TKN+Nitrate+Nitrite Benchmarks (Expressed in mg/L of
N
Antimony 340 µg/L 1/2 FAV
Copper Total 10 /L Acute Aquatic Criterion, %2 FAV
Zinc Total 126 µg/L Acute Aquatic Criterion, 1/2 FAV
Stormwater Pollution Prevention Plan: The proposed permit conditions reflect the EPA and NC's
pollution prevention approach to stormwater permitting. The Division's maintains that implementation
of Best Management Practices (BMPs) and traditional stormwater management practices that control the
source of pollutants meets the definition of Best Available Technology (BAT) and Best Conventional
Pollutant Control Technology(BCT). The permit conditions are not numeric effluent limitations but are
designed to be flexible requirements for implementing site-specific plans to minimize and control
pollutants in stormwater discharges associated with the industrial activity. Title 40 Code of Federal
Regulations (CFR) §122.44(k)(2) authorizes the use of BMPs in lieu of numeric effluent limitations in
NPDES permits when the agency finds numeric effluent limitations to be infeasible. The agency may
also impose BMP requirements which are "reasonably necessary" to carry out the purposes of the Act
under the authority of 40 CFR 122.44(k)(3). The conditions proposed in this draft permit are included
under the authority of both of these regulatory provisions. In essence, the pollution prevention and BMP
requirements operate as limitations on effluent discharges that reflect the application of BAT/BCT.
Page 5 of 8
Flexibility in Tier Responses: Tier Two actions provide an opportunity for the permittee to propose an
alternative monitoring plan for approval by the Region:
• Alternatively, in lieu of steps 2 and 3, the permittee may, after two consecutive exceedances,
exercise the option of contacting the DEMLR Regional Engineer as provided below in Tier
Three. The Regional Engineer may direct the response actions on the part of the permittee as
provided in Tier Three, including reduced or additional sampling parameters or frequency.
• If pursuing the alternative above after two consecutive exceedances, the permittee may propose
an alternative monitoring plan for approval by the Regional Engineer.
The permit therefore allows the permittee to petition the Regional Office for monitoring changes sooner
than Tier Three (upon any four benchmark exceedances) and gives guidance on one option to take. For
example, the permittee may request that mercury only be monitored semi-annually under the tiers, or
that only parameters over the benchmark be monitored more frequently. In this way, changes to the
monitoring scheme for any outfall could be handled outside of a permit modification.
Other Proposed Requirements:
• It is standard for Stormwater Pollution Prevention Plan(SWPPP)requirements to include an
annual certification that stormwater outfalls have been evaluated for the presence of non-
stormwater discharges, and if any are identified, how those discharges are permitted or otherwise
authorized.
• Requirement to submit a request for permit modification if the facility identifies or creates any
new outfalls, removes outfalls, or alters any drainage area that changes potential pollutants.
• The Division expects the permittee to apply best professional judgment and consider the safety
of its personnel in fulfilling sampling obligations under the permit.
• Federal regulations require electronic submittal of all discharge monitoring reports (DMRs). If a
state does not establish a system to receive such submittals, then permittees must submit DMRs
electronically to the EPA.
• Quarterly QualitativeNisual Monitoring to assure regular observation of outfalls throughout
year.
Section 4. Changes from previous permit to draft:
• Monitoring increased from semi-annually to quarterly for all parameters (qualitative and
quantitative)
• "No discharge" clarifications made
• eDMR requirement added
• Feasibility study requirement removed per updated stormwater program requirements
• Boilerplate language moved into body of the permit; boilerplate no longer attached
• Monitoring for total hardness added for all outfalls as monitoring for hardness dependent metals
is required
• Benchmarks updated for parameters per guidance from DWR Standards group on stormwater
benchmarks
• Monitoring for COD added as a potential pollutant indicator due to presence of materials stored
onsite
• Monitoring for total nitrogen added as liquid nitrogen is stored onsite
• Monitoring for antimony added as manufacturing has been added
• BMP permit condition updated
Page 6 of 8
Section 5. Changes from draft to final:
• None
Section 6. Discussions with the Facility and Regional Office:
• Initial contact with facility: 9/12/2022
• Initial contact with Regional Office: 9/16/2022
• Draft sent to CO peer review: 1/23/2023
• Draft sent to Regional Office: 1/24/2023
• Final permit sent for supervisor signature: 5/17/2023
Section 7. Comments received on draft permit:
• Michelle Woolfolk(City of Durham; via email 3/27/2023): The City has no comments. We do
have questions regarding the use of benchmarks, but that is more for the state.
• Permittee representative (via phone 4/14/2023): Permittee does not think they will be able to
meet copper and zinc benchmarks (were not in last permit); permittee may request a
stepwise/drop down in benchmark levels over permit term or a compliance schedule so they can
get extra controls on copper; Permittee may request ROS potentially.
• Jonathan White (SCM Metal Products, Inc.; via email 4/28/2023; summarized here):
o Given historical data, and despite recent and planned efforts to reduce discharges, it is
difficult to predict when SCM may be able to achieve these benchmarks. It is therefore
unreasonable for NCDEQ to impose a permit with unattainable benchmarks. Hardness
and site-specific considerations should be accounted for to have a tailored approach that
reflects a facility-specific nature in developing benchmarks.
■ DEMLR Response: Stormwater benchmarks are not based on the type of permit
issued, but are developed in conjunction with the DEQ DWR Classifications and
Standards Branch. All general and individual industrial permits issued by the
Stormwater Permitting Program use the same benchmarks for pollutants of
concern for a specific facility or industry. Different benchmarks for different
facilities/permits are not permitted.
o In lieu of the tier structure proposed in the draft permit, SCM proposes that DEMLR
include a permit requirement that SCM develop a stormwater controls enhancement plan,
to be approved by DEMLR, that commits SCM to develop and implement enhanced
stormwater controls under a reasonable time schedule.
■ DEMLR Response: Tiered Response is a Stormwater Permitting Program
requirement of all individual industrial permits. Therefore, Tiered Response will
remain in the permit as drafted.
o In place of a Total Antimony benchmark, SCM proposes inclusion of Total Antimony in
quarterly sampling of Outfall SW002, as the stormwater runoff from the antimony
process area discharges only to Outfall SW002.
■ Follow-up clarification(Westley Riscili via email 5/16/2023): You are correct.
Stormwater runoff for the area in which the antimony process is located does in
Page 7 of 8
fact discharge to SW001, as indicated on the site map. The site map that was
provided on October 7, 2022 is correct.
■ DEMLR Response: Monitoring for Total Antimony will remain for all outfalls as
access roads are throughout the site, with potential tracking from vehicles or other
means, and there has been previous concerns regarding potential air deposition.
As a stormwater benchmark exists for Total Antimony, the benchmark will
remain in the permit.
o The draft permit cover letter indicates that the Feasibility Study was removed, yet it is
still referenced in Part E of the draft permit.
■ DEMLR Response: This was an oversight and erroneously not removed from the
permit. The reference to the Feasibility Study will be removed.
o DEMLR also added benchmarks for Non-Polar Oil & Grease, Chemical Oxygen
Demand, and Total Nitrogen, citing to no supporting logic. SCM urges DEMLR to tailor
the final permit to SCM's facility, remedy the inconsistencies, and provide support for
the additional parameter benchmarks.
■ DEMLR response: Monitoring for Non-polar Oil & Grease is required
monitoring for all individual industrial permits and, as stated in the draft permit, is
only required for drainage areas that use>55 gallons/month of oil on average per
EPA Method 1664 (SGT-HEM). Monitoring for Chemical Oxygen Demand and
Total Nitrogen were added to the permit due to the type of materials stored onsite.
Page 8 of 8
DailyBeaufoFt Gazette The HeFald-Pock Hill el Nuevo Herald-Miami Sun News-Myrtle Beach
Belleville Slemp-DemccFat Herald Sun-Durham Modesto Bee The News Tribu rpe Tacoma
Bell ingharn Heirald Idaho Statesman Paleigh News&Observer The Telegraph-Macon
Bradenton Herald Island Packet The Olympian San Luis Obispo Tiribure
J&,MC,-CLATCHY Centre
Charlotte Obserwer Lexington Heirald-Leader Fort VlAyth Star-Telegram Wichita Ead3le
Fresno Bee Miami Herald Sun Herald-Biloxi
AFFIDAVIT OF PUBLICATION
Account# Order Number Identification Order PO Amount Cols Depth
38106 405889 Print Legal Ad-IPL01173780-IPLO117378 $495.60 2 25 L
Attention: Paul Clark STATE OF NORTH CAROLINA
NC DENR ENGERGY MINERAL&LAND RESOURCES COUNTY OF WAKE,COUNTY OF DURHAM
1612 MAIL SERVICE CENTER Before the undersigned,a Notary Public of Dallas
RALEIGH,NC 276991612 County,Texas,duly commissioned and authorized to
administer oaths,affirmations,etc.,personally
appeared Tara Pennington,who being duly sworn or
affirmed,according to law,cloth depose and say that he
---------------------------------------------------------------------------
NORTH CAROLINA ENVIRONMENTAL p or she is Accounts Receivable S ecialistoftheNews&
MANAGEMENT COMMISSION INTENT TO ISSUE Observer Publishing Company,a corporation organized
NPDES STORMWATER DISCHARGE PERMITS and doing business under the Laws of the State of North
The North Carolina Environmental Management Commission proposes to issue g
NPDES stormwater discharge permit(s) to the person(s) listed below. Public Carolina,and publishing a newspaper known as The
comment or objection to the draft permits is invited.Written comments regarding News&Observer,Wake and State aforesaid,the said
the proposed permit will be accepted until 30 days after the publish date of this
notice and considered in the final determination regarding permit issuance and newspaper in which such notice,paper,document,or
permit provisions.The Director of the NC Division of Energy,Mineral,and Land
Resources (DEMLR) may hold a public hearing should there be a significant legal advertisement was published was,at the time of
degree of public interest.Please mail comments and/or information requests to each and every such publication,a newspaper meeting
DEMLR at 1612 Mail Service Center,Raleigh,NC 27699-1612. all of the requirements and qualifications of Section 1
• SCM Metal Products,Inc.[2601 Weck Drive,Research Triangle Park,NC] q q
has requested renewal of permit NCS000050 for the SCM Metal Products, ; 597 of the General Statutes of North Carolina and was a
Inc.in Durham County.This facility discharges to an unnamed tributary to qualified within the meaning of Section 1 597
Northeast Creek in the Cape Fear River Basin and Stirrup Iron Creek in ; q newspaper per g
the Neuse River Basin. of the General Statutes of North Carolina,and that as
Interested persons may visit DEMLR at 512 N. Salisbury street, Raleigh, NC such he or she makes this affidavit;and is familiar with
27604 to review information on file.Additional information on NPDES permits
and this notice may be found on our website: https://deq.nc.gov/about/divi- the books,files and business of said corporation and by
sions/energy-mineral-and-land-resources/stormwater/stormwater-program/ reference to the files of said publication the attached
stormwater-public-notices,or by contacting Brianna Young at brianna.young @ p
ncdenr.gov or 919-707-3647. advertisement for NC DENR ENGERGY MINERAL&LAND
Apo71737 RESOURCES was inserted in the aforesaid newspaper on
dates as follows:
1 insertion(s)published on:
04/07/23
F
I certify or declare)under penalty of perjury that the
foregoing is true and correct.
Notary Public in and for the state of Texas,residing in
Dallas County
..•'`�", STEPHANIE WATCHER
= ;
x: •- My Notari 10#13353440$
Fors oanuary 14,2026
Extra charge for lost or duplicate affidavits.
Legal document please do not destroy!
Young, Brianna A
From: Westley Riscili <westley.riscili@kymerainternational.com>
Sent: Tuesday, May 16, 2023 3:33 PM
To: Young, Brianna A
Cc: Jonathan White; David Singer
Subject: RE: [External] Comments on NPDES Permit NC000050, SCM Metal Products, Inc.,
Durham County
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Dear Ms.Young,
Yes,you are correct. Stormwater runoff for the area in which the antimony process is located does in fact discharge to
SW001, as indicated on the site map. The site map that was provided on October 7, 2022 is correct. Please let me know
if you have any additional inquiries.
Best regards,
Westley Riscili, CQIA
N.A. Environmental Compliance Manager
2601 Weck Drive I Durham I NC 1 27709 1 USA
Office +1 (919).287.9891
Mobile +1 (716).307.3191
westley.riscili@kymerainternational.com
ACuPowder I AmeriTi Manufacturing I CASL Surface Technologies I ECKA Granules Innobraze
Reading Alloys I SCM Metal Products I Telex Metals I Thermal Spray Solutions
www.kymerainternational.com
Kymera
INTERNATIONAL
SILVER KymeraInternational
2022
ecovadisNamed 2022 EcoVadis
Sustainability ilver Medal • • Winner
Rating
Ky
From:Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent:Tuesday, May 16, 2023 9:58 AM
To: Westley Riscili<westley.riscili@kymerainternational.com>
1
Cc:Jonathan White<jonathan.white@kymerainternational.com>; David Singer
<David.Singer@kymerainternational.com>
Subject: RE: [External] Comments on NPDES Permit NC000050,SCM Metal Products, Inc., Durham County
[[EXTERNAL EMAIL]]
Good morning,
After reviewing the comments submitted on the draft permit, I have one question.You state "stormwater runoff from
the antimony process area discharges only to Outfall SW002." However, in information you provided October 7, 2022,
the antimony processing area is shown as a part of Outfall SWO01 (see attached). Please confirm whether the
information in the attached site map is accurate. If it is not accurate, please provide an accurately updated site map as
soon as possible.
Thank you,
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From:Young, Brianna A
Sent:Tuesday, May 2, 2023 11:26 AM
To:Westley Riscili<westley.riscili@kymerainternational.com>
Cc:Jonathan White<jonathan.white@kymerainternational.com>; David Singer
<David.Singer@kymerainternational.com>
Subject: RE: [External] Comments on NPDES Permit NC000050,SCM Metal Products, Inc., Durham County
Good morning,
Thank you for submitting comments on the draft permit. I will review these as part of the final issuance process.
Thank you,
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
2
Brlanna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From:Westley Riscili<westley.riscili@kymerainternational.com>
Sent: Friday,April 28, 2023 4:46 PM
To:Young, Brianna A<Brianna.Young@ncdenr.gov>
Cc:Jonathan White<jonathan.white@kvmerainternational.com>; David Singer
<David.Singer@kymerainternational.com>
Subject: [External] Comments on NPDES Permit NC000050,SCM Metal Products, Inc., Durham County
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Dear Ms.Young,
Please see the enclosed comments of SCM Metal Products on the referenced permit. Please confirm receipt of this
email.
Best regards,
Westley Riscili, CQIA— N.A. Environmental Compliance Manager
Kymera International
SCM Metal Products 12601 Weck Drive I RTP I NC 127709 1 USA
Tel +1 (919).544.8090
Direct +1 (919).287.9891
Mobile +1 (716).307.3191
westley.riscili(i,kymerainternational.com
ACuPowder I AmeriTi Manufacturing I CASL Surface Technologies I ECKA Granules Innobraze
Reading Alloys I SCM Metal Products I Telex Metals
www.kymerainternational.com
KymSILVER _
• International
2022
ecovadisNamed 2022 EcoVadis
W
- - • • • •
3
Young, Brianna A
From: Woolfolk, Michelle <Michelle.Woolfolk@durhamnc.gov>
Sent: Monday, March 27, 2023 3:16 PM
To: Young, Brianna A
Subject: RE: [External] RE: NC DEQ Stormwater Permit for SCM Metal Products, Inc.
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Thanks for checking back.The City has no comments. We do have questions regarding the use of benchmarks, but that is
more for the state.
Michelle
Michelle Woolfolk
City of Durham Public Works Department
Stormwater Division
Michelle.Woolfolk@durhamnc.gov
From:Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent: Monday, March 27, 2023 2:38 PM
To: Woolfolk, Michelle <Michelle.Woolfolk@durhamnc.gov>
Subject: RE: [External] RE: NC DEQ Stormwater Permit for SCM Metal Products, Inc.
Good afternoon Michelle,
I wanted to follow up on my previous email as I had not received a response. Does the City of Durham have any
comments or questions on the SCM Metal Products draft stormwater permit(NCS000050)? If the City has no comments,
I will move to put the draft permit out to public notice within the next two weeks.
Thank you,
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
1
From:Young, Brianna A
Sent:Wednesday, March 1, 2023 1:14 PM
To:Woolfolk, Michelle<Michelle.Woolfolk@durhamnc.gov>
Subject: RE: [External] RE: NC DEQ Stormwater Permit for SCM Metal Products, Inc.
Good afternoon,
A copy of the preliminary draft permit is attached. Please let me know if you have any questions or would like to set up a
call to discuss the permit and/or facility.
Thank you,
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From:Woolfolk, Michelle<Michelle.Woolfolk@durhamnc.gov>
Sent:Tuesday, February 28, 2023 9:37 AM
To:Young, Brianna A<Brianna.Young@ncdenr.gov>
Subject: RE: [External] RE: NC DEQ Stormwater Permit for SCM Metal Products, Inc.
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Send the draft to me. I will coordinate the City response.
Michelle Woolfolk
City of Durham Public Works Department
Stormwater Division
Michelle.Woolfolk@durhamnc.gov
From:Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent:Tuesday, February 28, 2023 9:34 AM
To: Woolfolk, Michelle<Michelle.Woolfolk@durhamnc.gov>
Subject: RE: [External] RE: NC DEQ Stormwater Permit for SCM Metal Products, Inc.
2
Hello Michelle,
I should have a draft ready for your review this week.We would welcome the opportunity to discuss any issues. Please
let me know who should receive the preliminary draft and I will include all parties on the email.
Thank you,
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brlanna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From: Woolfolk, Michelle<Michelle.Woolfolk@durhamnc.gov>
Sent:Tuesday, February 28, 2023 9:15 AM
To:Young, Brianna A<Brianna.Young@ncdenr.gov>
Subject: [External] RE: NC DEQ Stormwater Permit for SCM Metal Products, Inc.
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Hello Brianna. Yes,the City would like to be involved in the renewal of the stormwater permit. We would not only like a
copy of the draft permit before it goes to public notice, but would also appreciate the opportunity to discuss issues with
you.
Thank you for reaching out. When do you anticipate having a preliminary draft permit?
Michelle
Michelle Woolfolk
City of Durham Public Works Department
Stormwater Division
Michelle.Woolfolk@durhamnc.gov
From:Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent:Tuesday, February 28, 2023 9:05 AM
To:Woolfolk, Michelle<Michelle.Woolfolk@durhamnc.gov>
Subject: NC DEQ Stormwater Permit for SCM Metal Products, Inc.
3
Good morning,
I am with the NC DEQ Stormwater Permitting Program. I am working on renewing the stormwater permit for SCM Metal
Products, Inc. (NCS000050), located in Durham County at 2601 Weck Drive. According to our permit files,the City of
Durham was very involved in the renewal of the last stormwater permit for this facility. Is this permit still of interest to
the City of Durham? I am preparing the updated draft permit for public notice and am reaching out to confirm if the City
would like to provide comments before I submit the draft to public notice. If you are not the correct contact for this
request, can you please point me in the right direction?
Thank you,
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brlanna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
D EQ��
D*Mrlmnenl o'Miro nnloMal 4ual+gr
EmaR correspondence to and from this address is subject to the North
Carolina Public Records Lair and may be disclosed to third parties_
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
4
Young, Brianna A
From: Valentine, Thad
Sent: Tuesday, December 13, 2022 9:27 AM
To: Garcia, Lauren V;Young, Brianna A; Carson, Brittany; Georgoulias, Bethany
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
Looking at Laurens inspection report for the facility, she gives them 5 stars for PP&G and their BMP's. I don't see any
deficiencies noted or recommendations, other than continued sweeping, so it appears they do everything possible to
control pollutants from entering the stormwater and leaving the site.This may be one of those sites where we need to
make a judgement call. If there needs to be a conversation, let me know.
Thad Valentine
Environmental Senior Specialist— RRO
Division of Energy, Mineral, and Land Resources— Land Quality Section
Department of Environmental Quality
919 791 4220 office
thad.valentine@ncdenr.aov
1628 Mail Service Center, Raleigh, North Carolina 27699
From: Garcia, Lauren V<lauren.garcia@ncdenr.gov>
Sent:Tuesday, December 13, 2022 8:33 AM
To:Young, Brianna A<Brianna.Young@ncdenr.gov>; Valentine,Thad <thad.valentine@ncdenr.gov>; Carson, Brittany
<brittany.carson@ncdenr.gov>; Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
My bad, if the copper tier relief was requested a another facility, an inspection probably needs to be done there...
From:Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent: Friday, December 9, 2022 4:03 PM
To:Valentine,Thad <thad.valentine@ncdenr.gov>; Carson, Brittany<brittany.carson@ncdenr.gov>; Georgoulias,
Bethany<bethany.georgoulias@ncdenr.gov>
Cc:Garcia, Lauren V<lauren.garcia@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
Sorry for the second email. I just looked up the distance between the two facilities and they seem to be about 3 miles
apart. Not sure if that affects any thinking.
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
1
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From:Young, Brianna A
Sent: Friday, December 9, 2022 3:33 PM
To:Valentine,Thad <thad.valentine@ncdenr.gov>; Carson, Brittany<brittany.carson@ncdenr.gov>; Georgoulias,
Bethany<bethany.georgoulias@ncdenr.gov>
Cc:Garcia, Lauren V<lauren.garcia@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
SCM has many copper exceedances (basically every sample period reviewed for permit renewal). Zinc has a couple of
exceedances but is not a chronic problem. Lauren's inspection report indicated the facility does have good BMPs in
place, but that copper is still getting out of the facility. Is there anything I need to add to SCM's BMP permit condition?
Or should we just tell them they need to look into other options to stop copper being tracked outsie?
How can we assess/confirm whether air deposition is coming from SCM onto Wolfspeed (as Woflspeed claims)?What
do we need to do/review to move the SCM permit and Wolfspeed relief request forward?
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From:Valentine,Thad <thad.valentine@ncdenr.gov>
Sent: Friday, December 9, 2022 12:47 PM
To:Young, Brianna A<Brianna.Young@ncdenr.gov>; Carson, Brittany<brittany.carson@ncdenr.gov>; Georgoulias,
Bethany<bethany.georgoulias@ncdenr.gov>
Cc:Garcia, Lauren V<lauren.garcia@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
If they are sampling all their outfall areas and copper is not an issue, I don't think there is anything else beyond what is
required and actively being done that would need to be added. If they are getting high readings,they should have their
consultant investigate other options to reduce the tracking of copper.
2
If the permittee that believes that the SCM facility is the cause of their high copper sample results can sample the flow
coming onto their site from the SCM facility to confirm that the issue originates there,we can look at providing tier
relief, if they provide their proof.
Thad Valentine
Environmental Senior Specialist— RRO
Division of Energy, Mineral, and Land Resources— Land Quality Section
Department of Environmental Quality
919 791 4220 office
thad.valentineC�ncdenr.gov
1628 Mail Service Center, Raleigh, North Carolina 27699
From:Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent: Friday, December 9, 2022 11:25 AM
To: Carson, Brittany<brittany.carson@ncdenr.gov>; Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Cc:Valentine,Thad <thad.valentine@ncdenr.Bov>; Garcia, Lauren V<lauren.garcia@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
Lauren conducted an inspection this week on the SCM facility as part of the renewal. Based on the inspection report, it
sounds like they have good BMPs in place but that copper does get tracked outside the processing facility from feet and
tires. Is there anything we should add to the permit as another facility is citing SCM for their issues?There is already a
BMP condition in the permit to address copper issues:
The Permittee shall implement the following BMPs at this facility and shall include these BMPs in the facility's SWPPP:
(a) The Permittee shall ensure entryways and loading areas near manufacturing areas where dust track-out
occurs are swept daily, and that cleaning procedures are conspicuously posted within the affected work
areas.
(b) The Permittee shall ensure routine evaluations by employee task groups of BMPs intended to reduce
copper or other metal dust exposure and shall identify practices or areas in need of improvement.
(c) The Permittee shall implement BMPs to reduce fugitive dust, including but not limited to:
i. Moving fork truck and sweeper maintenance indoors;
ii. Improving preventative maintenance for dust collectors; and
iii. Handling and storing glycerin in reusable containers.
For BMPs that have already been implemented, the Permittee shall ensure those practices are maintained as long
as they effectively reduce fugitive dust.
(d) The Permittee shall maintain an Operation and Maintenance (O&M)Plan for any structural BMPs, such
as bioretention cells. The O&M Plan must indicate actions that shall be taken, specific criteria used for
determining when those actions shall be taken, and who is responsible for those actions. The plan must
clearly indicate the steps that shall be taken and who shall be responsible to restore the structural
stormwater BMP systems to design specifications if a failure occurs and must include acknowledgement
by the responsible party.
(e) For areas the Permittee has determined to be primary contributions to copper or other metals in runoff
from this facility, either through the Monitoring Plan approved by the Division in May 2007 or by other
means, the Permittee shall continue to:
3
i. Assess BMPs intended to reduce dust release and track-out from industrial activities;
ii. Improve dust collection efficiency;
lit. Reduce other sources of copper or other metals contamination; and/or
iv. Capture and treat the runoff with engineered controls.
The Permittee shall maintain current information about selected BMPs, their implementation, and
effectiveness in reducing metals concentrations in the Stormwater Pollution Prevention Plan. That
information should include reference to DWR stormwater benchmark concentrations for total
recoverable copper and zinc, currently 10 µg/L and 126 µg/L. All or part of this information should be
incorporated into the Feasibility Study component of the Stormwater Management Plan (see Part B
Section B-8 of Stormwater Pollution Prevention Plan requirements) as appropriate.
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From:Young, Brianna A
Sent:Tuesday, November 29, 2022 8:58 AM
To: Carson, Brittany<brittany.carson@ncdenr.gov>; Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Cc:Valentine,Thad <thad.valentine@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
NCS000050 is currently undergoing review for renewal. It's on RRO's inspection list for the renewal, so will be interesting
to see what they find.Their DMR data didn't show big zinc issues, but they have a lot of copper exceedances at all 3 of
their outfalls.
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
4
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From: Carson, Brittany<brittany.carson@ncdenr.gov>
Sent:Tuesday, November 29, 2022 8:10 AM
To: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Cc:Valentine,Thad <thad.valentine@ncdenr.gov>;Young, Brianna A<Brianna.Young@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
Thanks Bethany,
This is an interesting one. Brianna and I will collaborate on this.
Brittany Carson
General Industrial Stormwater Permit Coordinator
Stormwater Program,Division of Energy,Mineral,and Land Resources
N.C.Department of Environmental Quality
Phone: (919) 707-3648
From: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Sent: Monday, November 28, 2022 5:01 PM
To: Carson, Brittany<brittany.carson@ncdenr.gov>
Cc:Valentine,Thad <thad.valentine@ncdenr.gov>; Young, Brianna A<Brianna.Young@ncdenr.gov>
Subject: FW: [External] Request for Relief from Advance Tier Response for Copper and Zinc
Greetings, Brittany—getting you and Brianna in the loop on this. I've saved the records to both GP COC files in
Laserfiche.
Including Brianna because there's a reference to a potential influence from Kymera (formerly SCM Metal), which is
under an individual permit. A potential collaboration effort? Might even involve DAQ since there's a possible deposition
issue.
Bg
Bethany Georgoulias(she/her)
Environmental Engineer
Stormwater Program,Division of Energy,Mineral,and Land Resources
N.C.Department of Environmental Quality
919 707 3641 office
bethany.georgoulias@ncdenr.gov
512 N.Salisbury Street,Raleigh,NC 27604 (location)
1612 Mail Service Center,Raleigh,NC 27699-1612 (mailing)
Website: http://deq.nc.govlabout/divisions/energy-mineral-land-resources/stormwater
5
D_E
NORTH CAR
OLINA
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Robin Housh <Robin.Housh@wolfspeed.com>
Sent: Monday, November 28, 2022 4:06 PM
To:Valentine,Thad <thad.valentine@ncdenr.gov>
Cc:Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>; lames.azarelo@durhamnc.gov;Andy Rodak
<arodak@daa.com>; Madison Paul <Madison.Paul @wolfspeed.com>
Subject: [External] Request for Relief from Advance Tier Response for Copper and Zinc
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Mr. Valentine,
Please find attached a letter requesting relief from advance tier response for copper and zinc at both Wolfspeed
facilities in Durham County. Justification and supporting documentation is included.
(Hard copy to Mr. Valentine is in LISPS mail.)
Please acknowledge receipt of this email.
Sincerely,
Robin Housh
Wolfs d-e- Environmental Manager,EHS
4600 Silicon Drive, Durham,NC 27703
0:+1(919)407-6103 1 M:+1(919)616-4614
www.wo[fspeed.com
This e-mail message, including any attachments and previous email messages sent with it, contains CONFIDENTIAL and
PROPRIETARY information of Wolfspeed, Inc. or its subsidiaries and may be legally PRIVILEGED.You may not use,
disclose, reproduce or distribute such information without Wolfspeed's authorization. If you have received this message
in error, please notify the sender immediately and permanently delete the original message, its attachments and any
copies thereof.
6
Young, Brianna A
From: Garcia, Lauren V
Sent: Tuesday, December 13, 2022 8:30 AM
To: Young, Brianna A; Carson, Brittany; Georgoulias, Bethany
Cc: Valentine, Thad
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
Good morning! I am going through all my emails from when I was out. I definitely don't think they can justify tier relief
for copper,the dust was everywhere.There was a layer of it inside the facility, so much so,that I asked if it was safe to
breath it in.
Also,they are having their duct work replaced right now to improve collection efficiency. I saw evidence that they are
implementing all their required BMPs on some level.The biggest issue seemed to be the copper getting tracked out by
workers who are leaving doors open and running equipment through the dust.
They have drop inlets in the parking lot that drain to their bioretention cell, I don't know if anything can be added to
keep the copper from getting into those?
Thanks,
Lauren
From:Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent: Friday, December 9, 2022 11:25 AM
To: Carson, Brittany<brittany.carson@ncdenr.gov>; Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Cc:Valentine,Thad <thad.valentine@ncdenr.gov>; Garcia, Lauren V<lauren.garcia@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
Lauren conducted an inspection this week on the SCM facility as part of the renewal. Based on the inspection report, it
sounds like they have good BMPs in place but that copper does get tracked outside the processing facility from feet and
tires. Is there anything we should add to the permit as another facility is citing SCM for their issues?There is already a
BMP condition in the permit to address copper issues:
The Permittee shall implement the following BMPs at this facility and shall include these BMPs in the facility's SWPPP:
(a) The Permittee shall ensure entryways and loading areas near manufacturing areas where dust track-out
occurs are swept daily, and that cleaning procedures are conspicuously posted within the affected work
areas.
(b) The Permittee shall ensure routine evaluations by employee task groups of BMPs intended to reduce
copper or other metal dust exposure and shall identify practices or areas in need of improvement.
(c) The Permittee shall implement BMPs to reduce fugitive dust, including but not limited to:
i. Moving fork truck and sweeper maintenance indoors;
ii. Improving preventative maintenance for dust collectors; and
ill. Handling and storing glycerin in reusable containers.
For BMPs that have already been implemented, the Permittee shall ensure those practices are maintained as long
as they effectively reduce fugitive dust.
i
(d) The Permittee shall maintain an Operation and Maintenance (O&M)Plan for any structural BMPs, such
as bioretention cells. The O&M Plan must indicate actions that shall be taken, specific criteria used for
determining when those actions shall be taken, and who is responsible for those actions. The plan must
clearly indicate the steps that shall be taken and who shall be responsible to restore the structural
stormwater BMP systems to design specifications if a failure occurs and must include acknowledgement
by the responsible party.
(e) For areas the Permittee has determined to be primary contributions to copper or other metals in runoff
from this facility, either through the Monitoring Plan approved by the Division in May 2007 or by other
means, the Permittee shall continue to:
i. Assess BMPs intended to reduce dust release and track-out from industrial activities;
ii. Improve dust collection efficiency;
iii. Reduce other sources of copper or other metals contamination; and/or
iv. Capture and treat the runoff with engineered controls.
The Permittee shall maintain current information about selected BMPs, their implementation, and
effectiveness in reducing metals concentrations in the Stormwater Pollution Prevention Plan. That
information should include reference to DWR stormwater benchmark concentrations for total
recoverable copper and zinc, currently 10 µg/L and 126 µg/L. All or part of this information should be
incorporated into the Feasibility Study component of the Stormwater Management Plan (see Part B
Section B-8 of Stormwater Pollution Prevention Plan requirements) as appropriate.
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From:Young, Brianna A
Sent:Tuesday, November 29, 2022 8:58 AM
To: Carson, Brittany<brittany.carson@ncdenr.gov>; Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Cc:Valentine,Thad <thad.valentine@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
NCS000050 is currently undergoing review for renewal. It's on RRO's inspection list for the renewal, so will be interesting
to see what they find.Their DMR data didn't show big zinc issues, but they have a lot of copper exceedances at all 3 of
their outfalls.
2
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From: Carson, Brittany<brittany.carson@ncdenr.gov>
Sent:Tuesday, November 29, 2022 8:10 AM
To: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Cc:Valentine,Thad <thad.valentine@ncdenr.99V>; Young, Brianna A<Brianna.Young@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
Thanks Bethany,
This is an interesting one. Brianna and I will collaborate on this.
Brittany Carson
General Industrial Stormwater Permit Coordinator
Stormwater Program,Division of Energy,Mineral,and Land Resources
N.C.Department of Environmental Quality
Phone: (919) 707-3648
From: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Sent: Monday, November 28, 2022 5:01 PM
To: Carson, Brittany<brittany.carson@ncdenr.gov>
Cc:Valentine,Thad <thad.valentine@ncdenr.gov>; Young, Brianna A<Brianna.Young@ncdenr.gov>
Subject: FW: [External] Request for Relief from Advance Tier Response for Copper and Zinc
Greetings, Brittany—getting you and Brianna in the loop on this. I've saved the records to both GP COC files in
Laserfiche.
Including Brianna because there's a reference to a potential influence from Kymera (formerly SCM Metal), which is
under an individual permit. A potential collaboration effort? Might even involve DAQ since there's a possible deposition
issue.
Bg
Bethany Georgoulias (she/her)
Environmental Engineer
Stormwater Program,Division of Energy,Mineral, and Land Resources
3
N.C.Department of Environmental Quality
919 707 3641 office
bethany.georgoulias@ncdenr.gov
512 N. Salisbury Street, Raleigh,NC 27604 (location)
1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing)
Website: httl2://deq.nc.gov lab out/divisions/energy-mineral-land-resources/stormwater
D:;.,.E
NORTH CAROLINA
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Robin Housh <Robin.Housh@wolfspeed.com>
Sent: Monday, November 28, 2022 4:06 PM
To:Valentine,Thad <thad.valentine@ncdenr.gov>
Cc:Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>; lames.azarelo@durhamnc.gov;Andy Rodak
<arodak@daa.com>; Madison Paul <Madison.Pau I@wolfspeed.com>
Subject: [External] Request for Relief from Advance Tier Response for Copper and Zinc
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Mr. Valentine,
Please find attached a letter requesting relief from advance tier response for copper and zinc at both Wolfspeed
facilities in Durham County. Justification and supporting documentation is included.
(Hard copy to Mr. Valentine is in USPS mail.)
Please acknowledge receipt of this email.
Sincerely,
Robin Housh
WolfsP66—d, Environmental Manager,EHS
4600 Silicon Drive, Durham,NC 27703
0:+1(919)407-6103 1 M:+1(919)616-4614
www.wolfspeed.com
This e-mail message, including any attachments and previous email messages sent with it, contains CONFIDENTIAL and
PROPRIETARY information of Wolfspeed, Inc. or its subsidiaries and may be legally PRIVILEGED.You may not use,
disclose, reproduce or distribute such information without Wolfspeed's authorization. If you have received this message
in error, please notify the sender immediately and permanently delete the original message, its attachments and any
copies thereof.
4
Young, Brianna A
From: Valentine, Thad
Sent: Monday, December 12, 2022 10:51 AM
To: Young, Brianna A
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
Sorry,just getting to this email.That probably will affect our response
Thad Valentine
Environmental Senior Specialist— RRO
Division of Energy, Mineral, and Land Resources— Land Quality Section
Department of Environmental Quality
919 791 4220 office
thad.valentineC�ncdenr.gov
1628 Mail Service Center, Raleigh, North Carolina 27699
From:Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent: Friday, December 9, 2022 4:03 PM
To:Valentine,Thad <thad.valentine@ncdenr.gov>; Carson, Brittany<brittany.carson@ncdenr.gov>; Georgoulias,
Bethany<bethany.georgoulias@ncdenr.gov>
Cc: Garcia, Lauren V<lauren.garcia@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
Sorry for the second email. I just looked up the distance between the two facilities and they seem to be about 3 miles
apart. Not sure if that affects any thinking.
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From:Young, Brianna A
Sent: Friday, December 9, 2022 3:33 PM
To:Valentine,Thad <thad.valentine@ncdenr.gov>; Carson, Brittany<brittany.carson@ncdenr.gov>; Georgoulias,
Bethany<bethany.georgoulias@ncdenr.gov>
Cc:Garcia, Lauren V<lauren.garcia@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
SCM has many copper exceedances (basically every sample period reviewed for permit renewal). Zinc has a couple of
exceedances but is not a chronic problem. Lauren's inspection report indicated the facility does have good BMPs in
place, but that copper is still getting out of the facility. Is there anything I need to add to SCM's BMP permit condition?
Or should we just tell them they need to look into other options to stop copper being tracked outsie?
How can we assess/confirm whether air deposition is coming from SCM onto Wolfspeed (as Woflspeed claims)?What
do we need to do/review to move the SCM permit and Wolfspeed relief request forward?
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From:Valentine,Thad <thad.valentine@ncdenr.gov>
Sent: Friday, December 9, 2022 12:47 PM
To:Young, Brianna A<Brianna.Young@ncdenr.gov>; Carson, Brittany<brittany.carson@ncdenr.gov>; Georgoulias,
Bethany<bethany.georgoulias@ncdenr.gov>
Cc:Garcia, Lauren V<lauren.garcia@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
If they are sampling all their outfall areas and copper is not an issue, I don't think there is anything else beyond what is
required and actively being done that would need to be added. If they are getting high readings,they should have their
consultant investigate other options to reduce the tracking of copper.
If the permittee that believes that the SCM facility is the cause of their high copper sample results can sample the flow
coming onto their site from the SCM facility to confirm that the issue originates there, we can look at providing tier
relief, if they provide their proof.
Thad Valentine
Environmental Senior Specialist— RRO
Division of Energy, Mineral, and Land Resources— Land Quality Section
Department of Environmental Quality
919 791 4220 office
thad.valentine(c�ncdenr.gov
1628 Mail Service Center, Raleigh, North Carolina 27699
2
From: Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent: Friday, December 9, 2022 11:25 AM
To: Carson, Brittany<brittany.carson@ncdenr.gov>; Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Cc: Valentine,Thad <thad.valentine@ncdenr.gov>; Garcia, Lauren V<lauren.garcia@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
Lauren conducted an inspection this week on the SCM facility as part of the renewal. Based on the inspection report, it
sounds like they have good BMPs in place but that copper does get tracked outside the processing facility from feet and
tires. Is there anything we should add to the permit as another facility is citing SCM for their issues?There is already a
BMP condition in the permit to address copper issues:
The Permittee shall implement the following BMPs at this facility and shall include these BMPs in the facility's SWPPP:
(a) The Permittee shall ensure entryways and loading areas near manufacturing areas where dust track-out
occurs are swept daily, and that cleaning procedures are conspicuously posted within the affected work
areas.
(b) The Permittee shall ensure routine evaluations by employee task groups of BMPs intended to reduce
copper or other metal dust exposure and shall identify practices or areas in need of improvement.
(c) The Permittee shall implement BMPs to reduce fugitive dust, including but not limited to:
i. Moving fork truck and sweeper maintenance indoors;
ii. Improving preventative maintenance for dust collectors; and
iii. Handling and storing glycerin in reusable containers.
For BMPs that have already been implemented,the Permittee shall ensure those practices are maintained as long
as they effectively reduce fugitive dust.
(d) The Permittee shall maintain an Operation and Maintenance (O&M) Plan for any structural BMPs, such
as bioretention cells. The O&M Plan must indicate actions that shall be taken, specific criteria used for
determining when those actions shall be taken, and who is responsible for those actions. The plan must
clearly indicate the steps that shall be taken and who shall be responsible to restore the structural
stormwater BMP systems to design specifications if a failure occurs and must include acknowledgement
by the responsible party.
(e) For areas the Permittee has determined to be primary contributions to copper or other metals in runoff
from this facility, either through the Monitoring Plan approved by the Division in May 2007 or by other
means, the Permittee shall continue to:
i. Assess BMPs intended to reduce dust release and track-out from industrial activities;
ii. Improve dust collection efficiency;
iii. Reduce other sources of copper or other metals contamination; and/or
iv. Capture and treat the runoff with engineered controls.
The Permittee shall maintain current information about selected BMPs, their implementation, and
effectiveness in reducing metals concentrations in the Stormwater Pollution Prevention Plan. That
information should include reference to DWR stormwater benchmark concentrations for total
recoverable copper and zinc, currently 10 µg/L and 126 µg/L. All or part of this information should be
incorporated into the Feasibility Study component of the Stormwater Management Plan(see Part B
Section B-8 of Stormwater Pollution Prevention Plan requirements) as appropriate.
3
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From:Young, Brianna A
Sent:Tuesday, November 29, 2022 8:58 AM
To: Carson, Brittany<brittany.carson@ncdenr.gov>; Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Cc:Valentine,Thad <thad.valentine@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
NCS000050 is currently undergoing review for renewal. It's on RRO's inspection list for the renewal, so will be interesting
to see what they find.Their DMR data didn't show big zinc issues, but they have a lot of copper exceedances at all 3 of
their outfalls.
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From: Carson, Brittany<brittany.carson@ncdenr.gov>
Sent:Tuesday, November 29, 2022 8:10 AM
To: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Cc:Valentine,Thad <thad.valentine@ncdenr.gov>; Young, Brianna A<Brianna.Young@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
4
Thanks Bethany,
This is an interesting one. Brianna and I will collaborate on this.
Brittany Carson
General Industrial Stormwater Permit Coordinator
Stormwater Program,Division of Energy,Mineral, and Land Resources
N.C.Department of Environmental Quality
Phone: (919) 707-3648
From: Georgoulias, Bethany<bethany.Beorgoulias@ncdenr.gov>
Sent: Monday, November 28, 2022 5:01 PM
To: Carson, Brittany<brittany.carson@ncdenr.gov>
Cc:Valentine,Thad <thad.valentine@ncdenr.99v>; Young, Brianna A<Brianna.Young@ncdenr.gov>
Subject: FW: [External] Request for Relief from Advance Tier Response for Copper and Zinc
Greetings, Brittany—getting you and Brianna in the loop on this. I've saved the records to both GP COC files in
Laserfiche.
Including Brianna because there's a reference to a potential influence from Kymera (formerly SCM Metal), which is
under an individual permit. A potential collaboration effort? Might even involve DAQ since there's a possible deposition
issue.
Bg
Bethany Georgoulias (she/her)
Environmental Engineer
Stormwater Program,Division of Energy,Mineral,and Land Resources
N.C.Department of Environmental Quality
919 707 3641 office
bethany.georgoulias@ncdenr.gov
512 N. Salisbury Street, Raleigh, NC 27604 (location)
1612 Mail Service Center,Raleigh,NC 27699-1612 (mailing)
Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
D_E
NORTH CAROLINA
Department of Environmental Duality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Robin Housh <Robin.Housh@wolfspeed.com>
Sent: Monday, November 28, 2022 4:06 PM
To:Valentine,Thad <thad.valentine@ncdenr.gov>
Cc:Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>; lames.azarelo@durhamnc.gov;Andy Rodak
<arodak@daa.com>; Madison Paul <Madison.Paul @wolfspeed.com>
Subject: [External] Request for Relief from Advance Tier Response for Copper and Zinc
5
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Mr. Valentine,
Please find attached a letter requesting relief from advance tier response for copper and zinc at both Wolfspeed
facilities in Durham County. Justification and supporting documentation is included.
(Hard copy to Mr. Valentine is in LISPS mail.)
Please acknowledge receipt of this email.
Sincerely,
Robin Housh
} pei Environmental Manager,EHS
4600 Silicon Drive, Durham,NC 27703
0:+1(919)407-6103 1 M:+1(919)616-4614
www.wolfspeed.com
This e-mail message, including any attachments and previous email messages sent with it, contains CONFIDENTIAL and
PROPRIETARY information of Wolfspeed, Inc. or its subsidiaries and may be legally PRIVILEGED.You may not use,
disclose, reproduce or distribute such information without Wolfspeed's authorization. If you have received this message
in error, please notify the sender immediately and permanently delete the original message, its attachments and any
copies thereof.
6
Compliance Inspection Report
Permit:NCS000050 Effective: 01/01/12 Expiration: 12/31/16 Owner: SCM Metal Products, Inc.
SOC: Effective: Expiration: Facility: SCM Metal Products, Inc.
County: Durham 2601 Weck Dr
Region: Raleigh
Durham NC 27709
Contact Person:Westley Riscili Title: Phone: 919-287-9891
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 12/07/2022 Entry Time 09:15AM Exit Time: 11:30AM
Primary Inspector:Lauren Garcia Phone: 919-707-3648
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Stormwater Discharge, Individual
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCS000050 Owner-Facility:SCM Metal Products, Inc.
Inspection Date: 12/07/2022 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Inspection was in response to permit renewal. Information included in the application is accurate. The application states that
the tin manufacturing process has been discontinued.Tin manufacturing was brought back. The facility has also added
some special metals manufactuing, like antimony, bismuth,nuTin, etc. Antimony and tin dust are combustable, so
manufacturing is contained and there should be no transfer of the dusts around the facility. The copper manufactuing that
takes place onsite does generate a lot of dust. There is a dust residue that gets tracked outside the facility by foot and
loader traffic. The facilty is also partially under construction so BMPs that have previously been regularly used are not as
effective, like tacky matts to prevent the copper dust being tracked outside. There is a dust collection system and the
copper dust is collected in an exterior bag house. The copper dust is deposited in a bag and the bag is monitored multiple
times a shift to prevent over flow. There is still a risk of exposure of the copper dust to stormwater if there is a bag
malfunction. Copper dust was observed tracked outside. It should be noted that the facility has an impressive list of BMPS
that are regularly implemented to deal with the dust. There are tanks and other materials stored outside at the rear of the
facility. Everything appeared to be stored correctly. There are several drop inlets in the paved lot at the rear of the facility
where there is storage. The drop inlets drain to an onsite bioretention cell.Water in the bioretention cell infiltrates into the
ground. If there is ever any overflow, the water for the riser in the bioretention cell is pipes to outfall 1. The facility uses a
street sweeper in the back parking lot to control copper dust. Used oil drums are stored under cover and in propper
secondary containment in the back lot. Construction materials are also stored temporarily in this back lot.
I recomend the site map be updated to show the bag houses, outdoor storage of tanks, used oil, raw materials, etc.
Continue sweeping activities to address the copper dust tracked into the back lot.
Page 2 of 3
Permit: NCS000050 Owner-Facility:SCM Metal Products, Inc.
Inspection Date: 12/07/2022 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑
#Does the Plan include a General Location (USGS) map? ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑
#Does the facility provide all necessary secondary containment? ❑ ❑ ❑
#Does the Plan include a BMP summary? ❑ ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑
#Does the facility provide and document Employee Training? 0 ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑
Comment: Facility inspections are thorough and detailed. SWPPP documentation is well maintained.
DMRs are up to date.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑
Comment:
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
#Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
#Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑
Comment:
Page 3 of 3
Young, Brianna A
From: Young, Brianna A
Sent: Wednesday, December 7, 2022 2:11 PM
To: Carson, Brittany
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
What do we need to do about this one?Anything right now, or just wait for the regional office to do their inspections?
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brlanna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From:Young, Brianna A
Sent:Tuesday, November 29, 2022 8:58 AM
To: Carson, Brittany<brittany.carson@ncdenr.gov>; Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Cc:Valentine,Thad <thad.valentine@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
NCS000050 is currently undergoing review for renewal. It's on RRO's inspection list for the renewal, so will be interesting
to see what they find.Their DMR data didn't show big zinc issues, but they have a lot of copper exceedances at all 3 of
their outfalls.
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
1
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From: Carson, Brittany<brittany.carson@ncdenr.gov>
Sent:Tuesday, November 29, 2022 8:10 AM
To: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Cc:Valentine,Thad <thad.valentine@ncdenr.gov>; Young, Brianna A<Brianna.Young@ncdenr.gov>
Subject: RE: [External] Request for Relief from Advance Tier Response for Copper and Zinc
Thanks Bethany,
This is an interesting one. Brianna and I will collaborate on this.
Brittany Carson
General Industrial Stormwater Permit Coordinator
Stormwater Program,Division of Energy,Mineral,and Land Resources
N.C.Department of Environmental Quality
Phone: (919) 707-3648
From: Georgoulias, Bethany<bethany.eeorgoulias@ncdenr.gov>
Sent: Monday, November 28, 2022 5:01 PM
To: Carson, Brittany<brittany.carson@ncdenr.gov>
Cc:Valentine,Thad <thad.valentine@ncdenr.gov>; Young, Brianna A<Brianna.Young@ncdenr.gov>
Subject: FW: [External] Request for Relief from Advance Tier Response for Copper and Zinc
Greetings, Brittany—getting you and Brianna in the loop on this. I've saved the records to both GP COC files in
Laserfiche.
Including Brianna because there's a reference to a potential influence from Kymera (formerly SCM Metal), which is
under an individual permit. A potential collaboration effort? Might even involve DAQ since there's a possible deposition
issue.
Bg
Bethany Georgoulias(she/her)
Environmental Engineer
Stormwater Program,Division of Energy,Mineral,and Land Resources
N.C.Department of Environmental Quality
919 707 3641 office
bethany.georgouliasOncdenr.gDv
512 N.Salisbury Street,Raleigh,NC 27604 (location)
1612 Mail Service Center,Raleigh,NC 27699-1612 (mailing)
Website: http:/Ideq..nc.gov/about/divisions/energy-mineral-land-resources/stormwater
2
D_E
NORTH CAR
OLINA
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Robin Housh <Robin.Housh@wolfspeed.com>
Sent: Monday, November 28, 2022 4:06 PM
To:Valentine,Thad <thad.valentine@ncdenr.gov>
Cc:Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>; lames.azarelo@durhamnc.gov;Andy Rodak
<arodak@daa.com>; Madison Paul <Madison.Paul @wolfspeed.com>
Subject: [External] Request for Relief from Advance Tier Response for Copper and Zinc
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Mr. Valentine,
Please find attached a letter requesting relief from advance tier response for copper and zinc at both Wolfspeed
facilities in Durham County. Justification and supporting documentation is included.
(Hard copy to Mr. Valentine is in LISPS mail.)
Please acknowledge receipt of this email.
Sincerely,
Robin Housh
olfsP 6C Environmental Manager,EHS
4600 Silicon Drive, Durham,NC 27703
0:+1(919)407-6103 1 M:+1(919)616-4614
www.wo[fspeed.com
This e-mail message, including any attachments and previous email messages sent with it, contains CONFIDENTIAL and
PROPRIETARY information of Wolfspeed, Inc. or its subsidiaries and may be legally PRIVILEGED.You may not use,
disclose, reproduce or distribute such information without Wolfspeed's authorization. If you have received this message
in error, please notify the sender immediately and permanently delete the original message, its attachments and any
copies thereof.
3
Young, Brianna A
From: Georgoulias, Bethany
Sent: Monday, November 28, 2022 5:01 PM
To: Carson, Brittany
Cc: Valentine, Thad; Young, Brianna A
Subject: FW: [External] Request for Relief from Advance Tier Response for Copper and Zinc
Attachments: 2022-11-28 Request for Relief Letter.pdf
Greetings, Brittany—getting you and Brianna in the loop on this. I've saved the records to both GP COC files in
Laserfiche.
Including Brianna because there's a reference to a potential influence from Kymera (formerly SCM Metal), which is
under an individual permit. A potential collaboration effort? Might even involve DAQ since there's a possible deposition
issue.
Bg
Bethany Georgoulias(she/her)
Environmental Engineer
Stormwater Program,Division of Energy,Mineral,and Land Resources
N.C.Department of Environmental Quality
919 707 3641 office
bethany.georgouliasOncidenngDy
512 N.Salisbury Street,Raleigh,NC 27604 (location)
1612 Mail Service Center,Raleigh,NC 27699-1612 (mailing)
Website: http:/Ideq..nc.gov/about/divisions/energy-mineral-land-resources/stormwater
D_Etl /�
NORTH CAROLINA
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Robin Housh <Robin.Housh@wolfspeed.com>
Sent: Monday, November 28, 2022 4:06 PM
To:Valentine,Thad <thad.valentine@ncdenr.gov>
Cc:Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>;james.azarelo@durhamnc.gov;Andy Rodak
<arodak@daa.com>; Madison Paul<Madison.PauI@wolfspeed.com>
Subject: [External] Request for Relief from Advance Tier Response for Copper and Zinc
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Mr. Valentine,
Please find attached a letter requesting relief from advance tier response for copper and zinc at both Wolfspeed
facilities in Durham County. Justification and supporting documentation is included.
(Hard copy to Mr. Valentine is in USPS mail.)
Please acknowledge receipt of this email.
Sincerely,
Robin Housh
Ol P66-d Environmental Manager,EHS
4600 Silicon Drive, Durham,NC 27703
0:+1(919)407-6103 1 M:+1(919)616-4614
www.wolfspeed.com
This e-mail message, including any attachments and previous email messages sent with it, contains CONFIDENTIAL and
PROPRIETARY information of Wolfspeed, Inc. or its subsidiaries and may be legally PRIVILEGED.You may not use,
disclose, reproduce or distribute such information without Wolfspeed's authorization. If you have received this message
in error, please notify the sender immediately and permanently delete the original message, its attachments and any
copies thereof.
2
Wolfspeed.
November 28,2022
Wolfspeed Inc.
4600 Silicon Drive
Durham, North Carolina,27703
Mr.Thad Valentine, Environmental Specialist
Division Energy, Mineral,and Land Resources(DEMLR)
NC Department of Environmental Quality
3800 Barrett Drive
Raleigh, NC 27609
RE: NPDES Permits NCG030433 and NCG030541
Request for Relief from Advanced Tier Response for Copper and Zinc
Dear Mr.Valentine:
Wolfspeed, Inc. (formerly Cree, Inc.) operates under General Stormwater Permit NCG030000 for Metal
Fabrication. This General Stormwater Permit was renewed effective 07-01-2021. It was revised to increase
routine sampling from semi-annually to quarterly. It also rescinded Wolfspeed's Letter of Relief from
Advanced Tier Response for Copper and Zinc granted by DEMLR on 09-24-2014. Due to the increased
sampling frequency and the lack of relief from advanced tier response for copper and zinc exceedances,
Wolfspeed now has several stormwater outfalls at both locations requiring Tier III response.
Wolfspeed does not believe the elevated copper and zinc levels originate from the Silicon Drive (DUR) or
Cornwallis Road (RTP) locations based on the following:
• Kymera International (formerly SCM Metal Products, Inc.) is located at 2601 Weck Drive, Research
Triangle Park, NC 27709. The facility smelts copper which could be emiting unregulated concentrations
of copper and zinc to the atmosphere, as reported in their TRI annual report. The copper and zinc may
then be atmospherically deposited to surrounding surface areas such as roofs and parking lots and
"washed"to stormwater outfalls during rain events.
• Copper and zinc compounds are used in wet manufacturing processes at the DUR site. However, the
processes are contained within buildings with no impact to stormwater drains or outfalls.
• Copper and zinc compounds are not used at the RTP site.
• Elevated copper and zinc levels have consistently exceeded the benchmark values in several of the
industrial stormwater discharge outfalls between the two sites. Table 1 and Table 2 (attached) present
the history of copper and zinc exceedances.
• SDO-2,SDO-5, WOLF-1, and WOLF-4 receive the majority of flows from building roofs and paved
surfaces at the respective sites. The copper and zinc values for these outfalls are indicative of
atmospheric deposition.
4600 Silicon Drive
Durham,NC 27703 USA
Main: (800)533-2583
—k-
Wolfspeed.
• Possible mitigation measures are costly and are not guaranteed to reduce the copper and zinc values
below benchmark.
In summary,Wolfspeed does not see a benefit to continue to perform the costly monthly monitoring at both
Wolfspeed facilities beyond the required quarterly occasions or implement costly mitigation measures.
Based on these reasons and the previous Relief from Advanced Tier Response for CopperandZinc granted by
DEMLR,Wolfspeed respectfully requests to resume quarterly sampling stormwater analytical monitoring for
the remainder of our permit terms for the copper and zinc parameters. Wolfspeed will continue to perform
quarterly qualitative monitoring along with the quarterly analytical monitoring for all required parameter,
and Wolfspeed will continue to follow the Tier I-Tier III process should Wolfspeed's sampling results ever
exceed another parameter besides copper and zinc.
Please contact me at 919-407-6103 should you require additional information.
Regards,
dI Xllouj�
Robin L. Housh
Environmental Manager
Wolfspeed, Inc.
Enclosures
• August 4, 2014 Analytical Monitoring Request and Response to August 1, 2014 Meeting Letter
• September 24, 2014 Letter of Relief from Advanced Tier Response for Copper and Zinc
cc: Bethany Geogoulias, NC DEQ DEMLR Central Office
Jim Azarelo, City of Durham Stormwater Inspector
Andy Rodak,TRC Stormwater Consultant
4600 Silicon Drive
Durham,NC 27703 USA
Main:(800)533-2583
r-i CO Ln N N tD (D CO 00 c0 0) rn 1-1
Ln O " �t .-1 N N m m d" CO m r- O
:)Ulz O 0 0 0 0 r-+ O O N C) O O co
I- C) C)C) CD C) O C) CD CD CD
>j O O �: O
O O O O
11111� ri ri ri m r1 LL M m co ;t' c0 U- O w LL co
rt O ri O O O er m m m O O N m O m
I ,laddo� 0 0 N p o ri z ri o 0 0 o z o o z o
Q O O O O O O O O O o O O
0 0 0 0 0 0
v
0) Lr) Q1 d O W Ln LO co tD N N h d'
N O O m 01 m Ln o It Go C) ri H O
:)Ulz O r-I M CO W d d O N O N
O O O 0 0 0 0 CD O 0 O
3 O 3j O O O
O O O O
0 0') LL LL h .-1 00 LL ri Ln co Q) Ln Ln Ln m
to C) O O H N O rl (D (1 Go 0) O tD O
.laddo� O z z 0 o ri z 0 M r, ri m Ih M ri N o
o 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 CD o 0 0 0 CD
v v
o0 N M Ln Ln -ct %T co ri LA oo M oo ri
M I- to RT N N to Ln r1 ti ri 1- ti ti tD
JUlz N N rl M O O N M 0 ti N N R} ri „4
�
O O O O co O O O 0 0
O O
a0 N rl N N N IL N ti to tD ri N Lfl LL lD
G rl rl ri O O O O N � ri N M N N
W ioddo� ri O O O ri ri N O M M M O N
N O O O O O O Z O O � O 6 o O o Z 0
O O O O O 0 o O
uj O
u v
c
h O ti N N 0)
to N Q1 N tD
7Ulz rl ri N N N
r O O O O O O O O O O O O
Q. LL LL LL LL LL LL LL LL LL LL LL LL
C. N HIDrl r1 M O O O O O O O O O O O O
u aaddoD 0 0 0 0 o z z z z z z z z z z z z
w
'i
f�
= h 01 m ti N w 00 01
In V 7Ulz rrq O O O r� O O
O O O O O O O
,N M O O O O O O O O O
C Q ' LL N r-i Ln LL LL LL N LL LL LL L1.. LL .--I
O rl o ri O O O H O O O O C) O m
C taddo� o z o 0 o z z z rq i— z z z z O z m
41 Ln O O CDO O O
O O O
lD Q1 Ln 00 N h m Ln LA m DD ti tD Lf1 Ln N ri
dl M Ll) r1 M rl rl r-i v ti O ri l,- M ri oo h 0
,C :)U l z ri ri 6 M to 0 ri N i r i 0 ri 1� 0 ri M ri
F O O O O O O O O O O O O 0
N
ri M rn N M rn M 00 N tD LA M CI N
N N ri CD M M O M H ri r-i t0 O ri tD N ioddo� 0 0 0 0 0 0 ri ri N I— O O 0 ri O N ri
0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0
(D0 0 0 0 0
ID
lD Cfl d' ti M o0 ti m r-i N 00 1- v L d- Ln
Ln i- o-) ri M ri oo Ln M O M 1- 00 O I- N
D U l z ri o o N 0 N ri r-i rn CO r-i O ri r i I— rn Q
0 0 0 0 0 0 0 0 0 0 0 0 0 0 O Ln ro
ri o 0 0 0 ::) o0
Q O� N
v ri ri m m m tD N N m ri m N 00 `" r- m
N M ri O O O c0 r lD O � ri O M N N -i C) N Ln
aaddo� o 0 0 0 0 r` o ri r1 o r1 0 0 o Ln LD c u
O O O O 00 O O O O O p 0 O 00 00 Ov Z OO
0 0 0 0 0 0 0 0 0 - 00
V V Ln ro
O c _c
,,t' t Ln Ln CO (D t- 1- 00 00 rn m ri .--1 N N N ra
r-i r-1 ri . i .--1 . i r-1 ri r-1 .-1 r-I r i N N N N N C)
O O O O O O O O O O O O O O O O O
Y N N N N N N N N N N N N N N N N N
d' CO to H CO d' d' c0 4 N to c0 r-i N O 1- O
N N C\O o
Ln N CO N w r-i (D r-i d' 1-1 ri m 0) -1 O 0)
ri ri .-i r-i
lQ)
CL
QUIZ o o o C)o o 1-4 m
N
N o 0 0 0 0 o o p o h o
LL o 0 0 0 0 0 0
0 iaddo� o S ri CD M 0 0 0 ,�� m RT 0 0 0 tI 0 0
o O o o O Z Z Z O I N Z z Z N z o
O O O O O O o O C o
0
ri co N N ri N V O M to ri 01 M Ln N LnrlD
UIZ M qT M Ln m O ri M N N W r-i O tD Ln
ri N O ri h M N ri ri N N CO 1-1 -1 dLn a 0 0 0 O O O O O o o o 0 0 0CD u J@ ri ri ri N N N h CO Ln M Ln01 0)cu o aaddo� o O N O N h W ri Ln M ri ri to O oo
O O O d' ri ri ,-� 6 ri O Ln Ol ri ri O
U O o C p O O O ID O C C, O O O p
Lil
x o 0 0 0 0 0 0 6 6
U V
C
N rI N 01 tD d
:)uiZ o 0 o too
cu �? o O o o O
a 0 0 0 0 0 0 0 0 0 0 0
O. J U- U- U- Ln Li LL 'ch Ln N U- Ll LL LL Ln IL U-
0 O aaddo: p o o 0 ly 0 0 r`. M Ln o 0 0 o ti o 0
3 o z z z o z Z o0 0 o Z z z z Oo z z
m o C o 0
0 0
w
Ln
ao cm d .-i Ln N ro co rn ti d
N :)UlZ r-I N O O -i N N N ri N N rn
3 0 0 0 0 o CD cm O o 0 O
C N o 0 0 oC� o 0 0 o o
0 0
u LL O O O O O
`- -1rn Co lD N U- tL (.0O d d 61 U- LL, ri LL ri
O aaddo� CIDO ri o r4 0 0 W M N Ln O O O o 0 0
i O O p O p Z Z O ri CO O o Z Z ri Z ri
O O O O O CD CD O O O
,N O O CD
O O
Np O O O
2
N d f 61 N N to 00 ri r I d W ri CD M (D ri -i
A D U I Z O o O o O M o Ri co OD w Ln CO LLnn -1 01 O
O
to N N M ri N
0 0 0 0 0 0 0 CD 0 0 0 0 CD
p 0
LL
.J
O Ln M t0 Ln �t h w Ln M w v ri v tt N ri
jaddo� ri M M d of co M ?-Iri h N h ri M N ri
O O o 0 0 v N O o ri O N ri ri v ri
O O O O O o O O O O O O O O O O
u o 0 0 0 0 0 0 0
d' d' Ln Ln c� LD I� N co M rn rn rl r1 N N N
O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (D Q
O N N N N N N N N N N N N N N N N N N m
4' LD Ln l~ oo d i-- w w l~ o cD H N O I-- O Ln
m
inr-I �--� N �--I N N �-I '-I N �--I M N N N M ; O N
N N
Ln N CD N L,D .-I 61 r-I d' rl lD --I M 61 .-I CD rn to
r l t
C U —
0 Z o
._ E
Vn m
o 2- c
O L 'tp
low ■ - �O
4600 Silicon Drive, Durham, NC 27703 USA
Main: (919)407-5300
August 4, 2014
Attn: Mr. David Parnell
Environmental Senior Specialist
Water Quality, Surface Water Protection Section
North Carolina Department of Environment and Natural Resources
3800 Barrett Drive
Raleigh,NC 277609
RE: NPDES Permits NCG030433 and NCG030541
Analytical Monitoring Request and Response to August 1, 2014 Meeting
Dear Mr. Parnell:
It was a pleasure meeting with you and Bethany Georgoulias to discuss options for Cree's stormwater
monitoring for copper and zinc. This letter is to follow up the verbal request made during our meeting
on Friday, August 1, 2014 at NCDENR offices at 3800 Barrett Drive.
I
During the meeting Cree presented reasons why the Cree-Durham and Cree-RTP (Research Triangle
Park)facilities,which have both reached Tier Three status under Part II Section B of our NPDES
permits NCG030433 and NCG030541, should return to semi-annual stormwater analytical monitoring
from Tier Two monthly monitoring. Elevated copper and zinc levels, we feel, are not originating from
the Cree-Durham or Cree-RTP facilities based on the following objective evidence:
• No copper or zinc compounds are used in Cree's manufacturing processes at either location
which could contribute to these levels;
• Cree has performed an extensive review of its buildings and operational areas and no
significant sources of copper or zinc have been identified at either Cree facility that could be
contributing to these levels;
• Elevated copper and zinc levels have consistently exceeded the benchmark values in all seven
Cree-Durham industrial stormwater discharge outfalls and all five Cree-RTP industrial
stormwater discharge outfalls, even though several of these outfalls have on-site drainage areas
that contain no buildings, equipment,vehicles,or other possible sources of copper and zinc.
Further, Cree is aware of a copper smelting plant in the vicinity that could be contributing to these
elevated copper and zinc levels. That facility should be taken into consideration by NCDENR as a
potential source of copper and zinc due to atmospheric deposition.
In summary, Cree does not see a benefit to continue to perform the costly monthly monitoring at both
Cree facilities beyond the required four occasions already completed.
Based on these reasons and on the technical discussion held during our meeting on August 1, Cree
formally asks to resume semi-annual stormwater analytical monitoring for the remainder of our permit
terms for the zinc and copper parameters. Cree will continue to perform semi-annual qualitative
monitoring along with the semi-annual analytical monitoring for all required parameters, and Cree will
continue to follow the Tier One-Tier Three process should Cree's sampling results ever exceed another
parameter besides copper and zinc. If NCDENR agrees, and we are able to perform analytical
monitoring of stormwater discharges this next month, we also respectfully request that the next
samples collected be allowed to satisfy our upcoming fall 2014 reporting period.
In addition, during the August 1, 2014 meeting with you Cree asked for a reduction in the number of
outfalls that require analytical monitoring at both the Cree-Durham and Cree-RTP facilities based on
representative outfall status and in a few cases insignificant drainage from certain outfalls.
Cree will plan to submit a separate formal request for this reduction to NCDENR in the near future.
In the interim please advise Cree on our above request to return to semi-annual monitoring
immediately for both Cree-Durham and Cree-RTP facilities.
Please contact me at 919-407-6101 if you need additional information.
Sincerely,
Donna Lazzari
Environmental Manager
Cree, Inc.
Enclosures
cc: Bethany Georgoulias,NCDENR Central Office
Lloyd Smith, Cree, Inc.
Dan O'Connor, PE,URS Stormwater Consultant
Page 2 of 2
AiPA
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory John E, Skvarla, III
Governor Secretary
September 24, 2014
Ms. Donna Lazzari, Environmental Manager
CREE
4600 Silicon Drive
Durham, North Carolina 27703
Subject. CREE—Silicon Drive
NPDES Permit NCG030433
Relief from Advanced Tier Response
Durham County
Dear Ms. Lazzari:
In response to your discussions with NCDENR Land Quality Section staff, concerning multiple
exceedances of the benchmark values for zinc and copper, Dave Parnell of the Land Quality
Section -Stormwater staff, conducted a compliance evaluation inspection (CEI) on April 8,
2014. The inspection was conducted to determine compliance with the conditions of your
NPDES NCG030433 Stormwater Permit and to discuss any actions that have been or could be
taken to identify and eliminate potential sources of Zinc and Copper related to facility
operations,
Keep in mind that benchmark exceedances are not limit violations or violations of permit
conditions; however,you are obligated to follow the tiered response actions outlined in your
permit. At the time of the inspection,your facility was found to be in compliance with the
tiered response actions and other conditions of the permit, During the inspection,you are
reported to have relayed to Mr. Parnell that you have been unable to determine the source of
the higher levels of the metals, found at the Silicon Drive outfalls. It is notable in this case,
that CREE does not use copper or zinc in the manufacturing processes and the facility has
conducted extensive reviews of your site for external sources of the metals. Your diligence in
attempting to determine and eliminate the zinc source and your continued communication
with Raleigh Regional Office staff is commendable and is documented back to the April 8
compliance evaluation inspection.
Division of Energy,Mineral,and Land Resources
Energy Section•Geological Survey Section•Land Quality Section
1612 Mail Service Center,Raleigh,North Carolina 27699-1612-919-707.9200/FAX:919-715-8801
512 North Salisbury Street,Raleigh, North Carolina 27604•Internet:http://Portal.ncdenr.org/webAr/
An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper
Based on the aforementioned items, DENR Land Quality Section is granting regulatory relief in
the form of a collapsed Tier 2-'Pier 3 response. Upon receipt of this letter, CREE- Silicon
Drive, may resume the permit specified semi-annual analytical monitoring for the remainder
of the current permit term - which ends October 31, 2017. This decision applies only to the
zinc and copper benchmarks, A benchmark exceedance of any other parameter listed in
your permit will trigger the tiered response actions as described in your permit:
You must notify this office, in writing, within five business days if you become aware of any
significant source of zinc or copper at your facility, that has the potential to be exposed to
stormwater. The relief granted in this letter is contingent upon the current industrial
practices at CREE. If industrial practices change and zinc&copper does become a significant
stormwater exposure risk, then this office reserves the right to withdraw this decision and
reinstate the permit specified tiered response or other actions that may be warranted by the
new set of circumstances.
Retain and append this letter to your Stormwater Pollution Prevention Plan (SPPP) or permit.
Should you have questions or comments regarding the CEI or this letter, please contact Dave
Parnell at(919) 791-4200 or david.parnell@ncdenr.gov.
Sincerely,
�f
John L. Holley,Jr., PFj, CPESC
Regional Engineer
Rtileigh Regional Office
cc; Stormwater Permitting Program Files
DEMLR Raleigh Regional Office Stormwater Files
Young, Brianna A
From: Westley Riscili <westley.riscili@kymerainternational.com>
Sent: Tuesday, October 25, 2022 10:14 AM
To: Young, Brianna A
Subject: RE: [External] SCM Metal Products, Inc. update
Attachments: New Location of the Wastewater Process tank.pdf
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Good morning, Brianna,
The process tank that is being moved outside is part of our non-process wastewater pretreatment system. This is similar
to the large wastewater storage tank that receives wastewater from our employee shower drains, restroom sinks, and
laboratory sinks. The water from these drains is collected in the large wastewater storage tank,then pumped into the
process tank. Wastewater from the smaller process tank is then run through a series of 72 membrane filters,which is
then run through a resin bed filter prior to being discharged to the sanitary sewer. The location of the process tank will
be in close proximity to the existing large wastewater storage tank. This tank is located inside of a concrete secondary
containment. I have attached a site map showing this location. Please let me know if this will suffice, or if you would
prefer a satellite image showing this location.
Best regards,
Westley Riscili, CQIA— N.A. Environmental Compliance Manager
Kymera International
SCM Metal Products 12601 Weck Drive I RTP I NC 127709 1 USA
Tel +1 (919).544.8090
Direct +1 (919).287.9891
Mobile +1 (716).307.3191
westley.riscili@kymerainternational.com
ACuPowder I AmeriTi Manufacturing I ECKA Granules I Innobraze I Reading Alloys SCM Metal Products Telex Metals
www.kymerainternational.com
From:Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent:Tuesday, October 25, 2022 9:45 AM
To:Westley Riscili<westley.riscili@kymerainternational.com>
Subject: RE: [External] SCM Metal Products, Inc. update
[[EXTERNAL EMAIL]]
Hello Westley,
Can you please provide more information on the process tank that is being moved outside?What is being stored in this
tank? Please point on the map where the exact location will be.
Thank you,
Brianna Young, MS(she/her/hers)
i
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From:Westley Riscili<westlev.riscili@kymerainternational.com>
Sent: Friday, October 7, 2022 4:41 PM
To:Young, Brianna A<Brianna.Young@ncdenr.gov>
Subject: [External] SCM Metal Products, Inc. update
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Hi Brianna,
Please find attached an updated site map showing the locations of the new processes, as well as significant changes in
industrial activities. Please let me know if you have any questions.
Regards,
Westley Riscili, CQIA— N.A. Environmental Compliance Manager
Kymera International
SCM Metal Products 12601 Weck Drive I RTP I NC 127709 1 USA
Tel +1 (919).544.8090
Direct +1 (919).287.9891
Mobile +1 (716).307.3191
westley.riscilina kymerainternational.com
ACuPowder I AmeriTi Manufacturing I ECKA Granules I Innobraze I Reading Alloys I SCM Metal Products Telex Metals
www.kvmerainternational.com
2
Outfall1
Outfall1
Oil
� Outfall2
2 110 Outfall 3
—p / o
Used
Oil
Existing Wastewater Storage Tank
amimomi /
Produttiun /
NUTIn /
Bismuth /
L L L L L L L L
L L L L L
• L L L L L Wastewater Process Tank
•L L ` `1 L
LL LL
�L LLLLLLLL
LLLL
L�� o
L Outfall 3
Outfall2
KymeraIrSI
INTERNATIONAL
Pioneers in Material Science®
SIGNIFICANT CHANGES IN INDUSTRIAL ACTIVITIES — Updated 10/7/2022
In March of 2013, the Brazing Manufacturing Process was moved into the main facility from an outside
building. This relocation of this process has helped eliminate the transfer of materials between buildings.
In December of 2013, the Tin Manufacturing Process was discontinued at the RTP facility. This process
was moved to another SCM Manufacturing Plant in Union, New Jersey.
Most additives are stored indoors, with the exception of some drums of flammable liquids, which SCM is
required to store outdoors by the fire department. These drums are stored on secondary containment
pallets and are covered with tarps.
UPDATE SINCE ORIGINAL PERMIT RENEWAL SUBMISSION IN 2016:
In April of 2019, the Antimony process began operations. This process involves crushing antimony
ingots into powder form through a series of jaw crushers, mills, and screening activities. This is a dry
process that is located inside of the main building near the warehouse loading docks.
In December of 2021, the Catalyst process that was located in the TL#3 room was decommissioned
and all equipment was removed.
In September of 2022, the Tin Manufacturing Process was recommissioned, located in the room next
to the Antimony process. The process is currently under Engineering control and has not been
handed over to operations. This is expected to occur in the next week. An additional process for the
production of Bismuth and NuTin Powder is also being commissioned in this room. Bismuth
production will include the melting of bismuth ingot and the air atomization of the molten metal to
create bismuth powder, and screening operations. The NuTin process will include the melting and air
atomization of a 90/10 tin/copper mixture. The resulting powder will include dry handling operations
such as screening. Activities for all of these processes will occur indoors.
There are plans to install a water copper process in the main production area. In addition, a
continuous belt reduction furnace is planned to be installed in the previous TL#3 room. This is
expected to occur in the 4t" quarter of 2022. As a part of this construction, the wastewater
pretreatment system been moved to the Brazing Manufacturing Process area. This will included
moving the process tank outside, near the current storage tank. This tank will be installed inside of a
secondary containment bunker.
SCM Metal Products, Inc. 2601 Weck Drive, RTP, NC, 27709 USA
Tel (919)544.8090 Fax(919)544.7996 5 CM
www.kymerainternational.com
Outfall1
Outfall1
Oil
� Outfall2
2 110 Outfall 3
—p / o
Uxd
Oil
Bota Old— qy
animom / _
Produttion /
NUTIn /
Bismuth /
L L�L— L L L L
LLLLL�
LLLLL
L L L `1 L L
LL �s LL L
�L LLB
.LL LLLLLLLL-LLL
LLL-11
LLB O
LL Outfall 3
Outfall2
Young, Brianna A
From: Westley Riscili <westley.riscili@kymerainternational.com>
Sent: Monday, September 19, 2022 12:22 PM
To: Young, Brianna A
Cc: Jonathan White
Subject: RE: [External] RE: SCM Metal Products, Inc. (NCS000050)
Attachments: Outfall areas.pdf, Questions.pdf, Summary of Stormwater Analytical Results for 2022
Permit Renewal Review.xlsx
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Hi Brianna,
I have attached a map of our facility areas, describing which areas discharge to which outfalls. Also included are the
responses to your questions, and the summary of analytical results since the implementation of the current permit. I did
update the contact information as requested. Please confirm that you have received this information. I am working on
updating the renewal application as requested. I will provide this information as soon as possible. Please let me know if
you have any additional questions regarding the information that I have provided to you in this email. Thank you for you
time.
Best regards,
Westley Riscili, CQIA— N.A. Environmental Compliance Manager
Kymera International
SCM Metal Products 12601 Weck Drive I RTP I NC 127709 1 USA
Tel +1 (919).544.8090
Direct +1 (919).287.9891
Mobile +1 (716).307.3191
westley.riscili@kymerainternational.com
ACuPowder I AmeriTi Manufacturing I ECKA Granules I Innobraze I Reading Alloys I SCM Metal Products Telex Metals
www.kymerainternational.com
From:Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent: Friday, September 16, 2022 11:26 AM
To:Westley Riscili<westley.riscili@kymerainternational.com>
Cc:Jonathan White<jonathan.white@kymerainternational.com>
Subject: RE: [External] RE: SCM Metal Products, Inc. (NCS000050)
[[EXTERNAL EMAIL]]
If you already have access to eDMR,you will not need to do anything further for this renewal regarding that. However,
eDMR is a separate database from our internal database. In order to make sure our internal database is up to date,
please run the Stormwater Permit Summary Report and update the contact information as needed.
Facility/Company name or ownership: Name/Ownership Change Form
1
Owner Affiliation (Legally responsible person; i.e., someone with the company who is designated to
represent the company per signatory requirements or another authorized representative): Permit Contact
Update Request Form
Delegation of Signature Authority (DOSA): Permit Contact Update Request Form
Billing contact: Permit Contact Update Request Form
Permit contact: Permit Contact Update Request Form
Facility contact: Permit Contact Update Request Form
Facility address only: Email Bethany og ulias
Stormwater outfall information: Email Bethany Geor og ulias
Visit the eDMR Six Steps website and complete Steps 1 and 2.
Pay outstanding permit fees: Stormwater ePayment website
Thank you,
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From: Westley Riscili<westley.riscili@kymerainternational.com>
Sent: Friday, September 16, 2022 10:55 AM
To:Young, Brianna A<Brianna.YounR@ncdenr.gov>
Cc:Jonathan White<ionathan.white@kvmerainternational.com>
Subject: RE: [External] RE: SCM Metal Products, Inc. (NCS000050)
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Hi Brianna,
If I previously have been set up for eDMR submissions, do I need to complete this exercise again?
Regards,
Westley Riscili, CQIA— N.A. Environmental Compliance Manager
Kymera International
SCM Metal Products 12601 Weck Drive I RTP I NC 127709 1 USA
2
Tel +1 (919).544.8090
Direct +1 (919).287.9891
Mobile +1 (716).307.3191
westley.riscili(a kymerainternational.com
ACuPowder I AmeriTi Manufacturing I ECKA Granules I Innobraze I Reading Alloys I SCM Metal Products Telex Metals
www.kymerainternational.com
From:Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent:Tuesday, September 13, 2022 10:57 AM
To: Westley Riscili<westley.riscili@kymerainternational.com>
Cc:Jonathan White<ionathan.white@kymerainternational.com>
Subject: RE: [External] RE: SCM Metal Products, Inc. (NCS000050)
[[EXTERNAL EMAIL]]
Westley,
Thank you for the quick response. I received a bounce back on Jill Spaulding's email address on my original send. As you
gather the data, please make sure to also follow the links in the previous email to update the contacts for this permit so
our database is accurate. Please let me know if you have any questions as you work through the request.
Thank you,
Brianna Young, MS(she/her)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
INC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Low and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts.
Please check with the appropriate staff before visiting our offices,as we may be able to handle your requests by phone or email.We
appreciate your patience as we continue to serve the public during this challenging time.
From:Westley Riscili<westlev.riscili@kymerainternational.com>
Sent:Tuesday, September 13, 2022 10:38 AM
To:Young, Brianna A<Brianna.Young@ncdenr.gov>
Cc:Jonathan White<jonathan.white@kvmerainternational.com>
Subject: [External] RE: SCM Metal Products, Inc. (NCS000050)
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Good morning Brianna,
3
I am happy to assist with the requested information. Since our submission of this renewal,there have been some
changes at the facility. Jonathan White (in copy here) is the new Operations Manager. I am still the technical contact for
the facility. We are currently in the process of adding additional processes at the facility. These are both dry processes
in which all handling and processing activities occur indoors. These include the processing of tin and bismuth. None of
these processes should have an impact on the stormwater quality for this facility. Construction for these processes is
currently underway. The next phase of construction will also include some new processing equipment for copper. All
activities for this process will also occur indoors. If you have any questions while I gather the requested information,
please do not hesitate to ask.
Best regards,
Westley Riscili, CQIA— N.A. Environmental Compliance Manager
Kymera International
SCM Metal Products 12601 Weck Drive I RTP I NC 127709 1 USA
Tel +1 (919).544.8090
Direct +1 (919).287.9891
Mobile +1 (716).307.3191
westley.riscili(a kymerainternational.com
ACuPowder I AmeriTi Manufacturing I ECKA Granules I Innobraze I Reading Alloys SCM Metal Products Telex Metals
www.kvmerainternational.com
From: Barton White<barton.white@kvmerainternational.com>
Sent: Monday, September 12, 2022 5:51 PM
To:Westley Riscili<westlev.riscili@kvmerainternational.com>; Gabor Szentivanyi
<Gabor.Szentivanvi@kvmerainternational.com>
Subject: Fwd: SCM Metal Products, Inc. (NCS000050)
Not sure if this is Spam but it looks legit
From:Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent: Monday, September 12, 2022 4:06 PM
To: Ispaulding@scmmetals.com <ispaulding@scmmetals.com>
Cc: Barton White<barton.white@kvmerainternational.com>
Subject: SCM Metal Products, Inc. (NCS000050)
[[EXTERNAL EMAIL]]
Good afternoon,
I am working on renewing the individual stormwater permit for the SCM Metal Products, Inc. (NCS000050). I
need additional information in order to 1) confirm that the information I have is correct and 2) make sure the
permit adequately serves the needs of the facility. Please provide the following:
• Confirmation on number of outfalls and associated coordinates;
• Confirmation of the receiving stream for each outfall;
• Description of industrial activity in each drainage area;
• SIC (NAICS) code;
• An electronic spreadsheet summarizing all of the monitoring data that has been collected since the
effective date of the current permit;
• Verification that the information in the renewal application is still complete and correct; and
• An explanation of any operational changes since the renewal application was submitted.
4
Enter your stormwater permit number into the Stormwater Permit Summary Report and you will see a form that
includes the address of the facility, contact information for the permit, and the regulated stormwater outfall(s)for the
facility. Please review the facility information to make sure it is correct. Information can be updated using the links
provided below,where applicable:
Facility/Company name or ownership: Name/Ownership Change Form
Owner Affiliation (Legally responsible person; i.e., someone with the company who is designated to
represent the company per signatory requirements or another authorized representative): Permit Contact
Update Request Form
Delegation of Signature Authority (DOSA): Permit Contact Update Request Form
Billing contact: Permit Contact Update Request Form
Permit contact: Permit Contact Update Request Form
Facility contact: Permit Contact Update Request Form
Facility address only: Email BethanGeor og ulias
Stormwater outfall information: Email Bethany og ulias
Visit the cDMR Six Steps website and complete Steps I and 2.
Pay outstanding permit fees: Stormwater ePayment website
Once I have the above listed information, I can continue my review. You will receive a draft permit for a 30-day
comment period. During this time we will be able to address any comments or concerns you have. During the
same 30-day period, the draft will be sent to a Regional Office staff member for review as well as out to public
notice. Once all comments and concerns are addressed, you may be issued a final permit.
Please contact me if you have any questions.
Thank you,
Brianna Young, MS(she/her)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts.
Please check with the appropriate staff before visiting our offices,as we may be able to handle your requests by phone or email.We
appreciate your patience as we continue to serve the public during this challenging time.
Kymera International° Disclaimer:This message, including attachments, is intended only for the person(s) or entity to
which it is addressed and may contain confidential and/or privileged material.Any review, re-transmission,
dissemination or other use of, or taking of any action in reliance upon this information by persons or entities other than
5
the intended recipient is prohibited. If you received this message in error, please contact the sender and destroy any
copies of this correspondence and the information within.
6
Young, Brianna A
From: Westley Riscili <westley.riscili@kymerainternational.com>
Sent: Thursday, September 22, 2022 8:53 AM
To: Young, Brianna A
Cc: Jonathan White
Subject: RE: [External] RE: SCM Metal Products, Inc. (NCS000050)
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Hi Brianna,
No problem. I had the same issue when I initially set up our EDMR. Outfall#3 was not listed for reporting. However,
when I contacted Bethany we were able to get it on there. Please let me know if you need any additional information.
Best regards,
Westley Riscili, CQIA— N.A. Environmental Compliance Manager
Kymera International
SCM Metal Products 12601 Weck Drive I RTP I NC 127709 1 USA
Tel +1 (919).544.8090
Direct +1 (919).287.9891
Mobile +1 (716).307.3191
westley.riscili@kymerainternational.com
ACuPowder I AmeriTi Manufacturing I ECKA Granules I Innobraze Reading Alloys SCM Metal Products Telex Metals
www.kymerainternational.com
From:Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent:Thursday,September 22, 2022 8:42 AM
To: Westley Riscili<westley.riscili@kymerainternational.com>
Cc:Jonathan White<jonathan.white@kymerainternational.com>
Subject: RE: [External] RE: SCM Metal Products, Inc. (NCS000050)
[[EXTERNAL EMAIL]]
Thank you for this information. I will add it to our permit files.
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
1
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From:Westley Riscili<westley.riscili@kymerainternational.com>
Sent:Wednesday, September 21, 2022 4:49 PM
To:Young, Brianna A<Brianna.Young@ncdenr.gov>
Cc:Jonathan White<jonathan.white@kvmerainternational.com>
Subject: RE: [External] RE: SCM Metal Products, Inc. (NCS000050)
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Hi Brianna,
Outfall #3 was not added prior to 2007. It was added in September of 2011. The first stormwater sample collected for
Outfall #3 was on 9/30/2011.
2
r Chain of Custody
1I 11 �5 �f �f
TRiTEST
. n `JG't?E)D7
Crr f91918344!Ma (ape f919k834.67V
Mr-WA)f.iprfii W-DW'GMM37751
J€521;OL A-Raatl.�Aln Q.Wihrinplµ•s NO 25411
Grr[n1Ui 76° '913r krx IWgl 3C3.SM@
hCW!CAA075 NODWLerHa7?27
J M RMML13 OF SwM CR.O*TSn w&NE 270 Q
&A,e3Jl}e 76&7Bv ra r-W6 7$S-aP'l
.Nc7vNlCafkl0 Alt#.YGenrr3TM
Report Rosult.7u 811i 70:
Cornganx• Profe:tFe+.erenrE
— — — — pit Number: ---
Attu:--- �. .R �_ --- — - Ps�rchase Orderly. ,+.� � • .
Phone l rtifldard Hepwt Nlivary
--- - -
Fay fQ 44- PkAh Report r l re�y+rw vriapq
arm seen r ar h a alwm.a
�3fr1�iAif b'y �91[]fl#JRWL�} � mu!&e319rrfv
RLx�V%tQu Ow mow'
Stan Gvt - Eno Dale Mwflk An�Yse'.a eq.,c:ipq
�M' 7 Bid Tyre
- I
1py
co
t
I- , t. ,_ a _ fiecc-V CordAions(Ln UW Onh'I
/it Rrs chuf�lr6
Absorn -Amwn .:W4,
i G€hngu45t b1 i U;O: '*e[[te]tT 1x A-3kire y1rF 1$e Np rva
j haw oresery}iar
'Ma : Na
3
Best regards,
Westley Riscili, CQIA— N.A. Environmental Compliance Manager
Kymera International
SCM Metal Products 12601 Weck Drive I RTP I NC 127709 1 USA
Tel +1 (919).544.8090
Direct +1 (919).287.9891
Mobile +1 (716).307.3191
westley.riscili(a)kymerainternational.com
ACuPowder I AmeriTi Manufacturing I ECKA Granules I Innobraze Reading Alloys SCM Metal Products Telex Metals
www.kymerainternational.com
From:Young, Brianna A<Brianna.YounR@ncdenr.gov>
Sent: Wednesday, September 21, 2022 4:05 PM
To: Westley Riscili<westley.riscili@kymerainternational.com>
Cc:Jonathan White<ionathan.white@kymerainternational.com>
Subject: RE: [External] RE: SCM Metal Products, Inc. (NCS000050)
[[EXTERNAL EMAIL]]
Thank you for the quick response. If you are able to easily find when outfall SWO03 was added to the site, that
would be great. Otherwise, knowing it has been in place since at least 2007 is very helpful.
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From: Westley Riscili<westley.riscili@kymerainternational.com>
Sent: Wednesday, September 21, 2022 3:23 PM
To:Young, Brianna A<Brianna.YounR@ncdenr.gov>
Cc:Jonathan White<ionathan.white@kymerainternational.com>
Subject: RE: [External] RE: SCM Metal Products, Inc. (NCS000050)
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Hi Brianna,
4
There is an outdoor H2 storage tank located at the NW corner of the facilities perimeter fence, inside of a fenced area
within the perimeter fence.
A 36" pipe runs approximately 400' N from the underdrain of the bioretention cell towards the property line. The pipe
ends at a weir that then discharges down a riprap channel. Point at which the water leaves the weir is outfall#1.
I will need to review my archive to determine the date of installation for Outfall#3. This outfall is described in our
SWPPP as far back as 2007. It has been in place prior to that.
Regards,
Westley Riscili, CQIA— N.A. Environmental Compliance Manager
Kymera International
SCM Metal Products 12601 Weck Drive I RTP I NC 127709 1 USA
Tel +1 (919).544.8090
Direct +1 (919).287.9891
Mobile +1 (716).307.3191
westley.riscili(a kymerainternational.com
ACuPowder I AmeriTi Manufacturing I ECKA Granules I Innobraze Reading Alloys SCM Metal Products Telex Metals
www.kvmerainternational.com
From:Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent:Wednesday, September 21, 2022 2:48 PM
To:Westley Riscili<westlev.riscili@kymerainternational.com>
Cc:Jonathan White<ionathan.white@kvmerainternational.com>
Subject: RE: [External] RE: SCM Metal Products, Inc. (NCS000050)
[[EXTERNAL EMAIL]]
Westley,
I have a few follow-up questions.
1) Are there H2 storage tanks outdoors on the property?
2) Does outfall SW001 discharge from the bioretention pond?
3) When was Outfall SW003 identified at/added to the facility?Our permit files only discuss outfalls SW001 and
S W 002.
Thank you,
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brlanna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
5
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From:Young, Brianna A
Sent:Tuesday, September 20, 2022 8:46 AM
To:Westley Riscili<westlev.riscili@kymerainternational.com>
Cc:Jonathan White<jonathan.white@kvmerainternational.com>
Subject: RE: [External] RE: SCM Metal Products, Inc. (NCS000050)
Westley,
Thank you for providing this information. I will reach out with any questions once I review everything. Please let me
know if you have any questions as you work on updating the application.
Thank you,
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From:Westley Riscili<westlev.riscili@kymerainternational.com>
Sent: Monday, September 19, 2022 12:22 PM
To:Young, Brianna A<Brianna.Young@ncdenr.gov>
Cc:Jonathan White<lonathan.white@kvmerainternational.com>
Subject: RE: [External] RE: SCM Metal Products, Inc. (NCS000050)
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Hi Brianna,
I have attached a map of our facility areas, describing which areas discharge to which outfalls. Also included are the
responses to your questions, and the summary of analytical results since the implementation of the current permit. I did
6
update the contact information as requested. Please confirm that you have received this information. I am working on
updating the renewal application as requested. I will provide this information as soon as possible. Please let me know if
you have any additional questions regarding the information that I have provided to you in this email. Thank you for you
time.
Best regards,
Westley Riscili, CQIA— N.A. Environmental Compliance Manager
Kymera International
SCM Metal Products 12601 Weck Drive I RTP I NC 127709 1 USA
Tel +1 (919).544.8090
Direct +1 (919).287.9891
Mobile +1 (716).307.3191
westlev.riscili(a,kymerainternational.com
ACuPowder I AmeriTi Manufacturing I ECKA Granules I Innobraze I Reading Alloys I SCM Metal Products Telex Metals
www.kvmerainternational.com
From:Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent: Friday, September 16, 2022 11:26 AM
To:Westley Riscili<westlev.riscili@kymerainternational.com>
Cc:Jonathan White<ionathan.white@kvmerainternational.com>
Subject: RE: [External] RE: SCM Metal Products, Inc. (NCS000050)
[[EXTERNAL EMAIL]]
If you already have access to eDMR,you will not need to do anything further for this renewal regarding that. However,
eDMR is a separate database from our internal database. In order to make sure our internal database is up to date,
please run the Stormwater Permit Summary Report and update the contact information as needed.
Facility/Company name or ownership: Name/Ownership Change Form
Owner Affiliation (Legally responsible person; i.e., someone with the company who is designated to
represent the company per signatory requirements or another authorized representative): Permit Contact
Update Request Form
Delegation of Signature Authority (DOSA): Permit Contact Update Request Form
Billing contact: Permit Contact Update Request Form
Permit contact: Permit Contact Update Request Form
Facility contact: Permit Contact Update Request Form
Facility address only: Email Bethany og ulias
Stormwater outfall information: Email Bethany Geor og ulias
Visit the eDMR Six Steps website and complete Steps 1 and 2.
Pay outstanding permit fees: Stormwater ePayment website
Thank you,
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
7
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From: Westley Riscili<westley.riscili@kymerainternational.com>
Sent: Friday, September 16, 2022 10:55 AM
To:Young, Brianna A<Brianna.Young@ncdenr.gov>
Cc:Jonathan White<ionathan.white@kymerainternational.com>
Subject: RE: [External] RE: SCM Metal Products, Inc. (NCS000050)
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Hi Brianna,
If I previously have been set up for eDMR submissions, do I need to complete this exercise again?
Regards,
Westley Riscili, CQIA— N.A. Environmental Compliance Manager
Kymera International
SCM Metal Products 12601 Weck Drive I RTP I NC 127709 1 USA
Tel +1 (919).544.8090
Direct +1 (919).287.9891
Mobile +1 (716).307.3191
westley.riscili(a)kymerainternational.com
ACuPowder I AmeriTi Manufacturing I ECKA Granules I Innobraze Reading Alloys I SCM Metal Products I Telex Metals
www.kymerainternational.com
From:Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent:Tuesday, September 13, 2022 10:57 AM
To: Westley Riscili<westley.riscili@kymerainternational.com>
Cc:Jonathan White<ionathan.white@kymerainternational.com>
Subject: RE: [External] RE: SCM Metal Products, Inc. (NCS000050)
[[EXTERNAL EMAIL]]
Westley,
Thank you for the quick response. I received a bounce back on Jill Spaulding's email address on my original send. As you
gather the data, please make sure to also follow the links in the previous email to update the contacts for this permit so
our database is accurate. Please let me know if you have any questions as you work through the request.
8
Thank you,
Brianna Young, MS(she/her)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts.
Please check with the appropriate staff before visiting our offices,as we may be able to handle your requests by phone or email.We
appreciate your patience as we continue to serve the public during this challenging time.
From:Westley Riscili<westlev.riscili@kymerainternational.com>
Sent:Tuesday, September 13, 2022 10:38 AM
To:Young, Brianna A<Brianna.Young@ncdenr.gov>
Cc:Jonathan White<ionathan.white@kvmerainternational.com>
Subject: [External] RE: SCM Metal Products, Inc. (NCS000050)
CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
Report Spam.
Good morning Brianna,
I am happy to assist with the requested information. Since our submission of this renewal,there have been some
changes at the facility. Jonathan White (in copy here) is the new Operations Manager. I am still the technical contact for
the facility. We are currently in the process of adding additional processes at the facility. These are both dry processes
in which all handling and processing activities occur indoors. These include the processing of tin and bismuth. None of
these processes should have an impact on the stormwater quality for this facility. Construction for these processes is
currently underway. The next phase of construction will also include some new processing equipment for copper. All
activities for this process will also occur indoors. If you have any questions while I gather the requested information,
please do not hesitate to ask.
Best regards,
Westley Riscili, CQIA— N.A. Environmental Compliance Manager
Kymera International
SCM Metal Products 12601 Weck Drive I RTP I NC 127709 1 USA
Tel +1 (919).544.8090
Direct +1 (919).287.9891
Mobile +1 (716).307.3191
westlev.riscili(a)kymerainternational.com
ACuPowder I AmeriTi Manufacturing I ECKA Granules I Innobraze I Reading Alloys SCM Metal Products Telex Metals
www.kymerainternational.com
9
From: Barton White<barton.white@kvmerainternational.com>
Sent: Monday, September 12, 2022 5:51 PM
To:Westley Riscili<westley.riscili@kvmerainternational.com>; Gabor Szentivanyi
<Gabor.Szentivanvi@kvmerainternational.com>
Subject: Fwd: SCM Metal Products, Inc. (NCS000050)
Not sure if this is Spam but it looks legit
From: Young, Brianna A<Brianna.Young@ncdenr.gov>
Sent: Monday, September 12, 2022 4:06 PM
To: Ispaulding@scmmetals.com <Ispaulding@scmmetals.com>
Cc: Barton White<barton.white@kymerainternational.com>
Subject: SCM Metal Products, Inc. (NCS000050)
[[EXTERNAL EMAIL]]
Good afternoon,
I am working on renewing the individual stormwater permit for the SCM Metal Products, Inc. (NCS000050). I
need additional information in order to 1) confirm that the information I have is correct and 2) make sure the
permit adequately serves the needs of the facility. Please provide the following:
• Confirmation on number of outfalls and associated coordinates;
• Confirmation of the receiving stream for each outfall;
• Description of industrial activity in each drainage area;
• SIC (NAICS) code;
• An electronic spreadsheet summarizing all of the monitoring data that has been collected since the
effective date of the current permit;
• Verification that the information in the renewal application is still complete and correct; and
• An explanation of any operational changes since the renewal application was submitted.
Enter your stormwater permit number into the Stormwater Permit Summary Report and you will see a form that
includes the address of the facility, contact information for the permit, and the regulated stormwater outfall(s)for the
facility. Please review the facility information to make sure it is correct. Information can be updated using the links
provided below, where applicable:
Facility/Company name or ownership: Name/Ownership Change Form
Owner Affiliation (Legally responsible person; i.e., someone with the company who is designated to
represent the company per signatory requirements or another authorized representative): Permit Contact
Update Request Form
Delegation of Signature Authority (DOSA): Permit Contact Update Request Form
Billing contact: Permit Contact Update Request Form
Permit contact: Permit Contact Update Request Form
Facility contact: Permit Contact Update Request Form
Facility address only: Email Bethany oulias
Stormwater outfall information: Email Bethany og ulias
Visit the eDMR Six Steps website and complete Steps 1 and 2.
Pay outstanding permit fees: Stormwater ePayment website
10
Once I have the above listed information, I can continue my review. You will receive a draft permit for a 30-day
comment period. During this time we will be able to address any comments or concerns you have. During the
same 30-day period, the draft will be sent to a Regional Office staff member for review as well as out to public
notice. Once all comments and concerns are addressed, you may be issued a final permit.
Please contact me if you have any questions.
Thank you,
Brianna Young, MS(she/her)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts.
Please check with the appropriate staff before visiting our offices,as we may be able to handle your requests by phone or email.We
appreciate your patience as we continue to serve the public during this challenging time.
Kymera International° Disclaimer:This message, including attachments, is intended only for the person(s) or entity to
which it is addressed and may contain confidential and/or privileged material.Any review, re-transmission,
dissemination or other use of, or taking of any action in reliance upon this information by persons or entities other than
the intended recipient is prohibited. If you received this message in error, please contact the sender and destroy any
copies of this correspondence and the information within.
Outfall1
Outfall1
Oil
� Outfall2
2 110 Outfall 3
—p / o
Uxd
Oil
animom / _
Produttion /
NUTIn /
Bismuth /
LLL�f L L L L
LLL L�
LLLLL
� ` L
LL L
�L LLLLLLLL
.LL LLLLLLLLLLLL
LLL��
LLB O
L L Outfall 3
Outfall2
Requested information:
• Confirmation on number of outfalls and associated coordinates;
✓ The number of outfalls and associated coordinates have not changed.
• Confirmation of the receiving stream for each outfall;
✓ The receiving stream for each outfall remains unchanged.
• Description of industrial activity in each drainage area;
2.1 Outfall 1 (Area 1)
Industrial activities, consisting of raw material storage, chemical storage,waste storage, equipment
storage, and loading/unloading operations take place throughout the drainage area of the storm water
outfall. Because of this,the outfall drainage area will be subdivided into the following four sections:
(1)between the copper plant/warehouse building and the west fence line extending to the northwest
fence corner, (2) across the rear of the plant from the northwest fence corner to northeast fence
corner, (3)between the copper plant/warehouse building and the eastern fence, and(4)the general
area between the copper plant/warehouse building and the maintenance building.
2.1 Area 1 Section (1)
The area adjacent to the western fence line is primarily used for storage of new pallets, scrap
materials, equipment that is not in use, liquid hydrogen storage and loading/unloading operations.
The scrap materials consist of scrap metal. The equipment consists of process equipment that is not
in use as well as equipment that is used from time-to-time but temporarily stored in this area until
needed. Three newly commissioned processes reside in this area and are described below.
Adjoining the building is the copper storage area. This area, consisting of a concrete pad, is
completely covered and thus eliminates storm water exposure to the copper metal stored there. Slag
material from melt furnace skimming operations is stored in this area before shipment to a metal
reclamation facility. The southwest corner of the warehouse contains ancillary processes consisting
of the processing of antimony ingots into powder through a series of crushers and mills, and the air
atomization of tin, tin-copper alloy, and bismuth and associated screening operations. Emissions
from these processes are controlled with baghouses and do not have any open discharges to the
outside. A bulk storage tank for Argon is located in this area. There are also waste receptacles such
as dumpsters and a trash compactor in this area. The compactor is located in the truck
loading/unloading area and is mainly used for office trash and used shipping containers. The primary
source of storm water contamination in this area is from the waste materials themselves and residue
on waste materials and equipment that is stored outside.
2.1 Area 1 Section (2)
Located in the area beginning at the northwest fence corner and extending to the maintenance
building are SCM's oil storage building,propane, liquid oxygen and liquid nitrogen bulk storage
tanks. Drums in the oil storage building are stored on containment pallets and are completely
sheltered from contact with stormwater. The contents of the bulk storage tanks contain liquefied
gases that return to a gaseous state at ambient temperature and pressure and therefore do not
constitute a storm water contamination hazard.
Within the area that extends from the east corner of the maintenance building to the northeastern
fence corner is a cooling tower. The main potential for contamination in this area is from chemicals
used to treat the water used in the cooling tower. All chemicals used in the cooling tower are added
to the system inside the building that helps reduce the likelihood of contact with storm water. The
former drum crusher was eliminated from this area in 2018. It had not been used in several years, as
metal drums are now exchanged and picked up by our supplier.
2.1 Area 1 Section (3)
Near the northeast corner of the building is the waste oil storage tank. The waste filter storage bin has
been eliminated from this area, and the filters are now cleaned and stored inside of the maintenance
shop. The waste oil storage tank is located on a concrete secondary containment pad within an
additional secondary containment structure.
2.1 Area 1 Section (4)
The area between the maintenance building and the copper plant/warehouse building is primarily
used for storage of ethylene glycol and SCM mix, which are used in the Cubond process. The
materials are stored in sealed containers with appropriate covers and secondary containment.
2.2 Outfall 2 (Area 2)
Industrial activity contributing to storm water run-off from this area is limited to a
loading/unloading area that adjoins the Research and Development Labs and the road that provides
access to the manufacturing areas of the plant.Therefore, the primary source of storm water
contamination in this area is through accidental spills that could occur during transport of raw
materials and wastes through this area. The occurrence of large spills in this area is considered
unlikely.
2.2 Outfall 3
The industrial activity in this area that could contribute to storm water contamination includes the
production of Cubond®Brazing paste and the storage of tin powders. A waste water treatment tank
located in this area has a sufficiently sized secondary-containment structure.
The industrial activities occur indoors.The only potential source of storm water contamination is
the dust collector located between the copper production area and the Cubond° production area; it
is inspected at regular intervals.
• SIC (NAICS) code;
✓ 331420
• An electronic spreadsheet summarizing all of the monitoring data that has been collected
since the effective date of the current permit;
✓ Spreadsheet is attached in this email.
• Verification that the information in the renewal application is still complete and correct.
✓ Some modifications are required due to the commissioning of new processes. These
will be uploaded separately.
• An explanation of any operational changes since the renewal application was submitted.
✓ The primary changes since the renewal application was submitted are as follows:
• The commissioning of the Antimony Process. This is an ancillary process in
which antimony ingots are processed through crushing and milling into a
powder. The process is contained within the building and is not considered to
be a potential stormwater contamination source.
• The commissioning of the Tin/NuTin/Bismuth processes. These ancillary
processes produce tin powder, tin-copper alloy powders, and bismuth powders
through air atomization and screening. These processes are contained within
the same building and are not considered to be a potential stormwater
contamination source.
• The oil storage location for this facility was moved to an adjacent building to the
Maintenance shop. The floor was sealed, and all drums are contained in the
building on secondary containment pallets. These are not exposed to
stormwater.
• The former drum crusher had not been in use for many years, and in 2018, it
was decommissioned and removed from the site. Empty drums are now
exchanged with the vendor for these chemicals.
SCM Metal Products,Inc.Summary of Stormwater Ana lyticaI Results for 2022 Permit Renewal Review
Total
Copper,Total Zinc, Total Total Suspended
Year Period Date Rainfall Outfall Recoverable(mg/1) Recoverable(mg/I) Solids,(mg/1) pH
(inches)
1 13.5 0.118 145 7.7
1 1 5/9/2012 0.3 2 0.692 0.048 <2.5 7.5
3 12.1 0.106 1180 8.1
1 0.599 0.082 5.1 7.8
1 1 5/30/2012 0.2 2 0.756 0.055 16.8 7.9
esample R
3 0.36 0.03 5.6 8.4
1 4.29 0.102 9.1 7.7
1 1 6/11/2012 1 2 0.517 0.029 <2.5 7.8
Resample
3 0.794 0.021 8.4 7.9
1 0.919 0.037 7 8
1 2 11/13/2012 0.15 2 0.385 0.036 ND 8.1
3 2.64 0.11 53.5 8.1
1 1.29 0.0686 13.5 8.2
2 1 5/6/2013 1.35 2 1.32 0.0698 16.4 7.6
3 0.494 0.0403 5.2 8.5
1 0.72 0.04 4.1 8.1
2 2 12/7/2013 0.2 2 1.2 0.058 27.1 7.9
3 1.7 0.048 26 8.1
1 1.34 0.079 49.6 7.3
3 1 4/15/2014 1.1 2 1.62 0.026 9.3 7.4
3 1.47 0.036 63 7.3
1 1.27 0.168 13.6 7.3
3 2 11/17/2014 0.35 2 10.848 0.05 3.1 7.1
3 11.58 0.054 7.2 7.4
1 0.801 0.067 9.4 7.6
4 1 4/15/2015 1 2 0.937 0.046 3.4 7.3
3 1.16 0.037 6.1 7.5
1 0.675 0.035 9.7 7.6
4 2 11/19/2015 1.4 2 0.713 0.024 3.6 7.2
3 1.08 0.019 26.3 7.5
1 1.34 0.152 12.3 7.8
5 1 5/13/2016 0.5 2 0.963 0.062 3 7.4
3 0.89 0.024 5 7.5
1 1.39 0.117 2.7 7.1
5 2 9/27/2016 1.3 2 1.22 0.046 ND 7.3
3 0.598 0.02 5.1 7.8
1 2.62 0.346 6.8 7.8
6 1 3/13/2017 0.8 2 1.22 0.069 15.1 7.2
3 1.04 0.039 N D 8.2
1 3.58 0.1 11.5 7.2
6 2 8/23/2017 0.15 2 1.06 0.066 6.3 6.8
3 1.03 0.03 16.4 6.7
1 2.03 0.16 2.5 7.1
7 1 5/16/2018 0.5 2 1.4 0.07 6 6.8
3 1.79 0.04 11.3 6.7
1 1.02 0.06 ND 8
7 2 10/9/2018 0.1 2 0.79 0.04 2.9 7.2
3 1.06 0.04 8.4 7.5
1 1.83 0.152 ND 7.9
8 1 3/15/2019 0.45 2 1.3 0.044 10 7.6
3 0.937 0.042 5.3 7.3
1 1.74 0.122 ND 7.3
8 2 10/30/2019 0.4 2 0.838 0.053 2.8 6.7
3 0.853 0.036 5.2 7.6
1 1.89 0.101 ND 6.9
9 1 5/18/2020 0.35 2 0.893 0.046 3.1 6.7
3 1.22 0.029 7.8 6.9
1 1.18 0.073 ND 7.7
9 2 11/11/2020 3.15 2 0.93 0.036 ND 7.1
3 1.3 0.023 3.6 7.1
1 4.53 0.11 13.4 7.8
10 1 3/16/2021 0.2 2 1.17 0.1 ND 6.9
3 1.53 0.04 25.1 7.3
1 2.78 0.214 2.7 6.8
10 2 11/22/2021 0.6 2 2.05 10.075 115.8 7.5
3 0.855 0.066 7.3 7.5
1 1.96 0.444 16.8 7.5
11 1 3/31/2022 1 2 11.45 0.081 21.4 17.5
3 11.35 0.0296 14.3 16.9
9/12/22, 12:26 PM North Carolina Secretary of State Search Results
• File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online -
Add Entity to My Email Notification List • View Filings • Print a Pre-Populated Annual Report form • Print
an Amended a Annual Report form
Business Corporation
Legal Name
SCM Metal Products, Inc.
Information
Sosld: 0729075
Status: Current-Active O
Date Formed: 6/7/2004
Citizenship: Foreign
State of Incorporation: DE
Fiscal Month: December
Annual Report Due Date: April 15th
CurrentgnnuaL Report Status:
Registered Agent: CT Corporation System
Addresses
Reg Office Reg Mailing Mailing
160 Mine Lake Ct Ste 200 160 Mine Lake Ct Ste 200 2601 Weck Drive
Raleigh, NC 27615-6417 Raleigh, NC 27615-6417 Research Triangle Park, NC 27709
Principal Office
2601 Weck Drive
Research Triangle Park, NC 27709
Officers
Chief Financial Officer Vice President
James C. Hunt Julie Waymouth
2601 Weck Drive 2601 Weck Drive
Research Triangle Park NC 27709 Research Triangle Park NC 27709
https://www.sosnc.gov/online_services/search/Business_Registration_ResuIts 1/2
9/12/22, 12:26 PM North Carolina Secretary of State Search Results
President
Barton White
2601 Weck Drive
Research Triangle Park NC 27709
Stock
https://www.sosnc.gov/online_services/search/Business_Registration_ResuIts 2/2
ROY COOPER
Governor
`"" MICHAEL S. REGAN
Secretary
WILLIAM E. TOBY VINSON, JR.
Energy,Mineral Interim Director
and Land Resources
ENVIRONMENTAL QUALITY
April 26, 2018
Mr.Westley Riscili, CQIA
SCM Metal Products,Inc.
2601 Weck Drive
Durham,NC 27709
Subject:NPDES Stormwater Permit Renewal
Permit No.NCS000050
SCM Metal Products
Durham County
Dear Mr. Riscili:
The Division of Energy,Mineral and Land Resources' Stormwater Permitting Program acknowledges
receipt of your renewal application for coverage under NPDES Permit Number NCS0000050 on July 29,
2016. We are currently in the process of reducing our backlog of permit renewals,including the subject
renewal application. Please continue to comply with all conditions and monitoring requirements in your
current or expired NPDES stormwater permit. Since you submitted a complete renewal request package
in a timely manner, and as long as you maintain compliance with those permit conditions,
stormwater discharges from this facility are automatically authorized by that expired permit(Part
III Sect.B.1) until the Division issues a renewal permit or notifies you of an alternative action.
No additional information is required at this time. Please notify us if any significant changes have
taken place at this facility since you submitted the renewal package. If you have any questions or
comments concerning this permit, contact Bethany Georgoulias at(919) 807-6372 or at
Bethany.Geor og u�kncdenr.go .
Sincerely,
Robert D. Patterson,PE
Environmental Engineer
Stormwater Program
cc: Bethany Georgoulias—DEMLR Stormwater Program
NCS000050 File
DEMLR RRO
State of North Carolina I Environmental Quality I Energy,Mineral and Land Resources
1612 Mail Service Center 1512 North Salisbury Street I Raleigh,NC 27699-1612
919 707 9200 T
McCoy, Suzanne
From: westley riscilli <westley.riscili@kymerainternational.com>
Sent: Thursday, March 14, 2019 4:20 PM
To: McCoy, Suzanne
Subject: [External] FW: NPDES Permit Number NCS000050 renewal amendments
Attachments: Storm water renewal amendment.pdf
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Good afternoon Suzanne,
I just wanted to confirm that you have received my previous email. Please let me know if you need any additional
information.
Best regards,
Westley Riscili, CQIA— Environmental Specialist
Kymera International
SCM Metal Products 12601 Weck Drive I RTP I NC 1 27709 1 USA
Tel +1 (919).544.8090
Direct +1 (919).287.9891
Mobile +1 (716).307.3191
westley.riscilinkymerainternational.com
ACuPowder I ECKA Granules I SCM Metal Products
www.kymerainternational.com
From: westley riscilli
Sent: Monday, March 11, 2019 2:36 PM
To: suzanne.mccoy@ncdenr.gov
Subject: NPDES Permit Number NCS000050 renewal amendments
Good afternoon Suzanne,
I had submitted a renewal application for our storm water permit in 2016, in which we are still operating under the
parameters of the previous permit as instructed by the state because we have not received the renewal to date. However,
we would like to make a small amendment to that application, as we intend to install a new process onsite in June of this
year. Please see the attached cover letter, along with an amended Significant Changes in Industrial Activities and a site
map showing the location of the new process.
Also, our copier does not produce the best quality copies. Please let me know the supplied attachment is acceptable to
request this change, or the preferred method of submission if this is not acceptable.
I appreciate your help on this matter.
Best regards,
1
Westley Riscili, CQIA— Environmental Specialist
Kymera International
SCM Metal Products 12601 Weck Drive I RTP I NC 1 27709 1 USA
Tel +1 (919).544.8090
Direct +1 (919).287.9891
Mobile +1 (716).307.3191
westley.riscili(Cc�kymerainternational.com
ACuPowder I ECKA Granules I SCM Metal Products
www.kymerainternational.com
2
K y ra
K, V
iNTisi2iVATiONAL
Pioneers in Materiot Science"
March 11, 2019
SW Individual Permit Coverage Renewal
Stormwater Permitting Program
1612 Mail Service Center
Raleigh, NC 27699-1612
Registered Mail: 7004 1350 0002 8891 8848
To whom it may concern:
The purpose of this letter is to notify the state of SCM Metal Products' intent to install a new process at our
facility. In 2016 I had submitted a permit renewal form for SCM Metal Products, Inc., permit No. NCS000050.
We have not received the renewed permit to date, and we are currently operating within the parameters of our
previous permit as instructed by the state. However, there is a plan to install a new process in June of this year
in which antimony ingots will be processed into antimony powder. We would like for the state to include this
process in our permit during the renewal process.
This process will include crushing, milling, and screening operations. The process will be located indoors in the
previous location of our tin powder production area, which is no longer in operation. The process will be
connected to a baghouse that will be located outside of the building as a control device for air quality. There are
no floor drains associated with this process that are connected to any of our storm drains. This process will be
located in the area of our storm water site reap that is directed to outfall #1. We do not anticipate any emissions
that would affect storm water quality. We will update our storm water pollution prevention plan accordingly to
include this process.
If you have any questions or require additional information please contact me at
westley.riscili@kymeraintemational.com, and I can be reached direct at(919) 287-9891.
Sincerely,
Westley Riscili
Enclosures: SCM Metal Products, Inc. Storm Water Site Map showing the location of the antimony process
and an amendment to the Significant Changes in Industrial Activities that was submitted with the 2016 renewal
application.
SCM Metal Products, Inc.2601 Week Drive, RTP, NC,27709 USA
Tel(919)544.8090 Fax(919)544.7996SEM
www.kvmerainternational.com
Kymera
INTERNATIONAL.
Pioneers jr?Moterlal Science"
SIGNIFICANT CHANGES IN INDUSTRIAL ACTIVITIES
In March of 2013,the Brazing Manufacturing Process was moved into the main facility from an outside
building. This relocation of this process has helped eliminate the transfer of materials between buildings.
In December of 2013, the Tin Manufacturing Process was discontinued at the RTP facility. This product is now
produced at a sister facility.
Most additives are stored indoors, with the exception of some drums of flammable liquids, which SCM is
required to store outdoors by the fire department. These drums are stored on secondary containment pallets
and are covered with tarps.
SCM intends to install an Antimony Powder Process at our RTP facility. This process includes the crushing of
antimony ingots,and the grinding/milling and screening of antimony powder. This process is planned to be
installed in June of 2019. The Storm Water Pollution and Prevention Plan will be updated accordingly.
SCM Metal Products, Inc.2601 Week Drive, RTP, NC,27709 USA
Tel(919)544.8090 Fax(919)544.7996 FBEM
www.kvmerainternational.com
SCM Metal Products, Inc. Storm Water Site Map
OutfII
u° a l l
Outfa 11 2
9 I Outfall3
. ;
I
Location of the
� f
new antimony
process
E
a
� -
S
Si -
f
n.
,i.
Outfall 3
Outfall 2
A Permit Coverage "gq'VmnS
� n Renewal Application Form
NCDENR National Pollutant Discharge Elimination System NPDES Permit Number ^
Stormwater Individual Permit NCS000050 •OG�
Please provide your permit number in box in the upper right hand corner, complete the information in the space provided
below and return the completed renewal form along with the required supplemental information to the address indicated.
Owner Information * Address to which permit correspondence will be mailed
Owner/Organization Name: SCM Metal Products,Inc.
Owner Contact: Barton White
Mailing Address: 2601 Weck Drive
RTP,NC 27709
Phone Number: 919-S44-8090
Fax Number: 919-544-7996
E-mail address: bwhite@scmmetals.com
Facility Information
Facility Name: SCM Metal Products,Inc.
Facility Physical Address: 2601 Weck Drive
RTP, NC 27709
Facility Contact: Jill Spaulding
Mailing Address: 2601 Weck Drive
RTP, NC 27709
Phone Number: 919-544-8090
Fax Number: 919-544-8332
E-mail address: ispaulding@scmmetals.com
Permit Information
Permit Contact: Wesdey Riscili
Mailing Address: 2601 Weck Drive, RTP,NC 27709
RTP, NC 27709
Phone Number: 919-287-9891
Fax Number: 919-544-8332
E-mail address: wriscili@scmmetals.com
Aischame Information
Receiving Stream: Unnamed tributary to Northeast Creek, Stirrup Iron Creek
Stream Class: C,C
Basin: Cape Fear River Basin, Neuse River Basin
Sub-Basin:
Number of Outfalls: 3
Facility/Activity Changes Please describe below any changes to your facility or activities since issuance of your permit. Attached a
separate sheet if necessary.
The Brazing Paste Manufacturing Process was moved from an outside building into the main facility in march of 2013. In addition, the
Tln Manufacturing Process was discontinued at this facility in December of 2013. All additives, with the exception of some drums of
Flammable material,are stored Inside. SCM has an agreement with the local fire department to store these drums outdoors, covered on
a secondary containment pallet.
CERTIFICATION
I certify that I am familiar with the information contained in the application and that to the best of my knowledge and belief
such information is true com to and accurate.
Signature Date 7/ZS ZI L
Sau 1 � Plant I�ahage�
Print or type name of person signing above Title
SW Individual Permit Coverage Renewal
Please return this completed application form Stormwater Permitting Program
and requested supplemental information to: 1612 Mail Service Center
Raleigh, North Carolina 27699-1612
f
SUPPLEMENTAL INFORMATION REQUIRED FOR RENEWAL OF INDIVIDUAL
NPDES STORMWATER PERMIT
Two copies of each of the following shall accompany this submittal in order for the application
to be considered complete:
(Do not submit the site Stormwater Pollution Prevention Plan)
Initials
WSR 1. A current Site Map from the Stormwater Pollution Prevention Plan. The location of
industrial activities (including storage of materials, disposal areas, process areas and
loading and unloading areas), drainage structures, drainage areas for each outfall,
building locations and impervious surfaces should be clearly noted.
WSR 2. A summary of Analytical Monitoring results during the term of the existing permit
(if your permit required analytical sampling). Do not submit individual lab reports.
The summary can consist of a table including such items as outfall number,
parameters sampled, lab results, date sampled, and storm event data.
WSR 3. A summary of the Visual Monitoring results. Do not submit individual monitoring
reports. The summary can consist of a table including such items as outfall number,
parameters surveyed, observations, and date monitoring conducted.
WSR 4. A summary of the Best Management Practices utilized at the permitted facility.
Summary should consist of a short narrative description of each BMP's in place at
the facility. If the implementation of any BMP's is planned, please include
information on these BMP's.
WSR 5. A short narrative describing any significant changes in industrial activities at the
permitted facility. Significant changes could include the addition or deletion of
work processes, changes in material handling practices, changes in material storage
practices, and/or changes in the raw materials used by the facility.
WSR 6. Certification of the development and implementation of a Stormwater Pollution
Prevention Plan for the permitted facility (Sign and return attached form).
If the final year analytical monitoring of the existing permit term has not been completed
prior to filing the renewal submittal, then the last years monitoring results should be submitted
within 30 days of receipt of the laboratory reports. (i.e. do not withhold renewal submittal
waiting on lab results)
SCM Metal Products, Inc. Storm Water Site Map
Outfall1 Q
P
Outfall 1
Outfall 2
of -)Nz �' Outfall 3
ItIL
Lit
v
i
1 � 9
Outfall3
Outfall 2
Products,, Inc.
SCM Meta
Summary of Analytical Monitoring Results
Permit No. NCS000050
Date: 05/09/12 Total Rainfall(inches): 0.3 Year: 1 Period: I
Outfall# Copper,Total Recoverable(mg/1) Zinc,Total Recoverable(mg/1) Total Suspended Solids(TSS) pH
1 13.5 0.118 145 7.7
2 0.692 0.048 1 <2.5 7.5
3 1 12.1 1 0.106 1180 8.1
Date: 05/30/12 Total Rainfall(inches): 0.2 Year: 1 Period: 1(resample)
Outfall# Copper,Total Recoverable(mg/1) Zinc,Total Recoverable(mg/1) Total Suspended Solids(TSS) pH
1 0.599 0.082 5.1 7.8
2 0.756 0.055 16.8 7.9
3 0.360 1 0.030 1 5.6 1 8.4
Date: 06/11/12 Total Rainfall(inches): 1.0 Year: 1 Period:1(resample)
Outfall# Copper,Total Recoverable(mg/1) Zinc,Total Recoverable(mg/1) Total Suspended Solids(TSS) pH
1 4.29 0.102 9.1 7.7
2 0.517 0.029 <2.5 7.8
3 0.794 1 0.021 1 8.4 1 7.9
Date: 11/13/12 Total Rainfall(inches): 0.15 Year: 1 Period:2
Outfall# Copper,Total Recoverable(mg/1) Zinc,Total Recoverable(mg/1) Total Suspended Solids(TSS) pH
1 0.919 0.037 7.0 8.0
2 0.385 0.036 ND 8.1
3 2.64 1 0.110 1 53.5 1 8.1
SCIVI Metal Products,
Inc.
Summary of Analytical Monitoring Results
Permit No. NC5000050
Date: 05/06/13 Total Rainfall(inches): 1.35 Year: 2 Period: 1
Outfall# Copper,Total Recoverable(mg/1) Zinc,Total Recoverable(mg/1) Total Suspended Solids(TSS) pH
1 1.29 0.0686 13.5 8.2
2 1.32 0.0698 16.4 7.6
3 1 0.494 0.0403 5.2 8.5
Date: 12/07/13 Total Rainfall(inches): 0.2 Year: 2 Period:2
Outfall# Copper,Total Recoverable(mg/1) Zinc,Total Recoverable(mg/1) Total Suspended Solids(TSS) pH
1 0.72 0.040 4.1 8.1
2 1.2 0.058 27.1 7.9
3 1 1.7 1 0.048 1 26.0 8.1
Date: 04/15/14 Total Rainfall(inches): 1.10 Year: 3 Period:I
Outfall# Copper,Total Recoverable(mg/1) Zinc,Total Recoverable(mg/1) Total Suspended Solids(TSS) pH
1 1.34 0.079 49.6 7.3
2 1.62 0.026 9.3 7.4
3 1.47 1 0.036 63.0 7.3
Date: 11/17/14 Total Rainfall(inches): 0.35 Year: 3 Period:2
Outfall# Copper,Total Recoverable(mg/1) Zinc,Total Recoverable(mg/1) Total Suspended Solids(TSS) pH
1 1.27 0.168 13.6 7.3
2 0.848 0.050 1 3.1 1 7.1
3 1.58 1 0.054 1 7.2 1 7.4
t Inc .
Metal Pro uc sSCM
Summary of Analytical Monitoring Results
Permit No. NCS000050
Date: 04/15/15 Total Rainfall(inches): 1.00 Year: 4 Period: 1
Outfall# Copper,Total Recoverable(mg/1) Zinc,Total Recoverable(mg/1) Total Suspended Solids(TSS) pH
1 0.801 0.067 9.4 7.6
2 0.937 0.046 1 3.4 7.3
3 1.16 0.037 1 6.1 7.5
Date: 11/19/15 Total Rainfall(inches): 1.40 Year: 4 Period:2
Outfall# Copper,Total Recoverable(mg/1) Zinc,Total Recoverable(mg/1) Total Suspended Solids(TSS) pH
1 0.675 0.035 9.7 7.6
2 0.713 0.024 3.6 7.2
3 1.08 1 0.019 26.3 7.5
Date: 05/13/16 Total Rainfall(inches): 0.5 Year: 5 Period:1
Outfall# Copper,Total Recoverable(mg/1) Zinc,Total Recoverable(mg/1) Total Suspended Solids(TSS) pH
1 1.34 0.152 12.3 7.8
2 0.963 0.062 3.0 7.4
3 1 0.890 1 0.024 15.0 7.5
Date: Total Rainfall(inches): Year: 5 Period:2
Outfall# Copper,Total Recoverable(mg/1) I Zinc,Total Recoverable(mg/1) Total Suspended Solids(TSS) pH
1 Will report results after next rain event.
2
3
SCM Metal Products,
Inc.
Summary of Visual Monitoring Results
NCS000050
Date: 05/09/12 Total Rainfall (inches): 0.30 Year: 1 Period: 1
Outfall Color Odor Clarity Floating Suspended Foam Oil Sheen Erosion or deposition Obvious indicators of
# Solids Solids at the outfall pollution
1 Clear None 2 1 1 2 None None No No
2 Clear None 1 1 1 None None No No
3 Clear None 2 1 2 None None No No
Date: 05/30/12 Total Rainfall (inches): 0.20 1 Year: 1 Period: 1
Outfall Color Odor Clarity Floating Suspended Foam Oil Sheen Erosion or deposition Obvious indicators of
# Solids Solids at the outfall pollution
1 Clear None 1 1 1 None None No No
2 Clear None 1 1 1 None None No No
3 Clear None 1 1 1 1 None None No No
Date: 06/11/12 Total Rainfall (inches): 1.0 1 Year: 1 Period: 1
Outfall Color Odor Clarity Floating Suspended Foam Oil Sheen Erosion or deposition Obvious indicators of
# Solids Solids at the outfall pollution
1 Clear None 1 1 1 None None No No
2 1 Clear None 1 1 1 None None No No
3 1 Clear None 1 1 1 None None No No
Date: 11/13/12 Total Rainfall(inches): 0.15 Year: 1 Period: 2
Outfall Color Odor Clarity Floating Suspended Foam Oil Sheen Erosion or deposition Obvious indicators of
# Solids Solids at the outfall pollution
1 Slight Brown None 1 1-leaves 1 None None No No
2 Clear I None 1 1 1-leaves I 1 None None No No
3 Clear I None 1 1 1 1 11 None None No No
Products, Inc.
CM Meta
Summary of Visual Monitoring Results
NCS000050
Date: 05/06/13 Total Rainfall(inches): 1.35 Year: 2 Period: 1
Outfall Color Odor Clarity Floating Suspended Foam Oil Sheen Erosion or deposition Obvious indicators of
# Solids Solids at the outfall pollution
1 Clear None 1 2-pollen 1 None None No No
2 Clear None 2 1 2 None None No No
3 Clear None 1 1 1 None None No No
Date: 12/07/13 Total Rainfall(inches): 0.20 1 Year: 2 Period: 2
Outfall Color Odor Clarity Floating Suspended Foam Oil Sheen Erosion or deposition Obvious indicators of
# Solids Solids at the outfall pollution
1 Clear None 2 1 1 None None No No
2 Clear None 2 4-leaves A None I None I No No
3 Clear None 2 1 1 None None No No
Date: 04/1S/14 Total Rainfall (inches): 1.1 1 Year: 3 Period: 1
Outfall Color Odor Clarity Floating Suspended Foam Oil Sheen Erosion or deposition Obvious indicators of
# Solids Solids at the outfall pollution
1 Slight tan None 2 1 2 None None Yes No
2 Slight brown None 1 1 1 None None No No
3 Light tan None 2 1 2 None None Yes No
Date: 11/17/14 Total Rainfall(inches): 0.35 Year: 3 Period: 2
Outfall Color Odor Clarity Floating Suspended Foam Oil Sheen Erosion or deposition Obvious indicators of
# Solids Solids at the outfall pollution
1 Clear None 1 3-leaves 1 None None Yes No
2 Clear None 1 3-leaves 1 None None Yes No
3 Clear None 1 3-leaves 1 None None Yes No
SCM Metal Products,
Inc.
Summary of Visual Monitoring Results
NCS000050
Date: 04/15/15 Total Rainfall(inches): 1.00 Year: 4 Period: 1
Outfall Color Odor Clarity Floating Suspended Foam Oil Sheen Erosion or deposition Obvious indicators of
# Solids Solids at the outfall pollution
1 Clear None 2 1 2-silt None None Yes No
2 Clear None 1 2-leaves 1 None None Yes No
3 Clear None 1 2-pollen I 1 None None Yes No
Date: 11/19/15 Total Rainfall(inches): 1.40 1 Year: 4 Period: 2
Outfall Color Odor Clarity Floating Suspended Foam Oil Sheen Erosion or deposition Obvious indicators of
# Solids Solids at the outfall pollution
1 Clear None 1 1 1 None None Yes No
2 Clear None 1 2-leaves I None None No No
3 Clear None 1 2-leaves I 2-silt None None yes No
Date: 05/13/16 Total Rainfall(inches): 0.50 1 Year: 5 Period: 1
Outfall Color Odor Clarity Floating Suspended Foam Oil Sheen Erosion or deposition Obvious indicators of
# Solids Solids at the outfall pollution
1 Brown None 2 1 2 None None Yes No
2 Clear None 1 1 1 None None Yes No
3 Clear None 1 1 1 1 None None Yes No
Date: Total Rainfall(inches): I Year: 5 Period: 2
Outfall Color Odor Clarity Floating Suspended Foam Oil Sheen Erosion or deposition Obvious indicators of
# Solids Solids at the outfall pollution
1 Will report after next rain event.
2
3
HEM Metal Products, Inc.
BEST MANAGEMENT PRACTICES
1. A high-efficiency sweeper was purchased for use on the paved area around the copper
production area. The area between the copper production building and the
CuBond®/Maintenance Building receives intensive sweeping. This area is swept twice
per day, as weather conditions permit.
2. The slag storage has been located in the covered pad area. This storage removes this
material from any storm water exposure.
3. The CuBond®dust collector has been enclosed and a clean-up method will be installed to
gather possible spilled material.
4. A corrosion-proof storage tank with secondary containment has been installed for waste
oil storage.
5. Clean out corrugated pipe leading to Outfall 1
6. New style trash dumpster/compactor to minimize rain water entering and washing
through the dumpster. Also, an indicator will be included in the hydraulic system; this
indicator will lead to more efficient use of the dumpster by assuring maximum loading.
Maximum loading will minimize handling.
7. New rules on used pallet and card board disposal. These revisions have lowered the
amount of material in the dumpster. These improvements also minimize dumpster
handling.
8. Rules on material that can be added to the dumpster and different packaging
requirements. CuBond®regularly bags the trash they add to the dumpster.
9. "Tacky Mats" at doorways between the copper production area and the outside area.
10. Fork truck and sweeper maintenance is performed indoors.
11. Preventative Maintenance of dust collectors was improved to include dye inspection of
interior.
12. Glycerin storage has been moved indoors. Additionally, glycerin is stored in re-usable
containers.
13. Written and posted instructions on floor sweeping. Sweeping is accomplished at least
daily.
14. Work Instructions on Dust Collector Media change-out.
15. Implementation of employee task group meetings to elicit and evaluate copper exposure
reduction BMP's.
16. Installation of new equipment to reduction fugitive copper dust emissions.
17. The Dust Control Committee will be revitalized
18. Include Storm Water Prevention awareness as part of Housekeeping Committee
inspections.
19. A major Best Management Practice installed in 2010 was a Bio-Retention Device
servicing the run-off from the paved area between the copper production building and the
Maintenance/Cubond building.
20.The area north of the Maintenance/Cubond building was re-graded and planted to control
run-off.
21. The continued implementation and improvement of dust collector bag change-out
procedures, especially the Shot Furnace and Thin Layer Furnace dust collectors.
2601 Weck Drive, Box 12166, Research Triangle Park, NC 27709, Ph 919.544.8090, Fx 919.544.8332
HEM Metal Products, Inc.
22. Different filter media is being used in Dust Collector to determine efficacy
23. Improvement to storm drainage around the"Microbond Building"was completed. This
work is expected to improve silt run-off in Outfall 3. The work was also undertaken to
alleviate flooding conditions in the"Microbond Building."
24. Improvements to erosion control have been implemented in other locations around the
facility. These improvements were undertaken to reduce soil run-off.
25. Cubond®powder is stored indoors.
26. Additional erosion controls have been installed around the Cubond®building(formerly
the Microbond building.)
27. Cubond®paste operations relocated to allow transfer of raw materials and product
without exposure to storm water.
28. Additional erosion control installed.
29. Improved feeders were installed at belt furnaces to minimize fugitive emissions.
30. Cyclones in process area replaced to minimize fugitive emissions.
31. Trees have been planted in the Northwest corner of the property to help with erosion.
32. Used and broken pallets are stored indoors to minimize potential contact of contaminated
pallets with storm water.
33. Outfall 3 was cleared of silt.
34. The corrugated pipe leading to Outfall 1 was cleared of silt.
35. Additional trees have been planted in the Northeast corner of the property to help reduce
erosion.
36. A level spreader was installed in the Northeast corner of the property to help slow storm
water runoff coming from the top of the hill to help ameliorate erosion issues in that area.
This BMP runs North and South, parallel to the fence line on the east side of the property.
37. The earthen swale that runs from the Northeast corner of the property was re-graded, a
silt liner was added to the swale and covered with grade A rip rap to help protect the
swale from erosion.
38. The Bio-retention device located to the west of the hydrogen tank has been cleared of old
vegetation, mulch, and soil, all of which has been replaced to specification of the original
Bio-retention plans.
2601 Weck Drive, Box 12166, Research Triangle Park, NC 27709, Ph 919.544.8090, Fx 919.544.8332
SEW Metal Products, Inc.
SIGNIFICANT CHANGES IN INDUSTRIAL ACTIVITIES
In March of 2013, the Brazing Manufacturing Process was moved into the main
facility from an outside building. This relocation of this process has helped eliminate
the transfer of materials between buildings.
In December of 2013, the Tin Manufacturing Process was discontinued at the RTP
facility. This process was moved to another SCM Manufacturing Plant in Union, New
Jersey.
Most additives are stored indoors, with the exception of some drums of flammable
liquids, which SCM is required to store outdoors by the fire department. These
drums are stored on secondary containment pallets and are covered with tarps.
2601 Weck Drive, Box 12166, Research Triangle Park, NC 27109, Ph 919.544.8090, Fx 919.544.8332
STORMWATER POLLUTION PREVENTION PLAN
DEVELOPMENT AND IMPLEMENTATION
CERTIFICATION
/North Carolina Division of Energy, Mineral, and Land Resources-Stormwater Permitting
An PrpFacility Name: M !V L LACES-
Permit Number: A cs 0000
Location Address: a661V e-
County:
"I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all
attachments were developed and implemented under my direction or supervision in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible
for gathering the information, the information gathered is, to the best of my knowledge and belief, true,
accurate and complete."
And
"I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP
has been fully implemented at this facility location in accordance with the terms and conditions of the
stormwater discharge permit."
And
"I am aware that there are significant penalties for falsifying information, including the possibility of fines and
imprisonment for knowing violations."
Sign (according to permit signatory requirements) and return this Certification. DO NOT
SEND STORMWATER POLLUTION PREVENTION PLAN WITH THIS CERTIFICATION.
t 7/25 !,b
Signature Da e
Or V�Zjs / ,h e4or ghQ2 e
Print or type name of pefson signing ove Title
SPPP Certification 10/13