Loading...
HomeMy WebLinkAboutSW6130203_Application Return_20130225a � NC®ENR North Carolina Department of Environment and Division of Water Quality Pat McCrory Charles Wakild, P.E. Governor Director February 25, 2013 Mr. James Chandler, P.E. Chandler Engineering PA 309 S. Fuquay Avenue Fuquay-Varina, North Carolina 27526 Natural Resources Subject: Phase II Post -Construction Stormwater Permit Application Return Family Dollar Store #705283 Spout Springs, Harnett County Dear Mr. Chandler: John E. Skvarla, III The Division of Water Quality (DWQ) Central Office, Raleigh, reviewed your Stormwater Management Permit Application for the Family Dollar Store #705283 project the week of February 25, 2013. After a preliminary review, the submittal was found to be incomplete. Per DWQ requirements and policies, this Office is hereby returning the subject application package as incomplete. The appli 2th n is incomplete based on the following items: l✓ The proposed stormwater management plan does not meet the requirements of the Phase II post -construction stormwater requirements and will need to be redesigned. ,. �U�e of offsite BMP is allowed, but must be shown in a permanent drainage easement V efnd shown on final site plan. :Two driveway accesses are shown across the proposed infiltration basin. This cannot /be approved and permitted as shown. 7Division cannot approve and permit a stormwater plan stamped Preliminary, and all plan pages must be stamped by the engineer, signed and dated. If the BMP is to be moved in the future, a formal permit modification will need to be requested at that time. Until a State Stormwater Permit is issued for this project, the construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please prepare the missing information and return the revised, entire package to me at the DWQ Central Pifice, Raleigh, 1617 Mail Service Center, 27699-1617. If you have any questions, please contact Robert Patterson, P.E., at (919) 807-6375, or email: robert.petterson@ncdenr.gov. Mr. Patterson has been given a copy of your site plan if you wish to discuss your proposed changes with him. Wetlands and Stonnwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 1 FAX: 919-807-6494 Internet: w .nowateiquality.org An Equal Opportunity l Affirmative Action Employer NorthCarolina Naturally Mi. James Chandler, P.E. Chandler Engineering PA Family Dollar Store #705283 February 2S, 2013 Jim: Balance of site plan package actually looks pretty good. Feel free to call me at 919-807-6369, if you cannot reach Robert Patterson. Sincerely, William H. Diuguid, AICP Staff Planner DWQ Stormwater Permitting Unit Wetlands and Stormwater Branch Page 2 of 2 Application Completeness Review W First Submittal ❑ Re -submittal DevelopmenUProject Name: ,arm Receiving stream name /k River Basin: (' d he_ Date Received: 1 /3 Date Reviewed: Z Zs- /3 By Bill Diuguid 4 . l7u//na Sfeai � :2OGZS-9 For post -construction requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-I, WS-II, WS-III, WS-IV, HOW, ORW, Neuse River Basin N )4- NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient N/A High Density Projects that require a 401/404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water Sheds): h Latitude and Longitude:3S /$ 38&J —79 02- 3fMi Jurisdiction Project Address: �u-F Ao a /_a f y leo�c� ( a,2�; 16--+(- C Engineer name and firm: ^ �' e - - Phone: 919-39D - �zz�7 Email: ' al,, eo Is the project confirmed to be in the State MSI Stormwater Permit jurisdictio ? es r ❑ No 67,Migfi Dbnsity3 ❑ Other j r/a a 401/404 impacts ig surface waters, wetlands, and buffers (add language to cover letter and/or add info letter) UA72. % `70 Check for $505.00 included f�riginal signature of Photocopy) on application rY Legal signature rporatio VP/higher, Partnership -General Partner/higher, LLC-member/manager, Agent). I Check spelling, capitalization, punctuation: httD://www.secretarv.state.nc.us/coroorations/theDaee.asDx I O% If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. subdivided projects, a signed and notarized deed restriction statement U,Sealed, signed & dated calculations E( Correct supplement and O&M provided for each BMP on site (check all that were provided & number of each) ❑ Bioretention ❑ Dry Detention Basin ❑ Filter Strip ❑ Grass Swale Infiltration Basin . 6`Infi ralf- ffon Trench ❑ Level Spreader ❑ Permeable Pavement ❑ Restored Riparian Buffer ❑ Rooftop Runoff Management ❑ Sand Filter ❑ Stormwater Wetland ❑ Wet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Road o sets of sealed, signed & dated layout & finish grading plans with appropriate details arrative Description of stormwater management provided oils report, geotech information provided Wetlands delineated or a note on the plans or in the accompanying documents that none exist on site and/or /adjacent property �( Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; c,Dimensions &slopes provided ra'Drainage areas delineated ❑ Pervious and impervious reported for each ❑ Areas of high density BMP operation and maintenance a eements provided Application Incomplete Returned: (Date) Comments dR.hd IMP ohs-er. C e/raP�./ Ocr 29 2012 Revision, Bill Diuguitl l�?SC Y r _% ` W � &4 Ti �� `�~� P ��',/,r 3