Loading...
HomeMy WebLinkAboutSW6130203_Supplement Form_20130422-. Permit No. (to be Provided by DWD) AA WArfq mIr o2 OG ♦�!^ STORMWATER MANAGEMENT PERMIT APPLICATION FORM p�C 'c NCDENR 401 CERTIFICATION APPLICATION FORM I INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part W) must be printed, filled out and submitted along with all of the required information. Project Name Contact Person Phone Number Dale Drainage Area Number Drainage area Impervious area Percent impervious Design rainfall depth Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SA Waters Minimum design volume required Design volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum required volume Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area Store #705283 919-390-4227 2/15/2013 72,310.00 ftz 45,910.00 flz 63.49 % 1.00 in Jun In 0.13 in/hr 1.50 ft3/seC 0.00 RI/sec -1.50 ft3/sec 3,826.00 ft3 8,778.00 It' ft3 ft3 ft3 ft3 W I I I OK for non -SA waters Lakeland Sand 8.07 infhr 417.00 first 0.25 days OK 3 1 OK / 428.08.00 fmsl OK ✓/ 430.50 first / 5,765.00 f? 431.50 first 235.00 It 8.00 It 1,885.00 flz Foon SW401-Infinration Basin-Rev.S 11Ap2011 Palls 1. a IL Design Summary, Page 1 of 2 Permit (to be provided by DWQ) Additional Information Maximum runoff to each inlet to the basin? 1.01 ac-in OK Length of vegetative filter for overflow NIA it OK Distance to structure 16.00 it OK Distance from surface waters NIA it OK Distance from water supply well(s) NIA it OK Separation from impervious soil layer 12.00 it OK Naturally occuring soil above shwt 12.00 it OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Pretreatment device provided iwales, Catch Basins and Energy Dissipator Fonn SW401-Infiltration Basin-Rev.5 11Ap2011 Parts I. E 11. Design Summary, Page 2 of 2 Permit (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan iti s Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and �.-1 - Boundaries of drainage easement. � 1 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: - Bypass structure, - Maintenance access, - Basin bottom dimensions, - Basin cross-section with benchmark for sediment cleanout, - Flow distribution detail for inflow, - Vegetated filter, and - Pretreatment device. 3. Section view of the infiltration basin (1" = 20' or larger) showing: - Pretreatment and treatment areas, and c,•'_' - Inlet and outlet structures. J 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. V C& tom! 5. A soils report that is based upon an actual field investigation, soil bodngs, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. 6. A construction sequence that shows how the infiflration basin will be protected from sediment until the /� entire drainage area is stabilized. lI0 J/ 7. The supporting calculations. �" 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Basin-Rev.4 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1