Loading...
HomeMy WebLinkAboutSW6130203_O&M Agreement_20130422Permit Number: (to he provided by DWQ) Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide time and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 i BMP element: The forebay The main treatment area The embankment The outlet device The receiving water Potential problem: Sediment has accumulated and reduced the depth to 75% of the original design depth. Erosion has occurred or riprap is displaced. Weeds are present. A visible layer of sediment has accumulated. Water is standing more than 5 days after a storm event. Weeds and noxious plants are growing in the main treatment area. Shrubs or trees have started to grow on the embankment. An annual inspection by an appropriate professional shows that the embankment needs reuair. Clogging has occurred The outlet device is damagec Erosion or other signs of damage have occurred at the outlet. How I will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Replace the top few inches of filter media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (do not Remove shrubs or trees Make all needed repairs. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 401 Oversight Unit at 919- 733-1786. Form S W401-Infiltration Basin O&M-Rev.3 Page 2 of 3 Pennit Number: Jl. (to be provider! by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Famil y Dollar Store #705283 BMI' drainage area number: Print name:E. Frank Weaver, III Title:President of Allied Development, Inc. Address:350 Wagoner Drive, Fayetteville, NC 28303 Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, NFAL F. 6J J'O_ , a �N ary Public for the State of N o County of CUlri6etint do hereby certify that E , FQRI9 WbRWt -71T-- personally appeared before me this ;WA day of reUVAQ 1 and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my ha a d fficial seal, �•Gt J. 1� ?l . .. SEAL My commission expires 712a-11( Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3