Loading...
HomeMy WebLinkAbout20071439 Ver 1_Certified Return Receipt_20071016O~O~ W A T ~9QG >_ ~ ~ ~ Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality October 16, 2007 CERTIFIED MAIL 7007 0710 0005 2882 0779 RETURN RECEIPT REQUESTED Mr. Mike Holder, P.E., Division Engineer North Carolina Department of Transportation 1710 East Marion Street Shelby, North Carolina, 28152 SUBJECT: Proposed Secondary Road Paving on State Road 1449 (Davis Road) in Gaston County, DWQ No. 07-1635 Dear Mr. !older: The Division of Water Quality has reviewed your submittal fora 401 Water Quality Certification for the aforementioned project. Review of your application revealed it is lacking the necessary information required for making an informed permit decision. The permit application was deficient in the following areas: The application proposes to temporarily impact 0.29 acres of wetlands for the installation of various erosion control measures. A site visit was coriducted on October 16, 2007, to discuss avoidance and minimization of wetland impacts and the North Carolina Department of Transportation's (NCDOT) responsibilities regarding restoration of temporarily impacted wetland areas upon completion of the project. Based on this site visit, NCDOT representatives will investigate reducing or eliminating the temporary impacts associated with the installation of erosion control measures. If the impacts can be reduced or eliminated, NCDOT must provide a revised Pre-Construction Notification (PCN) application which accurately reflects the revised amount of temporary wetland impacts, narrative regarding wetland restoration (if required) and revised erosion control plans. If the impacts cannot be eliminated, NCDOT must provide a narrative regarding appropriate restoration for impacted wetland areas. Therefore, pursuant to 15A NCAC 2H .0507(a)(5), we will have to place the permit application on hold until we are supplied the necessary information. You have 21 days to respond in writing with the requested information or notification to this office that the information is forthcoming. If; at the end of the 21 days, this office has not received this information in writing, we will assume you are withdrawing your application and it will be returned. Furthermore, until the information is received by the NC Division of Water Quality, we request (by copy of this letter) that the US Army Corps of Engineers place the permit application on hold. If you have any questions or require additional information, please contact Polly Lespinasse at (704) 663-1699. Sincerely, t'~ ~J Cl for Coleen H. Sullins Director cc: Steve Lund, US Army Corps of Engineers, Asheville Field Office Trish Simon, Division 10 Environmental Officer Sonia Gregory, DWQ Central Regional Office File Copy No~° hCarolina ~atura!!y North Carolina Division of Water Quality 610 East Center Avenue, Suite 301 Phone (704) 663-1699 Internet: h2o.enr.state.nc.us Mooresville, NC 28115 Fax (704) 663-6040 An Equal OpportunitylAffrmative Action Employer - 50% Recycled/10% Past Consumer Paper