Loading...
HomeMy WebLinkAbout20150571 Ver 1_Application_20150610 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Section 404 Permit Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? Yes No 1d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit 401 Water Quality Certification – Express Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. Yes No 1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h below. Yes No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No 2. Project Information 2a. Name of project: Hwy 401 safety upgrade 2b. County: Hoke 2c. Nearest municipality / town: Rock Fish 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: W-5208J 3. Owner Information 3a. Name on Recorded Deed: NC DOT 3b. Deed Book and Page No. NA 3c. Responsible Party (for LLC if applicable): 3d. Street address: PO BOX 1067 3e. City, state, zip: Aberdeen, NC 28315 3f. Telephone no.: 910-944-2344 3g. Fax no.: 910-944-5623 3h. Email address: @ncdot.gov Office Use Only: Corps action ID no. _____________ DW Q project no. _______________ Form Version 1.0 November 2008 Page 1 of 11 PCN Form – Version 1.0 November 2008 Version Section A. Applicant Information, continued 4. Applicant Information (if different from owner) 4a. Applicant is: Agent Other, specify: Division Environmental Officer 4b. Name: Art King 4c. Business name (if applicable): North Carolina Department of Transportation 4d. Street address: PO BOX 1067 4e. City, state, zip: Aberdeen, NC, 28315 4f. Telephone no.: 910-944-2344 4g. Fax no.: 910-944-5623 4h. Email address: acking@ncdot.gov 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): North Carolina Department of Transportation 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 11 PCN Form – November 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): DB 971 PG 973 1b. Site coordinates (in decimal degrees): 35.03231‘N - 79.089086‘W 1c. Property size: 1 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: UT of Stewarts Creek 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Commercial/Church property 3b. List the total estimated acreage of all existing wetlands on the property: Approx. 1 ac 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 3d. Explain the purpose of the proposed project: To install an upgraded turn lane and turn about extension (bump out) between the Raeford Christian Fellowship Church entrance and a neighboring housing development entrance, to improve safety along Hwy 401 for cars making a U- turn to reach the church. Also to reduce traffic of larger truck attempting to make a left turn onto Wayside Drive from Hwy 401 east 3e. Describe the overall project in detail, including the type of equipment to be used: To clear,grade, base the area for the bump out and build a fill section large to accommodate the bump out. Equip used: dump trucks, track hoe, dozer, compactor, paving equipment. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Yes No Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes No Unknown 5b. If yes, explain in detail according to “help file” instructions. 6. Future Project Plans 6a. Is this a phased project? Yes No 6b. If yes, explain. Page 3 of 11 PCN Form – Version 1.0 November 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Wetlands Streams - tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number – Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland (if known) 2d. Forested 2e. Type of jurisdiction (Corps - 404, DWQ – non-404, other) 2f. Area of impact (acres) W1 P T Road Fill Yes No Corps DWQ 0.10 ac W2 P T Yes No Corps DWQ W3 P T Yes No Corps DWQ W4 P T Yes No Corps DWQ W5 P T Yes No Corps DWQ W6 P T Yes No Corps DWQ 2g. Total wetland impacts 0.10 ac 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number - Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Average stream width (feet) 3f. Impact length (linear feet) S1 P T PER INT S2 P T PER INT S3 P T . PER INT S4 P T PER INT S5 P T PER INT S6 P T PER INT 3g. Total stream and tributary impacts 3h. Comments: Page 4 of 11 PCN Form – Version 1.0 November 2008 Version C. Proposed Impacts Inventory, continued 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number – Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) O1 P T NA O2 P T O3 P T O4 P T 4f. Total open water impacts 0 4g. Comments: Page 5 of 11 PCN Form – November 2008 Version C. Proposed Impacts Inventory, continued 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 NA P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? Neuse Tar-Pamlico Other: Catawba Randleman 6b. Buffer impact number – Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 P T NA Yes No B2 P T Yes No B3 P T Yes No 6h. Total buffer impacts 6i. Comments: Not in a buffer area. Page 6 of 11 PCN Form – November 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Only the minimum amount of fill materal installed to provide a safe structure and meet current standards. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Install erosion control devices and compliance with all current BMP. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If yes, mitigation is required by (check all that apply): DWQ Corps 2c. If yes, which mitigation option will be used for this project? Mitigation bank Payment to in-lieu fee program Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: warm, cool, cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h.. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form – Version 1.0 November 2008 Version D. Impact Justification and Mitigation, continued 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone Reason for impact Total impact (square feet) Multiplier Required mitigation (square feet) Zone 1 NA 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 6c. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6d. Comments: Page 8 of 11 PCN Form – November 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No 1b. If yes, then is a diffuse flow plan included? Yes No 2. Determination if the Project Requires a Stormwater Management Plan 2a. Does the project require a Non-404 Jurisdictional General Permit? Yes No 2b. Is the project subject to General Certification 3704 or 3705? Yes No 3. Determination of Stormwater Review Jurisdiction 3a. Is this project subject to any of the following state-implemented stormwater management programs (check all that apply)? If so, attach one copy of the approval letter from the DWQ and one copy of the approved stormwater management plan. Coastal counties HQW ORW Session Law 2006-246 Other: 3b. In which local government’s jurisdiction is this project? Hoke County 3c. Is this local government certified to implement a state stormwater program? If so, attach one copy of the approval letter from the local government and one copy of the approved stormwater management plan (or one copy of the approved Stormwater management plan stamped as approved). Yes No 4. Information Required for DWQ 401 Unit Stormwater Review 4a. What is the overall percent imperviousness according to the most current site plan? <24% 4b. Does this project contain any areas that meet the criteria for “high density” per General Certifications 3704 and 3705? Yes No 4c. If the site is over 24% impervious and/or contains high density areas, then provide a brief narrative description of the stormwater management plan. 4d. Has a completed BMP Supplement Form with all required items been submitted for each stormwater BMP? Yes No Page 9 of 11 PCN Form – Version 1.0 November 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 1b. If you answered “yes” to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? Yes No 1c. If you answered “yes” to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: Yes No 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 2B .0200)? Yes No 2b. Is this an after-the-fact permit application? Yes No 2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s): Due to a miscommunication, our directions to limit the clearing on the site to " hand clearing only, and no grubbing past the existing toe of slope", was misintrepreted by the contractor to mean "to the toe of the newly proposed slope". This led to the contractor clearing and grubbing within the suspected wetland area prior to receipt of the permit. 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered “no,” provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. NA Page 10 of 11 PCN Form – Version 1.0 November 2008 Version F. Supplementary Information, continued 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? On site survey by NCDOT staff,and NCDOT SDV reference layer. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? Yes No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FEMA mapping Applicant/Agent's Printed Name _______________________________ Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Date Page 11 of 11 PCN Form – November 2008 Version