HomeMy WebLinkAboutNCC231360_ESC Approval Submitted_20230519 ROY COOPER ��y� o
Governor
i
ELIZABETH BISER l N
Secretary r 'sgo-
1e
DOUGLAS ANSEL •
Interim Director "
NORTH CAROLINA
Environmental Quality
April 26, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
Welden Residential Holdings, LLC
Attention: Stuart Parks,Member/Manager
418 North Marshal Street, Ste 200
Winston Salem, NC 27101
RE: Project Name: Welden— Stafford Property
Acres Approved: 21.83
Project ID: FORSY-2023-022
County: Forsyth
City: Kernersville
Address: Stafford Country Lane
River Basin: Yadkin
Stream Classification: WS-III
Submitted By: FEI Consulting
Date Received by LQS: April 4, 2023
Plan Type: New
Dear Mr. Parks:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
modifications required for approval are listed on the attached page. This plan approval shall
(3) years following the date of approval, if no land-disturbing activity has been undertaken,ak expire three
required by Title 15A NCAC 4B .0129. rtalcen, as is
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG01000
Construction General Permit. After the form is reviewed and found to be comp 1 a
link with payment instructions for the $100 annual permit fee. After the fee is processed, r our ve
will
a
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for
this project,you MUST obtain the COC prior to commencement of
activity. The eNOI form mayany land disturbing
be accessed at dect.nc.gov`G01. Please direct questions about
the eNOI form to the Stonnwater Pro�j'in the Raleigh central office. If the owner/o erator o
this project changes in the future, the new responsible party must obtain a new COC.
p f
Title 15A NCAC 4B .0118(a) and the NCG010000 permit require that the following documentation be
kept on file at the job site:
North Caroline Department of Environmental Quality I Division of Energy,Mineral,and Land Resources
Winston•Salem Regional Office 450 West Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105
336-776.9800
Letter of Approval with Modifications
Welden Residential Holdings,LLC
April 26, 2023
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
t is received.
2. The NCGO1 permit and
made during the the COC, once 1prev previous 12 months.
3. Records of inspections
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
o
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requ of this iring pro pro if
s
existing natural resources and adjoining properties. If, following the commencement
determined that the erosion and sedimentation control plan is inadequate
to metelt 3A et the requiremenughts
of
this
the
Sedimentation Pollution Control Act of 1973 (North Carolina General
Soffice may require revisions to the plan and implementation of the revisions to ensure compliance with
the Act.
eral and
Acceptance and approval of this plan is conditioned upon your oc�compliance
ordinances ordrules may also apply
ate water
quality laws, regulations, and rules. In addition, local city county
other permit or approval.
to this land-disturbing activity. This approval does not supersede any
Please note that this approval is based in part on the accuracy
oan amended form if there
rmation provided in the
Financial Responsibility Form, which you provided. You are requested to file
is any change in the information included on the form. In addition, it would be helpful if you notify this
office of the proposed starting date for this project.
Your cooperation is appreciated. Sincerely.
Nicole Chiles, EI
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
c: FEI Consulting
Attn: Brent Sievers, PE
8518 Triad Drive
Colfax,NC 27235
Letter of Approval with Modifications
Welden Residential Holdings, LLC
April 26, 2023
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Welden—Stafford Property
Project ID: FORSY-2023-022
County: Forsyth
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. This plan is approved for the erosion and sediment control measures for clearing and
grubbing only. If any mass grading, not shown on the current plan, occurs on-site without a
new plan submitted for engineering review, a Notice of Violation will be issued. No lot
erosion control plan will be approved without the mass grading plan submitted and approved.
2. Any off-site borrow and waste required for this project must come from a site with an
approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill
regulated by the Division of Solid Waste Management. Trash/debris from demolition
activities or generated by any activities on site must be disposed of at a facility regulated by
the Division of Solid Waste Management or per Division of Solid Waste Management or
Division of Water Resources rules and regulations. [15A NCAC 4B .0110]
3. Additional measures may be required - The applicant is responsible for the control of
sediment on-site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115]
4. The NCGO1 has a $100 yearly fee and our office often receives closure inspection requests
days prior to yearly NCGO1 fee payment due dates. Be advised the project requires a closure
inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate
NCGO1 coverage. The closure inspection should not be requested until after the site has
achieved full vegetative stabilization and measures have been removed. The removal of
temporary ESC measures, including basins, requires prior approval. Often, a full growing
season is necessary between initial seeding/mulching and removal of measures. Please plan
your construction accordingly to avoid contacting our office prematurely for a closure
inspection. Also be advised you may be asked for representative site pictures prior to a
closure inspection. [General Comment]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
C'ERTIFI
CATE OF PLAN APPROVAL
111
'SQuuw _
The posting of this certificate certifies that an erosio
n and sedimentation control plan has been
approved for this project by the North Carolina Department
accordance with North Carolina General Statutep tment of Environmental Quality in
113A — 57 (4) and 113A — 54 (d) (4) and North
Carolina Administrative Code, Title 15A, Chapter
at the primary entrance of the job 4B.0107 (c). This certificate must be posted
site before construction begins and until establish
permanent groundcover as required by North Carolina meat of
Chapter 4B.0127 (b). Administrative Code, Title 15A,
Ito E
i` -o b
Project Name and Location2S1/11,�C
Pr
zoZ3
Date of Plan Approval 1�RS� ' Zo23 — OZ2
cc
cot Lei4 ICES
1 ,15 Nicole Chiles, EI
Assistant Regional Engineer
NCGO1 Certificate of Coverage #