Loading...
HomeMy WebLinkAboutNCC231360_ESC Approval Submitted_20230519 ROY COOPER ��y� o Governor i ELIZABETH BISER l N Secretary r 'sgo- 1e DOUGLAS ANSEL • Interim Director " NORTH CAROLINA Environmental Quality April 26, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Welden Residential Holdings, LLC Attention: Stuart Parks,Member/Manager 418 North Marshal Street, Ste 200 Winston Salem, NC 27101 RE: Project Name: Welden— Stafford Property Acres Approved: 21.83 Project ID: FORSY-2023-022 County: Forsyth City: Kernersville Address: Stafford Country Lane River Basin: Yadkin Stream Classification: WS-III Submitted By: FEI Consulting Date Received by LQS: April 4, 2023 Plan Type: New Dear Mr. Parks: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall (3) years following the date of approval, if no land-disturbing activity has been undertaken,ak expire three required by Title 15A NCAC 4B .0129. rtalcen, as is As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG01000 Construction General Permit. After the form is reviewed and found to be comp 1 a link with payment instructions for the $100 annual permit fee. After the fee is processed, r our ve will a receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of activity. The eNOI form mayany land disturbing be accessed at dect.nc.gov`G01. Please direct questions about the eNOI form to the Stonnwater Pro�j'in the Raleigh central office. If the owner/o erator o this project changes in the future, the new responsible party must obtain a new COC. p f Title 15A NCAC 4B .0118(a) and the NCG010000 permit require that the following documentation be kept on file at the job site: North Caroline Department of Environmental Quality I Division of Energy,Mineral,and Land Resources Winston•Salem Regional Office 450 West Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105 336-776.9800 Letter of Approval with Modifications Welden Residential Holdings,LLC April 26, 2023 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. t is received. 2. The NCGO1 permit and made during the the COC, once 1prev previous 12 months. 3. Records of inspections Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. o North Carolina's Sedimentation Pollution Control Act is performance-oriented, requ of this iring pro pro if s existing natural resources and adjoining properties. If, following the commencement determined that the erosion and sedimentation control plan is inadequate to metelt 3A et the requiremenughts of this the Sedimentation Pollution Control Act of 1973 (North Carolina General Soffice may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. eral and Acceptance and approval of this plan is conditioned upon your oc�compliance ordinances ordrules may also apply ate water quality laws, regulations, and rules. In addition, local city county other permit or approval. to this land-disturbing activity. This approval does not supersede any Please note that this approval is based in part on the accuracy oan amended form if there rmation provided in the Financial Responsibility Form, which you provided. You are requested to file is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely. Nicole Chiles, EI Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval c: FEI Consulting Attn: Brent Sievers, PE 8518 Triad Drive Colfax,NC 27235 Letter of Approval with Modifications Welden Residential Holdings, LLC April 26, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Welden—Stafford Property Project ID: FORSY-2023-022 County: Forsyth Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. This plan is approved for the erosion and sediment control measures for clearing and grubbing only. If any mass grading, not shown on the current plan, occurs on-site without a new plan submitted for engineering review, a Notice of Violation will be issued. No lot erosion control plan will be approved without the mass grading plan submitted and approved. 2. Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 4B .0110] 3. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 4. The NCGO1 has a $100 yearly fee and our office often receives closure inspection requests days prior to yearly NCGO1 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate NCGO1 coverage. The closure inspection should not be requested until after the site has achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures, including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General Comment] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities C'ERTIFI CATE OF PLAN APPROVAL 111 'SQuuw _ The posting of this certificate certifies that an erosio n and sedimentation control plan has been approved for this project by the North Carolina Department accordance with North Carolina General Statutep tment of Environmental Quality in 113A — 57 (4) and 113A — 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter at the primary entrance of the job 4B.0107 (c). This certificate must be posted site before construction begins and until establish permanent groundcover as required by North Carolina meat of Chapter 4B.0127 (b). Administrative Code, Title 15A, Ito E i` -o b Project Name and Location2S1/11,�C Pr zoZ3 Date of Plan Approval 1�RS� ' Zo23 — OZ2 cc cot Lei4 ICES 1 ,15 Nicole Chiles, EI Assistant Regional Engineer NCGO1 Certificate of Coverage #