Loading...
HomeMy WebLinkAboutNCC231480_Site Plan or Location Map_20230516 ���_'r� '' i ioTiir boil ilpkn?/ygii 1. ON 4,41.1. ••� o��,,�.l ..s' :� 'oo�' .````/s t; - CONSTRUCTION SCHEDULE the needed depth.Soil from IingO For soft.loamy soilsplat do me htreorfl Fasie, EROSION CONTROL CONSTRUCTION SEQUENCE(REVISE AS NECESSARY TO ADDRESS SITE SPECIFIC ISSUES) SEEDING SCHEDULE pick to score `�.jip o tri -'ii,•i SODDING 1. Obtain all necessary permits and plan approvals of the trench to.used during WArocky soils dig a 2.3 TTLE 'n 1. INSTALL TEMPORARY CONSTRUCTION ENTRANCE. NOTE TEMPORARY SEED MIX SHALL BE USED FOR ALL AREAS EXPOSED GREATER THAN WE WEEK AND SUBJECT To FURTHER DISTURBANCE. I 2. Install gravel construction entrances first,and then reinforced silt fence outlets, saran bey Using nma 2, INSTALL TEMPORARY EROSION CONTROL MEASURES AT LOCATIONS SHOWN ON PLAN. 4 ``a���� '� :1/III wattles and Siff fences. 2 Lay the.straw wattle snuggI2 M Me.a.No aMe H seehw�enP.Fi,�ell"WON'mg ��g Weane 3, CALL FOR ON-SITE INSPECTION BY TOWN OF SOUTHERN PINES CONSTRUCTION INSPECTOR. ADEQUACY ON JULY 15. i / 1� �. '� ICI �' 3. Finish Beane and nubbin aareas on the lots as the are started. o NOT w ends. 4. INITIATE GRUBBING AND TOPSOIL STRIPPING OF THE SITE. AN PERMANENT EECOVER SHALL HAVEH50 SPRIGS BERMUDA OR SERILEA LESPEDEZA PER ONE SQUARE FOOT. g g any necessary y r stake me strew wattles at each end and tour root on center R 5. AS CONSTRUCTION PROGRESSES, REMOVE SILT AND SEDIMENT BUILDUPS AT ALL MEASURES TO MAINTAIN \ / 1' Al, /// �' - 4. Begin lot grading and excavation activities PEre 1� 7 .rr//�/ ADEQUATE EROSION CONTROL. TEMPORARY SEEDING RECOMMENDATION for SUMMER(TO BE FOLLOWED BY PERMANENT FALL SEED MIX) �. � 5, Begin continueWith houseconstruction activities. 6. WITHIN]CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING AND ON SLOPES GREATER THAN 3:1 \ O. •'i1 ��\•^',;'�TV. 'W/ swewomw..,o.«r. g. Finish all rough grading and house construction. s through the mlaalemlbe wattle.leaving 2a lncbesmme stake Q- \j GROUND COVER SHALL BE PROVIDED ON EXPOSED SLOPES AND PERMANENT GROUND COVER SHALL BE PROVIDED SPECIES RATE(LB/ACRE) i. P'V� �I\�% ��1//��� \ ]. Instal driveways,walks and patios. FOR ALL DISTURBED AREAS WITHIN 14.:ALENDAR DAYS FOLLOWYNG COMPLETION OF CONSTRUCTION Oft APR. 5-AUG.15 GERMANMILLET40 QO ►' t� IIj� � r�t�11t��1rtl�jl 4A B. Beginfnegrading of lot areas map kenani you� ax In«ae lo9n YaVkathrough we wattle up straw SOIL AMENDMENTS• A Q v DEVELOPMENT. i P\ /I- F-Q IIxY'���✓ MVP ..==..o.�•�,,.. 9. Final grassing,mulching and stabilizing of lot. a most cases this will involve the wattles are us.wanlea on sb as1 tlndvel ghe eakesround Pllw eas.ntllwlsrat tne a tM¢Ives atragnl down:wren Ins1elling ] CINJ TINUE WY1H FINE GRADING OF SITE. APPLY 2,OW LB/ACRE GROUND AGRICULNRAL LIMESTWE and]50 LB/ACRE 10-,0-10 FERnLIZER OR FOLLOW RECOAMENDAIIONG .` ? r`�/ �1� \ w s installation of sod on the lot.The silt fence will remain in place until the lots are P Pip Po B INSPECTION BYUTOWTJ OF SOUTHERN APINES ONSTRUCPON INSPECTOI R AREAS STABILIZED, CALL FOR ON-SITE OF SOUL TESTS. i �� sodded or grassing is sfablllzed and takes hold. 4 e at an ansle lowam tna nml WANE in Omar 9. IF SITE IS APPROVED,REMOVE TEMPORARY EROSION CONTROL MEASURES AS DIRECTED, SEED,FERTILIZE AND MULCH W 10.Inspection and foal acceplence letters rock slopesto help al.. mrore bar needed a trin Me stake nae�aWke into earemrey Kara or MULCH RESULTING DISTURBED AREAS.CLEAR ALL DEBRIS AND SEDIMENT ACCUMULATION.ESTABLISH PERMANENT APPLY a.OW LB/ACRE GRAIN:105:: 0 FERTILIZE AND MULCH IMMEDIATELY FO10W9NC EONoe Ono fir •,,,1,Jry ' A"SELF (TO BE FOLLON£D tr'�w'➢�I AVA UBt TAIYE�� `' + 1. SEED BED PREPARATION SOIL AMENDMENTS`�'_ .� _ APPEARANCE OF GOOD SOD COMPLETING,DATING AND SIGNING PN INSPECTION REPORT THAT LISTS EACH MEASURE.PRACTICE OR, ' �/ STRAW WATTLE:SHOWN IN 2'DEEP TRENCH /ACRE GROUND AGRICULTURAL LIMESTONE ono 1,000 LB/ACRE 10-10-10 FERTILZER OR FOLLOW RECOMMENDED SOIL 0•+%U 2. RIP THE ENTIRE AREA TO 6 INCH DEPTH. TESTS. 'fA�' ■ �/ r (I �� -4'--4'--1'--4'- 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND R r)f■ .` I GI I ', , STAKE UNIFORM. MULOJ ` ■ III /O APPLY 4,OW LB/ACRE GRAIN STRAW OR EQUIVALENT COVER. O .�� , /• - III I t II III I I'l II��d oEw J D 4. APPLY AGRICULTURAL LIME,FERTILIZER AND SUPERPHOSPHATE IN ACCORDANCE WITH"SEEDING SCHEDULE"AND ANCHOR STRAW BY ROVING.NETTING OR BY TACKING N1TH ASPHALT EMULSION AT A RAIL OF 400 GAL/ACRE II l YYY 144 - a.aa�e. MIX WITH SOIL. MAINTENANCE I• 4•I.4•� •O •V •V I OI F1 5. CONTINUE TILLAGE UNTIL AWELL-PULVERIZED FIRM REASONABLY UNIFORM SEED BED IS PREPARED 4 TO 6 '` -' o[mExm.".. .�11 �IQ,j�OI OI`pIjIN1 5� s� I•I INCHES DEEP. EXTEND sE IN FEeftua 6. SEED ON A FRESHLY PREPARED SEED BED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK REPAIR AN TEMPDRARLYZCD AMAGER ED RDEAS IMMEDIA JLINE 15,T LAY T�DRWESS ITHe 0 LBc/EACRE OF SPEDEEN IN MARCH.IF IT I YNECCESSARY nis 011 '. ."i NW AFTER SEEDING SEED ACCORDING TO"SEEDING SCHEDULE / - cw..ioaooa".ouoo� - EARL Y W./ o.c•sw... MARCH. 4 sox . ] MULCH IN ACCORDANCE WITH"SEEDING SCHEDULE"IMMEDIATELY AFTER SEEDING. TO . �`' ��/ / B. INSPECT ALL SEEDING FOR COMPLIANCE WITH THE REQUIREMENTS OF THE"SEEDING SCHEDULE".MAKE NECESSARY TEMPORARY SEEDING ftECOMMENDARON nor LAZE WINTER Ana EARLY SPRING(TO BE FIXLOW£D BY PERMANENT FALL SEED MIX) / ^j / REPAIRS AND RESEED G THE THE PLANTING SEASON, IF POSSIBLE. OR THE DAMAGED AREA SHALL BE SPECIES RATE LLB/ACRE) REESTABLISHED FOLLOWING THE ORIGINAL LIME,FERTILIZER AND SEEDING REQUIREMENTS. DEC 1-APR.15 TER RYE(GRAIN)120 CAROPIN�VENTURES,LLC ANNUAL KOBE LESPEDEZA 50 VICINITY MAP I ( ` 36 OMIT LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. 3j\ D.B.411�,-�G.260 �6 - ASOILPP AMENDMENTS (N.T.S.) I II \ p\\ - _- \ .y� \ OF SOIL TESTS. SLB/ACRE GROUND AGRICULNRAL LIMESTONE and 750 LB/ACRE 10-10-10 FERTILIZE OR FOLLOW RECgAMENDA110N5 ) \ '60' ,+\ \ ` L?O,\ I MULCH 'p \\ \ �\ APPLY 4.000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER. \\ N\ _3]8 - \\ \3 \ ( \\\\ ANCHOR STRAW BY ROVING,NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RATE OF 400 CAL/ACRE __ \0 \ MAINTENANCE / �) \ \ \ \ \ \\ \\ DAMAGE. IF GROWTH IS NOT FULLY ADEQUATE RESEED,RE-FERILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER �I 3 4 ,6,\ s\\\ \\,O\ 2 "__\ \ \ 5 \\ PERMANENT SPRING SEED MIX \ h 382 3j'a Lot Plan\ II SPECIES- RATE OM/ BERMUDA MARCH,- LY I COMMON BERMDDA 30 1G\--- \ "A"&"Drr 61 PERMANENT SPELL.SPRING oaMONALRR 1 \��\ \\ / _\\\\ SEPSERICEA LESPEDEZA(UN SCARIFIED)30 MUDA 30 General Erosion Control Notes $2 \ ��\ \ \ J / ( KOBE LESPEDEZA 10 1.Only the areas shown shall be disturbed. 3_ - \ .'q \ to / I WATER 2.All disturbed areas shall be grassed and mulched 85 soon ed _---- \\ \ ^\\ \\ \\ I / / �'/ I IwMUM OF 1 INCH OF RAINFALL A WEEK OF NOT SUPPLIED NATURALLY,CONTRACTOR SHALL SUPPLY THE REMAINING AMOUNT UNnL possible and maintained until permanent cover is established. _---- \\ \ 4e' \ \ / / /,jC / 7 / 1 GROUND LOVER HAS BEEN ESTABLISHED. rr�� \ , llinp� '/,�� ; ( NOT TgSCALE NOT TgSCALE J 19 378 \\ �� // I " 'D / /y�`� / // 1 EROSION CONTROL SEQUENCE& EROSION CONTROL _.. -- _ � , / ,,(( ) QA l TOWN OF SOUTHERN PINES _ TOWN OF SOUTHERN PINES CONSTRUCTION=�� 55 / / I K� O / // / DATE. JANUARY:ha SEEDING NOTES DATE JANUARYaeha SEEDING NOTES LIMITS �� _�' I I / / ' j CAROPINE/VENTURES,LLC 374 a s 32 ) I I D.B.4198,PG.260 ��>a 31 / ` \ST o / l \ 17 \ems \\ v L e'MAX H \ / J \\) \\ \ \ \ / /// ) o o .,I''J 374 /'' I A v / / 4 ' >I> II MIN.12-1/2 GA, / \ / ` �_ _� / �.. 0... INTERMEDIATE \ / / \\ \ MIN.WI GA. \I y% '�� WIRES \ \ 16 / // / \ \ /// / LINE QUIRES ddd __ ��� ERNEb lW `�°: ���4�° GRADE VJ7� /' /) \ \��\ O�EO�coS�O`�O�J0oio0A4 a, _ 29 / \ 9 \\ / // Provisions ground cover on exposed slopes must be '�� CAROPINE VENTURES,LLC`_____ i' fi� � Z2r?�/ v v V I -- /' accomplished within 21 calendar days following completion of any 15 D.B.4198,PG.260 /' phase of grading. I� Ic / 3y6- //� i \ 0 \ _ // / t 12 Cam/ hSCL� - --- 28 q4 �N� Provisions for permanent ground cover sufficient to restrain `L \ \ ---- / erosion must be accomplished for all disturbed areas within 15 FRONT NEW 4., / � 6 �- 1 \ ( // / working days or 90 calendar days following completion of / -- \ \ i / construction or development,whichever is shorter. STEEL POST NOTE: `� / 0 _f�4'i -�'� _ - 11\\ / USE SILT FENCE ONLY WHEN �( - _ -- / WOVEN WIRE FABRIC DRAINAGE AREA DOES NOi / \ .p - i _---- 1 \ IIIIIIEXCEED 1/4 ACRE AND / 1 9 /'/ / For HOW ZONES,ground cover shall be prodded within 15 ISILT FENCE FABRIC NEVER IN AREAS OF / sJ V /�.O,5 \ ' / working days or 60 calendar days following completion of CONCENTRATED FLOW / / - '/ / \ 35A --_- / \ \\ _' // construction or development,whichever is shorter. I SLOPE 24 26 , 12 i r \ GRADE i/ GROUND STABILIZATION ✓w �� i _ \ 350 -- ---- SITE AREA STABILIZATION " FOR REPAIR OF SILT ro ' 8 MIN.COVER ^/6 -- --/ / \ \ / EXCEPTIONS I T / DESCRIPTION TIME FRAME FENCE FAILURES,USE III i OVER SKIRT" \ 27 - 13 \ \ / PERIMETER DIKES, J DAYS NONE No.5]WASHED STONE. N - J'`)C C \ / SWALES,DITCHES FOR ANCHOR WHEN SILT k ANCHOR SKIRT AS / LJ 25 --- - . ) \ t �'/ / &SLOPES FENCE IS PROTECTING t DIRECTED BY ENGINEER• \ i' / / \ \ / / HIGH QUALITY WATER ZONES T DAYS NONE CATCH BASIN. IIIIII! �\` ---- - --- _ ---f// -----_346 / ( (How) 1 4 \ SLOPES STEEPER ]DAYS IF SLOPES ARE MIN. - / _-_- / THAN 3:1 10'OR LESS IN \ I \ \\ / LENOTHS AND TEEPER E /� tt I / THAN 2:1,14 SIDE NEW / // / ----_ _.y+4z J//�i - 24 __------� - - II \ \\ ) DAYS ARE ALLOWED ,28 / / _--- \ SLOPES 3:1 OR 14 DAYS ]DAYS FOR \ / / __-_--- ) 1 I / FLATTER SLOPES GREATER NOTES&MAINTENANCE- \ / // ---- - / I I f THAN SD IN 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS LENGTH IMMEDIATELY. / / ---_-_ ---- --_---- _ I I / ALL OTHER AREAS 14 DAYS NONE(EXCEPT 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE,TEAR,DECOMPOSE OR BECOME INEFFECTIVE,REPLACE IT / -_ WITH SLOPES FOR PERIMETERS PROMPTLY. I / __ •---- z[1i• ___ 1) I FLATTER THAN 4:1 AND HQW ZONES) 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND ( 1 6 23 h� J / / REDUCE PRESSURE ON THE FENCE TAKE CARE TO AVOID UNDERMINING THE FENCE DURING GRAUT, \ /( `,( 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND \\\ 9 \ I \ / }� --- ----------- �./ \\\ / I 1 STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. 1 .."/fS 5. REMOVE SEDIMENT DEEPER THAN 12". I Sf� NOTTOSCALE `\\ 40\ lase _-, ty� L�� ----- -- - -1 - ' \ PAGE 1 of 2 TOWN OF SOUTHERN PINES TEMPORARYDETAIL FENCE E-6I 1 ( -- I 22 / -\ ) / \ TOTAL DISTURBED ACREAGE:0.31 ACRES DATE NDART red C U ) 1 / \J / 1 / _ LOT EROSION CONTROL PLAN / (421 /49 , ( •)-4 CAROPINES PHASE 12 MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION A. ( FLOW TO THE REAR ) B. ( FLOW TO THE FRONT ) C. ( FLOW TO THE LEFT) D. ( FLOW TO THE RIGHT ) E. ( FLOW TO THE FRONT& REAR ) / Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic lopdressing PROPER,UNE NE LINE FOR with 2-Inch stone.After each rainfall,Inspect any structure used to Tap sedIment and clean k out ae necessary. Immediately remove all objectionable materials spilled,washed, r% 61��°P`rNtE"` I r SILT FACE 51L�P� -1 r% SLTOPEWN� DREAM FINDERS HOMES LLC or tracked onto public roadways. noow Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric x LOT f LOT + - « LOT LOT y LOT t I should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure that the removed sediment does not ash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during deanoul operations. w MOORE CO. N.C. McNEILL TWP. Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate p w x moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth and stabilization of the root bed.The ' MAY 2023 SCALE: 1"=60' sod should be limed and fertilized Me per soil type recommendations and type of grass recommendations when and if possible. HOUSE DOUSE HOUSE 00050 HousE Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has GRAPHIC SCALE been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be repaired,and reseeded as soon as possible.If the - - - a E. time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. ENTwwcE ENTRANCE ENreTNCE ENTRANCE CENTRANCE 60 0 30 60 120 240 General'All measures will be Inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction N f N u N y col a activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be relocated on the lotto insure that the FLOW n �j• ♦ �js!, +W- � �(y potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested In the erosion control manual. R !A; R R L% f L,. . R VW o J F.^'� R/w e L 5E= -J R R w %-2L'k`L,_,i':" Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. •..•• ... •••-. N FEET Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the l inch = 60 ft. filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed sediment shall be deposited within the STREET STREET STREET STREET STREET project in such a way that the sedimentis not subject to erosion by wind or water. MOORMAN,KIZER&REITZEL,INC. 115 BROADFOOT AVE. FAYETTEVILLE,N.C.28305 Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all fencing materials and unstable R/w R " "�" Rw PHONE(910)484-5191 FAX(910)484-0388 LICENSE#:F-0106 sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has beenen properly stabilized. EROSION CONTROL DETAIL FOR SINGLE FAMILY LOTS -(N.T.S.) ) UST SAVED:5/1/2023 1234 PM LAST PLOTTED:5/1/2023 1:16 PM PLOTTED BY.Dennis Gilbert FILENAME:G:\CURRENT JOBS\H&H CONSTRUCTORS\I6-1367-01 CAROPINES-EC\PLANS\CAROPINES PH-12 LOT 05.DWG