Loading...
HomeMy WebLinkAboutNC0021733_Pretreatment_Annual_Report_20230510Town of Marshall North Carolina Wastewater Treatment Facility Industrial Pretreatment Program 2022 Pretreatment Annual Report Narrative 10 May 2023 dl�l I. General Program Information • Pretreatment Program Information Sheet - The information sheet as provided by the PERCS Unit is accurate at this time. • Major Pretreatment Program Elements Headworks Analysis — The headworks analysis report was approved to the PERCS Unit on May 2015 • Enforcement Response Plan — The Town of Marshall WWTP has an approved Emergency Response Plan of file at this time • Sewer Use Ordinance - The Town of Marshall adopted the model SUO March 21:2013 • Industrial Waste Survey — The Town of Marshall P performed an Industrial Waste Survey on December 15. 2018 7 IL General Permit Information • IUP — The Industrial User Permit for Derringer Ney Manufacturing was renewed on April 1511, 2020. The IUP is to be renewed April 151h 2025. This is the Town's only active IUP. • IUP Changes —There have been no additions or changes for SIU during the year 2022 III. SIU Information • SUI's in SNC — There were no industrial users in SNC during 2022 Pretreatment Annual Report (PAR) Control Authority. Industry Industrial Data Summary Form (IDSF) Town Name -> Town Of Marshall Name DerringerNey Manufacturing W WTP Name Y> Marshall W WTP [UP # 0001 Use separate forms for each industry/pipe pNPDES # => NCO021733 Pipe # 001 Enter BDL values as < (value) I st 6 months, dates -> 1/112021 6/30/2022 2nd 6 months, dates => 7/ 1 /2021 12/31 /2022 Total # of samples => * Maximum (mg/l) => * or Maximum (lb/d) => * or Average (mg/1) _> % violations,(chronic SNC is >= 66%) => % TRC violations, (SNC is >= 33 %) => Total # of samples => * Maximum (mgll) => * or Maximum (lb/d) => * or Average (mg/l) => * or Average Loading (lb/d) % violations, (chronic SNC is >= 66%) => % TRC violations, (SNC is >= 33 %) => Total # of samples => * Maximum (mg/l) = * or Maximum (lb/d) => * or Average (mg/1) => ' or Average Loading (lb/d) => % violations, (chronic SNC is >— 66%) —> % TRC violations, (SNC is >= 33 %) ,t) 111c11i » 7113 6 monins Ist6morims 2naomontns s mon s _77.1ornontns 142 146 6 6 2 2 0 0.00093 550 453 7.8 <5 7 0.00108 0.00088 344 275 6 <5 — ---0 0 0 0 0 0 0 0 0 0 • POTW must enter at least one of these RJP => Industrial User Permit Ib/d => pounds per day four rows. Please indicate how averages were calculated SNC => Significant Nun -Compliance mgd => million gallons per day Avg period could be month. "r. or 6-month & if BDL . 1/2BDI_ or zero values used. TRC --> l'echnical Review Criteria WWTP —> wastewater treatment plant Chapter: PAR Guidance File name: pages 12. 13. 14 Blank R3SF Form. Copy and use in your PAR Number each set for each RJP pipe - Page of Pretreatment Annual Report (PAR) Industrial Data Summary Form (IDSF) Use seperate forms for eac�i industry/pipe Enter BDL values as < (value) Total # of samples => Maximum (mg/1) => or Maximum (lb/d) => or Average m => or Average Loading (lb/d) => % violations, (chronic SNC is >= 66%) => % TRC violations, (SNC is >= 33 %) => Total # of samples => ' Maximum (mg/1) => ' or Maximum (lb/d) => ' or Average (mg/1) —> or Average Loading (lb/d) => % violations, (chronic SNC is >= 66%) => % TRC violations, (SNC is >= 33 %) => Total # of samples => ' Maximum (mg/1) => ' or Maximum (lb/d) => ' or Average (mg/1) => ' or Average Loading (lb/d) => % violations, (chronic SNC is >= 66%) => % TRC violations, (SNC is >= 33 %) => Industry Name [UP # Pipe # IQMiZll 1.11EXEM'© UMMEEM 1 011 BDL => Below Detection Limit mg/I => milligrams per liter • POTW must enter at least one of these IUP => Industrial User Permit Ib/d => pounds per day four rows. Please indicate how average% were calculated SNC — Significant Non -Compliance mgd => million gallons per day Avg period could he month. QXT. or 6-month & if BDL . 112BDL, or zero values used. TRC => Technical Review Criteria WWTP —> wastewater treatment plant Chapter. PAR Guidance File name: pages 12. 13. 14 Blank IDSF Form, Copy and use in your PAR Number each set for each lUP pipe - Page of Pretreatment Annual Report (PAR) Industrial Data Summary Farm (IDSF) Use separate forms for each industry/pipe Enter BDL values as < (value) Total # of samples => * Maximum (mg/1) => * or Maximum (lb/d) => * or Average (me) * or Average Loading (lb /LI ) % violations, (chronic SNC is >= 66%) =y % TRC violations, (SNC is >= 33 %) = Total # of samples => * Maximum (mg/1) => * or Maximum (lb/d) => * or Average (mg/1) => * or Average Loading (lb/d) _> % violations, (chronic SNC is >= 66%) => % TRC violations, (SNC is >= 33 %) => Total # of samples -> * Maximum (mg/1) => * or Maximum (lb/d) => * or Average (mg/1) => * or Average Loading (lb/d) => % violations, (chronic SNC is >= 66%) => % TRC violations, (SNC is >- 33 %) => Industry Name Ik-rringcrNcy Manufacturing [ U P # 0001 Pipe # 0()I s mon s n mon s_n mon s s mon s. n mon s s mon s n man s2 7.Nelenlum 2 2 2 20.0268 0.2 0.0027 0.0013 0.02572 0.0898 0 0.078e1 0.01430 0.0014 0.0006 0.0396 0,051 0 0 0 0 0 0 0 0 0 0 0 0 >t rease st months n moats 2n months st months _n months st mon s n months Id6 2 2 7.8 <5 7.5 6.3 <55 M24'. <5 8.15 <5 0 0 lI 0 0 0 0 0 0 it st 6 moots 2nd 6 moots st moots 2nd 6 moots Tst moots 7nd 6 months st mon(s2nd 6 months BDL => Below Detection Limit mg/I => milligrams per liter * POTW must enter at ]east one of these IUP => Industrial User Permit lb/d => pounds per day four rows. Please indicate how averages were calculated SNC => Significant Non-Comptiancc mgd => million gallons per day Avg period could be month. W. or 6-month & if BDL , 1/2I3131— or zero values used. TRC => Technical Reviem Criteria WWTP —> wastewater treatment plant Chapter: PAR Guidance Pile name: s#xlW4413, pages 12, 13. 14 Blank [DSF Form. Copy and use in your PAR Number each set for each RIP pipe - Page of Pretreatment Annual Report (PAR) Industrial Data Summary Form (IDSF) Use separate forms for each industry/pipe Enter BDL values as < (value) Total # of samples * Maximum (mg/1) => * or Maximum (Ib/d) r Average m =- * or Average Loading (lb/d) => % violations, (chronic SNC is >= 66%) => % TRC violations, (SNC is >= 33 %) => Total # of samples => * Maximum (mg/1) _> * or Maximum (lb/d) => * or Average (mg/1) => * or Average Loading (lb/d) => % violations, (chronic SNC is >� 66%) => % TRC violations. (SNC is >= 33 %) => Total # of samples => * Maximum (mg/i) => * or Maximum (lb/d) => * or Average (mg/1) => * or Average Loading (lb/d) => % violations, (chronic SNC is >= 66%) => % TRC violations, (SNC is >= 33 %) => Industry Name IUP # Pipe # BDL => Below [Mcetion Limit mg/l => milligrams per liter • PO'T'W must enter at least one of these [UP => Industrial User Permit lb/d => pounds per day four rows, Please indicate how averages were calculated SNC => Significant Nun -Compliance mgd => million gallons per day Avg period could he month, Qtr. or 6-month & if BDL . IRBD[_ or zero values used. TRC => Technical Review Criteria W WTP => wastewater treatment plant Chapter: PAR Guidanoc File name: PMjd#Mff r sReiikiididdtih ftugitk sli clk*113. pages 12, 13. 14 Blank IDSF Form, Copy- and use in your PAR Number each set Im each IUP pipe - Pagc of 'retreatment Program Info Database tr Program Name Marshall WWTP Name Town of Marshall 'rogram Approval Date 04/20/1992 Pretreatment Status Modified Region ARO County Madison NPDI=S N printed on: 1/19/2023 Stream Information IWC % at 7Q10 0.12 7Q10 Flow cfs I mgd 535 / 345.61 1 Q10 Flow cfs 1 mgd 431,60 / 278.94 Stream Classification C Basin Number FR804 Receiving $tream Name FRENCH BROAD RIVER umber NCO021733 NPDES Effective Date Last PAR Rec 02/16/2022 PAR Due Date03/01/2023 mercury 04/01/2017 1631 Expire Date 09/30/2020 Current Fiscal Year PCI Done required )TW is Primary WWTP TRUE Last Audit on 09/15/2016 AUldit Year Nex120/21 es Design Fiaw mgd 0.4000 °/a Design mgd is SIU permitted 1.25 Permitted SM'tow jmgd) (Pt_S!U) •ads 'WTP SIU's 11 Program SIUs 1 'WTP CIU's 1 Program CIUs I' I HWA LTMP 1WS suo ERP to Inactive Date Next Due 12/31/2023 Date Received by DWR 02/27/2021 05/2212011 12/15/2018 01/15/2014 07/09/2020 Date Approved 08/10/2011 01 /09/2019 01 /21 /2014 09/23/2020 Adopt Date Required Date Adopted 03/21/2013 fo in this Box from Pt Contacts Date Date Date PT Pro Attended Attended Attended Formal Name 9-Prime Phone't ext Fax HWA Wksp UP Wksp PAR Wksp Lawrence Ponder B28) 649-3031 828) 649-3413 Mayor PO Box 548 8753 Don Byers Prim 28-577-9916 1 1 5/6/2010 1 1/26/2010 arsenvironmentai@gmail.com Pretreatment Coordinator jP0 Box 548 28753 ck Wallin yor@townofmarshall.org Mayor incy Allen I I� I I II ! I len@townofmarshall.org Town Administrator !� treatment Related NOVs from DWQ 1 3-1994 Failure to imple program: including submit SAR,inspect f11993 failure to imple program: including tohave PT coord, do 1/1993 ??iate SAR?? 1/2001 hwa; comp judg/enforce; pub. not.(from audit) 16/2008 Failure to submit IWS. Was due 12/31/06 1912009 Failure to operate program and retain elements ?012010 Failure to properly sample 51U and failure to reissue j/2013 NOV-2013-PC-0085. Failure to collect POTW samplin( DWR Central Office Contact Pretreatment Staff DWR Regional Contact pan Boss