Loading...
HomeMy WebLinkAboutNCC231436_Site Plan or Location Map_20230512 / CONSTRUCTION SCHEDULE °A�` \ \ �e1c#i Read�SR-1406 '_ _ (EA alle aedp mi nd pl approves Ero ions dSed ment ed trot \ _ 'tour. permit ova a BSC p 00 aP Coverage(CAC)moat be pic before any land disturbing preferably activities ` ` .A copy of the P.RBC permit,the COC and a hard copy of the plan ratter be kept on site,prafaably in a y r r v w permits box,an ssil�dng inspection. \\ 2. Install gravel construction a sma the,ails fences,reinforced silt 0 outlets and wattles. I \ � / � _ � � \l I. Fenian steering and grabbing any necessary areas on the rare as may are atWtea. 4 4 ll ll �� I'G � I � � � � ✓� � � N \---- ___N__ / y'yDO / '�\ I d. Begin lot grading and excavation activities N � tr. �y N \ \ \ � __.../ // � --NSfRUCTIO \ � 5. Begin or continue with house construction activities. \ 276 ENTRANC — 6. Finish all rough grading and house conarction. .� a ti ,� ,„� cos '� D wa .os sgooLLrg e \\ \ \ CONSTRUCTION i '/. InstallIIdriveways,walks dpa' ❑pp NPH \ \ LIMITS ''SILT F 8. Begin f grading flot most � L ku®cox � J `r/@' `� y uk .p N \ \ \\ —_ / ,�qAO - \ 9. F gr g I h g d 61' g f I I h' 'II I M1 11 of sod ov Me lot �nLi] J ` ®�®yy �'3d y \\ / Thesilt f 'll place -1 h 1 sodded gm gstabilized d k hold. o 1 \\ \ \ \ —�rL1`L LE II— / /(..." 10. Theshall dself-inspectionsf thedsedimentationncontrol measures and complete rry �k0 AY SRO AV RO WAV SRO NAY RO WAV -RO V '� 2 �zy r n f II g b' d If' p f f d the DEMLR website RIIB Lsoas°rcwm o \ \\ \ \ / 2A0� �RELT FENCE / ) / y I / Gettel/files.nc.gov/nederans7,°/20Mmeral/20and/Rev-Ao/20Resources/t Twelve Notes: xE'tsx ROAD _ LEGEND INLET 1.If needed.Tree Protection fencing should be installetl along the buffer zone,wetland b \ �- -� / SILT FENCE General A20PeriG/DEMLR-CSW-Monitoring-Fors-Rev-August-8-2019.Pdf.Twelve months of complete99 SR - \ \\ \ \ / 29 OUTLET 3 I I / tom.shall be keptand available for inspection at all times.It is recommended a co be boundary and/or around protected trees,provitlin9 a radius of at leas[1.25 feet for each .c -- —- —— inspection on site P copy\ \ \ �_ _/ ) kept in a box.GS 113A- () 1 inch of trunk tliameter. / p permits ( 541 e,ISA NCAC OSB.0131,NCGOI Pan Ili Sections A and B 2.Install Silt Fence on the low elevation sitles of each lot.Install Silt Fence outlets shown on $� I \\ \\N —— J 11. Self-inspections for erosion andrs of event measures are to in performed at least once every seven N gram and 1 ry, p points.If lots are ' --/ —_— —— I \ schematiclale d fold adjusted,if necassa for lacement et low /y calendar days and within 24 hours of every rain event of greater than 1 inch.Any needed repairs shall be Flow DIRELTIO �I I �' IJ /1 y�+ \ / I made immediately to maiataiv measures as designed.All ESC measures shall be main°ained as specified in SILT FENCE contiguous and have different land owners or builders,each lot should have individual Silt SIT rPs \\� ' the construction details on this Plan Amin gauge shall be installed et the project site for monitoring. SILT FENCE OUTLET J N. 28 12. Inspection and final acceptance letters.When the complete,the hall contact DEMLR to ENS Fences. required Silt Fence within 10 feet of property line to ensure there is no conflict with \ \ I{\ p p project is comp perittees sCONSTRUCTION septic t It Is the responsibility f the builder to ensure the installation of sediment '� \ � ,Oy I closeout the E&SC Plan.After DEMLR inf the perinea of the project close out,via inspection report, ep csys era. ports Ityo ay21pP1 ' —� \ hall visit"de MCG01"to submit an electronic Notice of termination NO ASI00 CURB INLET mn measures does not impact the septic system antl repair area(s). eJ+uxcyyOAR oR_,4zi ? \ \ \\` \ the perinea s q.vc.gov (e- 4.At least one Construction s dedicated is to be installed per lot. annual general permit fee will be charged until the o-NNOT has been filled out. r\ \ 5.Waste bins and other areas tie rain inlets for managing builtling material waste shall be at N \ _ )_ 27 �•J 11 least 50 feet away from storm drain inlets or drainage ditches unless it can be shown that illill , ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY pother alternative exists.If this separation cannot be achieved these areas must be \ \ NCGS 113A-54.1'IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR contained behind Silt Fence. \\ ` / _ COMPLETED AS AN EXCEL SPREADSHEET. 6.Inlets downstream of disturbances should be protected;streets should be swept when \ AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED sediment from the construction activityt \ EROSION AND \NC-Environmental.jpeg T.Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures am "3 3/ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A provided on additional sheets.Erosion and sediment control details are not drawn to scale. \� — \ / / 6 \� NCAC 04B.0131 STATES THAT-...DOCUMENTATION SHALL BE ACCOMPLISHED BY TYPICAL LOT LAYOUT WITH CURB AND GUTTER / N INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE 0 — — / iiiiik APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, \ / \ OPEN \ \ DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, DATE: ���777"' PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION ao SPACE \ CONTROL PLAN." VICINITY MAP (3 \ z5 ��� \ \ \ asp; lilik iffiti N.T.S. .4, 1 i c551' \\\ 43 ,... ., , \., ' 44 \ „...--:.„..t...,,i,,:...-t-itittl ;:.:tilt.:.}...it 46 DATE: PAGE: \ e- —42 \� w \ 4' -� �a.�4. .:,...... s' Sock/watt 51 Sock/wattle NOTE: \ \ _aI1..":1"..;,..: 11 ..t.:..- j. MI Area to be , Other materials providing equivalent protection `y 1°rTBa,avLOW � �I FL -.11,- 0 subatW�'ta `,, :: ..... ��• \ \ / - Pp'` 04 12. 11 Stakes ;: 7z �0 � \ • 1.Clear the entrance a.exit area f a vegetation. and other objectionable greater rainfall, SECTION SECTION graOpe.flat areas should he loyal.at the edge of the , �\ �'�e / ___.,) d 4406 \ make a,required repairs immediately. ""a`� grade and men trap or e plans.and 2.Manili%thone �D (1co land The ends of the silt / 20 \ remove nose materials =a.washed°tracked°W public <o ° 8 <_ sill 11- h° \ / 202 \ subject to seepage or Mph water carte. stability the foundation In locations roadways. v \ \\1 c- / \ \inch x 2 inch cross se..should be driven ..ANC-Envirq,menlal.jpeghw a= \ \ ` I / O CONSTRUCTION \ CONSTRUCTION ENTRANCE I EXIT silt aoeuwamaote�,m s«uwtleisl=ea at Stakes should maim interval \ wareWl,thee naaaroa4W. w Mulch or L°m „ ground 4 Min. bah pavement \\ \ \ 64 •.E4 \ To 1/2 height of log 5. In the event stating H net poss.e(e.when NTRENLHED INBTPllATION E° °1101 µINSTPLtATION' concrete blocks shall be MRENLHED elnspxfa&a eaWwa in Pla �Pe behind the THIS • .w.0 m.,". rw..,.,.ww,.w„. sock/wattle tncborgreaerpaceedug runoff events. \ \ \ Lot Plan usoMEmlc VIEW MAINTENANCE weekly1. at least and .r \\\\ �\ �� \ l/ "" �AU^� \ \ SODDING Mulch or CompOSI .. Dwa m IMnAL FLOW a \\\ \ \\\\ S70RMWATER °63n \ \\ \\\\ \ \ i� \ \ �� LAV SOD INA STAGGERED for unsn,aHow Socks � raaaT°aePwt 'P a,aer =m� l000oa,I c«n a l(�n.ml ��,Son 9 anle must b Pte e ltlt w. If t:.nding becomes excessive,the slit \ �\ \kATMEENT Plan nrfif torn 62f#16 \� \\ \ `''<Silt sock/Me"su(a°'q°° (ea`m)MS`r°°n) a \ \ Lot Plan \ \,enosertorwumlrvc Pleceacaner f wattle (" ) ca`4'm, (5oo°;n) \ \ \ 53 / \\\ \ \ \ M��as "m"o.g`°" '�";:" tmia a,s.on gzzs" 930,in r ,1 (; (z, arm/ 5 eeeeawtee r Peru.d" S.betel e \ \�\ \ � \ 54 �� \\\\ `\ \\ \ \ \ M meEn ee REmLY. SILT SOCK/WATTLE FOR PERIMETER AND� ce16OPPELT•v/I Inninl /miml n/mimj 1/en/en) \ _ _ m AM Enetr m n1vLJpeg INLET PROTECTION \\ \ \ ♦ Pl P'N \ \\\\ \ • \ ` CONSTRUCTION •�_ _ _ / / \ \\ \\ \ \ Y 55 ENTRANCE .l '(/./y�` \ \ I \ \\ \ / f�l' \\ \\ \ \ \ \18 Lot'lan 'R / ^� \ I I \ \ DATE: Filter Fabric PAGE. —_�\ I\\/,/ \ \ \ e x \° FE E \l \ ` it:--,,,,,.\ 'A' j 1L/T� /e4\ \l Steel Pent Paste or, --7_---_____--- \ I 1�\\ \ \ \ \ "�'."': I I ,1SIL \. R \ , I I \ \ Wire Bwckfll trench1 \ Lot Plan -! r SILT Y F CE v `Nr `J Wire Fence , ' and Compact \\�\ \ \ \\\ "q" ��/. FEN8CE:. 59 ATTL � I I Y thoroughly \ �� A \ LO 58 - � )&4 INII Steel Post 1 I\ _\ _\ \ A" I =YT 4 1 \ \ \\\ \\.\\ �\ \�\\� __/\ �� \ \ \ 'j 9TTLE ilk � /REEIN O Cs l / / I I I 1 \ \ w.Hmssot Tnm LT.As THE sop is ucrtzre srnaysre y 1 UP,I°P. \ \ \ \ \\\ -- - GU'I'LST / // I I \ \\ Wire ties T (`r� CONSTRUCTION FO'- RE,,,,/ / // \ f `-"`O"�D STABILIZATION \ �� �\\\ \ \\ IMITS '/ �B�cE 'CE / / / / / \ \ ceN IAPPEARANCIE FGOOD SOD t k SITE AREA STABILIZATION °ttT - �G I aenwn a4mwam e a� DESCRIPTION TIME FRAME EXCEPTIONS ��\�1 �� � � �E���� / A�� A\�� A �������d'��������� ° nnamnrea z4 the PERIMETER DIKES 7 DAYS NONE \ 1l I`\\ \ Y \� // \ �w re SWALES DITCHES \\ \\\�\ \..___, /f `� I I l ( \ \\ \ \ \ ,A Filter Fabric &SLOPES \ I \ a.",EaaarM.r CROSS SECTION VIEW HIGH QUALITY 7 DAYS NONE \ \\ \_ \ I I \ \ \ _ •�' o�.ar"' ...so ss..oaamass e I sinus os maims.,orw.w WATER ZONES `\\ am."te.Whenpins era nece..r.:..earfasten. tireomfl er.car (HOW) \ ` \\ ��� , Il/ \ \ \ \\ ' Ira.te:y Fenn!.rope.!rm.., cePal°.e..r sew,„ wee. General Erosion Control Notes M�=m.,w="saw vows owlwee�aeota,ereottPo+.waww�I°.Pan ebowa vewa SLOPES STEEPER 7 DAYS IF SLOPES ARE \ \ — \ \ \ THAN :1 3 � \ \ \ o."waeeea .w o.�e.,,,,,o,wm otat.we nsu om.vala a.aw I"wtb.wa"a. 10'OR LESS IN w P w PP a rmw.T.«ewa...o�a ro 1 I \ 1.Only the O show shall be disturbed. _ N0 Y o noxa s.w r nm.ewrrmdoa�meow° LENGTH AND ARE � I re n .w.. orwmm. can w,mbwaaa7a.eow.obw l.., NOT STEEPER \ \\ �� I 1 \ \ \ \ \ \\ M 2.All disturbed O shall be grassed and "P°meO°sae THAN 2:1, 14 \ \ \ \\ \ \ o�Q mulched an over possibles d maintained m.Do not aa«nelufle,ef..foot.. rr.a.r..Nm„PewmoAaon..,,P.wl.,mq.a�mn..wk.lwemt."m P.foa,.z.. DAYS ARE \ — —\ \ \\ \\\ \\\� \\\ \\ qz until peen ant c established. ° ALLOWED \ \\ \ \\ \ _ SLOPES 3:1 OR 14 DAYS 7 DAYS FOR `— — — \ \ \ \ FLATTER SLOPES GREATER �— —� \ \ \ �\\ \ �\ \\ \N \\ THAN 50'IN �� �i \ ..we-EnvlrcnrnertmLJpey SILT FENCE LENGTH // \�� \\ \\\\� _��\\N\\\ \� EFFECTIVE nATE,,v tn, ALL OTHER AREAS 14 DAYS NONE EXCEPT WITH SLOPES FOR PERIMETERS /� \ \�\ —� \\\ \\ _ FLATTER THAN 4:1 AND HOW ZONES) / ' \\ \ \\\ \� \\ \ � — DATE: PAGE: \ �/ \ / / / \\ \ \\ —\ \\\\ \ \ /� _ oats .� FENCE \\� \\ / 1 -" PAGE 1 of 2 \ �— —\\ / \\..._\ \ --) \ \ 11 �_ i TOTAL DISTURBED ACREAGE: 2.30 ACRES i LOT EROSION CONTROL PLAN TOP �- � / \ \ \\ \ ( LOTS 30 & 54 64 ABOVE ET ^��\\ ( \ \\\��� BLACKHAWK THEWASHEDaTD STEEL FENCE ST , HARDWME ARE RGNTwEw — ��^���\\ �— ( / / -� 1 \ \\� )/ LANDING F°L\ / FOR FILTER FABRIC, AND HARDWARE MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION DREAM FINDERS FILTER WASHED sro SET MA%MIN.1r INTOs° ID 3'FILTER FABRIC GROUND CLOTH IN TRENCH General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be oF\ ON GROUND NOTES, relocated on the lotto insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. HOMES L LC �8�m d on low sues..areas al WOG and Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all w swans. objectionable materials spilled,washed,or tacked onto public roadways. MCLAUCHLIN TOWNSHIP HOKE COUNTY Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure SCALE:1"=100' APRIL 2023 1.Per NCG-01,inspect outlet at lest once a week and after ea.1 in.suar easE FENCE AND owes CLOTH v that the removed sediment does not wash back against the fen..Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. FItTERFAemclN ZGE Of.ra 'nv,es_ Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth GRAPHIC SCALE a.Keepmesnrreelladebns sH Wee seeq�ate a°w. s 100 0 50 100 200 400 and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. 4.Remo.se.rnenn when of stone outlet Is covered. S.RePMu atone Be needed mfacilitate de-waterlog. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be = MMI SECTION VIEW repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. ..\Nc-Ewr entd.7peg Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third Of the wattles functional freeboard height.Removed ( IN FEET ) SILT FENCE OUTLET sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 1 inch = 100 ft Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE BF-0106 LAST SAVED:4/13/2023 4:40 PM LAST PLOTTED:4/17/2023 B:20 AM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\H&H CONSTRUCTORS\23-1367-03 BLACKHAWK LANDING-EC\PLANS\BLACKHAWK EC-LOTS 30&54-64.0We