Loading...
HomeMy WebLinkAboutGW1-2023-02389_Well Construction - GW1_20230404 Print Form WELL CONSTRUCTION RECORD{GW 1) For 1lltemal Use Only: 1.Well Contractor Information: Cameron Bazin 14.WATERZONES i Well Contractor Name FROM TO DESCRIPTION 4518-A NCWeliConhactorCertifiptionNumbfT 15.OUTER CASIIVG(formniti-cesedwells)ORLINIIi ifa livable Aqua Drill,Inc, r•ROM To DLAD E T111ClaQEss MATERIAL fL i( It in. ComparryName 16.INNERCASINGORTIIBING thermaldased-loo 2.Well Construction Permut#: . ' FROM TO DIAMETER TnICKNESS MATERIAL List all applicable well construction permits(i.e.UIC,CormtJ;Stale,1radaum eta.) fG R: In 3.Well Use(checkweltuse): fL % 1n Water Supply Well: 17.SCREEN FROM TO 101AMErER SLOTSIZE THICKNESS MATERIAL Ipicultutal DMunicipal/Public (t; In. Geothermal(Heating/Cooling Supply) Residential Water Supply(single) fL f. in, lndustrial/Commercial 0Restdeuual Water Supply(shamed) 18.GROUT i:11nigation FROM I TO MATERIAL EMPLACEMMUMErnOD&AMOUhz FAquifer er Supply Well: & z7 & ci ing -Recovery & % Well: ft. fL Recharge []GrotmdwaterRemediation 19.SANDIGllAVEi.PACK Gcable Storage and Recovery DSCmiLy Barrier FRant TO MATERIAL. I EMPLACEMENT METHOD Aquifer Test OStormwaterDrainage fL % Experimetdal Technology OSubsidence,Control fL & Geothermal(Closed Loop) 0Tracer 20.DRILLING LOG attach additionnl sheets irnec Geothetmal(Heating(CoolingReturn) n0ther(explainunder#21Remarks) FROM To DESCRIPTION rnrer,hardness,snrUmek stm.etc. 0 ft. IG,) E s r+ 4.Date Weli(s)Completed: Well M# it• 7�� fl: 5a.Well Location: D' f: Ile- F=utyiownmi4a= ttFacdityW#(ifopplicable) it itAPR Jg 2021 � 2� V✓l ©� 1%�Ad�i.l^v�Y�G fL fr ; Physical Address,City, Zip & fL 21.REMARKS County ParcelIdenfificationNo.(PIN) 5b.Latitude and longttudein degreeslminuteslseconds or decimal degrees: Gfw/c'll field,onee ladlonng is sufficient) [ 7 f 22.Certification:/ 6.Is(are)the weD(s) ermanent or OTemporary SignatmnofCertified ellConh=tor Date By signing dill form.I hereby certh,that the wells)was ila—)constructed in accordance 7.Is this a repair to an existing well: [Yes or No with 15A NCAC 02C_0100 or 1SA NCAC 02C.0200 Well Construction Stendardr and that a Jflhis is a repah;fill out Imorva well construction informadah and oplaln the nature of the copy offt record has beenprovidedto the xrll owner. repair under#21 reawkssection oron the back-afthisfornt 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only 1 GW-1 is needed.Indicate TOTALNUMBER ofwells construction details.You may also attach additional pages ifnecessary. drffled SUBMYTTALINSTRUCTIONS 9 Total well depth below land surface: Z-1 00 24a.For All Welts: Submit this form witbm 30 days of completion of well For multiple ivz&list all depths ifdigerent(aw nple-3@200'and 2Qa 100) construction to the following: 10.Static water level below top of casing. Ya (ft) Division of Water Resources,Information Processing Unit, Ywater level is above casing,use"}" 1617 Mail Service Center,Raleigh,NC 27699-1617 IL Borehole diameter: (in.) 24b.For Tniection Wells: In addition to sending the form to the address in 24a 12.WeD construction method: T above,also submit one copy of this form within 30 days of completion of well (Le.auger,rotary,cable,direetpush,etc.) construction to the following: Division of Water Rcsources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 276991636 13a.Yield(gpm) y� Method of test: 7 t�(t 24c.For Water Supply&Injection Wells: In addition to sending the form to the address(es) above; also submit one copy of this form within 30 days of 13b.Disinfection type: T` Amount: L �'-� completion of weu construction to the county health department of the county where constructed. Form GW-1 North CarolinaDepacrment of Environmental Quality-Division of Water Resources Revised 2 22 2016