HomeMy WebLinkAboutNCC231433_Site Plan or Location Map_20230511 CONSTRUCTION SCHEDULE ttir
. Obtain all necesmry permits and plan approvals.Erosion and Sediment Contol
permit and a Certificate of
\---..7 ���'� 0d v wa s me ra,a ( ) m as m.me verab.,.(mn�m must be
obraelaneeiau beforeTbefore ebar
react a„n wiag
Preferably punksboufib:during aWpxuoa
awastes.Ile lots y .mun7 / / � activities4. Begin la grading and excavation activities
5. Begin or continue with house construction
7. head driveways.walks and patios.
III
Y e, a dg � eon.E s / —�LINDEN!. 17
contractor shall ran re the ems, a sedimentation control �w ,4 P the following combined a T Tangy an the DEM R
,, 8. Begin fine grading of lot areas
website
F.
of
Tvelve months of complete inspect.forms shall be kept on site a.available for inspection a all times.It is recommeded a co,,y be kept in a semi.box.( t>
>C --S.'''N. ISA NCAC 04E1.0131,NC001 Part III Sections A and Ell
in
ed.All
easures
ntaMed as specified in the construction details on the plan.
or
� � _ e�pro Sillnio:::::
hall aaWolose �aaaarLEa RDgp aR„D� J \� / �—CI _� e E.SC Plan.After DEMLIC informs Mc pm-mines of the
7e �P nldwe-NDTI:eb�a tlkegaar.gym - / / ^� General Ero
C / / j +2��'� 1.Only the areas shown shall be disturbed.
—Th �� -82/ �\ 2.All disturbed areas shall be grassed and mulched as soon as
/ e" j/ / / ' 2t j� 'i- possible and maintained until permanent cover is established.
VICINITY MAP v0
(N.T.S.) �i
s1
L
rsuant to G.S.113A(3),provisions for permanent ground cover
Z
fficient to restrain erosion must be accomplished for all
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTIO oac o IC) P
Gravel Construction Entrance-The v d should remain a condition to t mud or sediment from leaving the construction site. This ma dit \ \ - — ' j / T (7 sturbed areas within 14 working days or 90 calendar days
gravel pa i n prevent trap
g y require pedo \ / Io ,(7
topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable - ` �� �/• /— p hlCheVer is Shorter)following completion of COnStruCtlon.
materials spilled,washed,or tracked onto public roadways. y \ / ••j iR _-D'�UFLE E p
Sill Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed \ - _ _ - _ / /� e 111 •"p?fabric should be replaced promptly,Any sediment deposits that build up against the fence should be removed and disposed of properly to insure that the removed t Z
cediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the ,,,/ / WATTLE C - YRm vfence tluring cleanout operetions. \ WATTL t. E / ce
Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintair \ \ •=�adequate moisture in the root zone and prevent dormancy of the sod. The sod should not be mowed to close,since this could inhibit adequate growth am / /
stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. 1CO
Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step In soil preparation. Once the \ /� / �Opp��A,j/� y`c0 N {
grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly. Any bare areas should be repaired,ant \ \ �yyy 1 c ��/�/ REwsoawD CONSTRUCTION LIMITS Z GROUND STABILIZATION
seeded as soon as possible. If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the \ �� toe / U/ .7� SILT FENCE LIMITS TR
growing season permits permanent grass. / OUTLET O SITE AREA STABILIZATION
t the use of t - - - / .D// / "Y{:� I f0 O DESCRIPTION TIME FRAME EXCEPTIONS
Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits iha i2 1 PERIMETER DINES, )DAYS NONE
air the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed sediment she \Imp p y 9 4\ i / BWALES,DITCHES
be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. \ ',u �_ Se SLOPES
Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take g / •:t ,= HIGH QUALITY 7 DAYS NONE
re to avoid undermining the fence during cleanout Remove and replace stone as necessary as it becomes clogged with sediment.Remove all fencing materials 104 /e ,O/ I r WATER ZONES
and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. `a / I CONSTRUCTION (HOB
General-AIL measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the N CONSTRUCTION �I SLOPES STEEPER 7 DAYS IF SLOPES ARE
COnSiruCl On acOV les any partcular let do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be \!'
,. \ LIMITS x` ' / /1. /} THAN 3:t ,0'OR LESS IN
relocated on the lot to re that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and I construction entrances will be - LENGTH AND ARE
po poss grave V „ NOT STEEPER
maintained as suggested In the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. \ ,- / ell / / . THAN 2 1,14
ATS ARE
.I `Y DALLOWED
112 SLOPES 3:1 OR 14 DAYS 7 DAYS FOR
DATE: PAGE: . . w . . + . \ _ v'1)1r oUTLETE / HIV / FLATTER SLOPES GREATER
\ / 1 / 1 THAN 50 IN
�1� I CBNST UCTION 'u5 >� ALL OTHER AREAS 14 DAYS NONE(E%CEPT
r - r x — SILTREIN FENCE
•l 1vtate fl WITH SLOPES AND HOW PERIMETERS
ZONES)
m SILT FENCE1 FLATTER THAN 4
n fi i i � � I IW W � e % % D ...�:.y / N
10fi IaJ WATTLE 112 v..--
If m"G 4 4,4
,. `� . ✓_ 10§ / Vf • SILT FENCEv I. \\\///
w .� w.. ..1-
■ � � _ ��� Q M � / 2 1�,>TB-T TATT r -,o- `:I'-<-T � g—�T T� —_ •�aLTFEN 'II cp 3 SODDING
f I ffYPID <=.1 6 „
Notes 6 of
LEGEND 1.If needed Tree Protection fencing should be installed along the buffer zone,wetland _ ® 7 �:u
boundary andlor around protected trees,providing a radius of et least 1.25 feet for each 8 • �' 888r"kw
FLOW N Inch of trunk diameter. _� 9 ,^,- - ."°'oo.
2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on J _
SILT
NON DITCH T�TB— schematicldlagram and Feld adjusted,if necessary,for placement at low points.If lots are �— —� \ w PENCE'. 11� / ®"w'p""'"°°"�''
contiguousand have different land owners or builders,each lot should have individual Silt \ If�1 4------,\NSILT FLE/SILT ECE OUTLETS ® Fences- noc \ _ — 11� ug SL'ttP) yn :� I /
3.1 t system
required SiltFence within10 fefthe line to ensureensure there s conflict _ ---„ IIYI4 ���..IIY"
CONSTRUCTION ENTRANCEsepticyt .It's the responsibility of the buildertoen Minstallationot sediment �� a MINI
controlmeasures does t impact the septic ytmandrepair () •• CORRECT
4.At t Construction Entrance/Exit t b installed p t - _/ —_/ \ E
S.Waste bins and otherdedicated fmanagingbuld'g to shall be of �— / \
least 50 feet away from t d inlets drainage tllh t be shown that /� re \ � „ �1� �/4
no other alternative exists.If thisseparation cannot be achieved,M1 areas must be
contained behind Silt F - �— ` —/ . y \
8.Inlets downstream of disturbances should be protected;streets should be swept when - �-
cetl ment from the construction activity is present �� \ \ \ \ t 4 I I • I I I f
ANC-Environmental.jpeg 7.Details for Silt Fence,Silt Fence Outlets Construction Entrances and other measures are \ \ \ _ ~N 1 111 i'.I
provided on additional sheets Erosion and sediment control details are not drawn to \ ....... \ — —11B •
III C LIMITS .m,m
--A
scale TYPICAL LOT LAYOUT WITH ROADSIDE DITCHES \� \ /\ }fI N I� v �12 �•^m==°= �,+d.•�=°"= e
\ \ "�� C
GATE: PAGE: CONSTRUCTION
Us N Ts M APPEARANCE OF GOOD SOD
Wire Fence Filter Fabric \ \ —1 8 l •. ^O\N CONSTRUCTION I
Steel P. A.Max standard Strength fabncwith wre fence PI. iWre Soc.!!trench \\ \\ C.
LMT6 I ,SLIM=S ON...jar.ON fir ��_� } 1�� I�I�III ��I III�I� I N0
e Max Extra Mrer4lb hbrcwMaut wire fence wre Fence , ' and Compact \ `$. 1[ JV V VII VV era
thoroughly \ \ I . I{ �Y w2.
J Steel Post \\ II., ( �12� TT,�.
1 1 Z?\ III - _20'UTILITY EASEMENT �� j�� N - ^,,,,,i "'OfN1i
30 x:r 1I or
_ 1 1 to 26 d• Ope \ \ SHAREDA I; E`_ .nch Ho11se Con�. -Tlvate) -- -- —
Wlre ties ta" \ \ EASEMENT �- Ery en
1 1 dmnal react e 4 I sIn Linden Road NC'
°1e4r°M1 \ \ \� �� A'SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113Aeasures5
AVAILABLE FOR USE.
z4 s 41111111111M \ ^ �� \ The contractor shall conduct self-inspections of the erosion and sedimentation control m
Filter Fabric CROSS SECTION VIEW _I \ and complete the following combined self-inspection form foundon the DEMLR website
°es m...W.Wa u�n<xe,morel.v..ry nvn.,r.aw.mrv�mna,a wl.me,awn., \ \ / \ N. hops://fiEMLR//files.nc.gov/ncdeq/Energy Mineral and Land Resourcesdf. Twelve
ermonths General
{1 Permits/DEMLR-CSW-Monitoring-Forms-Rev-August-8-2019.pdf. Twelve months of complete
�b1BBm nm . \ A. inspection forms shall be kept on to and available for inspection at all times.It's recommended
N
p°==. orereemWa.s, WemWW.Wa,We Ww xWe�•e p,T �rvewa a / \ �� �� \ copy be kept in a permits box.sioon 113A 541(e) i5A NCAC 04osu0131,re to Part III Sections
r. s n n.n rnn e / ) .-- , 1
A and B)Self nspect ons fore and sad mental on control me s as
to be performed at
least one every seven calendar days and wth n 24 hours of every ra nr event of greater than 1
WmPWn WW..:°.v wW W \ \ inch.Any needed repairs shall be made immediately to maintain measures s designed.All ESC
eraeomoo m.pwre+oabftei .r pmoere 8.e•
m e=8„,,ubmre,,,a n �^ / s shall be mantanei as spec'f'ed'n the<onstructon details onthis plan A ran gauge
\ shells be nstalled at the project site for man toting
Basuto,senon„as mom ome wm.oe..e oval can compass more.CO Ixe SWIM eem�®to serene performance. \ \
/ / JI
..\NC E ntal.jpeg \ O
SILT FENCE C. . /— ---
DATE
: ® ) \
S Sock/Wattle Slit Sock/W Itle NOTE / \ II\
PLOW--„„a 3.MI FLO MI t other mate - equivalent Pmlecban
re cps,.era eubslruree fw / \ \
" .'f4l PAGE 1 of 2
IIJ4 leas Sorrel II \
graded
.abeendea par lei \ TOTAL DISTURBED ACREAGE:8.81 ACRES
�� Mn�l • minimum
10 foot beyond
eetoebfNm
e located
nk,e Stokes W I I should be nary e ele —
LOT EROSION CONTROL PLAN FOR
SECTION SECTION
spa all softh to LOTS 1,4,7&8
M wland atdelela be turned ,Iapeto
'a ua* a e g. runoff... re \ \ IN
ill 4, Oak or in.x 2 inch cross...on should be drlven
O 1 LINDEN LANDING
gen • the,Iltsoo.anlnterval of 4 feet eiW V) vertically NUM through the.nter of Ha silt
sock/wattle.Stakes should.=lw;elna4m� \ PHASE 1
UNTRENCHED NMulch
"ALLAg INSTALLATION Corng et nd 4 Min. a. psocksewnles are used.ossible(ie.when 1 FOR
DM RroE� �MRoeT DwR.Ea Mapeacaccu bsocated holMtP'ter�oe stw.klny aana even. \ 1 A&G RESIDENTIAL, LLC
H aT TON ".rca°,.W.M \ I 1 \ CARVERS CREEK TOWNSHIP CUMBERLANDCOUNTY,N.C.
'Untr'nmeesooee i'I,i aTO se Pnr ppeme<.. (zm) ('sopom) em,`m)(saoom) IF-
s coo masneeded to allow for ecrege''nc Ospee 1 /J--/
SCALE:1"=120' GRAPHIC SCALE APRIL2023
Sheet nway11 Silt rk wattle`"/lio M`wots('xi i°03`mi isaFmi eao:`m) „Xt000 .) (Soon) S. '°olecomes r°,oe'��tllwirrem 1zO - s�D zo11
o aaD
"roar e"• 7. ,3. 22 3o nq ed [`?
e in a rail, 4 in e,air, raja 1
• b s (ex (..c (Tee (zer C .res.,r.0.�..n5.Lr.nen ma ( IN FEET)
/m/m) I/m/m) I/m/m) I/m/m) I/m/m) meaenmhaebeen uysamtree. I inch = 120 ft.
MOORMAN,KIZER&REITZEL,INC. 115 BROADFOOT AVE. FAYETTEVILLE,N.C.28305
ILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION
PHONE(910)484-5191 FAX(910)484-0388 LICENSE#:F-0106
UST SAVED:4/18/2023 3:57 PM LAST PL0TTE0:4/18/2023 4:43 PM PLOTTED BY:Donnie Gilbert FILENAME.0\CURRENT JOBS\AAO RESIDENTIAL LLC\23-2855-OS LINDEN LANDING-EC\PLANS\LINDEN EC-LOTS 1.4.7&8.0W0