HomeMy WebLinkAboutNCC190044_NOT Closeout Documents_20230509 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington,NC 27889 (252)946-6481
County: Beaufort Project: Wilkinson Solar River basin: Tar-Pamlico
Person financially responsible:Wilkinson Solar,LLC-Michael Kaplan,Vice Project#: BEAUF-2019-012
President
Address: One South Wacker Dr.Suite 1800,Chicago,IL 60606
1. Project Location: NC 1612& 1619,Pantego
Pictures: No
2. Weather and soil conditions: 70 degrees,sunny,dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: April 20,2021
9. Corrective action needed:None.
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self-monitoring or self-inspections are required. Project is released and coverage under
NPDES General Stormwater Permit for Construction Activities is terminated.
Reported by: Scott Graboski Others present:
Date of inspection: April 13,2021 Time arriving on site: 11:00 AM Time leaving site: 11:10 AM
cc: