Loading...
HomeMy WebLinkAboutNCC190044_NOT Closeout Documents_20230509 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington,NC 27889 (252)946-6481 County: Beaufort Project: Wilkinson Solar River basin: Tar-Pamlico Person financially responsible:Wilkinson Solar,LLC-Michael Kaplan,Vice Project#: BEAUF-2019-012 President Address: One South Wacker Dr.Suite 1800,Chicago,IL 60606 1. Project Location: NC 1612& 1619,Pantego Pictures: No 2. Weather and soil conditions: 70 degrees,sunny,dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: April 20,2021 9. Corrective action needed:None. 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. Project is released and coverage under NPDES General Stormwater Permit for Construction Activities is terminated. Reported by: Scott Graboski Others present: Date of inspection: April 13,2021 Time arriving on site: 11:00 AM Time leaving site: 11:10 AM cc: