Loading...
HomeMy WebLinkAboutWQ0017824_30-day plan of action_20230425PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: - 33 County: Facility Name: 1�R�id Loden nlb' f Certified Operator Name: Dagd 6Me.0 Operator # 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the darn for lagoons without spillways; and from the current.liquid level 'in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Spillway (Yes or No): Level (inches): 2. Check all applicable items - Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within ^ / acceptable ranges. Liquid level is within the 25 q year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within -acceptable- range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables.. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility . .3. Earliest possible date to begin land application of waste: '-//I95IQ3 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. >oyI%IBC Facility Facil er (print) (signature) 'Phone: I l � � o � q6 Date: �a6123 PoA Cover Page 2121100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 linches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 95836 ft2 e. line c/12 x line d x 7.48 gallons/ft3 59738 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 145388 ft3 h. current herd # 4410 certified herd #1 4410 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 2/16/23 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 145388 ft3 0 ft3 58333 Ife 253972 gallons 1.79 Ibs/1000 gal. 561.5 Ibs. PAN 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE .STRUCTURES FOR FACILITY 1. Structure ID: 1 line m = lb PAN 2. Structure ID: 2 3. Structure ID: 3 4. Structure ID: 5. Structure ID: 6. Structure ID: line m = 561.5 lb PAN line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN n. lines 1 +2+3+4+5+6= 561.5 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRIAD DA NOT I IST FIFI DR TA WHICH PAN CANNOT RF_ APPLIF❑ DURING THIS 3n DAY PERIOD- o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 4696 11 9.00 275.00 2475.0 Mar -Sept 4696 15 11.60 275.00 3190.0 Mar -Sept 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 5665.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 561.5 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 5665.0 lb. PAN y. Overall PAN balance (w - x) = -5103 lb. PAN NARRATIVE Pumping wil I begin as soon asfield conditions are acceptable. Used2fields.