Loading...
HomeMy WebLinkAboutNCC231298_ESC Approval Submitted_20230505 ��� PITT COUNTY �1fi , ��� PLANNING DEPARTMENT 0 41 1, 4#„ e DEVELOPMENT SERVICES BUILDING 20 ,i @ 1717 W. 5th STREET .per GREENVILLE,NORTH CAROLINA 27834-1696 JAMES F.RHODES,AICP +&C'�'$� TELEPHONE:(252)902-3250 Assistant County Manager for Planning and Environment FAX: (252)830-2576 September 28, 2022 Re: Hobbs Farm Subdivision-Clearing and Grubbing Project Tracking#/ID: PC SESC 2022-13 Disturbed Acres: 12.0 Jones and Smith Contractors, LLC 112 W. Fire Tower Road Winterville, NC 28590 Dear Sir: This is to advise you that the Pitt County Technical Review Committee conditionally approved the soil erosion and sedimentation control plan for the Hobbs Farm Subdivision-Clearing and Grubbing on September 28, 2022, and hereby issue this Certificate of Approval. Conditions and requirements as a part of this approval are attached below. Copies of the draft minutes from the meeting will be available upon request prior to the next Technical Review Committee meeting. As stipulated on the financial responsibility form, you are responsible for ensuring compliance with all aspects of the approved plan and the Pitt County Soil Erosion and Sedimentation Control Ordinance. Your primary objectives include, but are not limited to, preventing offsite sedimentation, preventing sediment from entering watercourses, and establishing vegetation on all disturbed areas within 7-14 calendar days, following any completion of a phase of grading. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Please be aware that your project will be covered by requirements of the NPDES Construction Stormwater General Permit NCG010000. Please become familiar with all the requirements and conditions of this permit in order to achieve compliance. Upon discovery of noncompliance by our office, the following actions may be taken: 1. No further permits for building or other construction will be issued. 2. The authority to continue construction, other than for erosion control measures, will be terminated. 3. Penalties of up to $5000 per day may begin to accrue. Failure to immediately comply upon notice of noncompliance will result in injunctive and/or criminal action. Other Comments: 4. This erosion control plan shall expire three years following the date of approval if no land disturbing activity has been undertaken. 5. The Division of Water Quality may pursue legal action against you in order to enforce requirements of the NPDES, Phase II permit. 6. The Pitt County Soil Erosion and Sedimentation Control Ordinance authorizes County officials to inspect sites to ensure compliance with the Sedimentation Pollution Control Act. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Land disturbance shall not begin until a preconstruction meeting has taken place. An updated approval letter will be sent once the revised plans have been submitted and reviewed. Please provide a copy of the certificate of coverage prior to beginning any land disturbance. If you need further information or assistance, please contact me at(252) 902-3250. Sincerely, Ca14,10/54fitiOV Thomas Shrader Planner III CC: Ken Malpass, Malpass and Associates CONDITIONS AND REQUIREMENTS [Pitt County Planning] 1. Our records indicate a riparian buffer is located on portions the feature that runs through Parcel 15476. Please provide the determination paperwork if a determination has been done. A buffer determination is on file for Parcel 05266. 2. These plans show forest harvesting occurring within the riparian buffer and wetlands on Parcel 05266. Please note that Item 11 in the Neuse Riparian Buffer Rules must be followed, specifically the rules on harvesting within Zones 1 and 2. 3. All wetlands paperwork and permits must be submitted before or at the pre-con meeting. A wetland determination is on file. 4. A construction entrance may be needed for the eastern portion of Parcel#15476. 5. In the construction sequence on Sheet 1, Silt Fence should be placed before all clearing occurs. (Swap items 2 & 3) [General Comments] [Environmental Health] • There have been no septic applications made with Environmental Health for this property at this time. [Planning] • Soils located on site include Bb, Co, GoA, LyA, NrA,Nrb, Nrb2, and RaA,per the Pitt County Soil Survey, Sheet 63. • SwiftCreek Watershed • Soils are prime farmland or have statewide importance for farming. Development will remove the site from agricultural production. • The site is currently in woods. Development will remove the site from future timber production. • The adjacent drainage laterals should be cleaned out to their original bottom for improved drainage. • There are no records of drain tile but it is possible for some to be onsite. • This parcel is within the %mile VAD Buffer. • The following agencies have reviewed the SESC Plan for the HOBBS FARM SUBDIVISION-CLEARING AND GRUBBING and have no comments: • Pitt County Emergency Management • Southeastern Drainage • Engineering • NCDOT • The following agencies have reviewed the SESC Plan for the HOBBS FARM SUBDIVISION-CLEARING AND GRUBBING and have not returned comments: