Loading...
HomeMy WebLinkAboutCertificate of CompletionNorth Carolina Department of Environmental Quality | Division of Water Resources Asheville Regional Office | 2090 U.S. Highway 70 | Swannanoa, North Carolina 28778 828.296.4500 WR Project No.: DWR# 22-1305 County: Burke County Applicant: Andrew Gerber Project Name: Gerber, Mallard Cove Lot 9, 2251 Mallard Cove Dr Date of Issuance of 401 Water Quality Certification: October 7, 2022 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 and Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant’s authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant’s Certification I, Andrew Gerber, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: ______________________________ Date: May 4, 2023 Agent’s Certification I, _____________________________________, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: ______________________________ Date:_________________________________ If this project was designed by a Certified Professional I, ____________________________________, as a duly registered Professional ___________ (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: ______________________________________ Registration No. ________________ Date ____________________