From: Alsmeyer, Eric C CIV USARMY CESAW (USA) < Eric.C.Alsmeyer@usace.army.mil >
Sent: Thursday, April 27, 2023 8:51 AM
To: Boulos, Leila
Cc: Euliss, Amy; Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA); Wanucha, Dave;
Jones, Matthew W; Braquet, Stephanie
Subject: RE: [External] RE: U-2579AA permit modification for additional temporary impacts
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Thanks, Leila. That's what I needed.
Please reply or call if you have any questions or if I may serve you in any other way.
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure
we continue to do so, please complete the Customer Satisfaction Survey located
at https://regulatorV.ops.usace.army.mil/customer-service-survey/.
Eric
Eric Alsmeyer
Project Manager
Work Cell: 919.817.1570
Regulatory - WRDA / NCDOT BRANCH
US Army Corps of Engineers, Wilmington District
3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587
Office Tel: (919) 554-4884, x23 (I am working out of the office most days of the week, but I try to check my
voicemails daily)
Regulatory Homepage: http://www.saw.usace.army.miI/Missions/ReguIatorVPermitProgram.aspx
From: Boulos, Leila <Iboulos@ncdot.gov>
Sent: Wednesday, April 26, 2023 4:16 PM
To: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>
Cc: Euliss, Amy <aeuliss@ncdot.gov>; Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA)
<Stephen.A.Brumagin@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov>; Jones, Matthew W
<mwjones2@ncdot.gov>; Braquet, Stephanie <scbraquet@ncdot.gov>
Subject: [URL Verdict: Neutral][Non-DoD Source] RE: [External] RE: U-2579AA permit modification for additional
temporary impacts
Eric,
The purpose for the crossing is both for access and sediment control. The only way to access the pier location at Permit
Site 6 would either be down a very steep embankment that is on two sides of the existing stream. To access the pier
without the temporary pipe, it would require substantial grading to create an access road which would place more
steep, disturbed ground directly adjacent to the stream.
Let me know if we still need to revise, or if this explanation supports the description for Site 6 in the cover letter.
Thanks,
Leila Boulos, PE
Assistant Resident Engineer
Division 9, Winston-Salem 2 Construction
North Carolina Department of Transportation
336 747 7950 office
704 779 9897 mobile
Iboulos ncdot.gov
1151 N Martin Luther King, Jr. Drive
Winston-Salem, NC 27101
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: Alsmeyer, Eric C CIV USARMY CESAW (USA)<Eric.C.Alsmeyer@usace.army.mil>
Sent: Tuesday, April 25, 2023 11:01 AM
To: Jones, Matthew W <mwlones2@ncdot.gov>
Cc: Euliss, Amy <aeuliss@ncdot.gov>; Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA)
<Stephen.A.Brumagin@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov>; Boulos, Leila
<I bou los@ ncdot.gov>
Subject: [External] RE: U-2579AA permit modification for additional temporary impacts
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Matt: Thank you for working on this. It appears that the proposed temporary pipe crossing at Site 6 still doesn't match
the description of the purpose in the cover letter. Can you revise that or explain it if the purpose still fits (i.e., is the
purpose only for access?)?
Thank you.
Please reply or call if you have any questions or if I may serve you in any other way.
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure
we continue to do so, please complete the Customer Satisfaction Survey located
at https://regulatorV.ops.usace.army.mil/customer-service-survey/.
Eric
Eric Alsmeyer
Project Manager
Work Cell: 919.817.1570
Regulatory - WRDA / NCDOT BRANCH
US Army Corps of Engineers, Wilmington District
3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587
Office Tel: (919) 554-4884, x23 (I am working out of the office most days of the week, but I try to check my
voicemails daily)
Regulatory Homepage: http://www.saw.usace.army.miI/Missions/ReguIatorVPermitProgram.aspx
From: Jones, Matthew W <mwlones2@ncdot.gov>
Sent: Tuesday, April 25, 2023 10:17 AM
To: Alsmeyer, Eric C CIV USARMY CESAW (USA)<Eric.C.Alsmeyer@usace.army.mil>
Cc: Euliss, Amy <aeuliss@ncdot.gov>; Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA)
<Stephen.A.Brumagin@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov>; Boulos, Leila
<I bou los@ ncdot.gov>
Subject: [URL Verdict: Neutral][Non-DoD Source] RE: [External] RE: U-2579AA permit modification for additional
temporary impacts
Good morning Eric,
I spoke with the construction office yesterday to get some clarification on Permit Site 6. Based on their discussions with
the contractor on their operations and intent of the impacts, we offer the revised permit package. The only revision
occurs on page 33 of 34 in the pdf, this is Sheet 5 of the permit drawings. The revision shifts the location of the
proposed temporary pipe to reflect the location that the contractor proposed.
Please let me know if you have any other questions or concerns.
Thanks,
Matt
From: Alsmeyer, Eric C CIV USARMY CESAW (USA)<Eric.C.Alsmeyer@usace.army.mil>
Sent: Monday, April 24, 2023 12:03 PM
To: Jones, Matthew W <mwlones2@ncdot.gov>
Cc: Euliss, Amy <aeuliss@ncdot.gov>; Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA)
<Stephen.A.Brumagin@usace.army.mil>
Subject: [External] RE: U-2579AA permit modification for additional temporary impacts
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Matt: I understand Amy may be out. I am helping Steve Brumagin with this mod and I have a question. If you are the
one I should be asking, please give me a call at 919.817.1570. If you aren't the right one, would you please pass on my
request?
Thank you.
Please reply or call if you have any questions or if I may serve you in any other way.
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure
we continue to do so, please complete the Customer Satisfaction Survey located
at https://regulatorV.ops.usace.army.mil/customer-service-survey/.
Eric
Eric Alsmeyer
Project Manager
Work Cell: 919.817.1570
Regulatory - WRDA / NCDOT BRANCH
US Army Corps of Engineers, Wilmington District
3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587
Office Tel: (919) 554-4884, x23 (I am working out of the office most days of the week, but I try to check my
voicemails daily)
Regulatory Homepage: http://www.saw.usace.army.miI/Missions/ReguIatorVPermitProgram.aspx
From: Euliss, Amy <aeuliss@ncdot.gov>
Sent: Friday, March 24, 2023 11:08 AM
To: Brumagin, Stephen A (Steve) CIV USARMY CESAW (USA) <Stephen.A.Brumagin@usace.army.mil>; Wanucha, Dave
<dave.wanucha@ncdenr.gov>
Cc: Marciniak, Katherine J <kimarciniak@ncdot.gov>; Barrett, William A <wabarrett@ncdot.gov>; Boulos, Leila
<Iboulos@ncdot.gov>; Hedrick, Kevin R <krhedrick@ncdot.gov>; Wyrick, Scott D <sdwyrick@ncdot.gov>; Brown, Klint
<kbrown@flatironcorp.com>; Alsmeyer, Eric C CIV USARMY CESAW (USA)<Eric.C.Alsmeyer@usace.army.mil>
Subject: [Non-DoD Source] U-2579AA permit modification for additional temporary impacts
Dave and Steve,
Please find the attached permit medication submittal for U-2579AA. I have also linked it here on the project connect
site. This is submittal results in an increase in temporary impacts. Please let me know if you have any questions.
Amy Euliss
Division 9 PDEA Engineer
North Carolina Department of Transportation
336 747 7802 office
aeuliss ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
mow*
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.