Loading...
HomeMy WebLinkAbout20230611 Ver 1_PMR 2-16-23_20230420From: Doliber, Brian C To: 401PreFile Subject: Ocracoke Ferry Terminal H-Pile Install Date: Thursday, February 16, 2023 12:25:00 PM Attachments: imaoe001.ono The Ferry Division is planning to install 2 H-piles behind each ramp at the Ocracoke Ferry Terminal (4 total) in order to stabilize the ramp and gantries that have started to lean forward. A metal beam would be welded in place from the pile to the gantry to support it. Brian Doliber Environmental Program Supervisor/Facility Maintenance Coordinator Ferry Division 252 232 8025 mobile 252 621 6251 office bcdoliberO)ncdot.clov 159 Lucinda Lane Powells Point, INC 27966