HomeMy WebLinkAbout20230611 Ver 1_PMR 2-16-23_20230420From:
Doliber, Brian C
To:
401PreFile
Subject:
Ocracoke Ferry Terminal H-Pile Install
Date:
Thursday, February 16, 2023 12:25:00 PM
Attachments:
imaoe001.ono
The Ferry Division is planning to install 2 H-piles behind each ramp at the Ocracoke Ferry Terminal (4
total) in order to stabilize the ramp and gantries that have started to lean forward. A metal beam
would be welded in place from the pile to the gantry to support it.
Brian Doliber
Environmental Program Supervisor/Facility Maintenance Coordinator
Ferry Division
252 232 8025 mobile
252 621 6251 office
bcdoliberO)ncdot.clov
159 Lucinda Lane
Powells Point, INC 27966