Loading...
HomeMy WebLinkAboutWQCS00312_NOI_NOV2021DV0041_Response_20210210 (5)S CITY OF KING *J&CSoo 356 Jack Warren, Mayor Homer Dearmin, City Manager Scott Barrow, City Engineer P.O. Drawer 1132 King, NC 27021-1132 Lon T. Snider, Regional Supervisor Environmental Receive FEB 16 2021 Winston-Salem NCDEQ DWR Regional Office 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Re.: eleti OV-2021-67-0044 229 S. Main Street Telephone (336) 983-8265 Lon T. Snider: The purpose of this letter is to respond to your letter for Permit # WQCS00350 dated 1-25-21 and received on 2-1-21. Your letter requested that we address the causes of the SSO, remedial actions, and all other actions taken to prevent the recurrence of this SSO. Causes: Hurricane Zeta created a power outage, the automatic transfer switch functioned correctly and we ran on generator power. The generator ran until one of the two belts broke. This generator is exercised weekly and it was just bad luck that the next time it ran we had belt failure. Remedial Actions: we had no generator replacement belts at that time for this generator, so we got a closed business to open for us to get a standard belt. The difficult belt replacement was performed and we got back on generator power. The generator ran again until the other belt broke. We then got the generator company to supply us with a matching belt set for generators and the difficult belt replacement was performed again. Prevent recurrence actions: we now have additional matching generator belts on hand at our maintenance shop. In the future, both belts will always be replaced at the same time and on a schedule. Please let me know if you have any issues or concerns with our resolutions listed above. Sincerely, J T. Scott8arrow, PE, PLS City Engineer Mayor Pro -Tern Rick McCraw Charles Allen Wesley Carter Terri Fowler