LETTER OF APPROVAL —EROSION CONTROL PLANS
McCord Road Development, LLC
ATTN: Mr.Anthony Nelson
150 South Fifth Street, Suite 2675
Minneapolis, MC 55402
ARCO National Construction
2137 South Boulevard, Suite 200
Charlotte, NC 28203
RE: Project Name: McCord Road Industrial - NCDOT Road Improvements
Disturbed Acres Approved: 5.44 acres (Total), 1.32 acres in Catawba Basin,
4.12 acres in Yadkin Pee Dee
Project ID: 445864
County: Mecklenburg
City: Huntersville
Address: 11607 McCord Road
River Basin: Catawba,Yadkin Pee Dee
Stream Classification: WS-IV (Catawba), C (Yadkin Pee Dee)
Submitted By: Matt Mobley
Date Accepted for Review: January 30, 2023
Plan Type: Minor changes to approved plans, Construction Documents
Dear Mr.Anthony Nelson,
This office has reviewed the subject erosion and sedimentation control plan. We find
the plan to be acceptable and hereby issue this Letter of Approval as Noted. The
Certificate of Approval must be posted at the job site. This plan shall expire three (3)
years following the date of approval, if no land disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129.
Letter of Approval
McCord Road Development, LLC
February 21, 2023
Page 2 of 3
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under
the NCG010000 Construction General Permit. After the form is reviewed and found to be
complete,you will receive a link with payment instructions for the $100 annual permit
fee. After the fee is processed,you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project,you MUST obtain the
COC prior to commencement of any land disturbing activity. The eNOI form maybe
accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form
to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this
project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,
requiring protection of existing natural resources and adjoining properties. If,
following the commencement of this project, it is determined that the erosion and
sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-
51 through 66), this office may require revisions to the plan and implementation of
the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with
Federal and State water quality laws, regulations, and rules. In addition, local city or
county ordinances or rules may also apply to this land-disturbing activity. This
approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information
provided in the Financial Responsibility Form, which you provided. You are
requested to file an amended form if there is any change in the information included
on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project.
No work shall begin on site prior to the pre-construction meeting. Please contact the
Town of Huntersville Erosion Control Coordinator,Anne Loftin at (704) 579-1090, or via
Letter of Approval
McCord Road Development, LLC
February 21, 2023
Page 3 of 3
email at aloftin@huntersville.org to set up a pre-construction meeting after providing the
revised FRO form (original copy/wet signatures) reflecting updated disturbed area, after
providing the Recorded PC019 Form, and after obtaining your Certificate of Coverage
(COC) from NCDEQ. Please refer to the attached Fact Sheet for additional information.
The Financially Responsible Owner (FRO) is responsible for ensuring this project meets all
federal, state, and local town codes, ordinances and standards.
Approved and stamped plans are accessible through the "Approved Package" section in
EPM for print. Please keep one set of stamped plans onsite at all times.
Your cooperation is appreciated.
Sincerely,
.-‘ ,/,/,‘/_______
Eian Fowler, PE
Engineering Project Manager
Enclosures: e-NOI Tips for Applicants
NPDES NCG01 Fact Sheet
Huntersville Sediment and Erosion Control Ordinance
cc: Town of Huntersville Planning Department- Brian Richards
Town of Huntersville Engineering-Eian Fowler
Town of Huntersville Construction Engineer-Kevin Garton
Town of Huntersville Erosion Control Coordinator-Anne Loftin
Town of Huntersville Executive Assistant Engineering-Kim Behrenbrinker
Town of Huntersville Land Development Inspector-Cecil Talbot
Mecklenburg County GIS-Angela Norward
Design Resource Group-Matthew Mobley
File Path: M:\PLANNING\Commercial Site Plans\McCord Road Industrial-NCDOT Road
Improvements\2. RTAP# 1 (#445864)\Approved Package(#445864)