Loading...
HomeMy WebLinkAbout20130800_Emails_20150323Wanucha, Dave From: Wanucha, Dave Sent: Monday, March 23, 2015 5:22 PM To: 'Stacey Triplett' Subject: RE: Hackett Town Rd �7"1. r !� Dave Wanucha NC DENR Winston Salem Region Office NC Division of Water Resources Transportation Permitting Unit 450 W. Hanes Mill Rd, Suite 300 Winston�Salem, NC 27105 Cell (336) 403�5655 Office (336) 776�9703 Dave. Wanucha(r�ncdenr.gov E-mail corr�spond�nc� to and from this addr�ss may b� subj�ct to th� North Carolina Public R�cords Lavv and may b� disclos�d to third parti�s. From: Stacey Triplett [mailto:sdtripCa�wilkes.net] Sent: Monday, March 23, 2015 5:06 PM To: Wanucha, Dave Subject: Hackett Town Rd Hey Dave, hope you are doing well. Dave I hate to keep on with this but at what point is anyone going to do what they have been instructed to do? You ask on Thursday for it to be done and nothing as of the end of today. See the pictures from today. On March 12th this is what I received. I am the DOT's roadside environmental technician who will be monitoring this project for any erosion and sedimentation issues. I appreciate your concern about the erosion potential on the project. All necessary right of ways have been previously donated for the project and there is an approved erosion and sedimentation plan. Current operations on site are clearing the trees/brush from the project's right of way. The clearing stage typically does not require erosion control measures to be installed because no land disturbing activities are occurring. However, the pathway made by the equipment has disturbed the ground and is a potential risk of eroding. I have instructed for the perimeter erosion control devices to be installed around any area of ground disturbance. Thank you for looking into this and I am looking forward to meeting with you again this week. Stacey Triplett