HomeMy WebLinkAboutNC0029190_NOI_NOV2021PC0580_Response_20211206NC D.
Envirc :
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
Roy COOPER
GOVERNOR
DATE:
December 6, 2021
CASE NO.:
NOV-2021-PC-0580
COUNTY:
Surry
SUBJECT:
Corrective Action
Mr. Lon T. Snider, Regional Supervisor
Water Quality Regional Operations Section
Winston-Salem Regional Office
NC Department of Environmental Quality
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105-7407
Dear Mr. Snider
J. ERIC BOYETTE
SECRETARY
This letter is in response to your letter dated November 29, 2021 to Division Engineer M. A. Pettyjohn
regarding compliance at the Surry County Rest Area/Welcome Center.
The following is a list of corrective actions being taken for the purpose of being in compliance with
permit number NCO029190 that has been issued to the NC Department of Transportation to operate the
Surry County wastewater treatment plant located on Interstate 77 at the Surry Rest Area/Welcome Center.
As noted in your letter the eDMRs had not been completed since November 2020. Our previous ORC,
retired, entered the eDMRs for November 2020 thru June 2021 with the exception of April 2021;
however, they were not validated/certified, and thus are not complete. We have found that once a report
has been started by another user the system will not allow us to view or make any updates to that report. If
you could offer any assistance with this issue, it would be greatly appreciated. As of December 3, 2021,
reports from April 2021, and July to October 2021 are entered and validated/certified.
In regard to the AtC permit, on March 3, 2021, the Department of Transportation was notified by an email
from Min Xiao, Environmental Engineer NPDES Industrial Permitting, NC DEQ / Division of Water
Resources / Water Quality Permitting that the scope of work did not require such a permit and that it
would be considered maintenance work. Please see the attached email.
If you have any questions, please contact me at 336-903-9243
Sincerely \
Ramie Wood C-�\,
Division Roadside Engineer
Attachment: Email from Min Xiao
cc:. Michael A. Pettyjohn, PE, Division Engineer
Wayne O. Atkins, PE, Division Project Development Engineer
Jimmy Parrish
Wood, Jamie D
From: Xiao, Min
Sent: Wednesday, March 3, 2021 2:33 PM
To: Stankiewicz, Paul
Subject: RE: Surry County WWTP Refurbishment
Paul,
Based on the project description provided, the proposed work at the facility can be considered as maintanance work. As a result, an ATC permit is not requried in
this case. I just realized Kevin Heath with The Lane Group asked me the same question yesterday as well, but he just provided generic info without disclosing the
facility's name. I do appreciate you providing much more detailed info which is very helpful.
Thanks again for the inquiry and have a nice day.
Min Xiao, El
Environmental Engineer
NPDES Industrial Permitting
NC DEQ / Division of Water Resources / Water Quality Permitting
919-707-3644
min.xiao()ncdenr.aov
512 North Salisbury St.
1617 Mail Service Center, Raleigh, NC, 27699-1617
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: Stankiewicz, Paul <pstankiewicz@ncdot.gov>
Sent: Wednesday, March 3, 202112:47 PM