Loading...
HomeMy WebLinkAboutNCC192771_NOT Closeout Documents_20230420 FINAL INSPECTION REPORT Town of Huntersville- Land Development 105 Gilead Rd, Ste 300, Huntersville NC 28078 (704)-875-7007 Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)should be requested by the permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination Process. NCGO1 COC# NCC192771 Project Name Stoneybrook Station Financially Responsible Owner(FRO) Meritage Homes of the Carolinas, Inc. FRO Address 13925 Ballantyne Corporate Place,Ste.300 Charlotte, NC Project Location 12150 Hambright Rd Huntersville, NC River Basin/Watershed McDowell EC Final Inspection Date 3/10/2023 Start Time 12:00 PM Time 12:30 PM Inspector Name Anne Loftin Others Present n/a Weather Conditions Sunny Soil Conditions Workable Onsite Contact Made No Name Title/Company Report Sent Yes See dispatch list at bottom of report Erosion/Sediment measures removed? Yes Site Permanently Stabilized? Yes Comment BMP's Installed Per Approved Plan? Yes As-Built BMP Project# 434275 approved 2/14/23 FINAL INSPECTION COMMENTS Project is completed,stable and the erosion measures removed. Punch list from pre-final inspection appears to have been addressed. Owner given the Declaration document and maintenance bond approved. Site visit 2/8/23 showed all BMPs functioning. BMP maintenance items conveyed to owner as well as owner annual compliance inspection guidance document. DISPATCH LIST Brower,Taylor<taylor.brower@meritagehomes.com>; 'Christian Caldwell (ccaldwell@ckcdllc.com)'; Brower,Taylor <taylor.brower@meritagehomes.com>; Roger Wood <rwood@ckcdllc.com>; Kim Behrenbrinker <kbehrenbrinker@huntersville.org>; Collins, Brian <Brian.Collins@meritagehomes.com> 1 of 1 Report Date: 3/28/2023