HomeMy WebLinkAboutNCC192771_NOT Closeout Documents_20230420 FINAL INSPECTION REPORT
Town of Huntersville- Land Development
105 Gilead Rd, Ste 300, Huntersville NC 28078
(704)-875-7007
Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)should be requested by the
permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of
Termination Process.
NCGO1 COC# NCC192771
Project Name Stoneybrook Station
Financially Responsible Owner(FRO) Meritage Homes of the Carolinas, Inc.
FRO Address 13925 Ballantyne Corporate Place,Ste.300 Charlotte, NC
Project Location 12150 Hambright Rd Huntersville, NC
River Basin/Watershed McDowell
EC Final Inspection Date 3/10/2023 Start Time 12:00 PM Time 12:30 PM
Inspector Name Anne Loftin
Others Present n/a
Weather Conditions Sunny Soil Conditions Workable
Onsite Contact Made No Name
Title/Company
Report Sent Yes See dispatch list at bottom of report
Erosion/Sediment measures removed? Yes
Site Permanently Stabilized? Yes
Comment
BMP's Installed Per Approved Plan? Yes
As-Built BMP Project# 434275 approved 2/14/23
FINAL INSPECTION COMMENTS
Project is completed,stable and the erosion measures removed. Punch list from pre-final inspection appears to have been addressed.
Owner given the Declaration document and maintenance bond approved. Site visit 2/8/23 showed all BMPs functioning. BMP
maintenance items conveyed to owner as well as owner annual compliance inspection guidance document.
DISPATCH LIST
Brower,Taylor<taylor.brower@meritagehomes.com>; 'Christian Caldwell (ccaldwell@ckcdllc.com)'; Brower,Taylor
<taylor.brower@meritagehomes.com>; Roger Wood <rwood@ckcdllc.com>; Kim Behrenbrinker
<kbehrenbrinker@huntersville.org>; Collins, Brian <Brian.Collins@meritagehomes.com>
1 of 1
Report Date: 3/28/2023