Loading...
HomeMy WebLinkAboutNCC190029_NOT Closeout Documents_20230418 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200 County: Lee Project: PROVIDENCE LANDING River basin: Cape Fear Person financially responsible:Harrington Properties of NC,LLC-Brandon Project#: LEE-2017-013 Harrington Address: 2659 SAN LEE DR,SANFORD NC 27330,Sanford, 1. Project Location: Farrell Rd,Deep River Township Pictures: Yes-Digital 2. Weather and soil conditions: Sunny and Dry-Workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): N/A Title: N/A Inspection report: Sent Report Date given/sent: April 12,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Celina Amaya Others present: N/A Date of inspection: April 12,2023 Time arriving on site: 12:00 PM Time leaving site: 12:10 PM CC: