HomeMy WebLinkAbout20221796 Ver 1_Correspondence_20230426ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Director
MEETING
DATE
NORTH CAROLINA
Environmental Quality
April 24, 2023
Project Ocean —Sound Timber Management LLC
DWR Project # 20221796
DWR January 6, 2021 Buffer Call NBRRO #20-391
Field Review of previously documented GPS Coordinates for Start Point 1 for
Stream Feature B
April 11, 2023
ATTENDEES: Sue Homewood, DWR
Chris Smith, DWR
Jeff Harbor, Terracon
David Parker, DC Insight LLC
Mike Kane, Capital Civil
DWR issued a Buffer Determination Letter to Sound Timber Management LLC on January 6, 2021. The
letter identified two portions of Feature B which were subject to the Neuse River Buffer Rules. It was
brought to the Division's attention that there appeared to be an error in the coordinates listed for Stop
Point 1 of Feature B in the Buffer Determination Letter. The purpose of the site visit was to ensure that
all parties were clear on what portion of Feature B was determined to be subject to the Neuse River
Buffer Rules by DWR during the site visit conducted on December 23, 2020.
The attendees walked to the US Army Corps of Engineers Jurisdictional Determination start point of
Feature B. The attendees then walked upstream to the start point 1 of the Neuse Buffer subjectivity as
previously identified by DWR staff. Although there was an error in GPS coordinates for the stop point 1
of Feature B in the January 6, 2021 DWR buffer determination letter, the site visit confirmed that the
coordinates for start point 1 of Feature B was accurately identified in DWR January 6, 2021 buffer
determination letter.
North Carolina Department of Environmental Quality I Division of Water Resources
4NORT�HCv 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611
NORTHCAROUNA 919.707.9000
Department ofEnvlronmantal Duali�