HomeMy WebLinkAboutSWA000200_Application Form_20230420DEMLR USE ONLY
Date Received
Fee Paid
Permit Number
SW Program(s): ❑ Coastal SA-HQW ❑ Coastal SA-ORW ❑ Coastal FW-ORW ❑ Coastal Other
❑ Non -coastal HQW ❑ Non -coastal ORW ❑ Urbanizing Areas ❑ USMP
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER FAST TRACK PROCESS:
"AUTHORIZATION TO CONSTRUCT" (ATC) PERMIT APPLICATION FORM
Link to Application Instructions
A. ELIGIBILITY FOR FAST -TRACK PERMITTING
To be considered for a Fast Track ATC Permit, all of the items below must be checked. If any item cannot
be checked, then the project must apply under the Standard Permitting Process.
® The project and all SCMs (including existing SCMs associated with the project) will meet all applicable
requirements of 15A NCAC 02H .1000 - .1062, including the Minimum Design Criteria (MDC), upon project
completion.
® The project is not proposing an alternative design.
® The project is not claiming an exemption from the MDC based on vested rights, a waiver or a Director's
Certification.
® The project is not out of compliance with an existing stormwater permit or any other environmental permit
® The project is not applying for an offsite permit, an exemption, or a minor modification (as defined in 15A
NCAC 02H .1002(25)) to an existing state stormwater permit.
® The project application bears the signature and seal of a professional licensed pursuant to either Chapter 89A
or 89C of the NC General Statutes.
® I understand that at project completion, an application with the as -built stormwater plans (as described in 15A
NCAC 02H .1044 must be submitted, and DEQ will review the as -built stormwater plans to confirm
compliance with the MDC. Approval of the as -built stormwater plans will be required before the Erosion and
Sedimentation Control Plan for the project may be closed out.
® I understand that the Fast Track ATC Permit will expire five years after the date of issuance.
B. GENERAL INFORMATION
1 Project Name: Stapleton Subdivision
2. Previous Project Name (if applicable):
3. Location of Project (street address): 5609 & 5601 PHELPS FARM ROAD
City: UNINCORPORATED County: FORSYTH Zip:27012
4. Directions to project (from nearest major intersection):
1325 FT NORTH FROM THE INTERSECTION OF
NCSR# 2998 AND NCSR# 2996 TOWARD NCSR# 2995.
5. Latitude:350 59' 38" N Longitude:-800 20' 43" W of the main entrance to the project.
C. PERMIT INFORMATION
1. Specify whether project is (check one):
® New, no previous application
❑ New, replacing a previous Fast Track ATC Permit -- provide previous permit number: SWA
By choosing this option, you are also requesting that DEQ rescind the previous Fast Track ATC Permit
upon issuance of the new Fast Track ATC Permit.
Stormwater Fast Track ATC Application Form Page 1 of 9 Feb. 10. 2018
❑ Major Modification, replacing an existing stormwater permit — provide existing permit number: SW
Status of construction? ❑ Not Started ❑ Partially Completed ❑ Completed
Major modifications must be submitted by the original permittee and are allowed only if the SW permit is
not expired. Minor modifications must use Standard Permitting Process. By choosing this option, you
are also requesting that DEQ rescind the previous SW Permit upon issuance of the new Fast
Track ATC Permit.
❑ Transfer of existing Fast Track ATC Permit — provide existing ATC permit number: SWA
Applicable state stormwater program(s) (check all that apply):
❑ Coastal SA-HQW ® Urbanizing Areas (Phase 2)
❑ Coastal SA-ORW ❑ Non -Coastal HQW
Is any portion of the project within 575 feet
of SA-ORW waters? ❑ Yes [:]No ❑ Non -Coastal ORW
❑ Coastal Freshwater ORW ❑ USMP
❑ Coastal — Other
3. Other Permits (as applicable; write "NA" for those permit types that are not applicable):
Project Name
PermitiAppl
Issue Date
Other Information
No.
CAMA Major
NA
NA
Erosion &
Sedimentation Control
Under review with COWS
Disturbed Area 42.7
acre
NPDES Industrial
NA
NA
Stormwater
404/401 Permit
The Stapleton
SAW-2021-
06/08/2022
Proposed Impacts
0010fi
203 Iflac
4. Local jurisdiction for building permits: FORSYTH COUNTY
Point of Contact: PLANNING AND DEVELOPMENT INSPECTIONS DIVISION
Phone #: 336 727-2624
D. CONTACT INFORMATION
1. Applicant/Financially Responsible Party (may be an Organization):CLAYTON PROPORTIES GROUP INC
Signing Official Name & Title:WILL DERRICKSON-LAND DEVELOPMENT MANAGER
Street Address:221 JONESTOWN
City:WI NSTON-SALEM State:NC Zip:27104
Mailing Address (if different):
City: State:
Phone: 336231-6767 Fax:
Email: wderrickson(@mungo.com
Zip:
2. If the Applicant is a Corporation or LLC (Address must match address on file with NC Dept of the Secretary of
State):
Name of Registered Agent:LINDA PONCE
Mailing Address:PO BOX 4098
City:MARYVILLE State:TN Zip:37802
Phone: 336 231-6767 Fax:
Email:wderrickson mun o.com
Stormwater Fast Track ATC Application Form Page 2 of 9 Feb. 10, 2018
The Applicant is the (check all that apply):
® Property Owner
❑ Lessee (Attach a copy of the lease agreement & complete Item 4.)
❑ Purchaser (Attach a copy of the pending sales agreement & complete Item 4.)
❑ Developer (Attach a copy of the development agreement & complete Item 4.)
4. If the Applicant is NOT the Property Owner (skip to Item 5 if the Applicant 1S the Property Owner):
Property Owner Name/Organization:
Signing Official & Title:
Street Address:
City: State:
Mailing Address (if applicable):
City:_
Phone:
Email:
Zip:
State: Zip:
Fax: ( )
The licensed Design Professional that will be retained for the duration of the project, who may provide
information on the Applicant's behalf, and who will prepare and certify the as -built package:
Consulting Engineer/Landscape Architect:Joseph O'Buch
Consulting Firm: GREEN MOUNTAIN ENGINEERING, PLLC
Mailing Address.-1 A WENDY CT,
City:GREENSBORO State:NC Zip:27409
Phone: 336 294-9394 Fax: ( }
Email: ioe reenmountainen ineers.com
6. [OPTIONAL] If you would like to designate another person to answer questions about the project:
Name & Title:
Organization:
Mailing Addre
City:
Phone:
Email:
E. PROJECT INFORMATION
1. Specify the type of project (check one): ® Low Density
State:
Fax:
❑ High Density
Zip:
2. Briefly summarize how the stormwater runoff will be treated/conveyed:
THE RUNOFF WILL TRAVEL THROUGH OPEN CHANNELS AND PIPES CONNECTING THE CHANNELS
BEFORE EXPELLING INTO EXISTING ON SITE WETLANDS
3. Stormwater runoff from this project drains to the YADKIN PEE-DEE River basin(s).
4. Receiving water information if more than 3 receiving waters, provide additional information on an attached sheet
Receiving
Water 1
Receiving
Water 2
Receiving
Water 3
Receiving Stream Name
MUDDY CREEK
Stream Classification
C
Stream Index Number
12-94-(0.5)
Stormwater Fast Track ATC Application Form Page 3 of 9 Feb. 10, 2018
5. Project area and density information:
Total Property Area
2631460 sf
Total Surface Water Area
53923 sf
Considered to include:
• the normal pool of impounded structures,
• the area between the banks of streams and rivers; and
• the area below the Normal High Water (NNW) line or Mean High Water (MHW) line.
Total Coastal Wetlands Area
0 sf
Considered to include: coastal wetlands landward from the NHW (or MHW) line.
Total Project Area
2577537 sf
Excludes the surface water area and coastal wetland area identified above.
May or may not be the same as Property Area.
Built -Upon Area (BUA) associated with Existing Development
6243 sf
"Existing development" means those projects that are built or those projects that have established a
vested right under North Carolina law as of the effective date of the state stormwater program or
applicable local government ordinance to which the project is subject.
Proposed New BUA
615457 sf
Includes proposed new BUA that is not associated with existing development.
"BUA" is defined in N. C. G. S. 143-214.7(b2). It includes, but is not limited to: buildings, roads, parking
areas, sidewalks, and some gravel areas. The design volume of SCMs must take into account the runoff
from build out from all surfaces draining to the SCM in accordance with 15A NCAC 02H .1050(1).
Project Density
w/ Existing Development: Project Density = (New BUAJ/(Total Project Area — Existing BUAJ x 100 or
23.93 %
w/o Existing Development: Project Density = [New BUA]/Total Project Area] x 100
6. Anticipated construction start date 6115I2023
7. Is the project located within 5 miles of a public airport? ® No ❑ Yes
If `Yes,' see S.L. 2012-200, Part Vk http://www.ncleg.net/Sessions/201 1 /Bills/Senate/PDF/S229v6.df and
DEQ Stormwater Design Manual Chapter E-4 Airports.
8. For projects in Union County: Contact DEMLR Central Office Stormwater staff at 919-707-9200 to determine
if the project is located within a Threatened & Endangered Species watershed that may be subject to more
stringent stormwater requirements per 15A NCAC 02B .0600_
Stormwater Fast Track ATC Application Form Page 4 of 9 Feb. 10, 2018
F. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQWI013W). Only application packages that include
all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package:
Initials
�la 1. Two original signed hard copies and one electronic copy of this State Stormwater Fast Track
Process "Authorization to Construct" (ATC) Permit Application Form.
yvv— 2. Permit application processing fee of $505 payable to NCDEQ.
14 3. Two hard copies and one electronic copy of a USGS map identifying the project location
and GPS coordinates for the project. If the receiving water is Class SA or the receiving water
drains to Class SA waters within '/2 mile of the project boundary, include the 'h mile radius
on the reap. If the project is within 575 feet of Class SA-ORW waters, include the 575-foot
radius on the map.
4. Two original signed hard copies and one electronic copy of a site plan depicting the boundary
of the project or project phase currently being permitted, including the locations of SCMs,
streams, wetlands, and buffers.
5. Two hard copies and one electronic copy of a construction sequence that discusses how any
Al future development on the project may be phased.
' Il 6. A copy of the most current property deed. Deed book: 3605 Page No: 2762
7. [IF APPLICABLE] When the applicant is a corporation or a limited liability corporation (LLC): Provide
two hard copies and one electronic copy of documentation from the NC Secretary of State, or other
official documentation, which supports the titles and positions held by the persons listed
in Section C.2 per 15A NCAC 2H. 1043(3)(b). The corporation or LLC must be listed as an active
corporation in good standing with the NC Department of the Secretary of State, otherwise, the
application will be returned. https:llwww.sosnc.aov/search/index/corD
B. [IF APPLICABLE] When the applicant is a Partnership or other person engaging in business under
an assumed name, attach a copy of the Certificate of Assumed Name.
9. [IF APPLICABLE] When the applicant is not the property owner: Provide two hard copies and one
electronic copy of lease agreements, affidavits, pending sales agreement, development agreement,
or other documents showing that the applicant has obtained legal rights to submit a stormwater
permit application within the proposed project area.
10. [IF APPLICABLE] If modifying an existing permit for completed or partially completed projects, a copy
of the designer's certification.
Stormwater Fast Track ATC Application Form Page 5 of 9 Feb. 10, 2018
G. CERTIFICATION OF APPLICANT/ FINANCIALLY RESPONSIBLE PARTY
The Applicant, who is also the Financially Responsible Party, identified in Section D of this form must sign and have
notarized the following guaranty:
I, (print or type name of Applicant/Financially Responsible Party) CLAYTON PROPOR TIES GROUP, INC
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that:
1, the design has been or will be completed in accordance with the MDC as set forth in Rules 15A NCAC
02H .1050 through .1062, to the best of my knowledge;
2. the completed design meets or will meet the MDC and that the percentage BUA that is the basis for the
design shall not be exceeded, to the best of my knowledge, and
3. As the applicant, I shall maintain a licensed professional of record for the duration of the project
who will prepare and certify the as -built package. If I retain another licensed
professional before the project is complete, then I shall provide an updated
guaranty with the current licensed professional's seal. A licensed professional shall inform
the Division if he is no longer associated with this project.
The above information is true and correct to the best of my knowledge and belief and was provided by me under oath I
agree to provide corrected information should there be any change in the information provided herein.
5
0mcs 14 art S% r'I _SeUe'7»
Type or print name
Title or Authority
7A?J6,7
Date
a Notary Publ' for the State of A&A Qb n n
County of do hereby certify that
personally appeare before me this 1 day of ,2023 , and acknowledge the
due ex tion f the a licatio f tormw er p it. Witness my hand and official seal,
KIMBERLY L NICHOLS
NOTARY PUBLIC
FORSYTH COUNTY
STATE OF NORTH CAROLINA
912Z 2,
y commission expires J
Stormwater Fast Track ATC Application Form Page 6 of 9 Feb. 10, 2018
H. DESIGN PROFESSIONAL'S CERTIFICATION
To be completed by the Design Professional identified in Section D.5.
I, Joseph O`Buch , attest to the following:
1. This application has been reviewed by me and is accurate and complete, to the best of my knowledge;
2. The design has been completed in accordance with the MDC as set forth in Rules 15A NCAC 02H
.1050 through .1062, as applicable;
3. The percentage built -upon area that is the basis for the design will not be exceeded; and
4. 1 have the expertise, education, and experience required to design the SCMs proposed in this
application in accordance with the MDC as set forth in Rules 15A NCAC 02H .1050 through .1062.
5. 1 will provide all documents and certified as -built plans in hard copy and electronic format related to
this permit to a new Applicant/Property Owner and to DEMLR upon transfer of this permit to a new
Applicant/Property Owner.
Note: In accordance with N.C.G.S. 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. In addition, any person
who knowingly makes any false statement, representation, or certification in any application may be reported to
the appropriate NC professional licensing board.
Signature:
SEAL
Date: 3II
Stormwater Fast Track ATC Application Form Page 7 of 9 Feb. 10, 2018
STORMWATER MANAGEMENT NARRATIVE
Stapleton Subdivsion
Phase 1 & 2
Forsyth County, NC
CLIENT:
CLAYTON PROPERTIES GROUP, INC.
CONTACT: WILL DISCKERSON
221 JONESTOWN ROAD
WINSTON-SALEM, NC 27104
WDERRICKSON MUNGO.COM
336-979-4054
March 1, 2023
Revised: March 10, 2023
Project No. 20-058
Joseph O'Buch, P.E.
Green Mountain Engineering, PLLC
joe@greenmountainengineers.com
7A Wendy Court
Greensboro, 27409
(336) 294-9394
3/10123, 8:39 AM
North Carolina Secretary of State Search Results
• File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online -
Add Entity to My Email Notification List • View Filings • Print a Pre -Populated Annual Report form • Print
an Amended a Annual Report form
Business Corporation
Legal Name
Clayton Properties Group, Inc.
Prev Legal Name
Clayton Properties, Inc.
Prev Legal Name
CMH Parks, Inc.
Information
Sosld: 0296674
Status: Current -Active O
Date Formed: 11/21/1991
Citizenship: Foreign
State of incorporation: TN
Fiscal Month: December
Annual Report Due Date: April 1 Sth
Currentgnnual Report Status:
Registered Agent: CT Corporation System
Addresses
https://www.sosnc.gov/online_services/search/Business_Registration_ResuIts 112