HomeMy WebLinkAboutSWA000198_Construction Sequence_20230419Richard L. Modlin, P.E.
Civil Engineer
7215 Terrace Drive, Charlotte, NC 28211
Phone: 980-322-4191
richardmodlinAatt.net
Date: March 23, 2023
By: Richard L. Modlin, PE
Proj: State Stormwater Fast Track ATC Permit Application
Rehobeth Flex Space — 216 Rehobeth Road, Waxhaw
Union County
Re: Construction Sequence
GENERAL CONSTRUCTION SEQUENCE FOR PROJECT:
1. INSTALLATION OF TEMPORARY EROSION & SEDIMENTATION CONTROL MEASURES
2. GRADING AND STABILIZATION OF ENTIRE SITE
3. CONSTRUCTION OF RETAINING WALLS
4. CONSTRUCTION OF BUILDINGS AND PARKING
5. INSTALLATION OF STORM DRAINAGE
6. CONSTRUCTION OF STORMWATER CONTROL MEASURES (SCM)
7. INSTALLATION OF WATER AND SEWER
8. CONSTRUCTION OF NEW ENTRANCE ON REHOBETH RD
9. INSTALLATION OF LANDSCAPING
THIS PROJECT WILL DEVELOP THE ENTIRE SITE AS SHOWN ON SITE PLAN, (SHEET SP-1, DATED 03/23/23)
IN A SINGLE PHASE. THERE WILL BE NO FUTURE DEVELOPMENT ON THE PROPERTY FOLLOWING THIS
PROJECT.