Loading...
HomeMy WebLinkAboutNCC192042_NOT Signed Certification_20230405 HiC6,01 N©Y kC of I crrnEi9C(ai lu'Li ([110Til Cerr cai lIo[I"u Form Print this form, complete, scan and upload to the electronic NOT(Rescission)form. Then, mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 6th Floor 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM YOU MAiL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL)[40 CFR 122.22) General Permit Certificate of Coverage (COC) No.: NCC192042 Name of Project: Reflection Pointe Per NC General Statute 143-215.6E(i), any person who knowingly makes any false statement, representation, or certification in any application, record, report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge and belief, such information is true,complete, and accurate. Legally Responsible Organizational Entity: Southwood Realty Company *Legally Responsible Person: William E. Ratchford Title of Legally Responsible Person: Vice President *Signature: Dater\5 \ Print Name and Title of Signed (only if authorized individual signing differs from Legally Responsible Person): * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president,secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,Section B, Item (6)of the NCG010000 permit. For more information on signatory requirements,see Part iV,Section B, Item (6)of the NCG010000 permit.