Loading...
HomeMy WebLinkAboutNCC231071_ESC Approval Submitted_20230421 -:00. Tf a --4Q---tikyve ROY COOPER 5` '� . Governor `` * If ��1 C?1 ELIZABETH S.BISER �r 6`' a� Secretary \* omm DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality April 13, 2023 LETTER OF APPROVAL WITH MODIFICATION NC Division of Parks and Recreation ATTN: Mr. Jerry Howerton 1615 Mail Service Center Raleigh, NC 27699-1615 RE: Project Name: Lake James State Park Visitor Center Acres Approved: 7.59 acres originally approved, 0.34 acres this revision, 7.93 acres total. Project ID: BURKE-2019-010 County: Burke City: Linville Address: 5631 NC 126 River Basin: Catawba Stream Classification: WS-V, B Submitted By: Mr. Bradley S. Ridnour, P.E. Date Originally Received by LQS: 13 December 2018 Date Current Revision Received by LQS: April 12, 2023 Plan Type: Park Facilities Dear Mr. Howerton, This office has reviewed the subject revised erosion and sedimentation control plan. We find the plan to be acceptable with modification and hereby issue this letter of Approval with Modification. The Modification Required for Approval is listed on the attached page. As of April 1, 2019, all new construction activities, including plan revisions, are required to complete and submit an electronic Notice of Intent(eNOI)form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central EQ 4 North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Asheville Regional Office 12090 U.S.Highway 70 I Swannanoa.North Carolina 28778 NORTH CAROUNAD Department ot Environmental \ 828296.4500 Letter of Approval with Modification NC Division of Parks and Recreation ATTN: Mr. Jerry Howerton April 13, 2023 Page 2 of 3 office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land- disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, ��\ k Mi hael Sm' h Assi tant Regional Engineer Land Quality Section Letter of Approval with Modification NC Division of Parks and Recreation ATTN: Mr. Jerry Howerton April 13, 2023 Page 3 of 3 Enclosures: NPDES NCGO1 Fact Sheet COC Enclosure ec: Mr. Bradley S. Ridnour, P.E. bsridnour@vaughnmelton.com Mr. Hardy Willis, P.E. bsridnour@vaughnmelton.com Mr. Corey Napier, P.E. mcnapier@jmt.com Regional Office file MODIFICATION Project Name: Lake James State Park Visitor Center Project ID: BURKE-2021-010 County: Burke For final plan approval, please complete the requested action below. As of April 1, 2019, all new construction activities, including plan revisions, are required to complete and submit an electronic Notice of Intent(eNOI)form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Using the information above, for this plan revision, please file for an electronic Notice of Intent (e-NOI) to obtain a Certificate of Coverage under the General Permit NCG01000 Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities