Loading...
HomeMy WebLinkAbout20150458 Ver 1_Application_20150508Low Impact Bridge Project Data Sheet - Attachment G Priori TIP NO BD-5109AA WBS 45355.127 Coun Davie Brid e Num6er 290060 Description Re lace Brid e no. 60 over Peeler Creek on SR 1802 ill Boone Rd Basin Yadkin Classification WSIV Stream SIN 12-103-1- 2 T Perennial Size width & de th 14' x 1' T Precast Prestressetl Concrete Channels; End Bents PPC Caps on Timber Substructure Existing Structure Size ien nxwimn om-am 31'X25.8' Suff. Ratin 28,g Proposed Structure T e Concrete Cored Slabs; Concrete End Bents on Steel Piles SiZ¢ len 'Mh out-out 65' X 30' Stream USACE Im cts LF New Im acts 20' Perm; 15' Tem NCDWQ Im acts LF New Im acts 20' Perm; 15' Tem USACE Im acts AC D Wetlands Non 404 Im acts AC 0 CAMA Im acls AC NA NC DWQ Buffers Impacts (SP) ry Buffer Application Required (VIN) N NC DWq StormWater Permit Required (Y/N) N Habitat In Michaux's sumac, Northern Lon Eered Bat T&E S cies Present No- Sumac (surveyetl 521A4); No Bal species found on bridge; No survey for speues in trees Bio Conclusion No Effed for Sumac; Ma affect not likel to adversel affect-NLEB Moretorium T r WRC None Dates NA Native/Hatche No Trout Waters T�out S cies Present No Trout Conditions !N No WRC Reviewer Mada Chambers CAMA AECs NA Essential Fish Habihat /n �o Nav.O nin no USCG Permit no Historic Pro rties na surve re uired Archaeolo ical Resources no surve re uired 7ribal Lands No 4 Resources No 6 LWC Resources No Wild and Scenic River No Forest Service Lands No NA Area No FEMA Bu out No FEMA Flood Stud MOA 2A - Limited Detailed Stud USTs Haz Mats No Relocatees No Location �T 35.851 N LONG 80.519 W 20' permanent impacts are due to rip rap bank stabilization. The total length of pertnanent rip rap is 45' but 25' of this is in the same location as the Prqect Comments existing timber abutment. The temporary impacts are due to piacement of an impervious dike during structure removal and rip rap placement. The total length af the impervious dike will be 60'. Completed by: ��� �_� � J� , � ead Engineer, Date 5��,�--. :�-5 -15 �� Division Environmental Officer, Date