Loading...
HomeMy WebLinkAbout20121055 Ver 2_Staff Comments_20150505Strickland, Bev From: Devane, Boyd Sent: Tuesday, May 05, 2015 10:59 AM To: Strickland, Bev Subject: FW: Review of South Tar River Greenway # 12 -1055 v2 Please file the note below. From: Devane, Boyd Sent: Tuesday, May 05, 2015 10:58 AM To: Scarbraugh, Anthony Subject: Review of South Tar River Greenway # 12 -1055 v2 I have looked at the drawings and engineering calculations for the City of Greenville's South Tar River Greenway, Phase 3 project. The drawings and calculations show a system that I believe will make considerable water quality protection improvements from the impacts of the stormwater discharge from adjacent development. The design calculations are sound and clearly presented. It appears tome that they've done an excellent job of sizing the stormwater conduits and inlet and outlet protection devices. There will be some infringement in Zone 1 and 2 but I believe they would be justified based on the specifications in the Tar - Pamlico buffer rule. Please let me know if I need to look into any specific details of the site.