HomeMy WebLinkAboutNCC231075_Site Plan or Location Map_20230418 rje:,. ■2 rr. l:_p� 't _ r V e •sf �1 F '''+,�.`. ♦•iii1 '3�,,�.'!� ,,�,�a f/ \kp\ ``/���� CONSTRUCTION SCHEDULE WATTLE CONSTRUCTION EROSION CONTROL CONSTRUCTION SEQUENCE(REVISE AS NECESSARY TO ADDRESS SITE SPECIFIC ISSUES) SEEDING SCHEDULE i a mat.Of=Sj�°•\ �j / „,rd,' 1`,•��„�� SODDING 1. Obtain all necessary permits and plan approvals 1. Use a hand tool eeaeeeepmusolitomexcavating the trencneaewnbeplareaontheupnUeor how sae� I, INSTALL TEMPORARYCINJSTRUCTION ENTRANCE. I �� �I� W� 2. Install gravel conslrUof enlroncesfrsl,antl then reinforced sill fence outlets. ^f tnetre^^nbbe used eunng insmlleb^n.For son,loamy oils eige33 into trench Fw hem, 2, INSTALL TEMPORARY EROSION CONTROL MEASURES AT LOCATIONS SHOWN ON PLAN. TEMPORARY SEED MIX SHALL BE USED FOR ALL AREAS EXPOSED GREATER THAN WE WEEK AND SUBJECT TO FURTHER DISTURBANCE. `` L•\\�' rocky sails dig a2J Teo trend,. ADEQUACY ON JULY I5. 1 ' • / 1� �` .III - wattles antl sift fences. areas z 3. CALL FOR ON-SITE INSPECTION BY TOWN OF SOUTHERN PINES CONSTRUCTION INSPECTOR. AN SEED MIX BE E SO o FOR 1 IiI,� 3. Finish clearing and grubbing any necessary on the lots as they are started. . Lay.M1e first straw wattle snuggly in Metrenm.No daylight shaua be seen under the watt.. 4. INITIATE GRUBBING AND TOPSOIL STRIPPING OF THE SITE. ADEQUATE COVER SHALL HAVE 5D SPRIGS OF BERMUDA OR SERICEA LESPEDEZA PER ONE SQUARE FOOT. l� 1i \ / �' - 4. Begin lot grading and excavation activities 5. AS CONSTRUCTION PROGRESSES, REMOVE SILT AND SEDIMENT BUILDUPS AT ALL MEASURES TO MAINTAIN PER \ }� I .rr///�/ We tlgMy against Me Est. NOT overlapADEQUATE EROSION CONTROL. TEMPORARY SEEDING RECOMMENDATION for SUMMER(TO BE FOLLOWED BY PERMANENT FALL SEED MIX) �. 1� 5. Begin continue with h house activities. 6. GROIN]CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING AND ON SLOPES GREATER THAN 3:1 \ O. i/ �'ity.i;'�-4, ,t/ swewom�v..,o.«s. g. Finish all rough grading and house construction. sake me straw wattles ateacM1 end and marmot^n aanar. Q- \jGROUND COVER SHALL BE PROVIDED ON EXPOSED SLOPES AND PERMANENT GROUND COVER SHALL BE PRONGED SPECIES RATE(LB/ACRE) QOP'A� �1. is",/�*Akio:. f1�11rtt�� 7. Install driveways,walks and patios. 3 FOR ALL DISTURBED AREAS WITHIN 14 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR APR. 5-AUG.I5 GERMAN MILBTaO ■ \� i_•s�I w A B. Begin foe grading of lot areas DEVELOPMENT. SOIL AMENDMENTS �• It will bennecessarylt make a hole In the 7 CONTINUE WITH FINE GRADING OF SITE. P I F-Q • 11\Y I r/ i,.....ora•�,,.. 9. Final grassing,mulching and stabilizing Of lot In most cases this will involve theAPPLY 2 0W LB ACRE GROUND AGRICULTURAL LIMESTONE and]50 LB ACRE 10-10-10 FERTILIZER OR FOLLOW RECOMMENDATIONS �►/ \✓� \ 9 9 9 ue pick endof your ma.In o.rtl q the stake through ue straw.When straw / / .` ? r`�/ \� w s installation of sod on the lot.The sill fence will remain in place until the lots are re ,woe^installing 8 INSPECTION BYHEN UTOWN OF SOUTHERNCTION ACTIVITIES APINES CONSTRUCTION INSPECTOR.RE COMPLETE AND ALL IAREAS STABILIZED, CALL FOR ON-SITE OF SOIL•TESTS. i \� sodded or grassing is stabilized and takes hold. wattles on copes arve me stakesperpendicular to me cope 9. IF SITE IS APPROVED,REMOVE TEMPORARY EROSION CONTROL MEASURES AS DIRECTED, SEED,FERTILIZE AND MULCH _J / Mi 9 0 Inspection and foal acceptance letters MULCH RESULPNG DIS URBED AREAS CLEAR ALL DEBRIS AND SEDIMENT ACCUMULATION ESTABLISH PERMANENTAPPLY 4.000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER. -�y � / ,`• U ` • < rocky sopes a p of ba acne�hl^u�a�e difficulty driving 1n stake into a attle noble STABILIZING VEGETATION DURING THE APPROPRIATE TIME OF YEAR ANCHOR STRAW BY ROVING,NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RAZE OF 40R CAL/ACRE -�/ 1or b M slak:le aw!the twartery herder ,0.UPINJ ESTABLISHED AND STABILIZED VEGETATION, CALL FOR FINAL INSPECTION BY TOWN OF BOUTHERN PINES T{I)' JO rmsy berneeEedro ego a e MAINTENANCE �1�•lit\ CONSTRUCTION INSPECTOR. 110 K. �Fiala% �%•..-� MM aTRgW WATTLE CROSS SECTION DAMACERLIZE IF GROWTH IS NOT FULLY ADEQUATE RESEED,RE FERTILIZE AND MULCH IMMEDIATELY FOLLOW9NC EROSION OR OTHER `K T ��=ITC+r" ;,��.,yry y��1,,, U II I(N A°SELF NSPECTON REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A 54.1"IS a w'W' 1'^ E TEMPORARY SEEDING RECOMMENDATION far FALL(TO BE FOLLOWED BY PERMANENT FALL SEED MIX) 1 t":UgI WR1 I 1 !N NI rfi III AVAILABLE FOR USE T CAN BE COMPLETED EN HAND OR COMPLETED AS AN EXCEL SPREADSHEET. NCH(PIP.) KE ,.ai� R ■. N AENTATIONE S TO MAKE NOTATIONS S ON THE COPY OF THE APPROVED EROSION AND r ♦ +�0�♦ _ _ © m.. :o. Two ,r.:oo: Fe iawEa SEDIMENTATION ON CONTROL PLAN THAT S KEPT ON THE PROJECT SITE.RULE 15A NCAC 04B 0131 MM ' p� AUG.SPECIES5 DEC IS WINTER RYE(GRAIN)120 _ 11 (+�� I A u'E Eu�:�i:. STATES THAT....DC...RATON SHALL BE ACCOMPLISHED BY INITIALING AND DATING EACH MEASURE OR I �•.� •�`'� iii PRACTICE SHOWN ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PUN OR BY 1. SEED BED PREPARATION SOL AMENDMENTS I. \� 11 - .� _ APPEARANCE OF G000 SOD COMPLETING,DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE,PRACTICE OR 2a APPLY 2,000 B/ACRE GROUND AGRICULTURAL LIMESTONE and 1,000 LB/ACRE 10-10-10 FERTILZER OR FOLLOW RECOMMENDED sac '�/ DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION CONTROL PUN: l� +�Al 2. RIP THE ENTIRE AREA TO 6 INCH DEPTH. TESTS. STRAW WATTLE SHOWN IN 2'DEEP TRENCH 'fA�' ■ �/ r IIIII �1 - 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND 0. A rR� GI I i� M .rrm v„ UNIFORM. MULGf ■ ' i APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER. ■ � - / 4. APPLY AGRICULTURAL LIME FERTILIZER AND SUPERPHOSPHATE IN ACCORDANCE WITH"SEEDING SCHEDULE"AND O ■� , , IIII G L IIIII `III J III J o.w - OD STAKE MIX WITH SOIL. MAINTENANCENCHa4 STRAW BY ROVING.NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RATE OF 400 GAL/ACRE y\ oe .Po.... 5. CONTINUE TILLAGE UNTIL AWELL-PULVERIZED, FIRM, REASONABLY UNIFORM SEED BED IS PREPARED 4 TO 6 m�rcw«s.µo / rs Ks,:tr.ooa.,.ouoo� �I �114•�1� �4Af INCHES DEEP. REPAIR AND RE FERTILIZE DAMAGED AREAS IMMEDIATELY TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH.IF IT IS NECESSARY �,I *fa 111�,111 6 AFTER SEEDING.SEED ON A ESEED ACCORDISHLY ENG STOED BED SEEDING DSCHEDURE SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK TEMPORARY COVER BEYOND JUNE 15,OVERSEE,WITH 50 Le/ACRE 011 .I J . �`' oncslewm._---_ _ \\\\ \\ '24 AIM ]. MULCH IN ACCORDANCE WITH"SEEDING SCHEDULE"IMMEDIATELY AFTER SEEDING. TEMPORARY SEEDING RECOMMENDATION(or LATE WINTER one EARLY SPRING(TO BE FOLLOWED BPY PERMANENT FALL BSEED RMIX) EARLY - - \ \ y•. a INSPECT ALL SEEDING FOR COMPLIANCE WITH THE REQUIREMENTS OF THE"SEEDING SCHEDULE".MAKE NECESSARY TO EXTEND 3 • REPAIRS AND RESEED WITHIN THE PLANTING SEASON, IF POSSIBLE. OR THE DAMAGED AREA SHALL BE SPECIES RATE(LB/ACRE) _ \4 \ REESTABLISHED FOLLOWNG THE ORIGINAL LIME,FERTILIZER AND SEEDING REQUIREMENTS. DEC 1-APR.15 TER RYE(GRAIN)120 1 ANNUAL KOBE LESPEDEZA 50 VICINITY MAP \ 2 \/ I OMIT LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. \ \ \ I SOIL AMENDMENTS (N.T.S.) \ ) I OF SOIL TESTS. SLB/ACRE GROUND AGRICULTURAL LIMESTONE and 750 LB/ACRE 10-10-10 FERTILIZE OR FOLLOW RECOMMENDATIONS 1 \\ \ \ \ / I \ MULCH APPLY 4.OW LB/ACRE GRAIN STRAW OR EQUIVALENT W VER. \ \ \ / / I / \ ANCHOR STRAW BY ROVING,NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RAZE OF 400 GAL/ACRE \ \ \ \ I / I MAINTENANCE -..,\ \ \ \ \ ' / 7 / I RLIZE IF GROWTH IS NOT FULLY ADEQUATE RESEED,RE-FERILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER \\ \ \ ` \ I DAMAGE. l /// / I ( ' PERMANENT SPRING SEED MIX General Erosion Control Notes .. \ \ "1 \I i i M oMBM�N"`RIM DA 30 1.Only the areas shown shall be disturbed. \ / logo / / l SERICEA LESPEDEZA 3, E 2.All disturbed areas shall be grassed and mulched as soon as / r 9-r1Ve I / / P SEED IXB possible and maintained until permanent cover is established. SEPT.SPECIES RATE coMMON ACRE) 3D / I 1I3 n / / / SERICEA LESPEDEZA(UNSCARIFIED)30 _ / / I / / KOBE LESPEDEZA IC / ) I I CAROPINE(/VENTURES,LLC WATER 32 � 1 D.B.4198,PG.260`\ NIMUM OF 1 INCH OF RAINFALL A WEEK OF NOT SUPPLIED NATURALLY,CONTRACTOR SHALL SUPPLY THE REMAINING AMOUNT UNTIL \\ ��, / It�s \�lS GROUND LOVER HAS BEEN ESTABLISHED. 31 ' A 0 NOT gTTgSCALE L 8'MAX I \\\ 3j�CO =" CTION // (\ \\v' \\\ TOWN OF SOUTHERN PINES EROSION CONTROL SEQUENCE& [ I TOWN OF SOUTHERN PINES EROSION CONTROL I- 17 LI/ S // / I \sd \ DATE. JANUARY.. SEEDING NOTES C' DATE JANUARYzena SEEDING NOTES E-� MIN.12-1/2 CA. INTERMEDIATE \\ \\ / / \\ \b / • MIN.10 GA. MORES 374 /31: I A O\ / /� LINE WIRES GRADE / / \\ \ l `- \ / / ' 1 - 29 g`�j/ 9 CAROPINE VENTURES,LLC ____ Q�� 15 366- ��� �G� ) D.B.4198,PG.260 FRONT VIEW �� ^ ---/ _-- 28 / I �,,k // STEEL POST NOTE */'>/ l' '/ Lot Plan-- I^ I USE SILT FENCE ONLY WHEN \'\ ' T \ \\\ 1 WOVEN WIRE FABRIC DRAINAGE AREA DOES NOT O 0A &nCrr \ \ IIIII NEVER 1/4 ACRE AND / O 8 27 \ Provisions ground cover on exposed slopes must be ll SILT FENCE FABRIC NEVER IN AREAS OF L • CONCENTRATED FLOW. __ '�5� ( -" 1 1\ 1 / accomplished within 21 calendar days following completion of any /' �1 3\ '�� 354 - - \I / Phase of grading. I FILL SLOPE J \ /// / GRADE 354- 's jJf I I \ "-- "�// / Provisions for permanent ground cover sufficient to restrain i�IIIII {g! sg l / 1`2 1 \ r " erosion must be accomplished for all disturbed areas within 15 • FOR REPAIR OF SILT To t 8'MIN.COVER \\�� _-/ ,� I \ / / working days or 90 calendar days following completion of FENCE FAILURES,USE <ql OVER SKIRT• - 26 _- of / I / construction or development,whichever is shorter. No.57 WASHED STONE. -01 //' / / \ FOR ANCHOR WHEN SILT ANCHOR SKIRT AS \ 35D- J , \ \ /// FENCE IS PROTECTING t DIRECTED BY ENGINEER• /6/ _ / \ \ CATCH BASIN. � I 27 l �5 25 4.5 --- =fie ' 13 \\ For HOW ZONES,ground cover shall be provided within 15 MIN. / ) \ / working days or 60 calendar days following completion of / - -i ; �/ construction or development,whichever is shorter. RIDE VIEW \\\ i" "-- __---___ __ ' '"// 14 1 \ ( / �a -J,^� _ I \ SITE GROUND TAS ABIL ZATION NOTES&MAINTENANCE: / / --•-"'_ _ L`3u'� _� l \ / EXCEPTIONS 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS 8 / - ----- �' 24 --_--- I I DESCRIPTION TIME FRAME IMMEDIATELY �2H / / i __ - \ I / PERIMETER DIKES. J DAYS NONE 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE,TEAR,DECOMPOSE OR BECOME INEFFECTIVE,REPLACE IT \ / / _---- 1 / ROOLES,DITCHES PROMPTLY / / ---- 1 / &SLOPES 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND \ / �' / \ / HIGH QUALITY J DAYS NONE REDUCE PRESSURE ON THE FENCE TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. / / --- --_ ____338 --" T, __- _ / I I / WATER ZONES 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND / - ` _ --- - (HOW) STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. I / -- __ --- i SLOPES STEEPER 7 DAYS IF SLOPES ARE 5. REMOVE SEDIMENT DEEPER THAN I2". ( I 23 .( /I / THAN Al: ID OR LESS IN f t a�ei DRAIN_ I,j l I / LENGTH AND ARE xor,OSDUE \�9 / zz _- 334, tG11ff Y _330 _--- EASEMENT- �� I I THAN z EPE4 TEMPORARY SILT FENCE \ II / s+.!' VAC \33��� \ __ / ,AYS ARE ALLOWED TOWN OF SOUTHERN PINES 40\ l 0 1_- E-g I I (� 326_ _- -- / \ SLOPES FLATTER OR DA SLOPES GREATER DATE. JANDaarawa 7 DAYS FOR DETAIL \) 1 / ,�q i --_ / ) THAN s0'IN / ro / \ LENGTH / / / I ALL OTHER AREAS 14 DAYS NONE(EXCEPT J 4 1 / 22 / / \ / / WITH SLOPES FOR PERIMETERS / 322 \\v / / FLATTER THAN a:1 AND HQW ZONES) l\ 49� 142( 23 \y/0� \\ PAGE 1 of 2 I / 22 3 8 • TOTAL DISTURBED ACREAGE:0.31 ACRES \ // I I 43 / /' PHASE-1 -' / */ • iii LOT EROSION CONTROL PLAN \\ 48_ I o FOR LOT28 / 44 / / CAROPIN ES, PHASE 12 MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION \ �� A. ( FLOW TO THE REAR ) B. ( FLOW TO THE FRONT ) C.( FLOW TO THE LEFT) D. ( FLOW TO THE RIGHT) E. ( FLOW TO THE FRONT& REAR ) / Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing PROPERTY NEPROPERTY PROPER,UNEPROPERTY PE NE LINE FOR with 2-Inch stone.After each rainfall,Inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled,washed, r x sMFiNCE rFx SILT FENCE siu rtrv�t� z SILTr Nce or tracked onto public roadways. now Silt Fence-Sediment fences should he inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric . LOT f . LOT + .11. LOT LOT il. . LOT An DREAM FINDERS HOMES, LLC should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure that the removed sediment does not FLOW wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanoul operations. MOORE COUNTY,N.C. McNEILL TOWNSHIP Sodding-The sod should be properly maintained to insure that the gross take holds in the areas being secured.The sod should be watered as necessary to maintain adequate C w x a a a a moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth and stabilization of the root bed.The ' ' APRIL 2023 SCALE: 111=60' sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. LOUSE OOLNe OOLNE 00000 HOUSE Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has _ _ _ _ been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be repaired,and reseeded as soon as possible.If the - - a E. 'w^r• - GRAPHIC SCALE time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. E vsrroC ENTRANCE, CONSTRUCTION % EmRANCE ENTRANCE (I3 (>E 60 0 30 SO 120 240 General'All measures will be Inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction m f N u m y w a activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be relocated on the lotto insure that the FLOW n �j• ♦ �ja!, +W- � �(y potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested In the erosion control manual. R !,; R R L x. fpL,I.?R R R/w x O ny.^'� R/w R L 5E= -J R R w x-2L'k`�--':{':" R Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. •..•• ... •••-. I N FEET Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the l inch = 60 ft. filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed sediment shall be deposited within the STREET STREET STREET STREET STREET project in such a way that the sediment is not subject to erosion by wind or water. MOORMAN,KIZER&REITZEL,INC. 115 BROADFOOT AVE. FAYETTEVILLE,N.C.28305 Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes with sediment.Remove all fencing materials and unstable RAH R R RAJ RAv PHONE(910)484-5191 FAX(910)484-0388 LICENSE#:F-0106 sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has beenen prop properly stabilized. EROSION CONTROL DETAIL FOR SINGLE FAMILY LOTS -( N.T.S.) ) UST SAVED:4/6/2023 10:19 AM AST PLOTTED.4/6/2023 10.45 AM PLOTTED BY.Dennis Gilbert FILENAME:G:\CURRENT JOBS\H&H CONSTRUCTORS\16-1367-01 CAROPINES-EC\PLANS\CAROPINES PH-12 LOT HELMS