Loading...
HomeMy WebLinkAboutNCC231065_NOI Signed Certification_20230417 NCG01 Notice of Intent (NOI) Certification Form Directions: Print this form, complete, scan and upload to the electronic NOI. Then, mail the original form to the NC DEMLR Storrwater Program (with $100 check if paying by check) at: Division of Energy, Mineral & Lind Resources Stormwater Program 512 N. Salisbury Street, 6,1, Floor (Office 64.0K) 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM ❑R PAYMENT UNTIL YOUR APPLICATION HAS BEEN ACCEPTED AS COMPLETE. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.221 Per NC General Statute 143-215.5E(i), any person who knowingly makes ony false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained render this Article or a rule implementing this Article . , .shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of lave, I certify that (cfEeti ail boxes to indicat-yowl aar earnei,'): i am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this perrnit. is,to the best of my knowledge and belief, true, accurate, and complete The information submitted in this NOI persons who manage the system, or those persons directly responsible for based on my inquiry of the person or gathering the information. r- �:'c n the approved Erosion and Sedirinent Control vvill abide by al! conditions of the iVCfifl10Qd0 General Permit and � Plan. If the approved. Erosion and Sediment Control Plan is not compliant with Fart ii (Stor mw'ater Pollution Prevention Plan) of the NCG010000 General Permit I will nonetheless ensure that all conditions of Parl 11 of the permit are met on the project at all times. v, q i hereby request coverage- under the NCG0100>00 General Permit arid uncierstand thai c0'v i— ge ur!der'tl-ils permit will constitute the permit requirements for the discharge(s) and is enforceable in the same ! anner as an individual permit. Project Name (must match Ala): Specific Lot Numbers (must match Alb): a 3 Permittee (must march 81): ream fiY1dPXs #vtmes LLCG Legally Responsible Person (must match B2 & B3): eslie Groves Title of Legally Responsible Person (must match B3b): �IVISIOn pYr;,Sld('X1� Name &Title of Signed if Authorized Individual Differs from Legally Responsible Person: - Pho Number: 91 0-486-4864 31131 3 - Signature of Legally esponsible Person or Authorized Individual Date * 9MPOR 1 ANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president,secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, section B, Item (6) of the NCGO10000 permit_