HomeMy WebLinkAbout20150411 Ver 1_Approval Letter_20150504Pat McCrory
Governor
���.'��
� ��
NCDENR
North Carolina Department of Environment and Natural Resources
Donald R. van der Vaart
Secretary
May 4, 2015
Iredell County
NCDWR Project No. 20150411 v.l
Culvert on SR 1324
TIP/State Project No. 12.20491 ]
APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDIT[ONAL COND[TIONS
Mr. Reuben Chandler, P.E., Division Engineer
NCDOT, Division 12
1710 East Marion Street
Shelby, NC 28151
Dear Mr. Chandler:
You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of
replacing a culverf under SR 1324 in Iredell County:
Stream Impacts in the Catawba River Basin
Permanent Fill Temporary Eill Stream [mpacts
Permanent Fill in Temporary Fill in, Total Stream
in Intermittent in Intermittent , Requiring
Site Perennial Stream Perennial Stream [mpact
Stream Stream Mitigation
(linear ft) (linear ft) (linear ft)
(linear ft) (linear ft) (linear ft)
S 1 1 -- -- -- 1 0
S2 5 -- -- -- 5 0
S3 -- 60 -- -- 60 0
TOTAL 6 ' 60 0 0 60* 0
* Note: Permanent impacts are within the temporary impact footprint
Total Stream Impact for Project: 60 linear feet.
The project shall be constructed in accordance with your application dated received April 28, 2015. After reviewing your
application, we have decided that these impacts are covered by General Water Quality Certification Number 3883. This
certification corresponds to the Nationwide Permit 3 issued by the Corps of Engineers. In addition, you should acquire any �
other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and
Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the
accompanying 404 permit.
This approval is valid solely for the purpose and design described in your application (unless modified below). Should your
project change, you must notify the NCDWR and submit a new application. If the property is sold, the new owner must be
giver. a copy of this Certification and appro��al !etter, and is ±hereby responsible for complying with all the conditior.s. If
total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future)
exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For
this approval to remain valid, you must adhere to the conditions listed in the attached certification(s) and any additional
conditions listed below.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Phone: 919-807-63001 Internet: www.ncdenr.gov
An Equal Opportunity 1 Affrmative Action Employer
Conditions of Certification:
General Conditions
1. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing
concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface
waters due to the potential for elevated pH and possible aquatic life and fish kills. [15A NCAC 02B.0200]
2. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or
protected riparian buffers. [15A NCAC 02H.0506(b)(2)]
3. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed
floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC 02H.0506(b)(2)]
4. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization
shall be placed in stream channels in such a manner that it does not impede aquatic life passage. [15A NCAC
02H.0506(b)(2)]
5. The Permittee shali ensure that the final design drawings adhere to the permit and to the permit drawings submitted for
approvaL [ 15A NCAC 02H .0507(c) and l5A NCAC 02H .0506 (b)(2) and (c)(2)]
6. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the
most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms,
cofferdams and other diversion structures shall be used to prevent.excavation in flowing water. [15A NCAC
02H.0506(b)(3) and (c)(3)]
7. Heary equipment shall be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream. [ 15A NCAC 02H.0506(b)(3)]
8. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [l5A NCAC
02H.0506(b)(3)]
9. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is
prohibited. [15A NCAC 02H.0506(b)(3)]
10. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the
Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and
the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)]
11. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization
shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the
fencing are prohibited unless otherwise authorized by this certification. [ I SA NCAC 02H.0501 and .0502]
12. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules,
regulations, or ordinances that may be imposed by other government agencies (i.e. locai, state, and federal) having
jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and
sedimentation,control requirements, etc.
13. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of
discovery. [15A NCAC 02B.0506(b)(2)]
l4. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality
standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other
appropriate requirements of State and Federal law. If the NCDWR determines that such stanciards or laws are,not being
met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that
further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [15A
NCAC 02B.0200]
] 5. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification.
[15A NCAC 02H.0506(b)(3)]
16. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division
Engineer shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all
work included in the 401 Certification has been completed. [15A NCAC 02H.0502(�]
17. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit
without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in
wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction
activities.[15A NCAC 02H.0506(b)(3) and (c)(3)]
18. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design,
installation and operation and maintenance of such Best Management Practices in order to protect surface waters
standards [15A NCAC 02H.0506(b)(3) and (c)(3]):
a) The erosion and sediment control measures for the project must be designed, installed, operated, and maintained
in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and
Design Manual.
b) The design, installation, operation, and maintenance of the sediment and erosion control measures must be such
that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment
and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste
pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project.
c) For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Surface Mining Manual.
d) The reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Act.
l9. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this
Certification. [15A NCAC 02H.0506(b)(3) and (c)(3)]
If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You
may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of
Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed w}ien it is receive� in
the office of Administrative Hearings during normal office hours. The Offce of Administrative Hearings accepts filings
Monday through Friday between the hours of 8:OOam and S:OOpm, except for official state holidays. The original and one
(1) copy of the petition must be filed with the Office of Adm.inistrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative
Hearings within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (919)-431-3000, Facsimile: (919)-431-3100
A copy of the petition must also be served on DENR as follows:
Mr. Sam M.Hayes, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have
any questions, please contact David Wainwright at (919)707-8787 or David.Wainwright@ncdenr.gov. `
Sincerely,
.��.C�.�'
�.
. Jay Zimmerman, Director
Division of Water Resources
Electronic copy only distribution:
Steve Kichefski, US Army Corps of Engineers, Asheville Field Office
Trish Beam, Division 12 Environmental Officer
Marella Buncick, US Fish and Wildlife Service
Marla Chambers, NC Wildlife Resources Commission
File Copy
���
����
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
NCDWR Project No.:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
County:
Donald R. van der Vaart
Secretary
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting
Unit, North Carolina Division of Water Resources, 16U Mail Service Center, Raleigh, NC, 27699-1617. This form
may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
1, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature:
� Agent's Certification
Date:
1, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature:
Engineer's Certification
Partial Final
Date:
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for tlie
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature
Date
Registration No.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Phone: 919-807-63001 Internet: www.ncdenr.gov
An Equal Opportunity 1 Affrmative Action Employer