Loading...
HomeMy WebLinkAbout20140046 Ver 3_Emails_201505011 Carpenter,Kristi From:Ward, Garcy Sent:Friday, May 01, 2015 12:31 PM To:Carpenter,Kristi Subject:FW: Permit Modifications for Bridge #12 Replacement Project Attachments:Bridge 12 Revised Utility Impact drawings.pdf; Pasquotank 12 topo.pdf; IMG_2910.JPG; IMG_2911.JPG Follow Up Flag:Follow up Flag Status:Completed Hey Kristilyn,  Here is a modification request for Bridge 12 in Pasquotank County.  Can you please enter it into BIMS.  It will be project #  20140046 v.3.  The new impacts will trigger written approval so you will need to debit the WBS # 45347.1.13 for the  appropriate fee.     I think they sent a hard copy to Rob but I’ve told them to start sending stuff to you from now on.  Thanks. ‐ Garcy    From: Williams, Paul C Sent: Wednesday, April 29, 2015 8:40 AM To: Tracey.L.Wheeler@usace.army.mil; Ward, Garcy; Daisey, Greg Cc: Willis, Thomas C Subject: Permit Modifications for Bridge #12 Replacement Project   Tracey, Garcy, and Greg,    Albemarle Electric has recently notified NCDOT that the temporary power line relocation would need to impact  additional area in jurisdictional wetlands on the Pasquotank Bridge #12 project site.  An additional temporary pole is  proposed in the north quadrant of the bridge, for a total of two temporary poles for the project.  Additionally, the utility  has now indicated both poles will each require a guy wire.  The installation of the guy wires will impact wetlands,  resulting in a total of 420 sq. ft. of temporary hand clearing.      Each guy wire will require hand clearing an area 6’ wide by 35’ long in the understory of the wetlands.  The areas are  shown in the attached photos.  The guy wires will be placed in a manner that will not impact any mature trees in the  wetlands, only impacting the understory of the flooded swamp.  Mats will be used in the wetland area of the  maintained  utility corridor to move the auger truck into position for pole and guy wire installation.  The auger arm of  the truck will reach into the hand cleared areas from the maintained corridor to install the anchors for the guy  wires.  After bridge construction, the power line will be relocated to its original alignment and the temporary poles and  guy wires will be removed.  The hand cleared areas for the guy wires will not be maintained.      Due to the use of matting in the maintained wetland areas of the corridor, the 106 sq. ft. of wetland impacts  for the  temporary pole from the previous utility permit drawings have been removed.  The attached revised permit drawing  includes the 420 sq. ft. of temporary hand clearing for the guy wires and the additional temporary pole.  With the  additional 420 sq. ft. (0.00964 acres)  of temp. hand clearing, the total temporary hand clearing for the project will be  0.08864 acres.  With the 0.005 acres of permanent fill and 0.006 acres of excavation, total wetland impacts will be  0.09964 acres.    Expedition of this permit modification request would be most appreciated, with the start of the bridge replacement  scheduled to begin the first of June.  The utilities will need to be relocated before the bridge replacement can  2 proceed.  Please let me know if there is any additional information you need, or any questions you may have about the  request.    USACE SAW‐2014‐00391  NCDWR Project #14‐0046 v.2  CAMA GP No. A64812    Thanks,      Paul C. Williams, Jr.  Environmental Specialist  NCDOT Division One  113 Airport Dr., Suite 100  Edenton, NC 27932  252‐482‐1861 office  252‐482‐8722 fax  252‐333‐9812 mobile  ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.